{"id":74399,"date":"2026-09-04T11:07:02","date_gmt":"2026-09-04T14:07:02","guid":{"rendered":"https:\/\/a3aengenharia.com\/?post_type=articles&#038;p=74399"},"modified":"2026-09-14T19:42:01","modified_gmt":"2026-09-14T22:42:01","slug":"adecuacion-infraestructura-red-diagnostico-retrofit-proyecto","status":"publish","type":"articles","link":"https:\/\/a3aengenharia.com\/es-es\/contenido\/articulos-tecnicos\/adecuacion-infraestructura-red-diagnostico-retrofit-proyecto\/","title":{"rendered":"Adecuaci\u00f3n de Infraestructura de Red: diagn\u00f3stico, retrofit y proyecto"},"content":{"rendered":"\n<p class=\"wp-block-paragraph\">Adecuar una infraestructura de red existente no significa simplemente sustituir switches antiguos o cambiar todo el cableado. En ambientes corporativos, industriales y de misi\u00f3n cr\u00edtica, la adecuaci\u00f3n debe comenzar con un <strong>diagn\u00f3stico t\u00e9cnico del estado real de la instalaci\u00f3n<\/strong>, establecer una baseline confiable y solo entonces definir qu\u00e9 elementos necesitan mantenerse, corregirse, ampliarse o sustituirse.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Este tipo de intervenci\u00f3n es t\u00edpicamente brownfield: la red ya est\u00e1 en operaci\u00f3n, existen restricciones f\u00edsicas, la documentaci\u00f3n puede estar incompleta y cada cambio puede afectar usuarios, sistemas y servicios cr\u00edticos. Un proyecto de adecuaci\u00f3n bien estructurado reduce incertidumbre, evita inversiones innecesarias y crea una transici\u00f3n controlada entre la condici\u00f3n actual y la arquitectura objetivo.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">\u00bfQu\u00e9 es una adecuaci\u00f3n de infraestructura de red?<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">La adecuaci\u00f3n es el proceso de llevar una infraestructura existente a una condici\u00f3n t\u00e9cnica compatible con sus requisitos actuales y futuros. Puede involucrar cableado estructurado, fibra \u00f3ptica, racks, patch panels, DIOs, switches, uplinks, PoE, Wi-Fi, energ\u00eda, rutas f\u00edsicas, identificaci\u00f3n, documentaci\u00f3n y arquitectura l\u00f3gica.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">La necesidad de adecuaci\u00f3n puede surgir por crecimiento de la empresa, aumento de dispositivos, nuevas aplicaciones, expansi\u00f3n de videovigilancia IP, migraci\u00f3n a telefon\u00eda IP, implantaci\u00f3n de Wi-Fi de mayor capacidad, adopci\u00f3n de PoE, cambios de layout, aumento de la disponibilidad exigida o simple deterioro y desorganizaci\u00f3n acumulados con el tiempo.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">El objetivo no es modernizar por modernizar. Es eliminar las brechas entre <strong>condici\u00f3n existente, requisitos operativos y desempe\u00f1o esperado<\/strong>.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Retrofit y adecuaci\u00f3n no son sin\u00f3nimos perfectos<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Retrofit suele significar modernizaci\u00f3n de una instalaci\u00f3n existente. La adecuaci\u00f3n puede ser m\u00e1s amplia o m\u00e1s localizada: corregir rutas, reorganizar racks, sustituir un backbone, revisar PoE, documentar puntos, ampliar capacidad o eliminar una no conformidad tambi\u00e9n son intervenciones de adecuaci\u00f3n.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">En un proyecto brownfield, cada intervenci\u00f3n necesita considerar activos que permanecen en operaci\u00f3n, interfaces con sistemas existentes, ventanas de parada y riesgo de descubrir condiciones no documentadas.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Por eso, la primera actividad no debe ser la compra de equipos. Debe ser <strong>levantamiento y diagn\u00f3stico<\/strong>.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Por qu\u00e9 fallan los proyectos de adecuaci\u00f3n<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Gran parte de las fallas nace de una premisa incorrecta: tratar la red existente como si su documentaci\u00f3n representara fielmente la realidad.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">En instalaciones con a\u00f1os de cambios, es com\u00fan encontrar:<\/p>\n\n\n\n<ul class=\"wp-block-list\"><li>puntos activos sin identificaci\u00f3n;<\/li><li>patch panels sin correspondencia confiable con las tomas;<\/li><li>switches agregados sin actualizaci\u00f3n de topolog\u00eda;<\/li><li>fibras remanejadas u ocupadas de forma diferente al proyecto original;<\/li><li>VLANs y direccionamiento sin documentaci\u00f3n actualizada;<\/li><li>racks con ocupaci\u00f3n, ventilaci\u00f3n y energ\u00eda diferentes de lo previsto;<\/li><li>bandejas y ductos saturados;<\/li><li>cables antiguos mezclados con expansiones recientes;<\/li><li>equipos PoE alimentando cargas que no exist\u00edan en el proyecto original;<\/li><li>rutas redundantes que comparten el mismo trayecto f\u00edsico;<\/li><li>As-Built incompleto o inexistente.<\/li><\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">Si el proyecto parte de una base equivocada, la soluci\u00f3n tambi\u00e9n tiende a estar equivocada.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Baseline: la condici\u00f3n real antes de proyectar<\/h2>\n\n\n\n<div class=\"wp-block-a3a-destaque\">\n<p class=\"wp-block-paragraph\">En brownfield, la principal variable de proyecto es la incertidumbre. Antes de comprar equipos, establezca una baseline confiable de lo que realmente existe.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><a href=\"https:\/\/a3aengenharia.com.br\/servicos\/levantamento-e-diagnostico\/due-diligence\/\">Conozca la Due Diligence T\u00e9cnica<\/a><\/p>\n<\/div>\n\n\n\n<p class=\"wp-block-paragraph\">Baseline es la representaci\u00f3n t\u00e9cnica confiable del estado existente que servir\u00e1 como punto de partida para la intervenci\u00f3n. No necesita ser un modelo sofisticado; necesita ser suficientemente precisa para sustentar decisiones.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">En una red, la baseline puede incluir:<\/p>\n\n\n\n<ul class=\"wp-block-list\"><li>plano con puntos y rutas;<\/li><li>identificaci\u00f3n de racks y salas t\u00e9cnicas;<\/li><li>mapa de patch panels y DIOs;<\/li><li>inventario de switches y activos;<\/li><li>topolog\u00eda f\u00edsica y l\u00f3gica;<\/li><li>puertos utilizados y libres;<\/li><li>capacidad y utilizaci\u00f3n de los uplinks;<\/li><li>disponibilidad de PoE;<\/li><li>backbone \u00f3ptico y fibras disponibles;<\/li><li>ocupaci\u00f3n de infraestructura seca;<\/li><li>alimentaci\u00f3n el\u00e9ctrica y UPS;<\/li><li>documentaci\u00f3n de VLANs y direccionamiento;<\/li><li>resultados de ensayos y certificaci\u00f3n cuando corresponda;<\/li><li>lista de anomal\u00edas y riesgos.<\/li><\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">La baseline transforma percepciones como \u201cla red est\u00e1 lenta\u201d o \u201cel cableado es viejo\u201d en un conjunto de hechos verificables.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Levantamiento catastral de la red existente<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">El levantamiento catastral necesita reconciliar documentos y campo. Planos antiguos, hojas de c\u00e1lculo, dibujos de rack, listas de puertos e informes deben compararse con la condici\u00f3n observada.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">El levantamiento no debe limitarse a contar puntos. Es necesario comprender <strong>c\u00f3mo se conectan, por d\u00f3nde pasan, qu\u00e9 sistemas atienden y qu\u00e9 dependencias crean<\/strong>.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">En un edificio de varios pisos, por ejemplo, el n\u00famero total de puntos es menos importante que saber qu\u00e9 racks atienden cada \u00e1rea, qu\u00e9 backbone interconecta esos racks, c\u00f3mo est\u00e1n distribuidos los uplinks y qu\u00e9 dominios de falla existen.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Diagn\u00f3stico del cableado met\u00e1lico<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">El cableado antiguo no debe condenarse \u00fanicamente por su edad. Es necesario evaluar categor\u00eda, integridad, instalaci\u00f3n, conectividad, longitud, rutas y desempe\u00f1o.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Una inspecci\u00f3n puede identificar da\u00f1os, curvaturas excesivas, terminaciones inadecuadas, patch cords incorrectos, mezclas de categor\u00edas, interferencias, cables abandonados y problemas de organizaci\u00f3n. Cuando el objetivo exige comprobaci\u00f3n de desempe\u00f1o, la certificaci\u00f3n de los enlaces proporciona evidencias cuantitativas.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">A partir de los resultados, la red puede clasificarse en grupos:<\/p>\n\n\n\n<ul class=\"wp-block-list\"><li>enlaces aptos para permanecer;<\/li><li>enlaces que exigen reparaci\u00f3n o reterminaci\u00f3n;<\/li><li>enlaces que necesitan ser sustituidos;<\/li><li>puntos cuya ruta debe modificarse;<\/li><li>\u00e1reas en las que la infraestructura necesita ampliarse.<\/li><\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">Este enfoque evita la sustituci\u00f3n indiscriminada de todo.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Diagn\u00f3stico del backbone \u00f3ptico<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">El backbone merece un an\u00e1lisis separado porque concentra tr\u00e1fico e interconecta dominios completos de la red. Deben evaluarse tipo de fibra, cantidad de fibras disponibles, terminaciones, DIOs, conectores, identificaci\u00f3n, rutas, transceptores, distancias y capacidad necesaria.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">En ambientes que crecieron por etapas, es com\u00fan encontrar fibras libres no documentadas, enlaces sin reserva adecuada o pares \u00f3pticos utilizados de forma diferente al dise\u00f1o original.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Los ensayos \u00f3pticos, cuando correspondan al alcance, ayudan a verificar continuidad y p\u00e9rdidas. La decisi\u00f3n de mantener o sustituir un backbone debe considerar no solo si \u201cest\u00e1 funcionando\u201d, sino si soporta la capacidad, redundancia y horizonte de expansi\u00f3n previstos.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Racks y salas t\u00e9cnicas<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">La modernizaci\u00f3n de la red con frecuencia encuentra l\u00edmites en el espacio f\u00edsico. Un nuevo switch puede caber el\u00e9ctricamente en el proyecto y no caber de forma segura en el rack existente.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">La inspecci\u00f3n debe considerar:<\/p>\n\n\n\n<ul class=\"wp-block-list\"><li>unidades de rack disponibles;<\/li><li>profundidad y compatibilidad mec\u00e1nica;<\/li><li>organizaci\u00f3n frontal y posterior;<\/li><li>radio de curvatura de cables y fibras;<\/li><li>ventilaci\u00f3n y disipaci\u00f3n t\u00e9rmica;<\/li><li>distribuci\u00f3n de energ\u00eda;<\/li><li>UPS;<\/li><li>puesta a tierra y equipotencializaci\u00f3n;<\/li><li>acceso para mantenimiento;<\/li><li>reserva para expansi\u00f3n.<\/li><\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">Los racks saturados generan riesgo operativo porque cualquier intervenci\u00f3n exige manipulaci\u00f3n de cables y equipos en un espacio insuficiente.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Infraestructura seca: el cuello de botella invisible<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Bandejas, ductos, lechos, shafts, cajas de paso y dem\u00e1s rutas forman parte del sistema. En retrofit, muchas veces el principal limitante no es el cable, sino la ausencia de ruta disponible para nuevos enlaces.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Una actualizaci\u00f3n de Cat6 a Cat6A, por ejemplo, puede aumentar la ocupaci\u00f3n y la exigencia de radio de curvatura. Instalar nuevos cables sin verificar la infraestructura puede resultar en haces comprimidos, curvas inadecuadas, rutas inaccesibles y mantenimiento futuro dif\u00edcil.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">La adecuaci\u00f3n necesita, por lo tanto, dimensionar rutas junto con el cableado.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Switches: \u00bfcambiar por edad o por requisito?<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Los switches deben evaluarse por su capacidad para atender la arquitectura objetivo, no solo por el a\u00f1o de fabricaci\u00f3n.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">El an\u00e1lisis normalmente considera:<\/p>\n\n\n\n<ul class=\"wp-block-list\"><li>cantidad y velocidad de puertos;<\/li><li>PoE disponible y potencia total;<\/li><li>capacidad de uplink;<\/li><li>soporte a la arquitectura l\u00f3gica necesaria;<\/li><li>recursos de redundancia;<\/li><li>soporte y ciclo de vida;<\/li><li>capacidad de gesti\u00f3n y monitoreo;<\/li><li>compatibilidad con los dem\u00e1s activos;<\/li><li>utilizaci\u00f3n actual y margen de crecimiento.<\/li><\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">Un switch puede seguir siendo adecuado para un \u00e1rea de baja demanda, pero ser insuficiente para un piso que pasar\u00e1 a soportar access points multigigabit y decenas de c\u00e1maras PoE.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">PoE como requisito de retrofit<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">PoE cambi\u00f3 la forma de dimensionar la infraestructura de red. C\u00e1maras, access points, tel\u00e9fonos, controladores, intercomunicadores y sensores pueden depender de la misma infraestructura para datos y energ\u00eda.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">En una adecuaci\u00f3n, deben levantarse la potencia m\u00e1xima de los dispositivos, el est\u00e1ndar PoE soportado por los puertos, el presupuesto total de potencia del switch, las p\u00e9rdidas en el canal, las condiciones t\u00e9rmicas y la autonom\u00eda de UPS.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Agregar equipos sin recalcular PoE puede crear fallas intermitentes que parecen problemas de red cuando, en realidad, son limitaciones de alimentaci\u00f3n.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Wi-Fi: la adecuaci\u00f3n no es solo cambiar access points<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Una actualizaci\u00f3n wireless puede exigir una revisi\u00f3n completa de la infraestructura que sostiene los APs.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Los nuevos access points pueden demandar:<\/p>\n\n\n\n<ul class=\"wp-block-list\"><li>m\u00e1s puntos de instalaci\u00f3n;<\/li><li>reposicionamiento f\u00edsico;<\/li><li>nuevos enlaces de cobre;<\/li><li>puertos multigigabit;<\/li><li>PoE de mayor potencia;<\/li><li>uplinks m\u00e1s robustos;<\/li><li>revisi\u00f3n de cobertura y capacidad;<\/li><li>cambios de VLAN y autenticaci\u00f3n.<\/li><\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">Por eso, la modernizaci\u00f3n Wi-Fi debe integrarse al proyecto de red y no tratarse como una compra aislada de access points.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Videovigilancia IP, control de acceso y automatizaci\u00f3n<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">La convergencia de sistemas sobre Ethernet aumenta la criticidad de la infraestructura. Antes, una falla pod\u00eda afectar \u00fanicamente computadoras de un sector. Hoy, la misma red puede soportar video, acceso, voz, Wi-Fi, automatizaci\u00f3n y dispositivos IoT.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">La adecuaci\u00f3n debe mapear cada sistema y sus requisitos. La videovigilancia, por ejemplo, genera tr\u00e1fico continuo y puede concentrar gran volumen en los uplinks. El control de acceso puede exigir alta disponibilidad incluso con bajo ancho de banda. Los access points combinan datos y PoE. Cada perfil necesita reflejarse en la arquitectura.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Capacidad: los puertos no son el \u00fanico indicador<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Es com\u00fan dimensionar una expansi\u00f3n contando puertos disponibles en el switch. Esto es insuficiente.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">La red necesita analizarse por niveles:<\/p>\n\n\n\n<ul class=\"wp-block-list\"><li>capacidad de acceso;<\/li><li>tr\u00e1fico agregado del switch;<\/li><li>uplinks;<\/li><li>backbone;<\/li><li>core\/distribuci\u00f3n;<\/li><li>firewall;<\/li><li>enlaces WAN;<\/li><li>servidores y storage cuando corresponda.<\/li><\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">Una red puede tener muchos puertos libres y aun as\u00ed estar limitada por un uplink de baja capacidad o por un backbone sin redundancia.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Redundancia e independencia f\u00edsica<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Dos enlaces no significan necesariamente dos rutas independientes. En retrofit, es com\u00fan encontrar enlaces redundantes pasando por el mismo shaft, la misma bandeja o la misma sala t\u00e9cnica.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">El an\u00e1lisis de disponibilidad necesita considerar:<\/p>\n\n\n\n<ul class=\"wp-block-list\"><li>diversidad de rutas f\u00edsicas;<\/li><li>switches distintos cuando se requiera;<\/li><li>alimentaci\u00f3n independiente;<\/li><li>UPS;<\/li><li>agregaci\u00f3n y protocolos de redundancia;<\/li><li>puntos \u00fanicos de falla;<\/li><li>comportamiento ante la p\u00e9rdida de un componente.<\/li><\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">La redundancia necesita ser dise\u00f1ada y probada.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Arquitectura l\u00f3gica y segmentaci\u00f3n<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">La adecuaci\u00f3n f\u00edsica debe coordinarse con la red l\u00f3gica. Nuevos sistemas, usuarios y dispositivos pueden exigir nuevas VLANs, subredes, pol\u00edticas de acceso, QoS y reglas de seguridad.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Un cambio de switches sin revisi\u00f3n l\u00f3gica puede limitarse a reproducir una arquitectura antigua en hardware nuevo. El proyecto debe aprovechar la modernizaci\u00f3n para alinear topolog\u00eda f\u00edsica, segmentaci\u00f3n y requisitos de seguridad.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Flujo recomendado para la adecuaci\u00f3n<\/h2>\n\n\n\n<figure class=\"a3a-mermaid\"><svg id=\"a3a-diagram-1\" width=\"100%\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" class=\"flowchart\" style=\"max-width:min(272.921875px, 100%);height:auto;display:block;margin:0 auto\" viewBox=\"0 0 272.921875 888.5\" role=\"graphics-document document\" aria-roledescription=\"flowchart-v2\" aria-labelledby=\"chart-title-a3a-diagram-1\"><title id=\"chart-title-a3a-diagram-1\">Flujo de ingenier\u00eda para adecuaci\u00f3n de infraestructura de red<\/title><style>#a3a-diagram-1{font-family:Roboto,sans-serif;font-size:15px;fill:var(--a3a-diag-text, #0a0a0a);}@keyframes edge-animation-frame{from{stroke-dashoffset:0;}}@keyframes dash{to{stroke-dashoffset:0;}}#a3a-diagram-1 .edge-animation-slow{stroke-dasharray:9,5!important;stroke-dashoffset:900;animation:dash 50s linear infinite;stroke-linecap:round;}#a3a-diagram-1 .edge-animation-fast{stroke-dasharray:9,5!important;stroke-dashoffset:900;animation:dash 20s linear infinite;stroke-linecap:round;}#a3a-diagram-1 .error-icon{fill:var(--a3a-diag-canvas, #ffffff);}#a3a-diagram-1 .error-text{fill:#000000;stroke:#000000;}#a3a-diagram-1 .edge-thickness-normal{stroke-width:1px;}#a3a-diagram-1 .edge-thickness-thick{stroke-width:3.5px;}#a3a-diagram-1 .edge-pattern-solid{stroke-dasharray:0;}#a3a-diagram-1 .edge-thickness-invisible{stroke-width:0;fill:none;}#a3a-diagram-1 .edge-pattern-dashed{stroke-dasharray:3;}#a3a-diagram-1 .edge-pattern-dotted{stroke-dasharray:2;}#a3a-diagram-1 .marker{fill:var(--a3a-diag-stroke, #2e42a2);stroke:var(--a3a-diag-stroke, #2e42a2);}#a3a-diagram-1 .marker.cross{stroke:var(--a3a-diag-stroke, #2e42a2);}#a3a-diagram-1 svg{font-family:Roboto,sans-serif;font-size:15px;}#a3a-diagram-1 p{margin:0;}#a3a-diagram-1 .label{font-family:Roboto,sans-serif;color:var(--a3a-diag-text, #0a0a0a);}#a3a-diagram-1 .cluster-label text{fill:var(--a3a-diag-title, #0124af);}#a3a-diagram-1 .cluster-label span{color:var(--a3a-diag-title, #0124af);}#a3a-diagram-1 .cluster-label span p{background-color:transparent;}#a3a-diagram-1 .label text,#a3a-diagram-1 span{fill:var(--a3a-diag-text, #0a0a0a);color:var(--a3a-diag-text, #0a0a0a);}#a3a-diagram-1 .node rect,#a3a-diagram-1 .node circle,#a3a-diagram-1 .node ellipse,#a3a-diagram-1 .node polygon,#a3a-diagram-1 .node path{fill:var(--a3a-diag-fill, #eef2fd);stroke:var(--a3a-diag-stroke, #2e42a2);stroke-width:1px;}#a3a-diagram-1 .rough-node .label text,#a3a-diagram-1 .node .label text,#a3a-diagram-1 .image-shape .label,#a3a-diagram-1 .icon-shape .label{text-anchor:middle;}#a3a-diagram-1 .node .katex path{fill:#000;stroke:#000;stroke-width:1px;}#a3a-diagram-1 .rough-node .label,#a3a-diagram-1 .node .label,#a3a-diagram-1 .image-shape .label,#a3a-diagram-1 .icon-shape .label{text-align:center;}#a3a-diagram-1 .node.clickable{cursor:pointer;}#a3a-diagram-1 .root .anchor path{fill:var(--a3a-diag-stroke, #2e42a2)!important;stroke-width:0;stroke:var(--a3a-diag-stroke, #2e42a2);}#a3a-diagram-1 .arrowheadPath{fill:var(--a3a-diag-stroke, #0b0b0b);}#a3a-diagram-1 .edgePath .path{stroke:var(--a3a-diag-stroke, #2e42a2);stroke-width:2.0px;}#a3a-diagram-1 .flowchart-link{stroke:var(--a3a-diag-stroke, #2e42a2);fill:none;}#a3a-diagram-1 .edgeLabel{background-color:var(--a3a-diag-canvas, #ffffff);text-align:center;}#a3a-diagram-1 .edgeLabel p{background-color:var(--a3a-diag-canvas, #ffffff);}#a3a-diagram-1 .edgeLabel rect{opacity:0.5;background-color:var(--a3a-diag-canvas, #ffffff);fill:var(--a3a-diag-canvas, #ffffff);}#a3a-diagram-1 .labelBkg{background-color:rgba(255, 255, 255, 0.5);}#a3a-diagram-1 .cluster rect{fill:var(--a3a-diag-surface, #f8f8f8);stroke:var(--a3a-diag-border, #e2e8f0);stroke-width:1px;}#a3a-diagram-1 .cluster text{fill:var(--a3a-diag-title, #0124af);}#a3a-diagram-1 .cluster span{color:var(--a3a-diag-title, #0124af);}#a3a-diagram-1 div.mermaidTooltip{position:absolute;text-align:center;max-width:200px;padding:2px;font-family:Roboto,sans-serif;font-size:12px;background:var(--a3a-diag-canvas, #ffffff);border:1px solid hsl(0, 0%, 90%);border-radius:2px;pointer-events:none;z-index:100;}#a3a-diagram-1 .flowchartTitleText{text-anchor:middle;font-size:18px;fill:var(--a3a-diag-text, #0a0a0a);}#a3a-diagram-1 rect.text{fill:none;stroke-width:0;}#a3a-diagram-1 .icon-shape,#a3a-diagram-1 .image-shape{background-color:var(--a3a-diag-canvas, #ffffff);text-align:center;}#a3a-diagram-1 .icon-shape p,#a3a-diagram-1 .image-shape p{background-color:var(--a3a-diag-canvas, #ffffff);padding:2px;}#a3a-diagram-1 .icon-shape rect,#a3a-diagram-1 .image-shape rect{opacity:0.5;background-color:var(--a3a-diag-canvas, #ffffff);fill:var(--a3a-diag-canvas, #ffffff);}#a3a-diagram-1 .label-icon{display:inline-block;height:1em;overflow:visible;vertical-align:-0.125em;}#a3a-diagram-1 .node .label-icon path{fill:currentColor;stroke:revert;stroke-width:revert;}#a3a-diagram-1 :root{--mermaid-font-family:Roboto,sans-serif;}<\/style><g><marker id=\"a3a-diagram-1_flowchart-v2-pointEnd\" class=\"marker flowchart-v2\" viewBox=\"0 0 10 10\" refX=\"5\" refY=\"5\" markerUnits=\"userSpaceOnUse\" markerWidth=\"8\" markerHeight=\"8\" orient=\"auto\"><path d=\"M 0 0 L 10 5 L 0 10 z\" class=\"arrowMarkerPath\" style=\"stroke-width: 1; stroke-dasharray: 1, 0;\"><\/path><\/marker><marker id=\"a3a-diagram-1_flowchart-v2-pointStart\" class=\"marker flowchart-v2\" viewBox=\"0 0 10 10\" refX=\"4.5\" refY=\"5\" markerUnits=\"userSpaceOnUse\" markerWidth=\"8\" markerHeight=\"8\" orient=\"auto\"><path d=\"M 0 5 L 10 10 L 10 0 z\" class=\"arrowMarkerPath\" style=\"stroke-width: 1; stroke-dasharray: 1, 0;\"><\/path><\/marker><marker id=\"a3a-diagram-1_flowchart-v2-circleEnd\" class=\"marker flowchart-v2\" viewBox=\"0 0 10 10\" refX=\"11\" refY=\"5\" markerUnits=\"userSpaceOnUse\" markerWidth=\"11\" markerHeight=\"11\" orient=\"auto\"><circle cx=\"5\" cy=\"5\" r=\"5\" class=\"arrowMarkerPath\" style=\"stroke-width: 1; stroke-dasharray: 1, 0;\"><\/circle><\/marker><marker id=\"a3a-diagram-1_flowchart-v2-circleStart\" class=\"marker flowchart-v2\" viewBox=\"0 0 10 10\" refX=\"-1\" refY=\"5\" markerUnits=\"userSpaceOnUse\" markerWidth=\"11\" markerHeight=\"11\" orient=\"auto\"><circle cx=\"5\" cy=\"5\" r=\"5\" class=\"arrowMarkerPath\" style=\"stroke-width: 1; stroke-dasharray: 1, 0;\"><\/circle><\/marker><marker id=\"a3a-diagram-1_flowchart-v2-crossEnd\" class=\"marker cross flowchart-v2\" viewBox=\"0 0 11 11\" refX=\"12\" refY=\"5.2\" markerUnits=\"userSpaceOnUse\" markerWidth=\"11\" markerHeight=\"11\" orient=\"auto\"><path d=\"M 1,1 l 9,9 M 10,1 l -9,9\" class=\"arrowMarkerPath\" style=\"stroke-width: 2; stroke-dasharray: 1, 0;\"><\/path><\/marker><marker id=\"a3a-diagram-1_flowchart-v2-crossStart\" class=\"marker cross flowchart-v2\" viewBox=\"0 0 11 11\" refX=\"-1\" refY=\"5.2\" markerUnits=\"userSpaceOnUse\" markerWidth=\"11\" markerHeight=\"11\" orient=\"auto\"><path d=\"M 1,1 l 9,9 M 10,1 l -9,9\" class=\"arrowMarkerPath\" style=\"stroke-width: 2; stroke-dasharray: 1, 0;\"><\/path><\/marker><g class=\"root\"><g class=\"clusters\"><\/g><g class=\"edgePaths\"><path d=\"M136.461,60.5L136.461,64.667C136.461,68.833,136.461,77.167,136.461,84.833C136.461,92.5,136.461,99.5,136.461,103L136.461,106.5\" id=\"L_A_B_0\" class=\"edge-thickness-normal edge-pattern-solid edge-thickness-normal edge-pattern-solid flowchart-link\" style=\";\" data-edge=\"true\" data-et=\"edge\" data-id=\"L_A_B_0\" data-points=\"W3sieCI6MTM2LjQ2MDkzNzUsInkiOjYwLjV9LHsieCI6MTM2LjQ2MDkzNzUsInkiOjg1LjV9LHsieCI6MTM2LjQ2MDkzNzUsInkiOjExMC41fV0=\" marker-end=\"url(#a3a-diagram-1_flowchart-v2-pointEnd)\"><\/path><path d=\"M136.461,163L136.461,167.167C136.461,171.333,136.461,179.667,136.461,187.333C136.461,195,136.461,202,136.461,205.5L136.461,209\" id=\"L_B_C_0\" class=\"edge-thickness-normal edge-pattern-solid edge-thickness-normal edge-pattern-solid flowchart-link\" style=\";\" data-edge=\"true\" data-et=\"edge\" data-id=\"L_B_C_0\" data-points=\"W3sieCI6MTM2LjQ2MDkzNzUsInkiOjE2M30seyJ4IjoxMzYuNDYwOTM3NSwieSI6MTg4fSx7IngiOjEzNi40NjA5Mzc1LCJ5IjoyMTN9XQ==\" marker-end=\"url(#a3a-diagram-1_flowchart-v2-pointEnd)\"><\/path><path d=\"M136.461,265.5L136.461,269.667C136.461,273.833,136.461,282.167,136.461,289.833C136.461,297.5,136.461,304.5,136.461,308L136.461,311.5\" id=\"L_C_D_0\" class=\"edge-thickness-normal edge-pattern-solid edge-thickness-normal edge-pattern-solid flowchart-link\" style=\";\" data-edge=\"true\" data-et=\"edge\" data-id=\"L_C_D_0\" data-points=\"W3sieCI6MTM2LjQ2MDkzNzUsInkiOjI2NS41fSx7IngiOjEzNi40NjA5Mzc1LCJ5IjoyOTAuNX0seyJ4IjoxMzYuNDYwOTM3NSwieSI6MzE1LjV9XQ==\" marker-end=\"url(#a3a-diagram-1_flowchart-v2-pointEnd)\"><\/path><path d=\"M136.461,368L136.461,372.167C136.461,376.333,136.461,384.667,136.461,392.333C136.461,400,136.461,407,136.461,410.5L136.461,414\" id=\"L_D_E_0\" class=\"edge-thickness-normal edge-pattern-solid edge-thickness-normal edge-pattern-solid flowchart-link\" style=\";\" data-edge=\"true\" data-et=\"edge\" data-id=\"L_D_E_0\" data-points=\"W3sieCI6MTM2LjQ2MDkzNzUsInkiOjM2OH0seyJ4IjoxMzYuNDYwOTM3NSwieSI6MzkzfSx7IngiOjEzNi40NjA5Mzc1LCJ5Ijo0MTh9XQ==\" marker-end=\"url(#a3a-diagram-1_flowchart-v2-pointEnd)\"><\/path><path d=\"M136.461,470.5L136.461,474.667C136.461,478.833,136.461,487.167,136.461,494.833C136.461,502.5,136.461,509.5,136.461,513L136.461,516.5\" id=\"L_E_F_0\" class=\"edge-thickness-normal edge-pattern-solid edge-thickness-normal edge-pattern-solid flowchart-link\" style=\";\" data-edge=\"true\" data-et=\"edge\" data-id=\"L_E_F_0\" data-points=\"W3sieCI6MTM2LjQ2MDkzNzUsInkiOjQ3MC41fSx7IngiOjEzNi40NjA5Mzc1LCJ5Ijo0OTUuNX0seyJ4IjoxMzYuNDYwOTM3NSwieSI6NTIwLjV9XQ==\" marker-end=\"url(#a3a-diagram-1_flowchart-v2-pointEnd)\"><\/path><path d=\"M136.461,573L136.461,577.167C136.461,581.333,136.461,589.667,136.461,597.333C136.461,605,136.461,612,136.461,615.5L136.461,619\" id=\"L_F_G_0\" class=\"edge-thickness-normal edge-pattern-solid edge-thickness-normal edge-pattern-solid flowchart-link\" style=\";\" data-edge=\"true\" data-et=\"edge\" data-id=\"L_F_G_0\" data-points=\"W3sieCI6MTM2LjQ2MDkzNzUsInkiOjU3M30seyJ4IjoxMzYuNDYwOTM3NSwieSI6NTk4fSx7IngiOjEzNi40NjA5Mzc1LCJ5Ijo2MjN9XQ==\" marker-end=\"url(#a3a-diagram-1_flowchart-v2-pointEnd)\"><\/path><path d=\"M136.461,675.5L136.461,679.667C136.461,683.833,136.461,692.167,136.461,699.833C136.461,707.5,136.461,714.5,136.461,718L136.461,721.5\" id=\"L_G_H_0\" class=\"edge-thickness-normal edge-pattern-solid edge-thickness-normal edge-pattern-solid flowchart-link\" style=\";\" data-edge=\"true\" data-et=\"edge\" data-id=\"L_G_H_0\" data-points=\"W3sieCI6MTM2LjQ2MDkzNzUsInkiOjY3NS41fSx7IngiOjEzNi40NjA5Mzc1LCJ5Ijo3MDAuNX0seyJ4IjoxMzYuNDYwOTM3NSwieSI6NzI1LjV9XQ==\" marker-end=\"url(#a3a-diagram-1_flowchart-v2-pointEnd)\"><\/path><path d=\"M136.461,778L136.461,782.167C136.461,786.333,136.461,794.667,136.461,802.333C136.461,810,136.461,817,136.461,820.5L136.461,824\" id=\"L_H_I_0\" class=\"edge-thickness-normal edge-pattern-solid edge-thickness-normal edge-pattern-solid flowchart-link\" style=\";\" data-edge=\"true\" data-et=\"edge\" data-id=\"L_H_I_0\" data-points=\"W3sieCI6MTM2LjQ2MDkzNzUsInkiOjc3OH0seyJ4IjoxMzYuNDYwOTM3NSwieSI6ODAzfSx7IngiOjEzNi40NjA5Mzc1LCJ5Ijo4Mjh9XQ==\" marker-end=\"url(#a3a-diagram-1_flowchart-v2-pointEnd)\"><\/path><\/g><g class=\"edgeLabels\"><g class=\"edgeLabel\"><g class=\"label\" data-id=\"L_A_B_0\" transform=\"translate(0, 0)\"><foreignObject width=\"0\" height=\"0\"><div xmlns=\"http:\/\/www.w3.org\/1999\/xhtml\" class=\"labelBkg\" style=\"display: table-cell; white-space: nowrap; line-height: 1.5; max-width: 200px; text-align: center;\"><span class=\"edgeLabel\"><\/span><\/div><\/foreignObject><\/g><\/g><g class=\"edgeLabel\"><g class=\"label\" data-id=\"L_B_C_0\" transform=\"translate(0, 0)\"><foreignObject width=\"0\" height=\"0\"><div xmlns=\"http:\/\/www.w3.org\/1999\/xhtml\" class=\"labelBkg\" style=\"display: table-cell; white-space: nowrap; line-height: 1.5; max-width: 200px; text-align: center;\"><span class=\"edgeLabel\"><\/span><\/div><\/foreignObject><\/g><\/g><g class=\"edgeLabel\"><g class=\"label\" data-id=\"L_C_D_0\" transform=\"translate(0, 0)\"><foreignObject width=\"0\" height=\"0\"><div xmlns=\"http:\/\/www.w3.org\/1999\/xhtml\" class=\"labelBkg\" style=\"display: table-cell; white-space: nowrap; line-height: 1.5; max-width: 200px; text-align: center;\"><span class=\"edgeLabel\"><\/span><\/div><\/foreignObject><\/g><\/g><g class=\"edgeLabel\"><g class=\"label\" data-id=\"L_D_E_0\" transform=\"translate(0, 0)\"><foreignObject width=\"0\" height=\"0\"><div xmlns=\"http:\/\/www.w3.org\/1999\/xhtml\" class=\"labelBkg\" style=\"display: table-cell; white-space: nowrap; line-height: 1.5; max-width: 200px; text-align: center;\"><span class=\"edgeLabel\"><\/span><\/div><\/foreignObject><\/g><\/g><g class=\"edgeLabel\"><g class=\"label\" data-id=\"L_E_F_0\" transform=\"translate(0, 0)\"><foreignObject width=\"0\" height=\"0\"><div xmlns=\"http:\/\/www.w3.org\/1999\/xhtml\" class=\"labelBkg\" style=\"display: table-cell; white-space: nowrap; line-height: 1.5; max-width: 200px; text-align: center;\"><span class=\"edgeLabel\"><\/span><\/div><\/foreignObject><\/g><\/g><g class=\"edgeLabel\"><g class=\"label\" data-id=\"L_F_G_0\" transform=\"translate(0, 0)\"><foreignObject width=\"0\" height=\"0\"><div xmlns=\"http:\/\/www.w3.org\/1999\/xhtml\" class=\"labelBkg\" style=\"display: table-cell; white-space: nowrap; line-height: 1.5; max-width: 200px; text-align: center;\"><span class=\"edgeLabel\"><\/span><\/div><\/foreignObject><\/g><\/g><g class=\"edgeLabel\"><g class=\"label\" data-id=\"L_G_H_0\" transform=\"translate(0, 0)\"><foreignObject width=\"0\" height=\"0\"><div xmlns=\"http:\/\/www.w3.org\/1999\/xhtml\" class=\"labelBkg\" style=\"display: table-cell; white-space: nowrap; line-height: 1.5; max-width: 200px; text-align: center;\"><span class=\"edgeLabel\"><\/span><\/div><\/foreignObject><\/g><\/g><g class=\"edgeLabel\"><g class=\"label\" data-id=\"L_H_I_0\" transform=\"translate(0, 0)\"><foreignObject width=\"0\" height=\"0\"><div xmlns=\"http:\/\/www.w3.org\/1999\/xhtml\" class=\"labelBkg\" style=\"display: table-cell; white-space: nowrap; line-height: 1.5; max-width: 200px; text-align: center;\"><span class=\"edgeLabel\"><\/span><\/div><\/foreignObject><\/g><\/g><\/g><g class=\"nodes\"><g class=\"node default\" id=\"flowchart-A-0\" transform=\"translate(136.4609375, 34.25)\"><rect class=\"basic label-container\" style=\"\" x=\"-128.4609375\" y=\"-26.25\" width=\"256.921875\" height=\"52.5\"><\/rect><g class=\"label\" style=\"\" transform=\"translate(-98.4609375, -11.25)\"><rect><\/rect><foreignObject width=\"196.921875\" height=\"22.5\"><div xmlns=\"http:\/\/www.w3.org\/1999\/xhtml\" style=\"display: table-cell; white-space: nowrap; line-height: 1.5; max-width: 200px; text-align: center;\"><span class=\"nodeLabel\"><p>Levantamiento y documentos<\/p><\/span><\/div><\/foreignObject><\/g><\/g><g class=\"node default\" id=\"flowchart-B-1\" transform=\"translate(136.4609375, 136.75)\"><rect class=\"basic label-container\" style=\"\" x=\"-102.828125\" y=\"-26.25\" width=\"205.65625\" height=\"52.5\"><\/rect><g class=\"label\" style=\"\" transform=\"translate(-72.828125, -11.25)\"><rect><\/rect><foreignObject width=\"145.65625\" height=\"22.5\"><div xmlns=\"http:\/\/www.w3.org\/1999\/xhtml\" style=\"display: table-cell; white-space: nowrap; line-height: 1.5; max-width: 200px; text-align: center;\"><span class=\"nodeLabel\"><p>Baseline existente<\/p><\/span><\/div><\/foreignObject><\/g><\/g><g class=\"node default\" id=\"flowchart-C-3\" transform=\"translate(136.4609375, 239.25)\"><rect class=\"basic label-container\" style=\"\" x=\"-97.6640625\" y=\"-26.25\" width=\"195.328125\" height=\"52.5\"><\/rect><g class=\"label\" style=\"\" transform=\"translate(-67.6640625, -11.25)\"><rect><\/rect><foreignObject width=\"135.328125\" height=\"22.5\"><div xmlns=\"http:\/\/www.w3.org\/1999\/xhtml\" style=\"display: table-cell; white-space: nowrap; line-height: 1.5; max-width: 200px; text-align: center;\"><span class=\"nodeLabel\"><p>Diagn\u00f3stico y riesgos<\/p><\/span><\/div><\/foreignObject><\/g><\/g><g class=\"node default\" id=\"flowchart-D-5\" transform=\"translate(136.4609375, 341.75)\"><rect class=\"basic label-container\" style=\"\" x=\"-92.0703125\" y=\"-26.25\" width=\"184.140625\" height=\"52.5\"><\/rect><g class=\"label\" style=\"\" transform=\"translate(-62.0703125, -11.25)\"><rect><\/rect><foreignObject width=\"124.140625\" height=\"22.5\"><div xmlns=\"http:\/\/www.w3.org\/1999\/xhtml\" style=\"display: table-cell; white-space: nowrap; line-height: 1.5; max-width: 200px; text-align: center;\"><span class=\"nodeLabel\"><p>Requisitos futuros<\/p><\/span><\/div><\/foreignObject><\/g><\/g><g class=\"node default\" id=\"flowchart-E-7\" transform=\"translate(136.4609375, 444.25)\"><rect class=\"basic label-container\" style=\"\" x=\"-85.40625\" y=\"-26.25\" width=\"170.8125\" height=\"52.5\"><\/rect><g class=\"label\" style=\"\" transform=\"translate(-55.40625, -11.25)\"><rect><\/rect><foreignObject width=\"110.8125\" height=\"22.5\"><div xmlns=\"http:\/\/www.w3.org\/1999\/xhtml\" style=\"display: table-cell; white-space: nowrap; line-height: 1.5; max-width: 200px; text-align: center;\"><span class=\"nodeLabel\"><p>Arquitectura objetivo<\/p><\/span><\/div><\/foreignObject><\/g><\/g><g class=\"node default\" id=\"flowchart-F-9\" transform=\"translate(136.4609375, 546.75)\"><rect class=\"basic label-container\" style=\"\" x=\"-108.1953125\" y=\"-26.25\" width=\"216.390625\" height=\"52.5\"><\/rect><g class=\"label\" style=\"\" transform=\"translate(-78.1953125, -11.25)\"><rect><\/rect><foreignObject width=\"156.390625\" height=\"22.5\"><div xmlns=\"http:\/\/www.w3.org\/1999\/xhtml\" style=\"display: table-cell; white-space: nowrap; line-height: 1.5; max-width: 200px; text-align: center;\"><span class=\"nodeLabel\"><p>Proyecto y especificaci\u00f3n<\/p><\/span><\/div><\/foreignObject><\/g><\/g><g class=\"node default\" id=\"flowchart-G-11\" transform=\"translate(136.4609375, 649.25)\"><rect class=\"basic label-container\" style=\"\" x=\"-100.9375\" y=\"-26.25\" width=\"201.875\" height=\"52.5\"><\/rect><g class=\"label\" style=\"\" transform=\"translate(-70.9375, -11.25)\"><rect><\/rect><foreignObject width=\"141.875\" height=\"22.5\"><div xmlns=\"http:\/\/www.w3.org\/1999\/xhtml\" style=\"display: table-cell; white-space: nowrap; line-height: 1.5; max-width: 200px; text-align: center;\"><span class=\"nodeLabel\"><p>Implantaci\u00f3n por fases<\/p><\/span><\/div><\/foreignObject><\/g><\/g><g class=\"node default\" id=\"flowchart-H-13\" transform=\"translate(136.4609375, 751.75)\"><rect class=\"basic label-container\" style=\"\" x=\"-119.453125\" y=\"-26.25\" width=\"238.90625\" height=\"52.5\"><\/rect><g class=\"label\" style=\"\" transform=\"translate(-89.453125, -11.25)\"><rect><\/rect><foreignObject width=\"178.90625\" height=\"22.5\"><div xmlns=\"http:\/\/www.w3.org\/1999\/xhtml\" style=\"display: table-cell; white-space: nowrap; line-height: 1.5; max-width: 200px; text-align: center;\"><span class=\"nodeLabel\"><p>Pruebas y comisionamiento<\/p><\/span><\/div><\/foreignObject><\/g><\/g><g class=\"node default\" id=\"flowchart-I-15\" transform=\"translate(136.4609375, 854.25)\"><rect class=\"basic label-container\" style=\"\" x=\"-96.1484375\" y=\"-26.25\" width=\"192.296875\" height=\"52.5\"><\/rect><g class=\"label\" style=\"\" transform=\"translate(-66.1484375, -11.25)\"><rect><\/rect><foreignObject width=\"132.296875\" height=\"22.5\"><div xmlns=\"http:\/\/www.w3.org\/1999\/xhtml\" style=\"display: table-cell; white-space: nowrap; line-height: 1.5; max-width: 200px; text-align: center;\"><span class=\"nodeLabel\"><p>As-Built y handover<\/p><\/span><\/div><\/foreignObject><\/g><\/g><\/g><\/g><\/g><\/svg><figcaption>Flujo de ingenier\u00eda para adecuaci\u00f3n de infraestructura de red<\/figcaption><\/figure>\n\n\n\n<p class=\"wp-block-paragraph\">Esta secuencia reduce la posibilidad de que el equipo proyecte sobre hip\u00f3tesis no verificadas.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Fase 1: levantamiento y Due Diligence<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">La primera fase consolida lo que se sabe e identifica lo que necesita verificarse. Documentaci\u00f3n, historial de incidentes, reclamaciones, mapas, inventarios y configuraciones existentes entran como insumos.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">En campo, el levantamiento confirma o refuta estas informaciones. Las divergencias deben registrarse, no \u201ccorregirse mentalmente\u201d por el proyectista.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Fase 2: diagn\u00f3stico y matriz de criticidad<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Las anomal\u00edas necesitan priorizarse seg\u00fan impacto y riesgo. No todo problema exige correcci\u00f3n inmediata.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Una matriz puede considerar:<\/p>\n\n\n\n<figure class=\"wp-block-table\"><table><tbody><tr><td>Condici\u00f3n<\/td><td>Impacto<\/td><td>Tratamiento<\/td><\/tr><tr><td>enlace fuera de desempe\u00f1o<\/td><td>alto<\/td><td>sustituir\/reparar<\/td><\/tr><tr><td>punto sin identificaci\u00f3n<\/td><td>medio<\/td><td>registrar y documentar<\/td><\/tr><tr><td>rack sin reserva<\/td><td>medio\/alto<\/td><td>redimensionar<\/td><\/tr><tr><td>uplink saturado<\/td><td>alto<\/td><td>ampliar capacidad<\/td><\/tr><tr><td>switch sin soporte<\/td><td>depende<\/td><td>planificar sustituci\u00f3n<\/td><\/tr><tr><td>bandeja saturada<\/td><td>alto para expansi\u00f3n<\/td><td>crear nueva ruta<\/td><\/tr><tr><td>As-Built divergente<\/td><td>alto para gobernanza<\/td><td>reconciliar baseline<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p class=\"wp-block-paragraph\">La prioridad t\u00e9cnica debe orientar la inversi\u00f3n.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Fase 3: requisitos y arquitectura objetivo<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Antes de detallar equipos, se definen requisitos de capacidad, disponibilidad, PoE, crecimiento, seguridad e integraci\u00f3n.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">La arquitectura objetivo debe responder preguntas como:<\/p>\n\n\n\n<ul class=\"wp-block-list\"><li>\u00bfcu\u00e1ntos puntos y dispositivos existir\u00e1n?<\/li><li>\u00bfqu\u00e9 aplicaciones son cr\u00edticas?<\/li><li>\u00bfqu\u00e9 crecimiento se espera?<\/li><li>\u00bfqu\u00e9 switches necesitan redundancia?<\/li><li>\u00bfqu\u00e9 uplinks y backbones necesitan ampliarse?<\/li><li>\u00bfd\u00f3nde la fibra es m\u00e1s adecuada que el cobre?<\/li><li>\u00bfqu\u00e9 \u00e1reas dependen de PoE?<\/li><li>\u00bfc\u00f3mo se segmentar\u00e1 la red?<\/li><li>\u00bfqu\u00e9 elementos existentes podr\u00e1n reutilizarse?<\/li><\/ul>\n\n\n\n<h2 class=\"wp-block-heading\">Fase 4: proyecto ejecutivo de adecuaci\u00f3n<\/h2>\n\n\n\n<div class=\"wp-block-a3a-destaque\">\n<p class=\"wp-block-paragraph\">La adecuaci\u00f3n debe distinguir lo que permanece, lo que sale, lo que se remaneja y lo que ser\u00e1 nuevo. Esta separaci\u00f3n reduce improvisaciones durante la obra.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><a href=\"https:\/\/a3aengenharia.com.br\/servicos\/planejamento\/projeto-de-cabeamento-estruturado\/\">Vea el servicio de Proyecto de Cableado Estructurado<\/a><\/p>\n<\/div>\n\n\n\n<p class=\"wp-block-paragraph\">El proyecto transforma la arquitectura en documentos ejecutables. Seg\u00fan el alcance, puede incluir planos, diagramas, detalles, listas, memoria de c\u00e1lculo, especificaciones y criterios de prueba.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Los documentos deben distinguir claramente:<\/p>\n\n\n\n<ul class=\"wp-block-list\"><li>existente a mantener;<\/li><li>existente a retirar;<\/li><li>existente a remanear;<\/li><li>nuevo a instalar;<\/li><li>interfaces temporales durante la migraci\u00f3n.<\/li><\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">Esta diferenciaci\u00f3n es cr\u00edtica en brownfield.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Procurement y equivalencia t\u00e9cnica<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">La especificaci\u00f3n debe permitir comparar propuestas mediante criterios objetivos. Definir solo marca y modelo o, en el extremo opuesto, \u00fanicamente \u201cswitch de 48 puertos\u201d, genera riesgo en la contrataci\u00f3n.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Es preferible especificar desempe\u00f1o, interfaces, PoE, uplinks, recursos de redundancia, gesti\u00f3n, compatibilidad, soporte y dem\u00e1s requisitos relevantes.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">En cableado, categor\u00eda, clase, conectividad, desempe\u00f1o de canal, tipo de fibra, conectores, ensayos y documentaci\u00f3n deben quedar expl\u00edcitos.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Planificaci\u00f3n de la migraci\u00f3n<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">La adecuaci\u00f3n necesita considerar que la red existente puede no poder detenerse por completo. Es necesario definir secuencia, ventanas de cambio, contingencia y reversi\u00f3n.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Las migraciones pueden organizarse por rack, piso, sistema o grupo de usuarios. El proyecto debe identificar dependencias para evitar desconectar un uplink que atiende sistemas no mapeados.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">En ambientes cr\u00edticos, la estrategia de rollback forma parte del plan.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Fiscalizaci\u00f3n durante la implantaci\u00f3n<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">La fiscalizaci\u00f3n debe verificar adherencia al proyecto y registrar cambios de campo. En brownfield, se esperan descubrimientos. El problema es incorporarlos sin control.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Cuando se encuentra una condici\u00f3n diferente de la baseline, el equipo debe evaluar impacto, definir soluci\u00f3n, registrar la decisi\u00f3n y actualizar la documentaci\u00f3n. Esto evita que el As-Built final sea solo una reproducci\u00f3n del proyecto original.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Certificaci\u00f3n, pruebas y comisionamiento<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">La adecuaci\u00f3n no termina cuando los cables est\u00e1n conectados y los LEDs se encienden.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">La infraestructura pasiva debe probarse seg\u00fan los criterios definidos. Los activos necesitan verificarse en operaci\u00f3n. El comisionamiento puede incluir:<\/p>\n\n\n\n<ul class=\"wp-block-list\"><li>certificaci\u00f3n de enlaces met\u00e1licos;<\/li><li>ensayos \u00f3pticos;<\/li><li>verificaci\u00f3n de velocidad negociada;<\/li><li>errores de interfaz;<\/li><li>pruebas de uplink;<\/li><li>failover y redundancia;<\/li><li>PoE;<\/li><li>VLANs y enrutamiento;<\/li><li>servicios de red;<\/li><li>Wi-Fi, cuando est\u00e9 incluido;<\/li><li>pruebas de aplicaciones cr\u00edticas.<\/li><\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">La aceptaci\u00f3n necesita estar vinculada al requisito, no solo a la percepci\u00f3n de que \u201cfunciona\u201d.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">As-Built como cierre de la adecuaci\u00f3n<\/h2>\n\n\n\n<div class=\"wp-block-a3a-destaque\">\n<p class=\"wp-block-paragraph\">El proyecto solo termina cuando la condici\u00f3n final est\u00e1 probada, aceptada y documentada. Sin As-Built, la pr\u00f3xima expansi\u00f3n vuelve a trabajar sobre hip\u00f3tesis.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><a href=\"https:\/\/a3aengenharia.com.br\/servicos\/implementacao\/as-built-documentacao-tecnica-encerramento\/\">Conozca el servicio de As-Built de Ingenier\u00eda<\/a><\/p>\n<\/div>\n\n\n\n<p class=\"wp-block-paragraph\">En brownfield, el As-Built tiene un papel doble. Antes de la obra, los documentos existentes ayudan a formar la baseline; despu\u00e9s de la intervenci\u00f3n, la documentaci\u00f3n debe representar la nueva condici\u00f3n instalada.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">El As-Built final debe reconciliar cambios, rutas, puntos, activos, puertos, topolog\u00eda y dem\u00e1s informaci\u00f3n relevante. Sin esto, la pr\u00f3xima expansi\u00f3n reinicia el ciclo de incertidumbre.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Indicadores para medir el \u00e9xito de la adecuaci\u00f3n<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">El resultado puede acompa\u00f1arse mediante indicadores t\u00e9cnicos y operativos, como:<\/p>\n\n\n\n<ul class=\"wp-block-list\"><li>reducci\u00f3n de incidentes recurrentes;<\/li><li>reducci\u00f3n del tiempo medio de reparaci\u00f3n;<\/li><li>porcentaje de enlaces certificados;<\/li><li>aumento de capacidad de uplink;<\/li><li>eliminaci\u00f3n de puntos \u00fanicos de falla;<\/li><li>aumento de reserva de puertos e infraestructura;<\/li><li>cobertura documental de los activos;<\/li><li>reducci\u00f3n de puertos y cables no identificados;<\/li><li>mejora de la disponibilidad de los sistemas cr\u00edticos.<\/li><\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">Sin baseline, no es posible demostrar una mejora de forma objetiva.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Errores comunes en proyectos de adecuaci\u00f3n<\/h2>\n\n\n\n<ul class=\"wp-block-list\"><li>comprar equipos antes del levantamiento;<\/li><li>sustituir todo el cableado por edad;<\/li><li>ignorar la infraestructura seca;<\/li><li>modernizar Wi-Fi sin revisar PoE y uplinks;<\/li><li>mantener una topolog\u00eda l\u00f3gica antigua en switches nuevos;<\/li><li>considerar redundantes dos cables que siguen la misma ruta;<\/li><li>no prever migraci\u00f3n y rollback;<\/li><li>aceptar continuidad como certificaci\u00f3n;<\/li><li>actualizar solo planos y olvidar topolog\u00eda y puertos;<\/li><li>dejar el As-Built para reconstruirlo al final.<\/li><\/ul>\n\n\n\n<h2 class=\"wp-block-heading\">\u00bfCu\u00e1ndo deber\u00eda una organizaci\u00f3n iniciar un proyecto de adecuaci\u00f3n?<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Las se\u00f1ales t\u00edpicas incluyen crecimiento sin documentaci\u00f3n, incidentes recurrentes, saturaci\u00f3n de puertos, falta de capacidad PoE, uplinks congestionados, racks desorganizados, dificultad para localizar puntos, expansi\u00f3n de sistemas IP y necesidad de modernizar Wi-Fi o videovigilancia.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Tambi\u00e9n es recomendable evaluar la infraestructura antes de grandes cambios de oficina, adquisici\u00f3n de nuevos sistemas, ampliaci\u00f3n de plantas industriales o contratos de modernizaci\u00f3n que dependan de la red existente.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Adecuaci\u00f3n como proyecto de ingenier\u00eda<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Tratar la adecuaci\u00f3n solo como instalaci\u00f3n tiende a desplazar las decisiones hacia la obra. El instalador pasa a definir rutas, dimensionamiento, sustituciones y arquitectura mientras ejecuta, muchas veces sin una visi\u00f3n completa de los requisitos.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Un proyecto de ingenier\u00eda separa decisi\u00f3n de ejecuci\u00f3n: primero identifica condiciones y requisitos, despu\u00e9s define la soluci\u00f3n, especifica criterios y solo entonces implanta y prueba.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Esto mejora la contrataci\u00f3n, la comparabilidad de propuestas, la fiscalizaci\u00f3n y la aceptaci\u00f3n.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Consideraciones finales<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Una infraestructura de red existente debe modernizarse a partir de evidencias. El proceso comienza por el levantamiento, reconcilia documentaci\u00f3n con campo, establece baseline, diagnostica limitaciones y define la arquitectura objetivo. Solo despu\u00e9s tiene sentido elegir equipos, cables y soluciones de retrofit.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">La adecuaci\u00f3n m\u00e1s eficiente no es la que sustituye m\u00e1s componentes, sino la que <strong>reduce riesgo, elimina cuellos de botella, crea capacidad para crecimiento y devuelve a la organizaci\u00f3n una red probada y documentada<\/strong>. En brownfield, esta disciplina es a\u00fan m\u00e1s importante porque cada decisi\u00f3n necesita convivir con activos existentes y con la operaci\u00f3n en curso.<\/p>\n\n\n\n<details class=\"wp-block-details is-layout-flow wp-block-details-is-layout-flow\"><summary>Referencias t\u00e9cnicas<\/summary>\n<p class=\"wp-block-paragraph\">[1] ISO\/IEC. ISO\/IEC 11801-1:2017 \u2014 Information technology \u2014 Generic cabling for customer premises \u2014 Part 1: General requirements. Disponible en: <a href=\"https:\/\/www.iso.org\/standard\/66182.html\">https:\/\/www.iso.org\/standard\/66182.html<\/a><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">[2] ABNT. ABNT NBR 14565 \u2014 Cableado estructurado para edificios comerciales y data centers. Cat\u00e1logo ABNT. Disponible en: <a href=\"https:\/\/www.abntcatalogo.com.br\/\">https:\/\/www.abntcatalogo.com.br\/<\/a><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">[3] IEEE. IEEE 802.3 \u2014 Ethernet. Disponible en: <a href=\"https:\/\/standards.ieee.org\/ieee\/802.3\/7071\/\">https:\/\/standards.ieee.org\/ieee\/802.3\/7071\/<\/a><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">[4] A3A ENGENHARIA. Proyectos Brownfield: ingenier\u00eda en instalaciones existentes, levantamiento, As-Built y retrofit. Disponible en: <a href=\"https:\/\/a3aengenharia.com.br\/conteudo\/artigos-tecnicos\/projetos-brownfield-engenharia-instalacoes-existentes\/\">https:\/\/a3aengenharia.com.br\/conteudo\/artigos-tecnicos\/projetos-brownfield-engenharia-instalacoes-existentes\/<\/a><\/p>\n<\/details>\n\n\n\n<details class=\"wp-block-details is-layout-flow wp-block-details-is-layout-flow\"><summary>Preguntas frecuentes<\/summary>\n<div class=\"schema-faq wp-block-yoast-faq-block\"><div class=\"schema-faq-section\" id=\"faq-question-quando-necess-rio-adequar-uma-infraestrutura-de--26aaadca\"><strong class=\"schema-faq-question\">\u00bfCu\u00e1ndo es necesario adecuar una infraestructura de red?<\/strong> <p class=\"schema-faq-answer\">Cuando la condici\u00f3n existente deja de atender requisitos de capacidad, disponibilidad, PoE, seguridad, documentaci\u00f3n o expansi\u00f3n. Incidentes recurrentes, uplinks saturados, falta de puertos y crecimiento desorganizado son se\u00f1ales comunes.<\/p><\/div><div class=\"schema-faq-section\" id=\"faq-question-necess-rio-trocar-todo-o-cabeamento-antigo-8341ad97\"><strong class=\"schema-faq-question\">\u00bfEs necesario cambiar todo el cableado antiguo?<\/strong> <p class=\"schema-faq-answer\">No. El cableado debe evaluarse por condici\u00f3n, categor\u00eda, instalaci\u00f3n y desempe\u00f1o. Los enlaces aptos pueden mantenerse; otros pueden exigir reparaci\u00f3n, reterminaci\u00f3n o sustituci\u00f3n.<\/p><\/div><div class=\"schema-faq-section\" id=\"faq-question-qual-a-primeira-etapa-de-um-projeto-de-retrofit--6f293424\"><strong class=\"schema-faq-question\">\u00bfCu\u00e1l es la primera etapa de un proyecto de retrofit de red?<\/strong> <p class=\"schema-faq-answer\">Levantamiento y formaci\u00f3n de baseline. Antes de especificar equipos, es necesario reconciliar documentaci\u00f3n y campo y mapear topolog\u00eda, puntos, activos, backbone, PoE e infraestructura f\u00edsica.<\/p><\/div><div class=\"schema-faq-section\" id=\"faq-question-adequa-o-de-rede-exige-parada-total-3bb00a6f\"><strong class=\"schema-faq-question\">\u00bfLa adecuaci\u00f3n de red exige una parada total?<\/strong> <p class=\"schema-faq-answer\">No necesariamente. Los proyectos brownfield pueden implantarse por etapas, con ventanas de cambio, contingencia y rollback para reducir el impacto operativo.<\/p><\/div><div class=\"schema-faq-section\" id=\"faq-question-qual-a-diferen-a-entre-certifica-o-e-comissionam-913a575c\"><strong class=\"schema-faq-question\">\u00bfCu\u00e1l es la diferencia entre certificaci\u00f3n y comisionamiento?<\/strong> <p class=\"schema-faq-answer\">La certificaci\u00f3n comprueba par\u00e1metros del enlace f\u00edsico seg\u00fan el criterio aplicable. El comisionamiento verifica el funcionamiento integrado de la soluci\u00f3n, incluidos activos, uplinks, redundancia, PoE, l\u00f3gica y aplicaciones cuando forman parte del alcance.<\/p><\/div><div class=\"schema-faq-section\" id=\"faq-question-o-as-built-necess-rio-em-uma-adequa-o-b5913330\"><strong class=\"schema-faq-question\">\u00bfEl As-Built es necesario en una adecuaci\u00f3n?<\/strong> <p class=\"schema-faq-answer\">S\u00ed. Registra la condici\u00f3n final y evita que futuras intervenciones vuelvan a comenzar sin una base confiable. En brownfield, la documentaci\u00f3n existente tambi\u00e9n se utiliza al inicio para construir la baseline.<\/p><\/div><\/div>\n<\/details>\n\n\n\n<details class=\"wp-block-details is-layout-flow wp-block-details-is-layout-flow\"><summary>Materiales t\u00e9cnicos complementarios<\/summary>\n<h4 class=\"wp-block-heading\">Soluciones relacionadas<\/h4>\n\n<ul class=\"wp-block-list\"><li><a href=\"https:\/\/a3aengenharia.com.br\/solucoes\/engenharia-de-redes-e-telecomunicacoes\/cabeamento-estruturado\/\">Cableado Estructurado<\/a><\/li><li><a href=\"https:\/\/a3aengenharia.com.br\/solucoes\/engenharia-de-redes-e-telecomunicacoes\/conectividade-e-rede-logica\/\">Conectividad y Red L\u00f3gica<\/a><\/li><\/ul>\n\n<h4 class=\"wp-block-heading\">Servicios relacionados<\/h4>\n\n<ul class=\"wp-block-list\"><li><a href=\"https:\/\/a3aengenharia.com.br\/servicos\/planejamento\/projeto-de-cabeamento-estruturado\/\">Proyecto de Cableado Estructurado<\/a><\/li><li><a href=\"https:\/\/a3aengenharia.com.br\/servicos\/levantamento-e-diagnostico\/due-diligence\/\">Due Diligence T\u00e9cnica<\/a><\/li><li><a href=\"https:\/\/a3aengenharia.com.br\/servicos\/levantamento-e-diagnostico\/levantamento-cadastral-edificacoes-instalacoes-infraestruturas\/\">Levantamiento Catastral<\/a><\/li><li><a href=\"https:\/\/a3aengenharia.com.br\/servicos\/implementacao\/as-built-documentacao-tecnica-encerramento\/\">As-Built de Ingenier\u00eda<\/a><\/li><\/ul>\n\n<h4 class=\"wp-block-heading\">Contenidos principales sobre el tema<\/h4>\n\n<ul class=\"wp-block-list\"><li><a href=\"https:\/\/a3aengenharia.com.br\/conteudo\/artigos-tecnicos\/projeto-de-rede-guia-de-implementacao-de-redes\/\">Proyecto de Red: etapas, arquitectura y documentaci\u00f3n t\u00e9cnica<\/a><\/li><li><a href=\"https:\/\/a3aengenharia.com.br\/conteudo\/artigos-tecnicos\/rede-fisica\/\">Red F\u00edsica: componentes, capa f\u00edsica, fallas y diagn\u00f3stico<\/a><\/li><\/ul>\n\n<h4 class=\"wp-block-heading\">Contenidos t\u00e9cnicos relacionados<\/h4>\n\n<ul class=\"wp-block-list\"><li><a href=\"https:\/\/a3aengenharia.com.br\/conteudo\/artigos-tecnicos\/projetos-brownfield-engenharia-instalacoes-existentes\/\">Proyectos Brownfield<\/a><\/li><li><a href=\"https:\/\/a3aengenharia.com.br\/conteudo\/artigos-tecnicos\/certificacao-de-rede\/\">Certificaci\u00f3n de Red<\/a><\/li><\/ul>\n<\/details>\n","protected":false},"excerpt":{"rendered":"<p>Entienda c\u00f3mo planificar la adecuaci\u00f3n de infraestructura de red con levantamiento, baseline, retrofit, diagn\u00f3stico, proyecto, migraci\u00f3n, pruebas, comisionamiento y As-Built.<\/p>\n","protected":false},"author":1,"featured_media":78492,"parent":0,"template":"","meta":{"_a3a_global_related_solutions":[],"_a3a_global_related_services":[],"_a3a_global_related_materials":[],"_a3a_post_lang":"es-es","_a3a_translation_group_id":"8bccbab1-de73-4518-a5d8-ee801a9b06ad","_a3a_i18n_canonical_slug":"adecuacion-infraestructura-red-diagnostico-retrofit-proyecto","_a3a_prod_post_id":"","_a3a_lang_url_en-us":"","_a3a_lang_url_es-es":""},"categories":[],"segments":[],"mercados":[],"etapas":[],"class_list":["post-74399","articles","type-articles","status-publish","has-post-thumbnail","hentry"],"_links":{"self":[{"href":"https:\/\/a3aengenharia.com\/es-es\/wp-json\/wp\/v2\/articles\/74399","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/a3aengenharia.com\/es-es\/wp-json\/wp\/v2\/articles"}],"about":[{"href":"https:\/\/a3aengenharia.com\/es-es\/wp-json\/wp\/v2\/types\/articles"}],"author":[{"embeddable":true,"href":"https:\/\/a3aengenharia.com\/es-es\/wp-json\/wp\/v2\/users\/1"}],"version-history":[{"count":1,"href":"https:\/\/a3aengenharia.com\/es-es\/wp-json\/wp\/v2\/articles\/74399\/revisions"}],"predecessor-version":[{"id":74405,"href":"https:\/\/a3aengenharia.com\/es-es\/wp-json\/wp\/v2\/articles\/74399\/revisions\/74405"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/a3aengenharia.com\/es-es\/wp-json\/wp\/v2\/media\/78492"}],"wp:attachment":[{"href":"https:\/\/a3aengenharia.com\/es-es\/wp-json\/wp\/v2\/media?parent=74399"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/a3aengenharia.com\/es-es\/wp-json\/wp\/v2\/categories?post=74399"},{"taxonomy":"segments","embeddable":true,"href":"https:\/\/a3aengenharia.com\/es-es\/wp-json\/wp\/v2\/segments?post=74399"},{"taxonomy":"mercados","embeddable":true,"href":"https:\/\/a3aengenharia.com\/es-es\/wp-json\/wp\/v2\/mercados?post=74399"},{"taxonomy":"etapas","embeddable":true,"href":"https:\/\/a3aengenharia.com\/es-es\/wp-json\/wp\/v2\/etapas?post=74399"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}