{"id":73965,"date":"2026-09-01T16:53:14","date_gmt":"2026-09-01T19:53:14","guid":{"rendered":"https:\/\/a3aengenharia.com\/?post_type=articles&#038;p=73965"},"modified":"2026-09-01T16:53:14","modified_gmt":"2026-09-01T19:53:14","slug":"empresa-automatizacion-industrial-evaluar-contratar-integrador","status":"publish","type":"articles","link":"https:\/\/a3aengenharia.com\/es-es\/contenido\/articulos-tecnicos\/empresa-automatizacion-industrial-evaluar-contratar-integrador\/","title":{"rendered":"Empresa de Automatizaci\u00f3n Industrial: c\u00f3mo evaluar, comparar y contratar un integrador"},"content":{"rendered":"\n<p class=\"wp-block-paragraph\">Una empresa de automatizaci\u00f3n industrial debe evaluarse por su capacidad para transformar requisitos de proceso en una soluci\u00f3n de control verificable, integrable y sostenible a lo largo del ciclo de vida \u2014 no solamente por la marca de PLC que utiliza o por el menor precio de la propuesta. Para contratar con seguridad, el propietario necesita definir alcance y criterios antes de la competencia, cualificar experiencia y equipo, comparar arquitectura y licenciamiento, igualar interfaces, exigir FAT\/SAT\/comisionamiento y establecer claramente documentaci\u00f3n, propiedad de archivos, accesos, soporte y criterios de aceptaci\u00f3n.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Qu\u00e9 hace una empresa de automatizaci\u00f3n industrial<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Una empresa de automatizaci\u00f3n industrial puede actuar en diferentes partes del ciclo de ingenier\u00eda: levantamiento de campo, proyecto, suministro de tableros y equipos, programaci\u00f3n de controladores, desarrollo de SCADA, integraci\u00f3n de redes OT, implantaci\u00f3n, migraci\u00f3n de sistemas legacy, pruebas, comisionamiento y soporte.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">El problema es que el mercado utiliza expresiones como \u201cempresa de automatizaci\u00f3n\u201d, \u201cintegradora\u201d, \u201cproveedor de automatizaci\u00f3n\u201d e \u201cingenier\u00eda de automatizaci\u00f3n\u201d para organizaciones con capacidades muy diferentes. Dos empresas pueden presentar propuestas para el mismo objeto y, en la pr\u00e1ctica, estar ofreciendo alcances t\u00e9cnicos incomparables.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Por eso, el primer paso de la contrataci\u00f3n no es pedir precio. Es comprender <strong>qu\u00e9 funci\u00f3n deber\u00e1 cumplir el proveedor dentro de la arquitectura del proyecto<\/strong>.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Consultor\u00eda de ingenier\u00eda, integrador y fabricante no son lo mismo<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Una consultor\u00eda de ingenier\u00eda puede definir requisitos, arquitectura, especificaciones, criterios de prueba y estrategia de contrataci\u00f3n sin necesariamente suministrar la soluci\u00f3n. Un system integrator normalmente desarrolla e integra hardware y software. Un fabricante u OEM domina su propio ecosistema de productos. Un panel builder puede concentrarse en tableros y montaje. Un especialista en comisionamiento puede participar como parte independiente de verificaci\u00f3n.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Estos papeles pueden coexistir en la misma empresa, pero esto debe demostrarse. La simple presencia del logotipo de un fabricante en la presentaci\u00f3n comercial no demuestra capacidad de ingenier\u00eda multidisciplinaria, integraci\u00f3n, gesti\u00f3n de interfaces o comisionamiento.<\/p>\n\n\n\n<figure class=\"a3a-mermaid\"><svg id=\"a3a-diagram-4\" width=\"100%\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" class=\"flowchart\" style=\"max-width:min(896.703125px, 100%);height:auto;display:block;margin:0 auto\" viewBox=\"0 0 896.703125 398.5\" role=\"graphics-document document\" aria-roledescription=\"flowchart-v2\" aria-labelledby=\"chart-title-a3a-diagram-4\"><title id=\"chart-title-a3a-diagram-4\">Roles t\u00edpicos en el ecosistema de una contrataci\u00f3n de automatizaci\u00f3n industrial<\/title><style>#a3a-diagram-4{font-family:Roboto,sans-serif;font-size:15px;fill:var(--a3a-diag-text, #0a0a0a);}@keyframes edge-animation-frame{from{stroke-dashoffset:0;}}@keyframes dash{to{stroke-dashoffset:0;}}#a3a-diagram-4 .edge-animation-slow{stroke-dasharray:9,5!important;stroke-dashoffset:900;animation:dash 50s linear infinite;stroke-linecap:round;}#a3a-diagram-4 .edge-animation-fast{stroke-dasharray:9,5!important;stroke-dashoffset:900;animation:dash 20s linear infinite;stroke-linecap:round;}#a3a-diagram-4 .error-icon{fill:var(--a3a-diag-canvas, #ffffff);}#a3a-diagram-4 .error-text{fill:#000000;stroke:#000000;}#a3a-diagram-4 .edge-thickness-normal{stroke-width:1px;}#a3a-diagram-4 .edge-thickness-thick{stroke-width:3.5px;}#a3a-diagram-4 .edge-pattern-solid{stroke-dasharray:0;}#a3a-diagram-4 .edge-thickness-invisible{stroke-width:0;fill:none;}#a3a-diagram-4 .edge-pattern-dashed{stroke-dasharray:3;}#a3a-diagram-4 .edge-pattern-dotted{stroke-dasharray:2;}#a3a-diagram-4 .marker{fill:var(--a3a-diag-stroke, #2e42a2);stroke:var(--a3a-diag-stroke, #2e42a2);}#a3a-diagram-4 .marker.cross{stroke:var(--a3a-diag-stroke, #2e42a2);}#a3a-diagram-4 svg{font-family:Roboto,sans-serif;font-size:15px;}#a3a-diagram-4 p{margin:0;}#a3a-diagram-4 .label{font-family:Roboto,sans-serif;color:var(--a3a-diag-text, #0a0a0a);}#a3a-diagram-4 .cluster-label text{fill:var(--a3a-diag-title, #0124af);}#a3a-diagram-4 .cluster-label span{color:var(--a3a-diag-title, #0124af);}#a3a-diagram-4 .cluster-label span p{background-color:transparent;}#a3a-diagram-4 .label text,#a3a-diagram-4 span{fill:var(--a3a-diag-text, #0a0a0a);color:var(--a3a-diag-text, #0a0a0a);}#a3a-diagram-4 .node rect,#a3a-diagram-4 .node circle,#a3a-diagram-4 .node ellipse,#a3a-diagram-4 .node polygon,#a3a-diagram-4 .node path{fill:var(--a3a-diag-fill, #eef2fd);stroke:var(--a3a-diag-stroke, #2e42a2);stroke-width:1px;}#a3a-diagram-4 .rough-node .label text,#a3a-diagram-4 .node .label text,#a3a-diagram-4 .image-shape .label,#a3a-diagram-4 .icon-shape .label{text-anchor:middle;}#a3a-diagram-4 .node .katex path{fill:#000;stroke:#000;stroke-width:1px;}#a3a-diagram-4 .rough-node .label,#a3a-diagram-4 .node .label,#a3a-diagram-4 .image-shape .label,#a3a-diagram-4 .icon-shape .label{text-align:center;}#a3a-diagram-4 .node.clickable{cursor:pointer;}#a3a-diagram-4 .root .anchor path{fill:var(--a3a-diag-stroke, #2e42a2)!important;stroke-width:0;stroke:var(--a3a-diag-stroke, #2e42a2);}#a3a-diagram-4 .arrowheadPath{fill:var(--a3a-diag-stroke, #0b0b0b);}#a3a-diagram-4 .edgePath .path{stroke:var(--a3a-diag-stroke, #2e42a2);stroke-width:2.0px;}#a3a-diagram-4 .flowchart-link{stroke:var(--a3a-diag-stroke, #2e42a2);fill:none;}#a3a-diagram-4 .edgeLabel{background-color:var(--a3a-diag-canvas, #ffffff);text-align:center;}#a3a-diagram-4 .edgeLabel p{background-color:var(--a3a-diag-canvas, #ffffff);}#a3a-diagram-4 .edgeLabel rect{opacity:0.5;background-color:var(--a3a-diag-canvas, #ffffff);fill:var(--a3a-diag-canvas, #ffffff);}#a3a-diagram-4 .labelBkg{background-color:rgba(255, 255, 255, 0.5);}#a3a-diagram-4 .cluster rect{fill:var(--a3a-diag-surface, #f8f8f8);stroke:var(--a3a-diag-border, #e2e8f0);stroke-width:1px;}#a3a-diagram-4 .cluster text{fill:var(--a3a-diag-title, #0124af);}#a3a-diagram-4 .cluster span{color:var(--a3a-diag-title, #0124af);}#a3a-diagram-4 div.mermaidTooltip{position:absolute;text-align:center;max-width:200px;padding:2px;font-family:Roboto,sans-serif;font-size:12px;background:var(--a3a-diag-canvas, #ffffff);border:1px solid hsl(0, 0%, 90%);border-radius:2px;pointer-events:none;z-index:100;}#a3a-diagram-4 .flowchartTitleText{text-anchor:middle;font-size:18px;fill:var(--a3a-diag-text, #0a0a0a);}#a3a-diagram-4 rect.text{fill:none;stroke-width:0;}#a3a-diagram-4 .icon-shape,#a3a-diagram-4 .image-shape{background-color:var(--a3a-diag-canvas, #ffffff);text-align:center;}#a3a-diagram-4 .icon-shape p,#a3a-diagram-4 .image-shape p{background-color:var(--a3a-diag-canvas, #ffffff);padding:2px;}#a3a-diagram-4 .icon-shape rect,#a3a-diagram-4 .image-shape rect{opacity:0.5;background-color:var(--a3a-diag-canvas, #ffffff);fill:var(--a3a-diag-canvas, #ffffff);}#a3a-diagram-4 .label-icon{display:inline-block;height:1em;overflow:visible;vertical-align:-0.125em;}#a3a-diagram-4 .node .label-icon path{fill:currentColor;stroke:revert;stroke-width:revert;}#a3a-diagram-4 :root{--mermaid-font-family:Roboto,sans-serif;}<\/style><g><marker id=\"a3a-diagram-4_flowchart-v2-pointEnd\" class=\"marker flowchart-v2\" viewBox=\"0 0 10 10\" refX=\"5\" refY=\"5\" markerUnits=\"userSpaceOnUse\" markerWidth=\"8\" markerHeight=\"8\" orient=\"auto\"><path d=\"M 0 0 L 10 5 L 0 10 z\" class=\"arrowMarkerPath\" style=\"stroke-width: 1; stroke-dasharray: 1, 0;\"><\/path><\/marker><marker id=\"a3a-diagram-4_flowchart-v2-pointStart\" class=\"marker flowchart-v2\" viewBox=\"0 0 10 10\" refX=\"4.5\" refY=\"5\" markerUnits=\"userSpaceOnUse\" markerWidth=\"8\" markerHeight=\"8\" orient=\"auto\"><path d=\"M 0 5 L 10 10 L 10 0 z\" class=\"arrowMarkerPath\" style=\"stroke-width: 1; stroke-dasharray: 1, 0;\"><\/path><\/marker><marker id=\"a3a-diagram-4_flowchart-v2-circleEnd\" class=\"marker flowchart-v2\" viewBox=\"0 0 10 10\" refX=\"11\" refY=\"5\" markerUnits=\"userSpaceOnUse\" markerWidth=\"11\" markerHeight=\"11\" orient=\"auto\"><circle cx=\"5\" cy=\"5\" r=\"5\" class=\"arrowMarkerPath\" style=\"stroke-width: 1; stroke-dasharray: 1, 0;\"><\/circle><\/marker><marker id=\"a3a-diagram-4_flowchart-v2-circleStart\" class=\"marker flowchart-v2\" viewBox=\"0 0 10 10\" refX=\"-1\" refY=\"5\" markerUnits=\"userSpaceOnUse\" markerWidth=\"11\" markerHeight=\"11\" orient=\"auto\"><circle cx=\"5\" cy=\"5\" r=\"5\" class=\"arrowMarkerPath\" style=\"stroke-width: 1; stroke-dasharray: 1, 0;\"><\/circle><\/marker><marker id=\"a3a-diagram-4_flowchart-v2-crossEnd\" class=\"marker cross flowchart-v2\" viewBox=\"0 0 11 11\" refX=\"12\" refY=\"5.2\" markerUnits=\"userSpaceOnUse\" markerWidth=\"11\" markerHeight=\"11\" orient=\"auto\"><path d=\"M 1,1 l 9,9 M 10,1 l -9,9\" class=\"arrowMarkerPath\" style=\"stroke-width: 2; stroke-dasharray: 1, 0;\"><\/path><\/marker><marker id=\"a3a-diagram-4_flowchart-v2-crossStart\" class=\"marker cross flowchart-v2\" viewBox=\"0 0 11 11\" refX=\"-1\" refY=\"5.2\" markerUnits=\"userSpaceOnUse\" markerWidth=\"11\" markerHeight=\"11\" orient=\"auto\"><path d=\"M 1,1 l 9,9 M 10,1 l -9,9\" class=\"arrowMarkerPath\" style=\"stroke-width: 2; stroke-dasharray: 1, 0;\"><\/path><\/marker><g class=\"root\"><g class=\"clusters\"><\/g><g class=\"edgePaths\"><path d=\"M232.988,55.668L217.192,60.64C201.396,65.612,169.803,75.556,154.007,89.07C138.211,102.583,138.211,119.667,138.211,136.75C138.211,153.833,138.211,170.917,139.072,184.842C139.934,198.767,141.656,209.533,142.518,214.917L143.379,220.3\" id=\"L_A_B_0\" class=\"edge-thickness-normal edge-pattern-solid edge-thickness-normal edge-pattern-solid flowchart-link\" style=\";\" data-edge=\"true\" data-et=\"edge\" data-id=\"L_A_B_0\" data-points=\"W3sieCI6MjMyLjk4ODI4MTI1LCJ5Ijo1NS42NjgyMDQwNjQwMDY5MX0seyJ4IjoxMzguMjEwOTM3NSwieSI6ODUuNX0seyJ4IjoxMzguMjEwOTM3NSwieSI6MTM2Ljc1fSx7IngiOjEzOC4yMTA5Mzc1LCJ5IjoxODh9LHsieCI6MTQ0LjAxMDkzNzUsInkiOjIyNC4yNX1d\" marker-end=\"url(#a3a-diagram-4_flowchart-v2-pointEnd)\"><\/path><path d=\"M301.035,60.5L301.035,64.667C301.035,68.833,301.035,77.167,301.035,89.875C301.035,102.583,301.035,119.667,301.035,136.75C301.035,153.833,301.035,170.917,309.287,183.341C317.539,195.766,334.042,203.531,342.294,207.414L350.546,211.297\" id=\"L_A_C_0\" class=\"edge-thickness-normal edge-pattern-solid edge-thickness-normal edge-pattern-solid flowchart-link\" style=\";\" data-edge=\"true\" data-et=\"edge\" data-id=\"L_A_C_0\" data-points=\"W3sieCI6MzAxLjAzNTE1NjI1LCJ5Ijo2MC41fSx7IngiOjMwMS4wMzUxNTYyNSwieSI6ODUuNX0seyJ4IjozMDEuMDM1MTU2MjUsInkiOjEzNi43NX0seyJ4IjozMDEuMDM1MTU2MjUsInkiOjE4OH0seyJ4IjozNTQuMTY0ODQzNzUsInkiOjIxM31d\" marker-end=\"url(#a3a-diagram-4_flowchart-v2-pointEnd)\"><\/path><path d=\"M303.859,274.812L269.826,281.176C235.792,287.541,167.724,300.271,133.69,310.135C99.656,320,99.656,327,99.656,330.5L99.656,334\" id=\"L_C_D_0\" class=\"edge-thickness-normal edge-pattern-solid edge-thickness-normal edge-pattern-solid flowchart-link\" style=\";\" data-edge=\"true\" data-et=\"edge\" data-id=\"L_C_D_0\" data-points=\"W3sieCI6MzAzLjg1OTM3NSwieSI6Mjc0LjgxMTU2MjAxNzg1OTY3fSx7IngiOjk5LjY1NjI1LCJ5IjozMTN9LHsieCI6OTkuNjU2MjUsInkiOjMzOH1d\" marker-end=\"url(#a3a-diagram-4_flowchart-v2-pointEnd)\"><\/path><path d=\"M363.486,288L355.667,292.167C347.847,296.333,332.209,304.667,324.39,312.333C316.57,320,316.57,327,316.57,330.5L316.57,334\" id=\"L_C_E_0\" class=\"edge-thickness-normal edge-pattern-solid edge-thickness-normal edge-pattern-solid flowchart-link\" style=\";\" data-edge=\"true\" data-et=\"edge\" data-id=\"L_C_E_0\" data-points=\"W3sieCI6MzYzLjQ4NTkzNzUsInkiOjI4OH0seyJ4IjozMTYuNTcwMzEyNSwieSI6MzEzfSx7IngiOjMxNi41NzAzMTI1LCJ5IjozMzh9XQ==\" marker-end=\"url(#a3a-diagram-4_flowchart-v2-pointEnd)\"><\/path><path d=\"M504.233,288L512.052,292.167C519.871,296.333,535.51,304.667,543.329,312.333C551.148,320,551.148,327,551.148,330.5L551.148,334\" id=\"L_C_F_0\" class=\"edge-thickness-normal edge-pattern-solid edge-thickness-normal edge-pattern-solid flowchart-link\" style=\";\" data-edge=\"true\" data-et=\"edge\" data-id=\"L_C_F_0\" data-points=\"W3sieCI6NTA0LjIzMjgxMjUsInkiOjI4OH0seyJ4Ijo1NTEuMTQ4NDM3NSwieSI6MzEzfSx7IngiOjU1MS4xNDg0Mzc1LCJ5IjozMzh9XQ==\" marker-end=\"url(#a3a-diagram-4_flowchart-v2-pointEnd)\"><\/path><path d=\"M563.859,272.716L603.147,279.43C642.435,286.144,721.01,299.572,760.298,309.786C799.586,320,799.586,327,799.586,330.5L799.586,334\" id=\"L_C_G_0\" class=\"edge-thickness-normal edge-pattern-solid edge-thickness-normal edge-pattern-solid flowchart-link\" style=\";\" data-edge=\"true\" data-et=\"edge\" data-id=\"L_C_G_0\" data-points=\"W3sieCI6NTYzLjg1OTM3NSwieSI6MjcyLjcxNjA1MTA5NjkxNzV9LHsieCI6Nzk5LjU4NTkzNzUsInkiOjMxM30seyJ4Ijo3OTkuNTg1OTM3NSwieSI6MzM4fV0=\" marker-end=\"url(#a3a-diagram-4_flowchart-v2-pointEnd)\"><\/path><path d=\"M369.082,45.417L409.788,52.098C450.495,58.778,531.908,72.139,572.614,82.32C613.32,92.5,613.32,99.5,613.32,103L613.32,106.5\" id=\"L_A_H_0\" class=\"edge-thickness-normal edge-pattern-solid edge-thickness-normal edge-pattern-solid flowchart-link\" style=\";\" data-edge=\"true\" data-et=\"edge\" data-id=\"L_A_H_0\" data-points=\"W3sieCI6MzY5LjA4MjAzMTI1LCJ5Ijo0NS40MTczNjUwNjM0ODExNH0seyJ4Ijo2MTMuMzIwMzEyNSwieSI6ODUuNX0seyJ4Ijo2MTMuMzIwMzEyNSwieSI6MTEwLjV9XQ==\" marker-end=\"url(#a3a-diagram-4_flowchart-v2-pointEnd)\"><\/path><path d=\"M496.367,154.788L460.479,160.324C424.59,165.859,352.813,176.929,304.687,188.223C256.562,199.516,232.089,211.031,219.853,216.789L207.616,222.547\" id=\"L_H_B_0\" class=\"edge-thickness-normal edge-pattern-solid edge-thickness-normal edge-pattern-solid flowchart-link\" style=\";\" data-edge=\"true\" data-et=\"edge\" data-id=\"L_H_B_0\" data-points=\"W3sieCI6NDk2LjM2NzE4NzUsInkiOjE1NC43ODgyNjQ4NTYyODYzNn0seyJ4IjoyODEuMDM1MTU2MjUsInkiOjE4OH0seyJ4IjoyMDMuOTk3MTA5Mzc1LCJ5IjoyMjQuMjV9XQ==\" marker-end=\"url(#a3a-diagram-4_flowchart-v2-pointEnd)\"><\/path><path d=\"M588.597,163L584.673,167.167C580.748,171.333,572.899,179.667,560.831,187.713C548.762,195.76,532.474,203.52,524.33,207.4L516.185,211.28\" id=\"L_H_C_0\" class=\"edge-thickness-normal edge-pattern-solid edge-thickness-normal edge-pattern-solid flowchart-link\" style=\";\" data-edge=\"true\" data-et=\"edge\" data-id=\"L_H_C_0\" data-points=\"W3sieCI6NTg4LjU5Njg5NDA1NDg3OCwieSI6MTYzfSx7IngiOjU2NS4wNTA3ODEyNSwieSI6MTg4fSx7IngiOjUxMi41NzQyMTg3NSwieSI6MjEzfV0=\" marker-end=\"url(#a3a-diagram-4_flowchart-v2-pointEnd)\"><\/path><path d=\"M666.036,163L674.404,167.167C682.772,171.333,699.507,179.667,707.875,189.208C716.242,198.75,716.242,209.5,716.242,214.875L716.242,220.25\" id=\"L_H_I_0\" class=\"edge-thickness-normal edge-pattern-solid edge-thickness-normal edge-pattern-solid flowchart-link\" style=\";\" data-edge=\"true\" data-et=\"edge\" data-id=\"L_H_I_0\" data-points=\"W3sieCI6NjY2LjAzNjM5NDgxNzA3MzIsInkiOjE2M30seyJ4Ijo3MTYuMjQyMTg3NSwieSI6MTg4fSx7IngiOjcxNi4yNDIxODc1LCJ5IjoyMjQuMjV9XQ==\" marker-end=\"url(#a3a-diagram-4_flowchart-v2-pointEnd)\"><\/path><\/g><g class=\"edgeLabels\"><g class=\"edgeLabel\"><g class=\"label\" data-id=\"L_A_B_0\" transform=\"translate(0, 0)\"><foreignObject width=\"0\" height=\"0\"><div xmlns=\"http:\/\/www.w3.org\/1999\/xhtml\" class=\"labelBkg\" style=\"display: table-cell; white-space: nowrap; line-height: 1.5; max-width: 200px; text-align: center;\"><span class=\"edgeLabel\"><\/span><\/div><\/foreignObject><\/g><\/g><g class=\"edgeLabel\"><g class=\"label\" data-id=\"L_A_C_0\" transform=\"translate(0, 0)\"><foreignObject width=\"0\" height=\"0\"><div xmlns=\"http:\/\/www.w3.org\/1999\/xhtml\" class=\"labelBkg\" style=\"display: table-cell; white-space: nowrap; line-height: 1.5; max-width: 200px; text-align: center;\"><span class=\"edgeLabel\"><\/span><\/div><\/foreignObject><\/g><\/g><g class=\"edgeLabel\"><g class=\"label\" data-id=\"L_C_D_0\" transform=\"translate(0, 0)\"><foreignObject width=\"0\" height=\"0\"><div xmlns=\"http:\/\/www.w3.org\/1999\/xhtml\" class=\"labelBkg\" style=\"display: table-cell; white-space: nowrap; line-height: 1.5; max-width: 200px; text-align: center;\"><span class=\"edgeLabel\"><\/span><\/div><\/foreignObject><\/g><\/g><g class=\"edgeLabel\"><g class=\"label\" data-id=\"L_C_E_0\" transform=\"translate(0, 0)\"><foreignObject width=\"0\" height=\"0\"><div xmlns=\"http:\/\/www.w3.org\/1999\/xhtml\" class=\"labelBkg\" style=\"display: table-cell; white-space: nowrap; line-height: 1.5; max-width: 200px; text-align: center;\"><span class=\"edgeLabel\"><\/span><\/div><\/foreignObject><\/g><\/g><g class=\"edgeLabel\"><g class=\"label\" data-id=\"L_C_F_0\" transform=\"translate(0, 0)\"><foreignObject width=\"0\" height=\"0\"><div xmlns=\"http:\/\/www.w3.org\/1999\/xhtml\" class=\"labelBkg\" style=\"display: table-cell; white-space: nowrap; line-height: 1.5; max-width: 200px; text-align: center;\"><span class=\"edgeLabel\"><\/span><\/div><\/foreignObject><\/g><\/g><g class=\"edgeLabel\"><g class=\"label\" data-id=\"L_C_G_0\" transform=\"translate(0, 0)\"><foreignObject width=\"0\" height=\"0\"><div xmlns=\"http:\/\/www.w3.org\/1999\/xhtml\" class=\"labelBkg\" style=\"display: table-cell; white-space: nowrap; line-height: 1.5; max-width: 200px; text-align: center;\"><span class=\"edgeLabel\"><\/span><\/div><\/foreignObject><\/g><\/g><g class=\"edgeLabel\"><g class=\"label\" data-id=\"L_A_H_0\" transform=\"translate(0, 0)\"><foreignObject width=\"0\" height=\"0\"><div xmlns=\"http:\/\/www.w3.org\/1999\/xhtml\" class=\"labelBkg\" style=\"display: table-cell; white-space: nowrap; line-height: 1.5; max-width: 200px; text-align: center;\"><span class=\"edgeLabel\"><\/span><\/div><\/foreignObject><\/g><\/g><g class=\"edgeLabel\"><g class=\"label\" data-id=\"L_H_B_0\" transform=\"translate(0, 0)\"><foreignObject width=\"0\" height=\"0\"><div xmlns=\"http:\/\/www.w3.org\/1999\/xhtml\" class=\"labelBkg\" style=\"display: table-cell; white-space: nowrap; line-height: 1.5; max-width: 200px; text-align: center;\"><span class=\"edgeLabel\"><\/span><\/div><\/foreignObject><\/g><\/g><g class=\"edgeLabel\"><g class=\"label\" data-id=\"L_H_C_0\" transform=\"translate(0, 0)\"><foreignObject width=\"0\" height=\"0\"><div xmlns=\"http:\/\/www.w3.org\/1999\/xhtml\" class=\"labelBkg\" style=\"display: table-cell; white-space: nowrap; line-height: 1.5; max-width: 200px; text-align: center;\"><span class=\"edgeLabel\"><\/span><\/div><\/foreignObject><\/g><\/g><g class=\"edgeLabel\"><g class=\"label\" data-id=\"L_H_I_0\" transform=\"translate(0, 0)\"><foreignObject width=\"0\" height=\"0\"><div xmlns=\"http:\/\/www.w3.org\/1999\/xhtml\" class=\"labelBkg\" style=\"display: table-cell; white-space: nowrap; line-height: 1.5; max-width: 200px; text-align: center;\"><span class=\"edgeLabel\"><\/span><\/div><\/foreignObject><\/g><\/g><\/g><g class=\"nodes\"><g class=\"node default\" id=\"flowchart-A-0\" transform=\"translate(301.03515625, 34.25)\"><rect class=\"basic label-container\" style=\"\" x=\"-68.046875\" y=\"-26.25\" width=\"136.09375\" height=\"52.5\"><\/rect><g class=\"label\" style=\"\" transform=\"translate(-38.046875, -11.25)\"><rect><\/rect><foreignObject width=\"76.09375\" height=\"22.5\"><div xmlns=\"http:\/\/www.w3.org\/1999\/xhtml\" style=\"display: table-cell; white-space: nowrap; line-height: 1.5; max-width: 200px; text-align: center;\"><span class=\"nodeLabel\"><p>Propietario<\/p><\/span><\/div><\/foreignObject><\/g><\/g><g class=\"node default\" id=\"flowchart-B-1\" transform=\"translate(148.2109375, 250.5)\"><rect class=\"basic label-container\" style=\"\" x=\"-105.6484375\" y=\"-26.25\" width=\"211.296875\" height=\"52.5\"><\/rect><g class=\"label\" style=\"\" transform=\"translate(-75.6484375, -11.25)\"><rect><\/rect><foreignObject width=\"151.296875\" height=\"22.5\"><div xmlns=\"http:\/\/www.w3.org\/1999\/xhtml\" style=\"display: table-cell; white-space: nowrap; line-height: 1.5; max-width: 200px; text-align: center;\"><span class=\"nodeLabel\"><p>Ingenier\u00eda y requisitos<\/p><\/span><\/div><\/foreignObject><\/g><\/g><g class=\"node default\" id=\"flowchart-C-3\" transform=\"translate(433.859375, 250.5)\"><rect class=\"basic label-container\" style=\"\" x=\"-130\" y=\"-37.5\" width=\"260\" height=\"75\"><\/rect><g class=\"label\" style=\"\" transform=\"translate(-100, -22.5)\"><rect><\/rect><foreignObject width=\"200\" height=\"45\"><div xmlns=\"http:\/\/www.w3.org\/1999\/xhtml\" style=\"display: table; white-space: break-spaces; line-height: 1.5; max-width: 200px; text-align: center; width: 200px;\"><span class=\"nodeLabel\"><p>Integradora de automatizaci\u00f3n<\/p><\/span><\/div><\/foreignObject><\/g><\/g><g class=\"node default\" id=\"flowchart-D-5\" transform=\"translate(99.65625, 364.25)\"><rect class=\"basic label-container\" style=\"\" x=\"-91.65625\" y=\"-26.25\" width=\"183.3125\" height=\"52.5\"><\/rect><g class=\"label\" style=\"\" transform=\"translate(-61.65625, -11.25)\"><rect><\/rect><foreignObject width=\"123.3125\" height=\"22.5\"><div xmlns=\"http:\/\/www.w3.org\/1999\/xhtml\" style=\"display: table-cell; white-space: nowrap; line-height: 1.5; max-width: 200px; text-align: center;\"><span class=\"nodeLabel\"><p>Fabricantes y OEM<\/p><\/span><\/div><\/foreignObject><\/g><\/g><g class=\"node default\" id=\"flowchart-E-7\" transform=\"translate(316.5703125, 364.25)\"><rect class=\"basic label-container\" style=\"\" x=\"-75.2578125\" y=\"-26.25\" width=\"150.515625\" height=\"52.5\"><\/rect><g class=\"label\" style=\"\" transform=\"translate(-45.2578125, -11.25)\"><rect><\/rect><foreignObject width=\"90.515625\" height=\"22.5\"><div xmlns=\"http:\/\/www.w3.org\/1999\/xhtml\" style=\"display: table-cell; white-space: nowrap; line-height: 1.5; max-width: 200px; text-align: center;\"><span class=\"nodeLabel\"><p>Panel builder<\/p><\/span><\/div><\/foreignObject><\/g><\/g><g class=\"node default\" id=\"flowchart-F-9\" transform=\"translate(551.1484375, 364.25)\"><rect class=\"basic label-container\" style=\"\" x=\"-109.3203125\" y=\"-26.25\" width=\"218.640625\" height=\"52.5\"><\/rect><g class=\"label\" style=\"\" transform=\"translate(-79.3203125, -11.25)\"><rect><\/rect><foreignObject width=\"158.640625\" height=\"22.5\"><div xmlns=\"http:\/\/www.w3.org\/1999\/xhtml\" style=\"display: table-cell; white-space: nowrap; line-height: 1.5; max-width: 200px; text-align: center;\"><span class=\"nodeLabel\"><p>Redes e infraestructura<\/p><\/span><\/div><\/foreignObject><\/g><\/g><g class=\"node default\" id=\"flowchart-G-11\" transform=\"translate(799.5859375, 364.25)\"><rect class=\"basic label-container\" style=\"\" x=\"-89.1171875\" y=\"-26.25\" width=\"178.234375\" height=\"52.5\"><\/rect><g class=\"label\" style=\"\" transform=\"translate(-59.1171875, -11.25)\"><rect><\/rect><foreignObject width=\"118.234375\" height=\"22.5\"><div xmlns=\"http:\/\/www.w3.org\/1999\/xhtml\" style=\"display: table-cell; white-space: nowrap; line-height: 1.5; max-width: 200px; text-align: center;\"><span class=\"nodeLabel\"><p>Software y SCADA<\/p><\/span><\/div><\/foreignObject><\/g><\/g><g class=\"node default\" id=\"flowchart-H-13\" transform=\"translate(613.3203125, 136.75)\"><rect class=\"basic label-container\" style=\"\" x=\"-116.953125\" y=\"-26.25\" width=\"233.90625\" height=\"52.5\"><\/rect><g class=\"label\" style=\"\" transform=\"translate(-86.953125, -11.25)\"><rect><\/rect><foreignObject width=\"173.90625\" height=\"22.5\"><div xmlns=\"http:\/\/www.w3.org\/1999\/xhtml\" style=\"display: table-cell; white-space: nowrap; line-height: 1.5; max-width: 200px; text-align: center;\"><span class=\"nodeLabel\"><p>Ingenier\u00eda del Propietario<\/p><\/span><\/div><\/foreignObject><\/g><\/g><g class=\"node default\" id=\"flowchart-I-19\" transform=\"translate(716.2421875, 250.5)\"><rect class=\"basic label-container\" style=\"\" x=\"-102.3828125\" y=\"-26.25\" width=\"204.765625\" height=\"52.5\"><\/rect><g class=\"label\" style=\"\" transform=\"translate(-72.3828125, -11.25)\"><rect><\/rect><foreignObject width=\"144.765625\" height=\"22.5\"><div xmlns=\"http:\/\/www.w3.org\/1999\/xhtml\" style=\"display: table-cell; white-space: nowrap; line-height: 1.5; max-width: 200px; text-align: center;\"><span class=\"nodeLabel\"><p>Pruebas y aceptaci\u00f3n<\/p><\/span><\/div><\/foreignObject><\/g><\/g><\/g><\/g><\/g><\/svg><figcaption>Roles t\u00edpicos en el ecosistema de una contrataci\u00f3n de automatizaci\u00f3n industrial<\/figcaption><\/figure>\n\n\n\n<h2 class=\"wp-block-heading\">Cu\u00e1ndo contratar una empresa de automatizaci\u00f3n industrial<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">La contrataci\u00f3n es necesaria cuando el emprendimiento necesita transformar requisitos operativos en un sistema implantado o cuando una instalaci\u00f3n existente exige modernizaci\u00f3n, integraci\u00f3n, ampliaci\u00f3n o recuperaci\u00f3n del control t\u00e9cnico.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Los casos t\u00edpicos incluyen nuevas plantas, ampliaci\u00f3n de l\u00edneas de proceso, sustituci\u00f3n de PLC o SCADA obsoletos, migraci\u00f3n de redes industriales, integraci\u00f3n de equipos de diferentes proveedores, implantaci\u00f3n de historiadores, telemetr\u00eda, sistemas de supervisi\u00f3n, acceso remoto controlado y recolecci\u00f3n de datos para aplicaciones de IIoT.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">En instalaciones brownfield, la necesidad suele ser m\u00e1s compleja. El integrador necesita comprender el legado, preservar la producci\u00f3n, planificar ventanas de intervenci\u00f3n, prever rollback y controlar versiones. En este escenario, la experiencia de campo y la metodolog\u00eda de migraci\u00f3n pesan tanto como la capacidad de programaci\u00f3n.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Antes de la RFP: el owner necesita definir el problema<\/h2>\n\n\n\n<div class=\"wp-block-a3a-destaque\">\n<p class=\"wp-block-paragraph\">Pedir precio antes de definir requisitos transfiere la ingenier\u00eda a los proponentes y produce propuestas incomparables. Un alcance t\u00e9cnico, una RFP y criterios de evaluaci\u00f3n bien estructurados reducen brechas antes del contrato.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><a href=\"https:\/\/a3aengenharia.com.br\/conteudo\/artigos-tecnicos\/rfp-engenharia-escopo-requisitos-criterios-selecao\/\">Vea c\u00f3mo estructurar una RFP de Ingenier\u00eda<\/a><\/p>\n<\/div>\n\n\n\n<p class=\"wp-block-paragraph\">Solicitar una propuesta con base en una descripci\u00f3n corta como \u201cmodernizar el sistema de automatizaci\u00f3n\u201d transfiere a cada proveedor la responsabilidad de interpretar el objeto. El resultado inevitable son soluciones diferentes, precios no comparables y discusiones de alcance durante la ejecuci\u00f3n.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">La contrataci\u00f3n debe comenzar por una base t\u00e9cnica m\u00ednima: condici\u00f3n existente, objetivos, fronteras, funciones requeridas, interfaces, criterios de desempe\u00f1o, documentaci\u00f3n disponible, restricciones operativas y requisitos de prueba.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Levantamiento de la condici\u00f3n existente<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">En brownfield, los documentos existentes deben confrontarse con el campo. Diagramas, listas de I\/O, topolog\u00edas, direccionamiento, versiones de firmware y software, licencias, backups, tableros y dispositivos pueden haber sido modificados sin actualizaci\u00f3n documental.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">El levantamiento debe identificar tambi\u00e9n dependencias poco visibles: servidores antiguos, conversores de protocolo, estaciones de ingenier\u00eda, dongles o licencias f\u00edsicas, relojes de sincronizaci\u00f3n, switches sin gesti\u00f3n y conexiones temporales que se volvieron permanentes.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Definici\u00f3n de requisitos<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Los requisitos funcionales deben explicar qu\u00e9 har\u00e1 el sistema y bajo qu\u00e9 condiciones. Los requisitos no funcionales tratan desempe\u00f1o, disponibilidad, seguridad, retenci\u00f3n, redundancia, expansi\u00f3n, diagn\u00f3stico y ciclo de vida.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Los criterios verificables permiten transformar la propuesta en compromiso t\u00e9cnico. Si el requisito afirma solamente que la soluci\u00f3n ser\u00e1 \u201cmoderna\u201d, \u201crobusta\u201d o \u201cde alta disponibilidad\u201d, la evaluaci\u00f3n objetiva se vuelve dif\u00edcil.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">El art\u00edculo pilar sobre <a href=\"https:\/\/a3aengenharia.com.br\/conteudo\/artigos-tecnicos\/automacao-industrial-o-que-e-arquitetura-sistemas-aplicacoes\/\">automatizaci\u00f3n industrial y su arquitectura de ingenier\u00eda<\/a> profundiza las capas que deben considerarse antes de la contrataci\u00f3n.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">C\u00f3mo estructurar el alcance para recibir propuestas comparables<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">El alcance debe separar claramente suministro, ingenier\u00eda, desarrollo, instalaci\u00f3n, integraci\u00f3n, prueba, documentaci\u00f3n, capacitaci\u00f3n y soporte. Tambi\u00e9n debe identificar exclusiones e interfaces con el\u00e9ctrica, instrumentaci\u00f3n, telecomunicaciones, TI, proceso, mec\u00e1nica y operaci\u00f3n.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Un <a href=\"https:\/\/a3aengenharia.com.br\/conteudo\/artigos-tecnicos\/scope-of-work-sow-escopo-trabalho-engenharia\/\">Scope of Work en Ingenier\u00eda<\/a> bien estructurado reduce la cantidad de premisas comerciales ocultas en las propuestas y hace visibles las responsabilidades antes de la firma.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Battery limits y fronteras<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">El l\u00edmite de suministro debe indicar d\u00f3nde termina la responsabilidad de cada parte. \u00bfQui\u00e9n suministra alimentaci\u00f3n? \u00bfQui\u00e9n instala los cables? \u00bfQui\u00e9n configura los switches? \u00bfQui\u00e9n proporciona IPs? \u00bfQui\u00e9n integra equipos de terceros? \u00bfQui\u00e9n actualiza firmware? \u00bfQui\u00e9n suministra VM, storage o sistema operativo? \u00bfQui\u00e9n proporciona se\u00f1ales de proceso para el FAT?<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Preguntas aparentemente peque\u00f1as se convierten en claims o atrasos cuando no se responden antes del award.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Matriz de interfaces<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Una matriz de interfaces registra disciplina, informaci\u00f3n o recurso, proveedor, receptor, plazo y criterio de cierre. Es especialmente importante cuando existen paquetes separados de el\u00e9ctrica, instrumentaci\u00f3n, telecomunicaciones, TI, m\u00e1quinas y automatizaci\u00f3n.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">La madurez del integrador puede observarse por la forma en que trata las interfaces. Las empresas que suponen que \u201ceso lo proporciona el cliente\u201d sin registrar dependencias tienden a llevar la discusi\u00f3n al campo.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">C\u00f3mo cualificar empresas de automatizaci\u00f3n industrial<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">La cualificaci\u00f3n t\u00e9cnica debe verificar adherencia al objeto, no solamente el tama\u00f1o de la empresa. Un integrador excelente en m\u00e1quinas seriadas puede no tener experiencia en sistemas distribuidos de una planta brownfield; una empresa fuerte en SCADA puede no dominar instrumentaci\u00f3n o redes OT; otra puede conocer el hardware, pero no poseer un proceso de ingenier\u00eda y documentaci\u00f3n compatible con el emprendimiento.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Experiencia relevante<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Los cases deben evaluarse por similitud de complejidad, criticidad, tecnolog\u00edas, interfaces y ambiente operativo. La cantidad bruta de proyectos es menos importante que la correspondencia entre experiencia anterior y riesgos del nuevo objeto.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Es \u00fatil solicitar ejemplos de arquitecturas, procedimientos de pruebas, documentaci\u00f3n final y enfoque de migraci\u00f3n \u2014 preservando, naturalmente, informaci\u00f3n confidencial de otros clientes.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Equipo clave<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">La propuesta debe identificar responsables de ingenier\u00eda, desarrollo, redes, ciberseguridad, comisionamiento y gesti\u00f3n del proyecto cuando estas funciones sean relevantes.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Las certificaciones de fabricantes ayudan a demostrar dominio de productos, pero no sustituyen experiencia de proyecto, comprensi\u00f3n del proceso y capacidad de integraci\u00f3n. De la misma forma, un curr\u00edculum fuerte de un profesional no demuestra que estar\u00e1 efectivamente asignado al contrato.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Capacidad de soporte y ciclo de vida<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">La automatizaci\u00f3n no termina en la aceptaci\u00f3n. El propietario necesita evaluar disponibilidad de soporte, gesti\u00f3n de versiones, capacidad de reposici\u00f3n, relaci\u00f3n con fabricantes, estructura para atenci\u00f3n remota y presencial, tiempo de respuesta y estrategia para obsolescencia.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Arquitectura antes que marca<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Una propuesta t\u00e9cnica debe explicar la arquitectura y las decisiones que sustentan la soluci\u00f3n. Cuando la respuesta es solamente una lista de equipos, todav\u00eda no existe evidencia suficiente de que el proveedor haya comprendido requisitos e interfaces.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Es necesario analizar topolog\u00eda, redundancia, controladores, servidores, almacenamiento, estaciones, redes, protocolos, sincronizaci\u00f3n, integraciones, zonas de seguridad y comportamiento ante fallos.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Vendor lock-in y dependencia t\u00e9cnica<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Los ecosistemas propietarios no son necesariamente inadecuados. El problema surge cuando el propietario descubre solamente despu\u00e9s de la implantaci\u00f3n que expansi\u00f3n, mantenimiento o acceso a los archivos dependen exclusivamente del integrador original.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">La contrataci\u00f3n debe aclarar formatos de proyecto, propiedad de c\u00f3digo y configuraciones, licencias de ingenier\u00eda, contrase\u00f1as administrativas, certificados, backups, herramientas necesarias y l\u00edmites de soporte del fabricante.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Estandarizaci\u00f3n versus interoperabilidad<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Estandarizar tecnolog\u00edas puede reducir inventario, capacitaci\u00f3n y complejidad. Sin embargo, la estandarizaci\u00f3n no debe impedir una integraci\u00f3n leg\u00edtima con equipos de terceros. Las interfaces deben especificarse y probarse.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Protocolos como <a href=\"https:\/\/a3aengenharia.com.br\/conteudo\/artigos-tecnicos\/opc-ua-o-que-e-seguranca-integracao-scada-modbus-mqtt\/\">OPC UA<\/a> pueden reducir dependencia de integraciones ad hoc, mientras protocolos legacy como <a href=\"https:\/\/a3aengenharia.com.br\/conteudo\/artigos-tecnicos\/modbus-o-que-e-rtu-tcp-seguranca-industrial\/\">Modbus<\/a> exigen documentaci\u00f3n cuidadosa de registros, escalas y tratamiento de fallos.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">C\u00f3mo comparar propuestas t\u00e9cnicas<\/h2>\n\n\n\n<div class=\"wp-block-a3a-destaque\">\n<p class=\"wp-block-paragraph\">En automatizaci\u00f3n, la propuesta m\u00e1s baja puede ser simplemente la que dej\u00f3 m\u00e1s elementos fuera. La TBE registra conformidad, desviaciones y alternativas antes de la igualaci\u00f3n comercial y ayuda a transformar comparaci\u00f3n de precio en comparaci\u00f3n de alcance equivalente.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><a href=\"https:\/\/a3aengenharia.com.br\/conteudo\/artigos-tecnicos\/tbe-technical-bid-evaluation-engenharia\/\">Profundice la evaluaci\u00f3n t\u00e9cnica de propuestas con TBE<\/a><\/p>\n<\/div>\n\n\n\n<p class=\"wp-block-paragraph\">La comparaci\u00f3n debe ocurrir antes de la igualaci\u00f3n comercial. Si una propuesta incluye redundancia, pruebas, licencias y documentaci\u00f3n completa y otra no, comparar solamente el precio total premia el alcance incompleto.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">La <a href=\"https:\/\/a3aengenharia.com.br\/conteudo\/artigos-tecnicos\/tbe-technical-bid-evaluation-engenharia\/\">Technical Bid Evaluation \u2014 TBE<\/a> es \u00fatil para transformar requisitos en criterios de conformidad, registrar desviaciones y construir una base t\u00e9cnica com\u00fan para la negociaci\u00f3n.<\/p>\n\n\n\n<figure class=\"a3a-mermaid\"><svg id=\"a3a-diagram-5\" width=\"100%\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" class=\"flowchart\" style=\"max-width:min(1828.875px, 100%);height:auto;display:block;margin:0 auto\" viewBox=\"0 0 1828.875 68.5\" role=\"graphics-document document\" aria-roledescription=\"flowchart-v2\" aria-labelledby=\"chart-title-a3a-diagram-5\"><title id=\"chart-title-a3a-diagram-5\">Embudo recomendado para seleccionar una empresa de automatizaci\u00f3n industrial<\/title><style>#a3a-diagram-5{font-family:Roboto,sans-serif;font-size:15px;fill:var(--a3a-diag-text, #0a0a0a);}@keyframes edge-animation-frame{from{stroke-dashoffset:0;}}@keyframes dash{to{stroke-dashoffset:0;}}#a3a-diagram-5 .edge-animation-slow{stroke-dasharray:9,5!important;stroke-dashoffset:900;animation:dash 50s linear infinite;stroke-linecap:round;}#a3a-diagram-5 .edge-animation-fast{stroke-dasharray:9,5!important;stroke-dashoffset:900;animation:dash 20s linear infinite;stroke-linecap:round;}#a3a-diagram-5 .error-icon{fill:var(--a3a-diag-canvas, #ffffff);}#a3a-diagram-5 .error-text{fill:#000000;stroke:#000000;}#a3a-diagram-5 .edge-thickness-normal{stroke-width:1px;}#a3a-diagram-5 .edge-thickness-thick{stroke-width:3.5px;}#a3a-diagram-5 .edge-pattern-solid{stroke-dasharray:0;}#a3a-diagram-5 .edge-thickness-invisible{stroke-width:0;fill:none;}#a3a-diagram-5 .edge-pattern-dashed{stroke-dasharray:3;}#a3a-diagram-5 .edge-pattern-dotted{stroke-dasharray:2;}#a3a-diagram-5 .marker{fill:var(--a3a-diag-stroke, #2e42a2);stroke:var(--a3a-diag-stroke, #2e42a2);}#a3a-diagram-5 .marker.cross{stroke:var(--a3a-diag-stroke, #2e42a2);}#a3a-diagram-5 svg{font-family:Roboto,sans-serif;font-size:15px;}#a3a-diagram-5 p{margin:0;}#a3a-diagram-5 .label{font-family:Roboto,sans-serif;color:var(--a3a-diag-text, #0a0a0a);}#a3a-diagram-5 .cluster-label text{fill:var(--a3a-diag-title, #0124af);}#a3a-diagram-5 .cluster-label span{color:var(--a3a-diag-title, #0124af);}#a3a-diagram-5 .cluster-label span p{background-color:transparent;}#a3a-diagram-5 .label text,#a3a-diagram-5 span{fill:var(--a3a-diag-text, #0a0a0a);color:var(--a3a-diag-text, #0a0a0a);}#a3a-diagram-5 .node rect,#a3a-diagram-5 .node circle,#a3a-diagram-5 .node ellipse,#a3a-diagram-5 .node polygon,#a3a-diagram-5 .node path{fill:var(--a3a-diag-fill, #eef2fd);stroke:var(--a3a-diag-stroke, #2e42a2);stroke-width:1px;}#a3a-diagram-5 .rough-node .label text,#a3a-diagram-5 .node .label text,#a3a-diagram-5 .image-shape .label,#a3a-diagram-5 .icon-shape .label{text-anchor:middle;}#a3a-diagram-5 .node .katex path{fill:#000;stroke:#000;stroke-width:1px;}#a3a-diagram-5 .rough-node .label,#a3a-diagram-5 .node .label,#a3a-diagram-5 .image-shape .label,#a3a-diagram-5 .icon-shape .label{text-align:center;}#a3a-diagram-5 .node.clickable{cursor:pointer;}#a3a-diagram-5 .root .anchor path{fill:var(--a3a-diag-stroke, #2e42a2)!important;stroke-width:0;stroke:var(--a3a-diag-stroke, #2e42a2);}#a3a-diagram-5 .arrowheadPath{fill:var(--a3a-diag-stroke, #0b0b0b);}#a3a-diagram-5 .edgePath .path{stroke:var(--a3a-diag-stroke, #2e42a2);stroke-width:2.0px;}#a3a-diagram-5 .flowchart-link{stroke:var(--a3a-diag-stroke, #2e42a2);fill:none;}#a3a-diagram-5 .edgeLabel{background-color:var(--a3a-diag-canvas, #ffffff);text-align:center;}#a3a-diagram-5 .edgeLabel p{background-color:var(--a3a-diag-canvas, #ffffff);}#a3a-diagram-5 .edgeLabel rect{opacity:0.5;background-color:var(--a3a-diag-canvas, #ffffff);fill:var(--a3a-diag-canvas, #ffffff);}#a3a-diagram-5 .labelBkg{background-color:rgba(255, 255, 255, 0.5);}#a3a-diagram-5 .cluster rect{fill:var(--a3a-diag-surface, #f8f8f8);stroke:var(--a3a-diag-border, #e2e8f0);stroke-width:1px;}#a3a-diagram-5 .cluster text{fill:var(--a3a-diag-title, #0124af);}#a3a-diagram-5 .cluster span{color:var(--a3a-diag-title, #0124af);}#a3a-diagram-5 div.mermaidTooltip{position:absolute;text-align:center;max-width:200px;padding:2px;font-family:Roboto,sans-serif;font-size:12px;background:var(--a3a-diag-canvas, #ffffff);border:1px solid hsl(0, 0%, 90%);border-radius:2px;pointer-events:none;z-index:100;}#a3a-diagram-5 .flowchartTitleText{text-anchor:middle;font-size:18px;fill:var(--a3a-diag-text, #0a0a0a);}#a3a-diagram-5 rect.text{fill:none;stroke-width:0;}#a3a-diagram-5 .icon-shape,#a3a-diagram-5 .image-shape{background-color:var(--a3a-diag-canvas, #ffffff);text-align:center;}#a3a-diagram-5 .icon-shape p,#a3a-diagram-5 .image-shape p{background-color:var(--a3a-diag-canvas, #ffffff);padding:2px;}#a3a-diagram-5 .icon-shape rect,#a3a-diagram-5 .image-shape rect{opacity:0.5;background-color:var(--a3a-diag-canvas, #ffffff);fill:var(--a3a-diag-canvas, #ffffff);}#a3a-diagram-5 .label-icon{display:inline-block;height:1em;overflow:visible;vertical-align:-0.125em;}#a3a-diagram-5 .node .label-icon path{fill:currentColor;stroke:revert;stroke-width:revert;}#a3a-diagram-5 :root{--mermaid-font-family:Roboto,sans-serif;}<\/style><g><marker id=\"a3a-diagram-5_flowchart-v2-pointEnd\" class=\"marker flowchart-v2\" viewBox=\"0 0 10 10\" refX=\"5\" refY=\"5\" markerUnits=\"userSpaceOnUse\" markerWidth=\"8\" markerHeight=\"8\" orient=\"auto\"><path d=\"M 0 0 L 10 5 L 0 10 z\" class=\"arrowMarkerPath\" style=\"stroke-width: 1; stroke-dasharray: 1, 0;\"><\/path><\/marker><marker id=\"a3a-diagram-5_flowchart-v2-pointStart\" class=\"marker flowchart-v2\" viewBox=\"0 0 10 10\" refX=\"4.5\" refY=\"5\" markerUnits=\"userSpaceOnUse\" markerWidth=\"8\" markerHeight=\"8\" orient=\"auto\"><path d=\"M 0 5 L 10 10 L 10 0 z\" class=\"arrowMarkerPath\" style=\"stroke-width: 1; stroke-dasharray: 1, 0;\"><\/path><\/marker><marker id=\"a3a-diagram-5_flowchart-v2-circleEnd\" class=\"marker flowchart-v2\" viewBox=\"0 0 10 10\" refX=\"11\" refY=\"5\" markerUnits=\"userSpaceOnUse\" markerWidth=\"11\" markerHeight=\"11\" orient=\"auto\"><circle cx=\"5\" cy=\"5\" r=\"5\" class=\"arrowMarkerPath\" style=\"stroke-width: 1; stroke-dasharray: 1, 0;\"><\/circle><\/marker><marker id=\"a3a-diagram-5_flowchart-v2-circleStart\" class=\"marker flowchart-v2\" viewBox=\"0 0 10 10\" refX=\"-1\" refY=\"5\" markerUnits=\"userSpaceOnUse\" markerWidth=\"11\" markerHeight=\"11\" orient=\"auto\"><circle cx=\"5\" cy=\"5\" r=\"5\" class=\"arrowMarkerPath\" style=\"stroke-width: 1; stroke-dasharray: 1, 0;\"><\/circle><\/marker><marker id=\"a3a-diagram-5_flowchart-v2-crossEnd\" class=\"marker cross flowchart-v2\" viewBox=\"0 0 11 11\" refX=\"12\" refY=\"5.2\" markerUnits=\"userSpaceOnUse\" markerWidth=\"11\" markerHeight=\"11\" orient=\"auto\"><path d=\"M 1,1 l 9,9 M 10,1 l -9,9\" class=\"arrowMarkerPath\" style=\"stroke-width: 2; stroke-dasharray: 1, 0;\"><\/path><\/marker><marker id=\"a3a-diagram-5_flowchart-v2-crossStart\" class=\"marker cross flowchart-v2\" viewBox=\"0 0 11 11\" refX=\"-1\" refY=\"5.2\" markerUnits=\"userSpaceOnUse\" markerWidth=\"11\" markerHeight=\"11\" orient=\"auto\"><path d=\"M 1,1 l 9,9 M 10,1 l -9,9\" class=\"arrowMarkerPath\" style=\"stroke-width: 2; stroke-dasharray: 1, 0;\"><\/path><\/marker><g class=\"root\"><g class=\"clusters\"><\/g><g class=\"edgePaths\"><path d=\"M139.156,34.25L143.323,34.25C147.49,34.25,155.823,34.25,163.49,34.25C171.156,34.25,178.156,34.25,181.656,34.25L185.156,34.25\" id=\"L_A_B_0\" class=\"edge-thickness-normal edge-pattern-solid edge-thickness-normal edge-pattern-solid flowchart-link\" style=\";\" data-edge=\"true\" data-et=\"edge\" data-id=\"L_A_B_0\" data-points=\"W3sieCI6MTM5LjE1NjI1LCJ5IjozNC4yNX0seyJ4IjoxNjQuMTU2MjUsInkiOjM0LjI1fSx7IngiOjE4OS4xNTYyNSwieSI6MzQuMjV9XQ==\" marker-end=\"url(#a3a-diagram-5_flowchart-v2-pointEnd)\"><\/path><path d=\"M327.031,34.25L331.198,34.25C335.365,34.25,343.698,34.25,351.365,34.25C359.031,34.25,366.031,34.25,369.531,34.25L373.031,34.25\" id=\"L_B_C_0\" class=\"edge-thickness-normal edge-pattern-solid edge-thickness-normal edge-pattern-solid flowchart-link\" style=\";\" data-edge=\"true\" data-et=\"edge\" data-id=\"L_B_C_0\" data-points=\"W3sieCI6MzI3LjAzMTI1LCJ5IjozNC4yNX0seyJ4IjozNTIuMDMxMjUsInkiOjM0LjI1fSx7IngiOjM3Ny4wMzEyNSwieSI6MzQuMjV9XQ==\" marker-end=\"url(#a3a-diagram-5_flowchart-v2-pointEnd)\"><\/path><path d=\"M514.672,34.25L518.839,34.25C523.005,34.25,531.339,34.25,539.005,34.25C546.672,34.25,553.672,34.25,557.172,34.25L560.672,34.25\" id=\"L_C_D_0\" class=\"edge-thickness-normal edge-pattern-solid edge-thickness-normal edge-pattern-solid flowchart-link\" style=\";\" data-edge=\"true\" data-et=\"edge\" data-id=\"L_C_D_0\" data-points=\"W3sieCI6NTE0LjY3MTg3NSwieSI6MzQuMjV9LHsieCI6NTM5LjY3MTg3NSwieSI6MzQuMjV9LHsieCI6NTY0LjY3MTg3NSwieSI6MzQuMjV9XQ==\" marker-end=\"url(#a3a-diagram-5_flowchart-v2-pointEnd)\"><\/path><path d=\"M649.578,34.25L653.745,34.25C657.911,34.25,666.245,34.25,673.911,34.25C681.578,34.25,688.578,34.25,692.078,34.25L695.578,34.25\" id=\"L_D_E_0\" class=\"edge-thickness-normal edge-pattern-solid edge-thickness-normal edge-pattern-solid flowchart-link\" style=\";\" data-edge=\"true\" data-et=\"edge\" data-id=\"L_D_E_0\" data-points=\"W3sieCI6NjQ5LjU3ODEyNSwieSI6MzQuMjV9LHsieCI6Njc0LjU3ODEyNSwieSI6MzQuMjV9LHsieCI6Njk5LjU3ODEyNSwieSI6MzQuMjV9XQ==\" marker-end=\"url(#a3a-diagram-5_flowchart-v2-pointEnd)\"><\/path><path d=\"M845.391,34.25L849.557,34.25C853.724,34.25,862.057,34.25,869.724,34.25C877.391,34.25,884.391,34.25,887.891,34.25L891.391,34.25\" id=\"L_E_F_0\" class=\"edge-thickness-normal edge-pattern-solid edge-thickness-normal edge-pattern-solid flowchart-link\" style=\";\" data-edge=\"true\" data-et=\"edge\" data-id=\"L_E_F_0\" data-points=\"W3sieCI6ODQ1LjM5MDYyNSwieSI6MzQuMjV9LHsieCI6ODcwLjM5MDYyNSwieSI6MzQuMjV9LHsieCI6ODk1LjM5MDYyNSwieSI6MzQuMjV9XQ==\" marker-end=\"url(#a3a-diagram-5_flowchart-v2-pointEnd)\"><\/path><path d=\"M1129.047,34.25L1133.214,34.25C1137.38,34.25,1145.714,34.25,1153.38,34.25C1161.047,34.25,1168.047,34.25,1171.547,34.25L1175.047,34.25\" id=\"L_F_G_0\" class=\"edge-thickness-normal edge-pattern-solid edge-thickness-normal edge-pattern-solid flowchart-link\" style=\";\" data-edge=\"true\" data-et=\"edge\" data-id=\"L_F_G_0\" data-points=\"W3sieCI6MTEyOS4wNDY4NzUsInkiOjM0LjI1fSx7IngiOjExNTQuMDQ2ODc1LCJ5IjozNC4yNX0seyJ4IjoxMTc5LjA0Njg3NSwieSI6MzQuMjV9XQ==\" marker-end=\"url(#a3a-diagram-5_flowchart-v2-pointEnd)\"><\/path><path d=\"M1429.781,34.25L1433.948,34.25C1438.115,34.25,1446.448,34.25,1454.115,34.25C1461.781,34.25,1468.781,34.25,1472.281,34.25L1475.781,34.25\" id=\"L_G_H_0\" class=\"edge-thickness-normal edge-pattern-solid edge-thickness-normal edge-pattern-solid flowchart-link\" style=\";\" data-edge=\"true\" data-et=\"edge\" data-id=\"L_G_H_0\" data-points=\"W3sieCI6MTQyOS43ODEyNSwieSI6MzQuMjV9LHsieCI6MTQ1NC43ODEyNSwieSI6MzQuMjV9LHsieCI6MTQ3OS43ODEyNSwieSI6MzQuMjV9XQ==\" marker-end=\"url(#a3a-diagram-5_flowchart-v2-pointEnd)\"><\/path><path d=\"M1623.047,34.25L1627.214,34.25C1631.38,34.25,1639.714,34.25,1647.38,34.25C1655.047,34.25,1662.047,34.25,1665.547,34.25L1669.047,34.25\" id=\"L_H_I_0\" class=\"edge-thickness-normal edge-pattern-solid edge-thickness-normal edge-pattern-solid flowchart-link\" style=\";\" data-edge=\"true\" data-et=\"edge\" data-id=\"L_H_I_0\" data-points=\"W3sieCI6MTYyMy4wNDY4NzUsInkiOjM0LjI1fSx7IngiOjE2NDguMDQ2ODc1LCJ5IjozNC4yNX0seyJ4IjoxNjczLjA0Njg3NSwieSI6MzQuMjV9XQ==\" marker-end=\"url(#a3a-diagram-5_flowchart-v2-pointEnd)\"><\/path><\/g><g class=\"edgeLabels\"><g class=\"edgeLabel\"><g class=\"label\" data-id=\"L_A_B_0\" transform=\"translate(0, 0)\"><foreignObject width=\"0\" height=\"0\"><div xmlns=\"http:\/\/www.w3.org\/1999\/xhtml\" class=\"labelBkg\" style=\"display: table-cell; white-space: nowrap; line-height: 1.5; max-width: 200px; text-align: center;\"><span class=\"edgeLabel\"><\/span><\/div><\/foreignObject><\/g><\/g><g class=\"edgeLabel\"><g class=\"label\" data-id=\"L_B_C_0\" transform=\"translate(0, 0)\"><foreignObject width=\"0\" height=\"0\"><div xmlns=\"http:\/\/www.w3.org\/1999\/xhtml\" class=\"labelBkg\" style=\"display: table-cell; white-space: nowrap; line-height: 1.5; max-width: 200px; text-align: center;\"><span class=\"edgeLabel\"><\/span><\/div><\/foreignObject><\/g><\/g><g class=\"edgeLabel\"><g class=\"label\" data-id=\"L_C_D_0\" transform=\"translate(0, 0)\"><foreignObject width=\"0\" height=\"0\"><div xmlns=\"http:\/\/www.w3.org\/1999\/xhtml\" class=\"labelBkg\" style=\"display: table-cell; white-space: nowrap; line-height: 1.5; max-width: 200px; text-align: center;\"><span class=\"edgeLabel\"><\/span><\/div><\/foreignObject><\/g><\/g><g class=\"edgeLabel\"><g class=\"label\" data-id=\"L_D_E_0\" transform=\"translate(0, 0)\"><foreignObject width=\"0\" height=\"0\"><div xmlns=\"http:\/\/www.w3.org\/1999\/xhtml\" class=\"labelBkg\" style=\"display: table-cell; white-space: nowrap; line-height: 1.5; max-width: 200px; text-align: center;\"><span class=\"edgeLabel\"><\/span><\/div><\/foreignObject><\/g><\/g><g class=\"edgeLabel\"><g class=\"label\" data-id=\"L_E_F_0\" transform=\"translate(0, 0)\"><foreignObject width=\"0\" height=\"0\"><div xmlns=\"http:\/\/www.w3.org\/1999\/xhtml\" class=\"labelBkg\" style=\"display: table-cell; white-space: nowrap; line-height: 1.5; max-width: 200px; text-align: center;\"><span class=\"edgeLabel\"><\/span><\/div><\/foreignObject><\/g><\/g><g class=\"edgeLabel\"><g class=\"label\" data-id=\"L_F_G_0\" transform=\"translate(0, 0)\"><foreignObject width=\"0\" height=\"0\"><div xmlns=\"http:\/\/www.w3.org\/1999\/xhtml\" class=\"labelBkg\" style=\"display: table-cell; white-space: nowrap; line-height: 1.5; max-width: 200px; text-align: center;\"><span class=\"edgeLabel\"><\/span><\/div><\/foreignObject><\/g><\/g><g class=\"edgeLabel\"><g class=\"label\" data-id=\"L_G_H_0\" transform=\"translate(0, 0)\"><foreignObject width=\"0\" height=\"0\"><div xmlns=\"http:\/\/www.w3.org\/1999\/xhtml\" class=\"labelBkg\" style=\"display: table-cell; white-space: nowrap; line-height: 1.5; max-width: 200px; text-align: center;\"><span class=\"edgeLabel\"><\/span><\/div><\/foreignObject><\/g><\/g><g class=\"edgeLabel\"><g class=\"label\" data-id=\"L_H_I_0\" transform=\"translate(0, 0)\"><foreignObject width=\"0\" height=\"0\"><div xmlns=\"http:\/\/www.w3.org\/1999\/xhtml\" class=\"labelBkg\" style=\"display: table-cell; white-space: nowrap; line-height: 1.5; max-width: 200px; text-align: center;\"><span class=\"edgeLabel\"><\/span><\/div><\/foreignObject><\/g><\/g><\/g><g class=\"nodes\"><g class=\"node default\" id=\"flowchart-A-0\" transform=\"translate(73.578125, 34.25)\"><rect class=\"basic label-container\" style=\"\" x=\"-65.578125\" y=\"-26.25\" width=\"131.15625\" height=\"52.5\"><\/rect><g class=\"label\" style=\"\" transform=\"translate(-35.578125, -11.25)\"><rect><\/rect><foreignObject width=\"71.15625\" height=\"22.5\"><div xmlns=\"http:\/\/www.w3.org\/1999\/xhtml\" style=\"display: table-cell; white-space: nowrap; line-height: 1.5; max-width: 200px; text-align: center;\"><span class=\"nodeLabel\"><p>Requisitos<\/p><\/span><\/div><\/foreignObject><\/g><\/g><g class=\"node default\" id=\"flowchart-B-1\" transform=\"translate(258.09375, 34.25)\"><rect class=\"basic label-container\" style=\"\" x=\"-68.9375\" y=\"-26.25\" width=\"137.875\" height=\"52.5\"><\/rect><g class=\"label\" style=\"\" transform=\"translate(-38.9375, -11.25)\"><rect><\/rect><foreignObject width=\"77.875\" height=\"22.5\"><div xmlns=\"http:\/\/www.w3.org\/1999\/xhtml\" style=\"display: table-cell; white-space: nowrap; line-height: 1.5; max-width: 200px; text-align: center;\"><span class=\"nodeLabel\"><p>RFP t\u00e9cnica<\/p><\/span><\/div><\/foreignObject><\/g><\/g><g class=\"node default\" id=\"flowchart-C-2\" transform=\"translate(445.8515625, 34.25)\"><rect class=\"basic label-container\" style=\"\" x=\"-68.8203125\" y=\"-26.25\" width=\"137.640625\" height=\"52.5\"><\/rect><g class=\"label\" style=\"\" transform=\"translate(-38.8203125, -11.25)\"><rect><\/rect><foreignObject width=\"77.640625\" height=\"22.5\"><div xmlns=\"http:\/\/www.w3.org\/1999\/xhtml\" style=\"display: table-cell; white-space: nowrap; line-height: 1.5; max-width: 200px; text-align: center;\"><span class=\"nodeLabel\"><p>Calificaci\u00f3n<\/p><\/span><\/div><\/foreignObject><\/g><\/g><g class=\"node default\" id=\"flowchart-D-3\" transform=\"translate(607.125, 34.25)\"><rect class=\"basic label-container\" style=\"\" x=\"-42.453125\" y=\"-26.25\" width=\"84.90625\" height=\"52.5\"><\/rect><g class=\"label\" style=\"\" transform=\"translate(-12.453125, -11.25)\"><rect><\/rect><foreignObject width=\"24.90625\" height=\"22.5\"><div xmlns=\"http:\/\/www.w3.org\/1999\/xhtml\" style=\"display: table-cell; white-space: nowrap; line-height: 1.5; max-width: 200px; text-align: center;\"><span class=\"nodeLabel\"><p>TBE<\/p><\/span><\/div><\/foreignObject><\/g><\/g><g class=\"node default\" id=\"flowchart-E-4\" transform=\"translate(772.484375, 34.25)\"><rect class=\"basic label-container\" style=\"\" x=\"-72.90625\" y=\"-26.25\" width=\"145.8125\" height=\"52.5\"><\/rect><g class=\"label\" style=\"\" transform=\"translate(-42.90625, -11.25)\"><rect><\/rect><foreignObject width=\"85.8125\" height=\"22.5\"><div xmlns=\"http:\/\/www.w3.org\/1999\/xhtml\" style=\"display: table-cell; white-space: nowrap; line-height: 1.5; max-width: 200px; text-align: center;\"><span class=\"nodeLabel\"><p>Aclaraciones<\/p><\/span><\/div><\/foreignObject><\/g><\/g><g class=\"node default\" id=\"flowchart-F-5\" transform=\"translate(1012.21875, 34.25)\"><rect class=\"basic label-container\" style=\"\" x=\"-116.828125\" y=\"-26.25\" width=\"233.65625\" height=\"52.5\"><\/rect><g class=\"label\" style=\"\" transform=\"translate(-86.828125, -11.25)\"><rect><\/rect><foreignObject width=\"173.65625\" height=\"22.5\"><div xmlns=\"http:\/\/www.w3.org\/1999\/xhtml\" style=\"display: table-cell; white-space: nowrap; line-height: 1.5; max-width: 200px; text-align: center;\"><span class=\"nodeLabel\"><p>Homogeneizaci\u00f3n t\u00e9cnica<\/p><\/span><\/div><\/foreignObject><\/g><\/g><g class=\"node default\" id=\"flowchart-G-6\" transform=\"translate(1304.4140625, 34.25)\"><rect class=\"basic label-container\" style=\"\" x=\"-125.3671875\" y=\"-26.25\" width=\"250.734375\" height=\"52.5\"><\/rect><g class=\"label\" style=\"\" transform=\"translate(-95.3671875, -11.25)\"><rect><\/rect><foreignObject width=\"190.734375\" height=\"22.5\"><div xmlns=\"http:\/\/www.w3.org\/1999\/xhtml\" style=\"display: table-cell; white-space: nowrap; line-height: 1.5; max-width: 200px; text-align: center;\"><span class=\"nodeLabel\"><p>Homogeneizaci\u00f3n comercial<\/p><\/span><\/div><\/foreignObject><\/g><\/g><g class=\"node default\" id=\"flowchart-H-7\" transform=\"translate(1551.4140625, 34.25)\"><rect class=\"basic label-container\" style=\"\" x=\"-71.6328125\" y=\"-26.25\" width=\"143.265625\" height=\"52.5\"><\/rect><g class=\"label\" style=\"\" transform=\"translate(-41.6328125, -11.25)\"><rect><\/rect><foreignObject width=\"83.265625\" height=\"22.5\"><div xmlns=\"http:\/\/www.w3.org\/1999\/xhtml\" style=\"display: table-cell; white-space: nowrap; line-height: 1.5; max-width: 200px; text-align: center;\"><span class=\"nodeLabel\"><p>Negociaci\u00f3n<\/p><\/span><\/div><\/foreignObject><\/g><\/g><g class=\"node default\" id=\"flowchart-I-8\" transform=\"translate(1746.9609375, 34.25)\"><rect class=\"basic label-container\" style=\"\" x=\"-73.9140625\" y=\"-26.25\" width=\"147.828125\" height=\"52.5\"><\/rect><g class=\"label\" style=\"\" transform=\"translate(-43.9140625, -11.25)\"><rect><\/rect><foreignObject width=\"87.828125\" height=\"22.5\"><div xmlns=\"http:\/\/www.w3.org\/1999\/xhtml\" style=\"display: table-cell; white-space: nowrap; line-height: 1.5; max-width: 200px; text-align: center;\"><span class=\"nodeLabel\"><p>Adjudicaci\u00f3n<\/p><\/span><\/div><\/foreignObject><\/g><\/g><\/g><\/g><\/g><\/svg><figcaption>Embudo recomendado para seleccionar una empresa de automatizaci\u00f3n industrial<\/figcaption><\/figure>\n\n\n\n<h3 class=\"wp-block-heading\">Conformidad, desviaci\u00f3n y alternativa<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Cada requisito relevante debe recibir una clasificaci\u00f3n clara. Un elemento puede estar conforme, parcialmente conforme, no conforme o ser objeto de una alternativa t\u00e9cnica. Las alternativas pueden ser valiosas, pero no deben mezclarse silenciosamente con la propuesta base.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Es recomendable pedir que el proponente declare expl\u00edcitamente todas las desviaciones. La ausencia de esta disciplina puede hacer que las limitaciones aparezcan solamente despu\u00e9s del contrato.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Criterios eliminatorios y criterios puntuables<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">No todo debe convertirse en puntuaci\u00f3n. Los requisitos m\u00ednimos de seguridad, compatibilidad, capacidad, documentaci\u00f3n o cualificaci\u00f3n pueden ser eliminatorios. Otros aspectos, como facilidad de expansi\u00f3n, recursos de diagn\u00f3stico o metodolog\u00eda de implantaci\u00f3n, pueden recibir puntuaci\u00f3n.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Separar estos dos grupos evita que una ventaja secundaria compense una no conformidad cr\u00edtica.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">La igualaci\u00f3n comercial solo tiene sentido despu\u00e9s de la igualaci\u00f3n t\u00e9cnica<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">El menor precio nominal no representa necesariamente el menor costo. Las propuestas pueden diferir en licencias, horas de ingenier\u00eda, n\u00famero de pantallas, tags, servidores, redundancia, FAT, viajes, pruebas, capacitaci\u00f3n, documentaci\u00f3n y soporte.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">La igualaci\u00f3n debe identificar elementos incluidos, opcionales, excluidos y condicionados. Solo entonces es posible comparar CAPEX y, cuando sea pertinente, costo del ciclo de vida.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Licenciamiento<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Es fundamental comprender la m\u00e9trica de licenciamiento. Algunas plataformas licencian por tag, conexi\u00f3n, driver, servidor, cliente, redundancia, hist\u00f3rico, usuario o m\u00f3dulo funcional.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">El propietario debe conocer tanto la configuraci\u00f3n inicial como el costo de expansi\u00f3n previsible. Una soluci\u00f3n barata en adquisici\u00f3n puede volverse costosa cuando cada ampliaci\u00f3n exige un nuevo paquete de licencias.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Horas y premisas de ingenier\u00eda<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Las propuestas con pocas horas pueden ocultar un alcance simplificado. Es importante comprender qu\u00e9 documentos se producir\u00e1n, cu\u00e1ntas revisiones se consideran, c\u00f3mo se conducir\u00e1n workshops, pruebas y reuniones y cu\u00e1l es la premisa para integraci\u00f3n de terceros.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">La ciberseguridad debe formar parte de la cualificaci\u00f3n del integrador<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">La seguridad de la soluci\u00f3n depende tanto de la arquitectura como de los procesos del proveedor. El integrador tendr\u00e1 acceso privilegiado a controladores, servidores, estaciones de ingenier\u00eda, redes y backups. Por lo tanto, su madurez de seguridad forma parte de la cualificaci\u00f3n t\u00e9cnica.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">La IEC 62443-2-4:2023 trata espec\u00edficamente requisitos de programas de seguridad para proveedores de servicios de IACS durante actividades de integraci\u00f3n y mantenimiento. Esto es directamente aplicable a la evaluaci\u00f3n de integradores y prestadores que trabajan sobre sistemas de automatizaci\u00f3n.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Qu\u00e9 evaluar<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Dependiendo del riesgo del proyecto, la diligencia puede incluir:<\/p>\n\n\n\n<ul class=\"wp-block-list\"><li>control de credenciales y cuentas privilegiadas;<\/li><li>proceso para acceso remoto;<\/li><li>gesti\u00f3n de notebooks y estaciones de ingenier\u00eda;<\/li><li>tratamiento de vulnerabilidades;<\/li><li>backup y protecci\u00f3n de configuraciones;<\/li><li>control de medios removibles;<\/li><li>gesti\u00f3n de cambios;<\/li><li>registro de actividades;<\/li><li>proceso de respuesta a incidentes;<\/li><li>separaci\u00f3n entre ambientes de desarrollo y producci\u00f3n.<\/li><\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">No es necesario transformar toda contrataci\u00f3n en una auditor\u00eda extensa de ciberseguridad. La profundidad debe ser proporcional a la criticidad y exposici\u00f3n del sistema.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">FAT: la primera evidencia de que la soluci\u00f3n cumple el contrato<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">El FAT debe preverse todav\u00eda durante la contrataci\u00f3n. Dejar la definici\u00f3n de la prueba para despu\u00e9s del desarrollo crea un conflicto de inter\u00e9s: el mismo proveedor que implement\u00f3 pasa a decidir qu\u00e9 se considerar\u00e1 suficiente para la aprobaci\u00f3n.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">El procedimiento debe derivar de los requisitos y describir precondiciones, pasos, resultados esperados, evidencias, responsables y tratamiento de no conformidades.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Qu\u00e9 puede probarse en f\u00e1brica<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Seg\u00fan el proyecto, FAT puede verificar:<\/p>\n\n\n\n<ul class=\"wp-block-list\"><li>arquitectura l\u00f3gica y versiones;<\/li><li>inicializaci\u00f3n y recuperaci\u00f3n;<\/li><li>pantallas y navegaci\u00f3n;<\/li><li>alarmas y eventos;<\/li><li>secuencias e interlocks;<\/li><li>comunicaci\u00f3n entre controladores;<\/li><li>redundancia;<\/li><li>hist\u00f3ricos;<\/li><li>usuarios y permisos;<\/li><li>integraci\u00f3n simulada;<\/li><li>backups;<\/li><li>documentaci\u00f3n y listas de pendientes.<\/li><\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">No todo puede reproducirse fuera de la planta. El procedimiento debe identificar claramente qu\u00e9 permanece para SAT y comisionamiento.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">SAT, comisionamiento y aceptaci\u00f3n<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Despu\u00e9s de la implantaci\u00f3n, el SAT verifica la soluci\u00f3n en el ambiente real. El comisionamiento ampl\u00eda el an\u00e1lisis hacia interfaces y comportamiento integrado del sistema en condiciones operativas y de fallo.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">El contenido sobre <a href=\"https:\/\/a3aengenharia.com.br\/conteudo\/artigos-tecnicos\/comissionamento-sistemas-criticos-prontos-para-operar\/\">Comisionamiento Industrial<\/a> detalla precomisionamiento, pruebas en fr\u00edo, pruebas en caliente, start-up y readiness. En la contrataci\u00f3n de la integradora, estos hitos necesitan estar conectados con responsabilidades y criterios de aceptaci\u00f3n.<\/p>\n\n\n\n<figure class=\"a3a-mermaid\"><svg id=\"a3a-diagram-6\" width=\"100%\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" class=\"flowchart\" style=\"max-width:min(1792.75px, 100%);height:auto;display:block;margin:0 auto\" viewBox=\"0 0 1792.75 68.5\" role=\"graphics-document document\" aria-roledescription=\"flowchart-v2\" aria-labelledby=\"chart-title-a3a-diagram-6\"><title id=\"chart-title-a3a-diagram-6\">Gobernanza de la entrega de automatizaci\u00f3n hasta la aceptaci\u00f3n t\u00e9cnica<\/title><style>#a3a-diagram-6{font-family:Roboto,sans-serif;font-size:15px;fill:var(--a3a-diag-text, #0a0a0a);}@keyframes edge-animation-frame{from{stroke-dashoffset:0;}}@keyframes dash{to{stroke-dashoffset:0;}}#a3a-diagram-6 .edge-animation-slow{stroke-dasharray:9,5!important;stroke-dashoffset:900;animation:dash 50s linear infinite;stroke-linecap:round;}#a3a-diagram-6 .edge-animation-fast{stroke-dasharray:9,5!important;stroke-dashoffset:900;animation:dash 20s linear infinite;stroke-linecap:round;}#a3a-diagram-6 .error-icon{fill:var(--a3a-diag-canvas, #ffffff);}#a3a-diagram-6 .error-text{fill:#000000;stroke:#000000;}#a3a-diagram-6 .edge-thickness-normal{stroke-width:1px;}#a3a-diagram-6 .edge-thickness-thick{stroke-width:3.5px;}#a3a-diagram-6 .edge-pattern-solid{stroke-dasharray:0;}#a3a-diagram-6 .edge-thickness-invisible{stroke-width:0;fill:none;}#a3a-diagram-6 .edge-pattern-dashed{stroke-dasharray:3;}#a3a-diagram-6 .edge-pattern-dotted{stroke-dasharray:2;}#a3a-diagram-6 .marker{fill:var(--a3a-diag-stroke, #2e42a2);stroke:var(--a3a-diag-stroke, #2e42a2);}#a3a-diagram-6 .marker.cross{stroke:var(--a3a-diag-stroke, #2e42a2);}#a3a-diagram-6 svg{font-family:Roboto,sans-serif;font-size:15px;}#a3a-diagram-6 p{margin:0;}#a3a-diagram-6 .label{font-family:Roboto,sans-serif;color:var(--a3a-diag-text, #0a0a0a);}#a3a-diagram-6 .cluster-label text{fill:var(--a3a-diag-title, #0124af);}#a3a-diagram-6 .cluster-label span{color:var(--a3a-diag-title, #0124af);}#a3a-diagram-6 .cluster-label span p{background-color:transparent;}#a3a-diagram-6 .label text,#a3a-diagram-6 span{fill:var(--a3a-diag-text, #0a0a0a);color:var(--a3a-diag-text, #0a0a0a);}#a3a-diagram-6 .node rect,#a3a-diagram-6 .node circle,#a3a-diagram-6 .node ellipse,#a3a-diagram-6 .node polygon,#a3a-diagram-6 .node path{fill:var(--a3a-diag-fill, #eef2fd);stroke:var(--a3a-diag-stroke, #2e42a2);stroke-width:1px;}#a3a-diagram-6 .rough-node .label text,#a3a-diagram-6 .node .label text,#a3a-diagram-6 .image-shape .label,#a3a-diagram-6 .icon-shape .label{text-anchor:middle;}#a3a-diagram-6 .node .katex path{fill:#000;stroke:#000;stroke-width:1px;}#a3a-diagram-6 .rough-node .label,#a3a-diagram-6 .node .label,#a3a-diagram-6 .image-shape .label,#a3a-diagram-6 .icon-shape .label{text-align:center;}#a3a-diagram-6 .node.clickable{cursor:pointer;}#a3a-diagram-6 .root .anchor path{fill:var(--a3a-diag-stroke, #2e42a2)!important;stroke-width:0;stroke:var(--a3a-diag-stroke, #2e42a2);}#a3a-diagram-6 .arrowheadPath{fill:var(--a3a-diag-stroke, #0b0b0b);}#a3a-diagram-6 .edgePath .path{stroke:var(--a3a-diag-stroke, #2e42a2);stroke-width:2.0px;}#a3a-diagram-6 .flowchart-link{stroke:var(--a3a-diag-stroke, #2e42a2);fill:none;}#a3a-diagram-6 .edgeLabel{background-color:var(--a3a-diag-canvas, #ffffff);text-align:center;}#a3a-diagram-6 .edgeLabel p{background-color:var(--a3a-diag-canvas, #ffffff);}#a3a-diagram-6 .edgeLabel rect{opacity:0.5;background-color:var(--a3a-diag-canvas, #ffffff);fill:var(--a3a-diag-canvas, #ffffff);}#a3a-diagram-6 .labelBkg{background-color:rgba(255, 255, 255, 0.5);}#a3a-diagram-6 .cluster rect{fill:var(--a3a-diag-surface, #f8f8f8);stroke:var(--a3a-diag-border, #e2e8f0);stroke-width:1px;}#a3a-diagram-6 .cluster text{fill:var(--a3a-diag-title, #0124af);}#a3a-diagram-6 .cluster span{color:var(--a3a-diag-title, #0124af);}#a3a-diagram-6 div.mermaidTooltip{position:absolute;text-align:center;max-width:200px;padding:2px;font-family:Roboto,sans-serif;font-size:12px;background:var(--a3a-diag-canvas, #ffffff);border:1px solid hsl(0, 0%, 90%);border-radius:2px;pointer-events:none;z-index:100;}#a3a-diagram-6 .flowchartTitleText{text-anchor:middle;font-size:18px;fill:var(--a3a-diag-text, #0a0a0a);}#a3a-diagram-6 rect.text{fill:none;stroke-width:0;}#a3a-diagram-6 .icon-shape,#a3a-diagram-6 .image-shape{background-color:var(--a3a-diag-canvas, #ffffff);text-align:center;}#a3a-diagram-6 .icon-shape p,#a3a-diagram-6 .image-shape p{background-color:var(--a3a-diag-canvas, #ffffff);padding:2px;}#a3a-diagram-6 .icon-shape rect,#a3a-diagram-6 .image-shape rect{opacity:0.5;background-color:var(--a3a-diag-canvas, #ffffff);fill:var(--a3a-diag-canvas, #ffffff);}#a3a-diagram-6 .label-icon{display:inline-block;height:1em;overflow:visible;vertical-align:-0.125em;}#a3a-diagram-6 .node .label-icon path{fill:currentColor;stroke:revert;stroke-width:revert;}#a3a-diagram-6 :root{--mermaid-font-family:Roboto,sans-serif;}<\/style><g><marker id=\"a3a-diagram-6_flowchart-v2-pointEnd\" class=\"marker flowchart-v2\" viewBox=\"0 0 10 10\" refX=\"5\" refY=\"5\" markerUnits=\"userSpaceOnUse\" markerWidth=\"8\" markerHeight=\"8\" orient=\"auto\"><path d=\"M 0 0 L 10 5 L 0 10 z\" class=\"arrowMarkerPath\" style=\"stroke-width: 1; stroke-dasharray: 1, 0;\"><\/path><\/marker><marker id=\"a3a-diagram-6_flowchart-v2-pointStart\" class=\"marker flowchart-v2\" viewBox=\"0 0 10 10\" refX=\"4.5\" refY=\"5\" markerUnits=\"userSpaceOnUse\" markerWidth=\"8\" markerHeight=\"8\" orient=\"auto\"><path d=\"M 0 5 L 10 10 L 10 0 z\" class=\"arrowMarkerPath\" style=\"stroke-width: 1; stroke-dasharray: 1, 0;\"><\/path><\/marker><marker id=\"a3a-diagram-6_flowchart-v2-circleEnd\" class=\"marker flowchart-v2\" viewBox=\"0 0 10 10\" refX=\"11\" refY=\"5\" markerUnits=\"userSpaceOnUse\" markerWidth=\"11\" markerHeight=\"11\" orient=\"auto\"><circle cx=\"5\" cy=\"5\" r=\"5\" class=\"arrowMarkerPath\" style=\"stroke-width: 1; stroke-dasharray: 1, 0;\"><\/circle><\/marker><marker id=\"a3a-diagram-6_flowchart-v2-circleStart\" class=\"marker flowchart-v2\" viewBox=\"0 0 10 10\" refX=\"-1\" refY=\"5\" markerUnits=\"userSpaceOnUse\" markerWidth=\"11\" markerHeight=\"11\" orient=\"auto\"><circle cx=\"5\" cy=\"5\" r=\"5\" class=\"arrowMarkerPath\" style=\"stroke-width: 1; stroke-dasharray: 1, 0;\"><\/circle><\/marker><marker id=\"a3a-diagram-6_flowchart-v2-crossEnd\" class=\"marker cross flowchart-v2\" viewBox=\"0 0 11 11\" refX=\"12\" refY=\"5.2\" markerUnits=\"userSpaceOnUse\" markerWidth=\"11\" markerHeight=\"11\" orient=\"auto\"><path d=\"M 1,1 l 9,9 M 10,1 l -9,9\" class=\"arrowMarkerPath\" style=\"stroke-width: 2; stroke-dasharray: 1, 0;\"><\/path><\/marker><marker id=\"a3a-diagram-6_flowchart-v2-crossStart\" class=\"marker cross flowchart-v2\" viewBox=\"0 0 11 11\" refX=\"-1\" refY=\"5.2\" markerUnits=\"userSpaceOnUse\" markerWidth=\"11\" markerHeight=\"11\" orient=\"auto\"><path d=\"M 1,1 l 9,9 M 10,1 l -9,9\" class=\"arrowMarkerPath\" style=\"stroke-width: 2; stroke-dasharray: 1, 0;\"><\/path><\/marker><g class=\"root\"><g class=\"clusters\"><\/g><g class=\"edgePaths\"><path d=\"M136.328,34.25L140.495,34.25C144.661,34.25,152.995,34.25,160.661,34.25C168.328,34.25,175.328,34.25,178.828,34.25L182.328,34.25\" id=\"L_A_B_0\" class=\"edge-thickness-normal edge-pattern-solid edge-thickness-normal edge-pattern-solid flowchart-link\" style=\";\" data-edge=\"true\" data-et=\"edge\" data-id=\"L_A_B_0\" data-points=\"W3sieCI6MTM2LjMyODEyNSwieSI6MzQuMjV9LHsieCI6MTYxLjMyODEyNSwieSI6MzQuMjV9LHsieCI6MTg2LjMyODEyNSwieSI6MzQuMjV9XQ==\" marker-end=\"url(#a3a-diagram-6_flowchart-v2-pointEnd)\"><\/path><path d=\"M316.547,34.25L320.714,34.25C324.88,34.25,333.214,34.25,340.88,34.25C348.547,34.25,355.547,34.25,359.047,34.25L362.547,34.25\" id=\"L_B_C_0\" class=\"edge-thickness-normal edge-pattern-solid edge-thickness-normal edge-pattern-solid flowchart-link\" style=\";\" data-edge=\"true\" data-et=\"edge\" data-id=\"L_B_C_0\" data-points=\"W3sieCI6MzE2LjU0Njg3NSwieSI6MzQuMjV9LHsieCI6MzQxLjU0Njg3NSwieSI6MzQuMjV9LHsieCI6MzY2LjU0Njg3NSwieSI6MzQuMjV9XQ==\" marker-end=\"url(#a3a-diagram-6_flowchart-v2-pointEnd)\"><\/path><path d=\"M448.766,34.25L452.932,34.25C457.099,34.25,465.432,34.25,473.099,34.25C480.766,34.25,487.766,34.25,491.266,34.25L494.766,34.25\" id=\"L_C_D_0\" class=\"edge-thickness-normal edge-pattern-solid edge-thickness-normal edge-pattern-solid flowchart-link\" style=\";\" data-edge=\"true\" data-et=\"edge\" data-id=\"L_C_D_0\" data-points=\"W3sieCI6NDQ4Ljc2NTYyNSwieSI6MzQuMjV9LHsieCI6NDczLjc2NTYyNSwieSI6MzQuMjV9LHsieCI6NDk4Ljc2NTYyNSwieSI6MzQuMjV9XQ==\" marker-end=\"url(#a3a-diagram-6_flowchart-v2-pointEnd)\"><\/path><path d=\"M648.656,34.25L652.823,34.25C656.99,34.25,665.323,34.25,672.99,34.25C680.656,34.25,687.656,34.25,691.156,34.25L694.656,34.25\" id=\"L_D_E_0\" class=\"edge-thickness-normal edge-pattern-solid edge-thickness-normal edge-pattern-solid flowchart-link\" style=\";\" data-edge=\"true\" data-et=\"edge\" data-id=\"L_D_E_0\" data-points=\"W3sieCI6NjQ4LjY1NjI1LCJ5IjozNC4yNX0seyJ4Ijo2NzMuNjU2MjUsInkiOjM0LjI1fSx7IngiOjY5OC42NTYyNSwieSI6MzQuMjV9XQ==\" marker-end=\"url(#a3a-diagram-6_flowchart-v2-pointEnd)\"><\/path><path d=\"M782.359,34.25L786.526,34.25C790.693,34.25,799.026,34.25,806.693,34.25C814.359,34.25,821.359,34.25,824.859,34.25L828.359,34.25\" id=\"L_E_F_0\" class=\"edge-thickness-normal edge-pattern-solid edge-thickness-normal edge-pattern-solid flowchart-link\" style=\";\" data-edge=\"true\" data-et=\"edge\" data-id=\"L_E_F_0\" data-points=\"W3sieCI6NzgyLjM1OTM3NSwieSI6MzQuMjV9LHsieCI6ODA3LjM1OTM3NSwieSI6MzQuMjV9LHsieCI6ODMyLjM1OTM3NSwieSI6MzQuMjV9XQ==\" marker-end=\"url(#a3a-diagram-6_flowchart-v2-pointEnd)\"><\/path><path d=\"M1011.266,34.25L1015.432,34.25C1019.599,34.25,1027.932,34.25,1035.599,34.25C1043.266,34.25,1050.266,34.25,1053.766,34.25L1057.266,34.25\" id=\"L_F_G_0\" class=\"edge-thickness-normal edge-pattern-solid edge-thickness-normal edge-pattern-solid flowchart-link\" style=\";\" data-edge=\"true\" data-et=\"edge\" data-id=\"L_F_G_0\" data-points=\"W3sieCI6MTAxMS4yNjU2MjUsInkiOjM0LjI1fSx7IngiOjEwMzYuMjY1NjI1LCJ5IjozNC4yNX0seyJ4IjoxMDYxLjI2NTYyNSwieSI6MzQuMjV9XQ==\" marker-end=\"url(#a3a-diagram-6_flowchart-v2-pointEnd)\"><\/path><path d=\"M1188.078,34.25L1192.245,34.25C1196.411,34.25,1204.745,34.25,1212.411,34.25C1220.078,34.25,1227.078,34.25,1230.578,34.25L1234.078,34.25\" id=\"L_G_H_0\" class=\"edge-thickness-normal edge-pattern-solid edge-thickness-normal edge-pattern-solid flowchart-link\" style=\";\" data-edge=\"true\" data-et=\"edge\" data-id=\"L_G_H_0\" data-points=\"W3sieCI6MTE4OC4wNzgxMjUsInkiOjM0LjI1fSx7IngiOjEyMTMuMDc4MTI1LCJ5IjozNC4yNX0seyJ4IjoxMjM4LjA3ODEyNSwieSI6MzQuMjV9XQ==\" marker-end=\"url(#a3a-diagram-6_flowchart-v2-pointEnd)\"><\/path><path d=\"M1364.188,34.25L1368.354,34.25C1372.521,34.25,1380.854,34.25,1388.521,34.25C1396.188,34.25,1403.188,34.25,1406.688,34.25L1410.188,34.25\" id=\"L_H_I_0\" class=\"edge-thickness-normal edge-pattern-solid edge-thickness-normal edge-pattern-solid flowchart-link\" style=\";\" data-edge=\"true\" data-et=\"edge\" data-id=\"L_H_I_0\" data-points=\"W3sieCI6MTM2NC4xODc1LCJ5IjozNC4yNX0seyJ4IjoxMzg5LjE4NzUsInkiOjM0LjI1fSx7IngiOjE0MTQuMTg3NSwieSI6MzQuMjV9XQ==\" marker-end=\"url(#a3a-diagram-6_flowchart-v2-pointEnd)\"><\/path><path d=\"M1549.172,34.25L1553.339,34.25C1557.505,34.25,1565.839,34.25,1573.505,34.25C1581.172,34.25,1588.172,34.25,1591.672,34.25L1595.172,34.25\" id=\"L_I_J_0\" class=\"edge-thickness-normal edge-pattern-solid edge-thickness-normal edge-pattern-solid flowchart-link\" style=\";\" data-edge=\"true\" data-et=\"edge\" data-id=\"L_I_J_0\" data-points=\"W3sieCI6MTU0OS4xNzE4NzUsInkiOjM0LjI1fSx7IngiOjE1NzQuMTcxODc1LCJ5IjozNC4yNX0seyJ4IjoxNTk5LjE3MTg3NSwieSI6MzQuMjV9XQ==\" marker-end=\"url(#a3a-diagram-6_flowchart-v2-pointEnd)\"><\/path><\/g><g class=\"edgeLabels\"><g class=\"edgeLabel\"><g class=\"label\" data-id=\"L_A_B_0\" transform=\"translate(0, 0)\"><foreignObject width=\"0\" height=\"0\"><div xmlns=\"http:\/\/www.w3.org\/1999\/xhtml\" class=\"labelBkg\" style=\"display: table-cell; white-space: nowrap; line-height: 1.5; max-width: 200px; text-align: center;\"><span class=\"edgeLabel\"><\/span><\/div><\/foreignObject><\/g><\/g><g class=\"edgeLabel\"><g class=\"label\" data-id=\"L_B_C_0\" transform=\"translate(0, 0)\"><foreignObject width=\"0\" height=\"0\"><div xmlns=\"http:\/\/www.w3.org\/1999\/xhtml\" class=\"labelBkg\" style=\"display: table-cell; white-space: nowrap; line-height: 1.5; max-width: 200px; text-align: center;\"><span class=\"edgeLabel\"><\/span><\/div><\/foreignObject><\/g><\/g><g class=\"edgeLabel\"><g class=\"label\" data-id=\"L_C_D_0\" transform=\"translate(0, 0)\"><foreignObject width=\"0\" height=\"0\"><div xmlns=\"http:\/\/www.w3.org\/1999\/xhtml\" class=\"labelBkg\" style=\"display: table-cell; white-space: nowrap; line-height: 1.5; max-width: 200px; text-align: center;\"><span class=\"edgeLabel\"><\/span><\/div><\/foreignObject><\/g><\/g><g class=\"edgeLabel\"><g class=\"label\" data-id=\"L_D_E_0\" transform=\"translate(0, 0)\"><foreignObject width=\"0\" height=\"0\"><div xmlns=\"http:\/\/www.w3.org\/1999\/xhtml\" class=\"labelBkg\" style=\"display: table-cell; white-space: nowrap; line-height: 1.5; max-width: 200px; text-align: center;\"><span class=\"edgeLabel\"><\/span><\/div><\/foreignObject><\/g><\/g><g class=\"edgeLabel\"><g class=\"label\" data-id=\"L_E_F_0\" transform=\"translate(0, 0)\"><foreignObject width=\"0\" height=\"0\"><div xmlns=\"http:\/\/www.w3.org\/1999\/xhtml\" class=\"labelBkg\" style=\"display: table-cell; white-space: nowrap; line-height: 1.5; max-width: 200px; text-align: center;\"><span class=\"edgeLabel\"><\/span><\/div><\/foreignObject><\/g><\/g><g class=\"edgeLabel\"><g class=\"label\" data-id=\"L_F_G_0\" transform=\"translate(0, 0)\"><foreignObject width=\"0\" height=\"0\"><div xmlns=\"http:\/\/www.w3.org\/1999\/xhtml\" class=\"labelBkg\" style=\"display: table-cell; white-space: nowrap; line-height: 1.5; max-width: 200px; text-align: center;\"><span class=\"edgeLabel\"><\/span><\/div><\/foreignObject><\/g><\/g><g class=\"edgeLabel\"><g class=\"label\" data-id=\"L_G_H_0\" transform=\"translate(0, 0)\"><foreignObject width=\"0\" height=\"0\"><div xmlns=\"http:\/\/www.w3.org\/1999\/xhtml\" class=\"labelBkg\" style=\"display: table-cell; white-space: nowrap; line-height: 1.5; max-width: 200px; text-align: center;\"><span class=\"edgeLabel\"><\/span><\/div><\/foreignObject><\/g><\/g><g class=\"edgeLabel\"><g class=\"label\" data-id=\"L_H_I_0\" transform=\"translate(0, 0)\"><foreignObject width=\"0\" height=\"0\"><div xmlns=\"http:\/\/www.w3.org\/1999\/xhtml\" class=\"labelBkg\" style=\"display: table-cell; white-space: nowrap; line-height: 1.5; max-width: 200px; text-align: center;\"><span class=\"edgeLabel\"><\/span><\/div><\/foreignObject><\/g><\/g><g class=\"edgeLabel\"><g class=\"label\" data-id=\"L_I_J_0\" transform=\"translate(0, 0)\"><foreignObject width=\"0\" height=\"0\"><div xmlns=\"http:\/\/www.w3.org\/1999\/xhtml\" class=\"labelBkg\" style=\"display: table-cell; white-space: nowrap; line-height: 1.5; max-width: 200px; text-align: center;\"><span class=\"edgeLabel\"><\/span><\/div><\/foreignObject><\/g><\/g><\/g><g class=\"nodes\"><g class=\"node default\" id=\"flowchart-A-0\" transform=\"translate(72.1640625, 34.25)\"><rect class=\"basic label-container\" style=\"\" x=\"-64.1640625\" y=\"-26.25\" width=\"128.328125\" height=\"52.5\"><\/rect><g class=\"label\" style=\"\" transform=\"translate(-34.1640625, -11.25)\"><rect><\/rect><foreignObject width=\"68.328125\" height=\"22.5\"><div xmlns=\"http:\/\/www.w3.org\/1999\/xhtml\" style=\"display: table-cell; white-space: nowrap; line-height: 1.5; max-width: 200px; text-align: center;\"><span class=\"nodeLabel\"><p>Ingenier\u00eda<\/p><\/span><\/div><\/foreignObject><\/g><\/g><g class=\"node default\" id=\"flowchart-B-1\" transform=\"translate(251.4375, 34.25)\"><rect class=\"basic label-container\" style=\"\" x=\"-65.109375\" y=\"-26.25\" width=\"130.21875\" height=\"52.5\"><\/rect><g class=\"label\" style=\"\" transform=\"translate(-35.109375, -11.25)\"><rect><\/rect><foreignObject width=\"70.21875\" height=\"22.5\"><div xmlns=\"http:\/\/www.w3.org\/1999\/xhtml\" style=\"display: table-cell; white-space: nowrap; line-height: 1.5; max-width: 200px; text-align: center;\"><span class=\"nodeLabel\"><p>Desarrollo<\/p><\/span><\/div><\/foreignObject><\/g><\/g><g class=\"node default\" id=\"flowchart-C-2\" transform=\"translate(407.65625, 34.25)\"><rect class=\"basic label-container\" style=\"\" x=\"-41.109375\" y=\"-26.25\" width=\"82.21875\" height=\"52.5\"><\/rect><g class=\"label\" style=\"\" transform=\"translate(-11.109375, -11.25)\"><rect><\/rect><foreignObject width=\"22.21875\" height=\"22.5\"><div xmlns=\"http:\/\/www.w3.org\/1999\/xhtml\" style=\"display: table-cell; white-space: nowrap; line-height: 1.5; max-width: 200px; text-align: center;\"><span class=\"nodeLabel\"><p>FAT<\/p><\/span><\/div><\/foreignObject><\/g><\/g><g class=\"node default\" id=\"flowchart-D-3\" transform=\"translate(573.7109375, 34.25)\"><rect class=\"basic label-container\" style=\"\" x=\"-74.9453125\" y=\"-26.25\" width=\"149.890625\" height=\"52.5\"><\/rect><g class=\"label\" style=\"\" transform=\"translate(-44.9453125, -11.25)\"><rect><\/rect><foreignObject width=\"89.890625\" height=\"22.5\"><div xmlns=\"http:\/\/www.w3.org\/1999\/xhtml\" style=\"display: table-cell; white-space: nowrap; line-height: 1.5; max-width: 200px; text-align: center;\"><span class=\"nodeLabel\"><p>Implantaci\u00f3n<\/p><\/span><\/div><\/foreignObject><\/g><\/g><g class=\"node default\" id=\"flowchart-E-4\" transform=\"translate(740.5078125, 34.25)\"><rect class=\"basic label-container\" style=\"\" x=\"-41.8515625\" y=\"-26.25\" width=\"83.703125\" height=\"52.5\"><\/rect><g class=\"label\" style=\"\" transform=\"translate(-11.8515625, -11.25)\"><rect><\/rect><foreignObject width=\"23.703125\" height=\"22.5\"><div xmlns=\"http:\/\/www.w3.org\/1999\/xhtml\" style=\"display: table-cell; white-space: nowrap; line-height: 1.5; max-width: 200px; text-align: center;\"><span class=\"nodeLabel\"><p>SAT<\/p><\/span><\/div><\/foreignObject><\/g><\/g><g class=\"node default\" id=\"flowchart-F-5\" transform=\"translate(921.8125, 34.25)\"><rect class=\"basic label-container\" style=\"\" x=\"-89.453125\" y=\"-26.25\" width=\"178.90625\" height=\"52.5\"><\/rect><g class=\"label\" style=\"\" transform=\"translate(-59.453125, -11.25)\"><rect><\/rect><foreignObject width=\"118.90625\" height=\"22.5\"><div xmlns=\"http:\/\/www.w3.org\/1999\/xhtml\" style=\"display: table-cell; white-space: nowrap; line-height: 1.5; max-width: 200px; text-align: center;\"><span class=\"nodeLabel\"><p>Comisionamiento<\/p><\/span><\/div><\/foreignObject><\/g><\/g><g class=\"node default\" id=\"flowchart-G-6\" transform=\"translate(1124.671875, 34.25)\"><rect class=\"basic label-container\" style=\"\" x=\"-63.40625\" y=\"-26.25\" width=\"126.8125\" height=\"52.5\"><\/rect><g class=\"label\" style=\"\" transform=\"translate(-33.40625, -11.25)\"><rect><\/rect><foreignObject width=\"66.8125\" height=\"22.5\"><div xmlns=\"http:\/\/www.w3.org\/1999\/xhtml\" style=\"display: table-cell; white-space: nowrap; line-height: 1.5; max-width: 200px; text-align: center;\"><span class=\"nodeLabel\"><p>Punch list<\/p><\/span><\/div><\/foreignObject><\/g><\/g><g class=\"node default\" id=\"flowchart-H-7\" transform=\"translate(1301.1328125, 34.25)\"><rect class=\"basic label-container\" style=\"\" x=\"-63.0546875\" y=\"-26.25\" width=\"126.109375\" height=\"52.5\"><\/rect><g class=\"label\" style=\"\" transform=\"translate(-33.0546875, -11.25)\"><rect><\/rect><foreignObject width=\"66.109375\" height=\"22.5\"><div xmlns=\"http:\/\/www.w3.org\/1999\/xhtml\" style=\"display: table-cell; white-space: nowrap; line-height: 1.5; max-width: 200px; text-align: center;\"><span class=\"nodeLabel\"><p>Handover<\/p><\/span><\/div><\/foreignObject><\/g><\/g><g class=\"node default\" id=\"flowchart-I-8\" transform=\"translate(1481.6796875, 34.25)\"><rect class=\"basic label-container\" style=\"\" x=\"-67.4921875\" y=\"-26.25\" width=\"134.984375\" height=\"52.5\"><\/rect><g class=\"label\" style=\"\" transform=\"translate(-37.4921875, -11.25)\"><rect><\/rect><foreignObject width=\"74.984375\" height=\"22.5\"><div xmlns=\"http:\/\/www.w3.org\/1999\/xhtml\" style=\"display: table-cell; white-space: nowrap; line-height: 1.5; max-width: 200px; text-align: center;\"><span class=\"nodeLabel\"><p>Aceptaci\u00f3n<\/p><\/span><\/div><\/foreignObject><\/g><\/g><g class=\"node default\" id=\"flowchart-J-9\" transform=\"translate(1691.9609375, 34.25)\"><rect class=\"basic label-container\" style=\"\" x=\"-92.7890625\" y=\"-26.25\" width=\"185.578125\" height=\"52.5\"><\/rect><g class=\"label\" style=\"\" transform=\"translate(-62.7890625, -11.25)\"><rect><\/rect><foreignObject width=\"125.578125\" height=\"22.5\"><div xmlns=\"http:\/\/www.w3.org\/1999\/xhtml\" style=\"display: table-cell; white-space: nowrap; line-height: 1.5; max-width: 200px; text-align: center;\"><span class=\"nodeLabel\"><p>Garant\u00eda y soporte<\/p><\/span><\/div><\/foreignObject><\/g><\/g><\/g><\/g><\/g><\/svg><figcaption>Gobernanza de la entrega de automatizaci\u00f3n hasta la aceptaci\u00f3n t\u00e9cnica<\/figcaption><\/figure>\n\n\n\n<h3 class=\"wp-block-heading\">Probar fallos y no solamente la condici\u00f3n normal<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">La redundancia solo queda demostrada cuando ocurre un fallo controlado del componente primario. El backup solo queda demostrado cuando se prueba la restauraci\u00f3n. El failover del servidor debe observarse. La p\u00e9rdida de comunicaci\u00f3n debe provocar el comportamiento especificado.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Probar solamente el escenario nominal deja los principales mecanismos de resiliencia sin evidencia.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Documentaci\u00f3n m\u00ednima de entrega<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">El contrato debe relacionar documentos y activos digitales obligatorios. \u201cEntregar As Built\u201d es demasiado gen\u00e9rico para sistemas de automatizaci\u00f3n.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">El paquete final puede incluir, seg\u00fan el alcance:<\/p>\n\n\n\n<ul class=\"wp-block-list\"><li>arquitectura As Built;<\/li><li>topolog\u00eda y direccionamiento;<\/li><li>lista de I\/O;<\/li><li>lista de equipos y firmware;<\/li><li>filosof\u00eda y narrativas funcionales;<\/li><li>matriz de causa y efecto;<\/li><li>lista de alarmas;<\/li><li>programas fuente y proyectos de ingenier\u00eda;<\/li><li>backups de controladores, HMI y servidores;<\/li><li>archivos de configuraci\u00f3n de switches y gateways;<\/li><li>licencias y comprobantes;<\/li><li>credenciales administrativas conforme a la gobernanza acordada;<\/li><li>procedimientos e informes de FAT\/SAT;<\/li><li>registros de comisionamiento;<\/li><li>manuales y capacitaci\u00f3n;<\/li><li>lista de pendientes cerrada.<\/li><\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">El art\u00edculo <a href=\"https:\/\/a3aengenharia.com.br\/conteudo\/artigos-tecnicos\/sistema-instalado-nao-e-sistema-entregue-entrega-tecnica-aceite\/\">Un sistema instalado no es un sistema entregado<\/a> es especialmente aplicable: la conclusi\u00f3n f\u00edsica no equivale a una entrega t\u00e9cnica aceptada.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Propiedad intelectual, archivos y acceso del propietario<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">La contrataci\u00f3n debe diferenciar propiedad intelectual del proveedor, licencias de terceros y derecho del propietario a operar y mantener el sistema adquirido.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Es necesario aclarar el acceso a programas, backups, proyectos, par\u00e1metros, documentaci\u00f3n y credenciales. Las restricciones leg\u00edtimas deben estar expl\u00edcitas antes de la contrataci\u00f3n, no descubrirse cuando otra empresa necesite realizar mantenimiento.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">C\u00f3digo fuente y proyectos de ingenier\u00eda<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">No toda soluci\u00f3n exige la entrega del c\u00f3digo fuente del software propietario. Sin embargo, las aplicaciones desarrolladas espec\u00edficamente para el proyecto \u2014 l\u00f3gicas de PLC, pantallas, bases de tags, scripts y configuraciones \u2014 necesitan tener un r\u00e9gimen de acceso y propiedad claramente definido.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Cuentas administrativas<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">El integrador no debe permanecer como \u00fanico poseedor del acceso administrativo despu\u00e9s del handover. El propietario necesita tener gobernanza sobre cuentas, certificados y mecanismos de recuperaci\u00f3n, aunque el soporte contin\u00fae tercerizado.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Garant\u00eda, SLA y soporte<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">La garant\u00eda del equipo y el soporte de ingenier\u00eda son cosas diferentes. Una CPU puede estar cubierta por el fabricante mientras la l\u00f3gica, integraci\u00f3n o configuraci\u00f3n requiere atenci\u00f3n del integrador.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">La contrataci\u00f3n debe definir horario de atenci\u00f3n, criticidad, tiempo de respuesta, soporte remoto, movilizaci\u00f3n presencial, escalamiento, actualizaci\u00f3n de software y responsabilidad por interacci\u00f3n con fabricantes.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Repuestos y obsolescencia<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Para sistemas de larga vida \u00fatil, debe analizarse la disponibilidad de m\u00f3dulos, fuentes, switches, servidores y licencias. El proveedor debe informar elementos en fin de venta o pr\u00f3ximos a obsolescencia cuando esa informaci\u00f3n est\u00e9 disponible.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Empresas de automatizaci\u00f3n en proyectos brownfield<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Brownfield exige competencia adicional porque el sistema existente sigue formando parte del proceso durante la transici\u00f3n. La empresa necesita demostrar metodolog\u00eda para levantamiento, coexistencia, migraci\u00f3n, cutover y rollback.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">El contenido sobre <a href=\"https:\/\/a3aengenharia.com.br\/conteudo\/artigos-tecnicos\/projetos-brownfield-engenharia-instalacoes-existentes-retrofit\/\">Proyectos Brownfield<\/a> presenta los riesgos de ingenier\u00eda en instalaciones existentes. En automatizaci\u00f3n, se amplifican porque los cambios de software pueden tener impacto f\u00edsico inmediato.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Plan de migraci\u00f3n<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">El plan debe organizar secuencia, prerrequisitos, backups, responsables, ventana, pruebas intermedias, criterios de avance y condici\u00f3n de retorno.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Migrar \u201cdurante el fin de semana\u201d no es un plan. El per\u00edodo disponible debe descomponerse en actividades verificables con m\u00e1rgenes y puntos de decisi\u00f3n.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Red flags en la propuesta de un integrador<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Algunas se\u00f1ales justifican una diligencia adicional:<\/p>\n\n\n\n<ul class=\"wp-block-list\"><li>propuesta esencialmente compuesta por una lista de materiales;<\/li><li>ausencia de arquitectura o premisas de integraci\u00f3n;<\/li><li>FAT descrito solamente como \u201cprueba en f\u00e1brica\u201d;<\/li><li>documentaci\u00f3n final sin relaci\u00f3n de entregables;<\/li><li>exclusiones amplias y gen\u00e9ricas;<\/li><li>ning\u00fan enfoque de ciberseguridad para acceso remoto;<\/li><li>licencias sin m\u00e9trica o cantidad definida;<\/li><li>dependencia de un \u00fanico profesional no formalizada;<\/li><li>ausencia de estrategia de migraci\u00f3n en brownfield;<\/li><li>precio muy inferior sin explicaci\u00f3n t\u00e9cnica correspondiente;<\/li><li>ausencia de responsabilidades para interfaces con terceros.<\/li><\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">Un red flag no significa autom\u00e1ticamente incapacidad. Indica un punto que debe aclararse antes del contrato.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">C\u00f3mo utilizar RFP y TBE en la contrataci\u00f3n<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Una <a href=\"https:\/\/a3aengenharia.com.br\/conteudo\/artigos-tecnicos\/rfp-engenharia-escopo-requisitos-criterios-selecao\/\">RFP de Ingenier\u00eda<\/a> organiza alcance, requisitos, instrucciones al proponente y formato de respuesta. Esto reduce propuestas incomparables.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Despu\u00e9s, la TBE registra conformidad y desviaciones. La negociaci\u00f3n comercial debe ocurrir sobre una base t\u00e9cnica igualada.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">La secuencia es especialmente importante en automatizaci\u00f3n porque los costos ocultos aparecen en integraci\u00f3n, licenciamiento, pruebas y documentaci\u00f3n, y no necesariamente en los principales elementos de hardware.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">El papel de la Ingenier\u00eda del Propietario<\/h2>\n\n\n\n<div class=\"wp-block-a3a-destaque\">\n<p class=\"wp-block-paragraph\">Cuando varias integradoras ofrecen arquitecturas diferentes, una funci\u00f3n independiente del propietario ayuda a preservar requisitos, acompa\u00f1ar FAT\/SAT, controlar interfaces y verificar la documentaci\u00f3n antes de la aceptaci\u00f3n.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><a href=\"https:\/\/a3aengenharia.com.br\/servicos\/contratacao-integrada\/engenharia-do-proprietario\/\">Conozca el servicio de Ingenier\u00eda del Propietario<\/a><\/p>\n<\/div>\n\n\n\n<p class=\"wp-block-paragraph\">Cuando el propietario no posee equipo interno suficiente para estructurar y acompa\u00f1ar la contrataci\u00f3n, <a href=\"https:\/\/a3aengenharia.com.br\/servicos\/contratacao-integrada\/engenharia-do-proprietario\/\">Ingenier\u00eda del Propietario<\/a> puede actuar como funci\u00f3n t\u00e9cnica independiente.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">El papel puede incluir levantamiento, requisitos, arquitectura de referencia, RFP, evaluaci\u00f3n t\u00e9cnica, igualaci\u00f3n, seguimiento del desarrollo, witness de FAT, supervisi\u00f3n de la implantaci\u00f3n, comisionamiento, gesti\u00f3n de pendientes y verificaci\u00f3n del handover.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">La independencia es valiosa cuando cada integrador propone la soluci\u00f3n que mejor conoce. El owner necesita comparar alternativas seg\u00fan el inter\u00e9s del emprendimiento, y no seg\u00fan el portafolio de un proveedor espec\u00edfico.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Checklist t\u00e9cnico antes del award<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Antes de cerrar la contrataci\u00f3n, es recomendable poder responder objetivamente:<\/p>\n\n\n\n<ul class=\"wp-block-list\"><li>\u00bfel alcance y las exclusiones est\u00e1n claros?<\/li><li>\u00bflos requisitos cr\u00edticos son comprobables?<\/li><li>\u00bflas interfaces tienen responsables definidos?<\/li><li>\u00bfla arquitectura propuesta fue revisada?<\/li><li>\u00bfse comprenden versiones, licencias y crecimiento?<\/li><li>\u00bfexiste un plan preliminar de FAT, SAT y comisionamiento?<\/li><li>\u00bfla documentaci\u00f3n final est\u00e1 relacionada en el contrato?<\/li><li>\u00bflos archivos, backups y accesos del owner est\u00e1n definidos?<\/li><li>\u00bfest\u00e1n establecidos los criterios de ciberseguridad y acceso remoto?<\/li><li>\u00bfla estrategia brownfield y el rollback fueron tratados cuando corresponda?<\/li><li>\u00bfgarant\u00eda y soporte fueron separados conceptualmente?<\/li><li>\u00bflas desviaciones t\u00e9cnicas de la propuesta est\u00e1n formalizadas?<\/li><\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">Si estas respuestas dependen de \u201cver despu\u00e9s con el proveedor\u201d, la contrataci\u00f3n todav\u00eda no est\u00e1 t\u00e9cnicamente madura.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Consideraciones finales<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Elegir una empresa de automatizaci\u00f3n industrial no es seleccionar solamente hardware, software o precio. Es contratar capacidad de ingenier\u00eda para transformar requisitos de proceso en una soluci\u00f3n controlable, comprobable, documentada y sostenible durante su vida \u00fatil.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Cuanto mejor estructura el owner los requisitos, interfaces, criterios de evaluaci\u00f3n y aceptaci\u00f3n antes del award, menor es la dependencia de negociaciones durante la implantaci\u00f3n. El proveedor deja de competir por interpretaciones diferentes del alcance y pasa a competir sobre una base t\u00e9cnica comparable.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Este proceso aumenta la calidad de la contrataci\u00f3n, protege la operaci\u00f3n y mejora la gobernanza sobre FAT, SAT, comisionamiento, documentaci\u00f3n, soporte y futuras ampliaciones.<\/p>\n\n\n\n<details class=\"wp-block-details is-layout-flow wp-block-details-is-layout-flow\"><summary>Referencias t\u00e9cnicas<\/summary>\n<p class=\"wp-block-paragraph\">[1] 1. INTERNATIONAL ELECTROTECHNICAL COMMISSION. IEC 62443-2-4:2023 \u2014 Security for industrial automation and control systems \u2014 Part 2-4: Security program requirements for IACS service providers. Geneva: IEC, 2023. Disponible en: [<a href=\"https:\/\/webstore.iec.ch\/en\/publication\/67631\">https:\/\/webstore.iec.ch\/en\/publication\/67631<\/a>](<a href=\"https:\/\/webstore.iec.ch\/en\/publication\/67631\">https:\/\/webstore.iec.ch\/en\/publication\/67631<\/a>)<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">[2] 2. NATIONAL INSTITUTE OF STANDARDS AND TECHNOLOGY. Guide to Operational Technology (OT) Security. NIST SP 800-82 Rev. 3. Gaithersburg: NIST, 2023. Disponible en: [<a href=\"https:\/\/csrc.nist.gov\/pubs\/sp\/800\/82\/r3\/final\">https:\/\/csrc.nist.gov\/pubs\/sp\/800\/82\/r3\/final<\/a>](<a href=\"https:\/\/csrc.nist.gov\/pubs\/sp\/800\/82\/r3\/final\">https:\/\/csrc.nist.gov\/pubs\/sp\/800\/82\/r3\/final<\/a>)<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">[3] 3. INTERNATIONAL SOCIETY OF AUTOMATION. ANSI\/ISA-95.00.01-2025 (IEC 62264-1 Mod), Enterprise-Control System Integration \u2014 Part 1: Models and Terminology. Research Triangle Park: ISA, 2025. Disponible en: [<a href=\"https:\/\/www.isa.org\/products\/ansi-isa-95-00-01-2025-iec-62264-1-mod-enterprise\">https:\/\/www.isa.org\/products\/ansi-isa-95-00-01-2025-iec-62264-1-mod-enterprise<\/a>](<a href=\"https:\/\/www.isa.org\/products\/ansi-isa-95-00-01-2025-iec-62264-1-mod-enterprise\">https:\/\/www.isa.org\/products\/ansi-isa-95-00-01-2025-iec-62264-1-mod-enterprise<\/a>)<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">[4] 4. INTERNATIONAL ELECTROTECHNICAL COMMISSION. IEC 62443-3-2:2020 \u2014 Security for industrial automation and control systems \u2014 Part 3-2: Security risk assessment for system design. Geneva: IEC, 2020. Disponible en: [<a href=\"https:\/\/webstore.iec.ch\/en\/publication\/30727\">https:\/\/webstore.iec.ch\/en\/publication\/30727<\/a>](<a href=\"https:\/\/webstore.iec.ch\/en\/publication\/30727\">https:\/\/webstore.iec.ch\/en\/publication\/30727<\/a>)<\/p>\n<\/details>\n\n\n\n<details class=\"wp-block-details is-layout-flow wp-block-details-is-layout-flow\"><summary>Preguntas frecuentes<\/summary>\n<div class=\"schema-faq wp-block-yoast-faq-block\"><div class=\"schema-faq-section\" id=\"faq-question-como-escolher-uma-empresa-de-automa-o-industrial-8bd39c25\"><strong class=\"schema-faq-question\">\u00bfC\u00f3mo elegir una empresa de automatizaci\u00f3n industrial?<\/strong> <p class=\"schema-faq-answer\">Defina primero requisitos, alcance, interfaces y criterios de aceptaci\u00f3n; despu\u00e9s eval\u00fae experiencia relevante, equipo, arquitectura propuesta, interoperabilidad, licenciamiento, ciberseguridad, metodolog\u00eda de pruebas, documentaci\u00f3n, soporte y capacidad de actuaci\u00f3n en campo.<\/p><\/div><div class=\"schema-faq-section\" id=\"faq-question-qual-a-diferen-a-entre-integradora-e-fabricante--87e4a268\"><strong class=\"schema-faq-question\">\u00bfCu\u00e1l es la diferencia entre un integrador y un fabricante de automatizaci\u00f3n?<\/strong> <p class=\"schema-faq-answer\">El fabricante desarrolla productos y plataformas; el integrador combina equipos y software para entregar una soluci\u00f3n aplicada al proceso. Algunas empresas cumplen ambos papeles, pero las responsabilidades deben definirse claramente.<\/p><\/div><div class=\"schema-faq-section\" id=\"faq-question-o-menor-pre-o-o-melhor-crit-rio-para-contratar-a-60dd243e\"><strong class=\"schema-faq-question\">\u00bfEl menor precio es el mejor criterio para contratar automatizaci\u00f3n?<\/strong> <p class=\"schema-faq-answer\">No aisladamente. Las propuestas pueden tener alcances diferentes en redundancia, licencias, ingenier\u00eda, FAT, integraci\u00f3n, documentaci\u00f3n y soporte. La igualaci\u00f3n t\u00e9cnica debe preceder la comparaci\u00f3n comercial.<\/p><\/div><div class=\"schema-faq-section\" id=\"faq-question-o-que-deve-ser-exigido-no-fat-fb89e7ca\"><strong class=\"schema-faq-question\">\u00bfQu\u00e9 debe exigirse en el FAT?<\/strong> <p class=\"schema-faq-answer\">Un procedimiento aprobado con requisitos trazables, precondiciones, pasos, resultados esperados, evidencias y tratamiento de pendientes. Seg\u00fan el sistema, deben probarse l\u00f3gicas, alarmas, pantallas, integraciones, redundancia, hist\u00f3ricos y backups.<\/p><\/div><div class=\"schema-faq-section\" id=\"faq-question-quais-documentos-a-integradora-deve-entregar-24b2749b\"><strong class=\"schema-faq-question\">\u00bfQu\u00e9 documentos debe entregar el integrador?<\/strong> <p class=\"schema-faq-answer\">Seg\u00fan el alcance: arquitectura As Built, topolog\u00edas, listas de I\/O, filosof\u00eda de control, programas y backups, configuraciones, licencias, procedimientos e informes de pruebas, registros de comisionamiento, manuales y documentaci\u00f3n de handover.<\/p><\/div><div class=\"schema-faq-section\" id=\"faq-question-como-avaliar-ciberseguran-a-de-uma-empresa-de-au-c17182c4\"><strong class=\"schema-faq-question\">\u00bfC\u00f3mo evaluar la ciberseguridad de una empresa de automatizaci\u00f3n?<\/strong> <p class=\"schema-faq-answer\">Eval\u00fae procesos para credenciales, acceso remoto, estaciones de ingenier\u00eda, vulnerabilidades, backups, gesti\u00f3n de cambios y respuesta a incidentes. IEC 62443-2-4 trata espec\u00edficamente requisitos de seguridad para prestadores de servicios IACS.<\/p><\/div><div class=\"schema-faq-section\" id=\"faq-question-quando-owner-s-engineering-ajuda-na-contrata-o-d-0f5d4ee7\"><strong class=\"schema-faq-question\">\u00bfCu\u00e1ndo ayuda la Ingenier\u00eda del Propietario en la contrataci\u00f3n de automatizaci\u00f3n?<\/strong> <p class=\"schema-faq-answer\">Cuando el propietario necesita apoyo independiente para estructurar requisitos y RFP, comparar propuestas, acompa\u00f1ar desarrollo e implantaci\u00f3n, presenciar FAT\/SAT, gestionar interfaces y verificar la aceptaci\u00f3n t\u00e9cnica.<\/p><\/div><\/div>\n<\/details>\n\n\n\n<details class=\"wp-block-details is-layout-flow wp-block-details-is-layout-flow\"><summary>Materiales t\u00e9cnicos complementarios<\/summary>\n<h4 class=\"wp-block-heading\">Soluciones relacionadas<\/h4>\n\n<ul class=\"wp-block-list\"><li><a href=\"https:\/\/a3aengenharia.com.br\/solucoes\/engenharia-de-automacao-industrial\/sistemas-scada\/\">Sistemas SCADA: supervisi\u00f3n, control, alarmas y datos operativos<\/a><\/li><li><a href=\"https:\/\/a3aengenharia.com.br\/solucoes\/engenharia-de-automacao-industrial\/sistemas-de-supervisao-e-controle-sdsc\/\">Sistemas Digitales de Supervisi\u00f3n y Control (SDSC): automatizaci\u00f3n y operaci\u00f3n integrada<\/a><\/li><\/ul>\n\n<h4 class=\"wp-block-heading\">Servicios relacionados<\/h4>\n\n<ul class=\"wp-block-list\"><li><a href=\"https:\/\/a3aengenharia.com.br\/servicos\/planejamento\/projeto-de-automacao-industrial\/\">Proyecto de Automatizaci\u00f3n Industrial: control, supervisi\u00f3n, redes OT e integraci\u00f3n<\/a><\/li><li><a href=\"https:\/\/a3aengenharia.com.br\/servicos\/contratacao-integrada\/engenharia-do-proprietario\/\">Ingenier\u00eda del Propietario (Owner\u2019s Engineering): gobernanza t\u00e9cnica, supervisi\u00f3n y aceptaci\u00f3n<\/a><\/li><\/ul>\n\n<h4 class=\"wp-block-heading\">Contenidos principales sobre el tema<\/h4>\n\n<ul class=\"wp-block-list\"><li><a href=\"https:\/\/a3aengenharia.com.br\/conteudo\/artigos-tecnicos\/automacao-industrial-o-que-e-arquitetura-sistemas-aplicacoes\/\">Automatizaci\u00f3n Industrial: qu\u00e9 es, arquitectura, sistemas y aplicaciones en Ingenier\u00eda<\/a><\/li><li><a href=\"https:\/\/a3aengenharia.com.br\/conteudo\/artigos-tecnicos\/rfp-engenharia-escopo-requisitos-criterios-selecao\/\">RFP en Ingenier\u00eda: c\u00f3mo estructurar alcance, requisitos y criterios de selecci\u00f3n<\/a><\/li><li><a href=\"https:\/\/a3aengenharia.com.br\/conteudo\/artigos-tecnicos\/tbe-technical-bid-evaluation-engenharia\/\">TBE \u2014 Technical Bid Evaluation en Ingenier\u00eda<\/a><\/li><\/ul>\n\n<h4 class=\"wp-block-heading\">Contenidos t\u00e9cnicos relacionados<\/h4>\n\n<ul class=\"wp-block-list\"><li><a href=\"https:\/\/a3aengenharia.com.br\/conteudo\/artigos-tecnicos\/strategic-sourcing-engenharia-estrategia-fornecimento-fornecedores\/\">Strategic Sourcing en Ingenier\u00eda: estrategia de suministro, mercado y proveedores<\/a><\/li><li><a href=\"https:\/\/a3aengenharia.com.br\/conteudo\/artigos-tecnicos\/scope-of-work-sow-escopo-trabalho-engenharia\/\">Scope of Work (SOW) en Ingenier\u00eda: c\u00f3mo definir el alcance de trabajo de una contrataci\u00f3n<\/a><\/li><li><a href=\"https:\/\/a3aengenharia.com.br\/conteudo\/artigos-tecnicos\/comissionamento-sistemas-criticos-prontos-para-operar\/\">Comisionamiento Industrial: precomisionamiento, start-up, pruebas en fr\u00edo y en caliente<\/a><\/li><li><a href=\"https:\/\/a3aengenharia.com.br\/conteudo\/artigos-tecnicos\/projetos-brownfield-engenharia-instalacoes-existentes-retrofit\/\">Proyectos Brownfield: ingenier\u00eda en instalaciones existentes, levantamiento, As Built y retrofit<\/a><\/li><\/ul>\n<\/details>\n","protected":false},"excerpt":{"rendered":"<p>Vea c\u00f3mo evaluar y contratar una empresa de automatizaci\u00f3n industrial: requisitos, cualificaci\u00f3n, arquitectura, TBE, licencias, ciberseguridad, FAT, SAT, comisionamiento y aceptaci\u00f3n.<\/p>\n","protected":false},"author":1,"featured_media":0,"parent":0,"template":"","meta":{"_a3a_global_related_solutions":[],"_a3a_global_related_services":[],"_a3a_global_related_materials":[],"_a3a_post_lang":"es-es","_a3a_translation_group_id":"89662c1e-2114-49e2-9044-ff8df774f83b","_a3a_i18n_canonical_slug":"empresa-automatizacion-industrial-evaluar-contratar-integrador"},"categories":[],"segments":[],"mercados":[],"etapas":[],"class_list":["post-73965","articles","type-articles","status-publish","hentry"],"_links":{"self":[{"href":"https:\/\/a3aengenharia.com\/es-es\/wp-json\/wp\/v2\/articles\/73965","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/a3aengenharia.com\/es-es\/wp-json\/wp\/v2\/articles"}],"about":[{"href":"https:\/\/a3aengenharia.com\/es-es\/wp-json\/wp\/v2\/types\/articles"}],"author":[{"embeddable":true,"href":"https:\/\/a3aengenharia.com\/es-es\/wp-json\/wp\/v2\/users\/1"}],"version-history":[{"count":6,"href":"https:\/\/a3aengenharia.com\/es-es\/wp-json\/wp\/v2\/articles\/73965\/revisions"}],"predecessor-version":[{"id":73980,"href":"https:\/\/a3aengenharia.com\/es-es\/wp-json\/wp\/v2\/articles\/73965\/revisions\/73980"}],"wp:attachment":[{"href":"https:\/\/a3aengenharia.com\/es-es\/wp-json\/wp\/v2\/media?parent=73965"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/a3aengenharia.com\/es-es\/wp-json\/wp\/v2\/categories?post=73965"},{"taxonomy":"segments","embeddable":true,"href":"https:\/\/a3aengenharia.com\/es-es\/wp-json\/wp\/v2\/segments?post=73965"},{"taxonomy":"mercados","embeddable":true,"href":"https:\/\/a3aengenharia.com\/es-es\/wp-json\/wp\/v2\/mercados?post=73965"},{"taxonomy":"etapas","embeddable":true,"href":"https:\/\/a3aengenharia.com\/es-es\/wp-json\/wp\/v2\/etapas?post=73965"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}