{"id":73931,"date":"2026-09-01T16:01:33","date_gmt":"2026-09-01T19:01:33","guid":{"rendered":"https:\/\/a3aengenharia.com\/?post_type=articles&#038;p=73931"},"modified":"2026-09-01T16:01:33","modified_gmt":"2026-09-01T19:01:33","slug":"estudio-viabilidad-ingenieria-analisis-tecnico-economico-riesgos","status":"publish","type":"articles","link":"https:\/\/a3aengenharia.com\/es-es\/contenido\/articulos-tecnicos\/estudio-viabilidad-ingenieria-analisis-tecnico-economico-riesgos\/","title":{"rendered":"Estudio de Viabilidad en Ingenier\u00eda: an\u00e1lisis t\u00e9cnico, econ\u00f3mico, riesgos y decisi\u00f3n"},"content":{"rendered":"\n<p class=\"wp-block-paragraph\">Un estudio de viabilidad en Ingenier\u00eda es el an\u00e1lisis estructurado utilizado para determinar si un emprendimiento, modernizaci\u00f3n, ampliaci\u00f3n o soluci\u00f3n t\u00e9cnica debe avanzar, reformularse, aplazarse o descartarse. Compara alternativas seg\u00fan criterios t\u00e9cnicos, econ\u00f3micos, operativos, regulatorios, de plazo y de riesgo antes de que la organizaci\u00f3n comprometa recursos significativos con proyecto detallado, contrataci\u00f3n o implantaci\u00f3n.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Un estudio de viabilidad no es solamente una hoja de c\u00e1lculo financiera. El resultado econ\u00f3mico solo es confiable cuando deriva de premisas t\u00e9cnicas coherentes: capacidad, ubicaci\u00f3n, tecnolog\u00eda, interfaces, disponibilidad, vida \u00fatil, requisitos de implantaci\u00f3n, CAPEX, OPEX, cronograma y riesgos. La funci\u00f3n de la Ingenier\u00eda Consultiva es transformar una necesidad todav\u00eda abierta en alternativas comparables y una recomendaci\u00f3n t\u00e9cnicamente defendible para la decisi\u00f3n de inversi\u00f3n.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Qu\u00e9 es un estudio de viabilidad en Ingenier\u00eda<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">El estudio de viabilidad reduce la incertidumbre antes de una decisi\u00f3n relevante. En esencia, responde tres preguntas: \u00bfla soluci\u00f3n es t\u00e9cnicamente posible, tiene sentido para el negocio y los riesgos son aceptables frente a las alternativas disponibles?<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">La respuesta rara vez es binaria. Un proyecto puede ser t\u00e9cnicamente posible y econ\u00f3micamente d\u00e9bil; econ\u00f3micamente atractivo y operativamente inviable; viable solamente en determinada escala; o depender de condicionantes que deben resolverse antes del pr\u00f3ximo gate.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Por eso, el producto final debe explicitar premisas, incertidumbres, alternativas y condiciones para avanzar. La conclusi\u00f3n \u201cviable\u201d sin criterios ni trazabilidad crea una falsa sensaci\u00f3n de certeza.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Cu\u00e1ndo debe realizarse el estudio de viabilidad<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">El estudio tiene sentido antes de compromisos dif\u00edciles de revertir. Algunos ejemplos son la implantaci\u00f3n de una nueva planta o instalaci\u00f3n, ampliaci\u00f3n de capacidad, retrofit de infraestructura, sustituci\u00f3n de tecnolog\u00eda, construcci\u00f3n de Data Center, modernizaci\u00f3n el\u00e9ctrica, automatizaci\u00f3n, sistemas cr\u00edticos o cambios relevantes de proceso.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Tambi\u00e9n es \u00fatil cuando existen alternativas competidoras. Si la decisi\u00f3n ya fue tomada y el trabajo se limita a detallar una soluci\u00f3n definida, el proyecto conceptual, b\u00e1sico o ejecutivo puede ser la etapa adecuada; llamar a todo \u201cviabilidad\u201d solamente a\u00f1ade nomenclatura sin mejorar la decisi\u00f3n.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">La viabilidad t\u00e9cnica y la viabilidad econ\u00f3mica forman parte del mismo problema<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Separar completamente Ingenier\u00eda y econom\u00eda suele producir conclusiones fr\u00e1giles. La estimaci\u00f3n de inversi\u00f3n depende de la soluci\u00f3n t\u00e9cnica; la soluci\u00f3n t\u00e9cnica depende de requisitos, capacidad y restricciones; y el beneficio econ\u00f3mico depende del desempe\u00f1o esperado y de la operaci\u00f3n.<\/p>\n\n\n\n<figure class=\"a3a-mermaid\"><svg id=\"a3a-diagram-4\" width=\"100%\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" class=\"flowchart\" style=\"max-width:min(1931.03125px, 100%);height:auto;display:block;margin:0 auto\" viewBox=\"0 0 1931.03125 68.5\" role=\"graphics-document document\" aria-roledescription=\"flowchart-v2\" aria-labelledby=\"chart-title-a3a-diagram-4\"><title id=\"chart-title-a3a-diagram-4\">Relaci\u00f3n entre viabilidad t\u00e9cnica, viabilidad econ\u00f3mica y decisi\u00f3n<\/title><style>#a3a-diagram-4{font-family:Roboto,sans-serif;font-size:15px;fill:var(--a3a-diag-text, #0a0a0a);}@keyframes edge-animation-frame{from{stroke-dashoffset:0;}}@keyframes dash{to{stroke-dashoffset:0;}}#a3a-diagram-4 .edge-animation-slow{stroke-dasharray:9,5!important;stroke-dashoffset:900;animation:dash 50s linear infinite;stroke-linecap:round;}#a3a-diagram-4 .edge-animation-fast{stroke-dasharray:9,5!important;stroke-dashoffset:900;animation:dash 20s linear infinite;stroke-linecap:round;}#a3a-diagram-4 .error-icon{fill:var(--a3a-diag-canvas, #ffffff);}#a3a-diagram-4 .error-text{fill:#000000;stroke:#000000;}#a3a-diagram-4 .edge-thickness-normal{stroke-width:1px;}#a3a-diagram-4 .edge-thickness-thick{stroke-width:3.5px;}#a3a-diagram-4 .edge-pattern-solid{stroke-dasharray:0;}#a3a-diagram-4 .edge-thickness-invisible{stroke-width:0;fill:none;}#a3a-diagram-4 .edge-pattern-dashed{stroke-dasharray:3;}#a3a-diagram-4 .edge-pattern-dotted{stroke-dasharray:2;}#a3a-diagram-4 .marker{fill:var(--a3a-diag-stroke, #2e42a2);stroke:var(--a3a-diag-stroke, #2e42a2);}#a3a-diagram-4 .marker.cross{stroke:var(--a3a-diag-stroke, #2e42a2);}#a3a-diagram-4 svg{font-family:Roboto,sans-serif;font-size:15px;}#a3a-diagram-4 p{margin:0;}#a3a-diagram-4 .label{font-family:Roboto,sans-serif;color:var(--a3a-diag-text, #0a0a0a);}#a3a-diagram-4 .cluster-label text{fill:var(--a3a-diag-title, #0124af);}#a3a-diagram-4 .cluster-label span{color:var(--a3a-diag-title, #0124af);}#a3a-diagram-4 .cluster-label span p{background-color:transparent;}#a3a-diagram-4 .label text,#a3a-diagram-4 span{fill:var(--a3a-diag-text, #0a0a0a);color:var(--a3a-diag-text, #0a0a0a);}#a3a-diagram-4 .node rect,#a3a-diagram-4 .node circle,#a3a-diagram-4 .node ellipse,#a3a-diagram-4 .node polygon,#a3a-diagram-4 .node path{fill:var(--a3a-diag-fill, #eef2fd);stroke:var(--a3a-diag-stroke, #2e42a2);stroke-width:1px;}#a3a-diagram-4 .rough-node .label text,#a3a-diagram-4 .node .label text,#a3a-diagram-4 .image-shape .label,#a3a-diagram-4 .icon-shape .label{text-anchor:middle;}#a3a-diagram-4 .node .katex path{fill:#000;stroke:#000;stroke-width:1px;}#a3a-diagram-4 .rough-node .label,#a3a-diagram-4 .node .label,#a3a-diagram-4 .image-shape .label,#a3a-diagram-4 .icon-shape .label{text-align:center;}#a3a-diagram-4 .node.clickable{cursor:pointer;}#a3a-diagram-4 .root .anchor path{fill:var(--a3a-diag-stroke, #2e42a2)!important;stroke-width:0;stroke:var(--a3a-diag-stroke, #2e42a2);}#a3a-diagram-4 .arrowheadPath{fill:var(--a3a-diag-stroke, #0b0b0b);}#a3a-diagram-4 .edgePath .path{stroke:var(--a3a-diag-stroke, #2e42a2);stroke-width:2.0px;}#a3a-diagram-4 .flowchart-link{stroke:var(--a3a-diag-stroke, #2e42a2);fill:none;}#a3a-diagram-4 .edgeLabel{background-color:var(--a3a-diag-canvas, #ffffff);text-align:center;}#a3a-diagram-4 .edgeLabel p{background-color:var(--a3a-diag-canvas, #ffffff);}#a3a-diagram-4 .edgeLabel rect{opacity:0.5;background-color:var(--a3a-diag-canvas, #ffffff);fill:var(--a3a-diag-canvas, #ffffff);}#a3a-diagram-4 .labelBkg{background-color:rgba(255, 255, 255, 0.5);}#a3a-diagram-4 .cluster rect{fill:var(--a3a-diag-surface, #f8f8f8);stroke:var(--a3a-diag-border, #e2e8f0);stroke-width:1px;}#a3a-diagram-4 .cluster text{fill:var(--a3a-diag-title, #0124af);}#a3a-diagram-4 .cluster span{color:var(--a3a-diag-title, #0124af);}#a3a-diagram-4 div.mermaidTooltip{position:absolute;text-align:center;max-width:200px;padding:2px;font-family:Roboto,sans-serif;font-size:12px;background:var(--a3a-diag-canvas, #ffffff);border:1px solid hsl(0, 0%, 90%);border-radius:2px;pointer-events:none;z-index:100;}#a3a-diagram-4 .flowchartTitleText{text-anchor:middle;font-size:18px;fill:var(--a3a-diag-text, #0a0a0a);}#a3a-diagram-4 rect.text{fill:none;stroke-width:0;}#a3a-diagram-4 .icon-shape,#a3a-diagram-4 .image-shape{background-color:var(--a3a-diag-canvas, #ffffff);text-align:center;}#a3a-diagram-4 .icon-shape p,#a3a-diagram-4 .image-shape p{background-color:var(--a3a-diag-canvas, #ffffff);padding:2px;}#a3a-diagram-4 .icon-shape rect,#a3a-diagram-4 .image-shape rect{opacity:0.5;background-color:var(--a3a-diag-canvas, #ffffff);fill:var(--a3a-diag-canvas, #ffffff);}#a3a-diagram-4 .label-icon{display:inline-block;height:1em;overflow:visible;vertical-align:-0.125em;}#a3a-diagram-4 .node .label-icon path{fill:currentColor;stroke:revert;stroke-width:revert;}#a3a-diagram-4 :root{--mermaid-font-family:Roboto,sans-serif;}<\/style><g><marker id=\"a3a-diagram-4_flowchart-v2-pointEnd\" class=\"marker flowchart-v2\" viewBox=\"0 0 10 10\" refX=\"5\" refY=\"5\" markerUnits=\"userSpaceOnUse\" markerWidth=\"8\" markerHeight=\"8\" orient=\"auto\"><path d=\"M 0 0 L 10 5 L 0 10 z\" class=\"arrowMarkerPath\" style=\"stroke-width: 1; stroke-dasharray: 1, 0;\"><\/path><\/marker><marker id=\"a3a-diagram-4_flowchart-v2-pointStart\" class=\"marker flowchart-v2\" viewBox=\"0 0 10 10\" refX=\"4.5\" refY=\"5\" markerUnits=\"userSpaceOnUse\" markerWidth=\"8\" markerHeight=\"8\" orient=\"auto\"><path d=\"M 0 5 L 10 10 L 10 0 z\" class=\"arrowMarkerPath\" style=\"stroke-width: 1; stroke-dasharray: 1, 0;\"><\/path><\/marker><marker id=\"a3a-diagram-4_flowchart-v2-circleEnd\" class=\"marker flowchart-v2\" viewBox=\"0 0 10 10\" refX=\"11\" refY=\"5\" markerUnits=\"userSpaceOnUse\" markerWidth=\"11\" markerHeight=\"11\" orient=\"auto\"><circle cx=\"5\" cy=\"5\" r=\"5\" class=\"arrowMarkerPath\" style=\"stroke-width: 1; stroke-dasharray: 1, 0;\"><\/circle><\/marker><marker id=\"a3a-diagram-4_flowchart-v2-circleStart\" class=\"marker flowchart-v2\" viewBox=\"0 0 10 10\" refX=\"-1\" refY=\"5\" markerUnits=\"userSpaceOnUse\" markerWidth=\"11\" markerHeight=\"11\" orient=\"auto\"><circle cx=\"5\" cy=\"5\" r=\"5\" class=\"arrowMarkerPath\" style=\"stroke-width: 1; stroke-dasharray: 1, 0;\"><\/circle><\/marker><marker id=\"a3a-diagram-4_flowchart-v2-crossEnd\" class=\"marker cross flowchart-v2\" viewBox=\"0 0 11 11\" refX=\"12\" refY=\"5.2\" markerUnits=\"userSpaceOnUse\" markerWidth=\"11\" markerHeight=\"11\" orient=\"auto\"><path d=\"M 1,1 l 9,9 M 10,1 l -9,9\" class=\"arrowMarkerPath\" style=\"stroke-width: 2; stroke-dasharray: 1, 0;\"><\/path><\/marker><marker id=\"a3a-diagram-4_flowchart-v2-crossStart\" class=\"marker cross flowchart-v2\" viewBox=\"0 0 11 11\" refX=\"-1\" refY=\"5.2\" markerUnits=\"userSpaceOnUse\" markerWidth=\"11\" markerHeight=\"11\" orient=\"auto\"><path d=\"M 1,1 l 9,9 M 10,1 l -9,9\" class=\"arrowMarkerPath\" style=\"stroke-width: 2; stroke-dasharray: 1, 0;\"><\/path><\/marker><g class=\"root\"><g class=\"clusters\"><\/g><g class=\"edgePaths\"><path d=\"M138.813,34.25L142.979,34.25C147.146,34.25,155.479,34.25,163.146,34.25C170.813,34.25,177.813,34.25,181.313,34.25L184.813,34.25\" id=\"L_A_B_0\" class=\"edge-thickness-normal edge-pattern-solid edge-thickness-normal edge-pattern-solid flowchart-link\" style=\";\" data-edge=\"true\" data-et=\"edge\" data-id=\"L_A_B_0\" data-points=\"W3sieCI6MTM4LjgxMjUsInkiOjM0LjI1fSx7IngiOjE2My44MTI1LCJ5IjozNC4yNX0seyJ4IjoxODguODEyNSwieSI6MzQuMjV9XQ==\" marker-end=\"url(#a3a-diagram-4_flowchart-v2-pointEnd)\"><\/path><path d=\"M422.25,34.25L426.417,34.25C430.583,34.25,438.917,34.25,446.583,34.25C454.25,34.25,461.25,34.25,464.75,34.25L468.25,34.25\" id=\"L_B_C_0\" class=\"edge-thickness-normal edge-pattern-solid edge-thickness-normal edge-pattern-solid flowchart-link\" style=\";\" data-edge=\"true\" data-et=\"edge\" data-id=\"L_B_C_0\" data-points=\"W3sieCI6NDIyLjI1LCJ5IjozNC4yNX0seyJ4Ijo0NDcuMjUsInkiOjM0LjI1fSx7IngiOjQ3Mi4yNSwieSI6MzQuMjV9XQ==\" marker-end=\"url(#a3a-diagram-4_flowchart-v2-pointEnd)\"><\/path><path d=\"M672.719,34.25L676.885,34.25C681.052,34.25,689.385,34.25,697.052,34.25C704.719,34.25,711.719,34.25,715.219,34.25L718.719,34.25\" id=\"L_C_D_0\" class=\"edge-thickness-normal edge-pattern-solid edge-thickness-normal edge-pattern-solid flowchart-link\" style=\";\" data-edge=\"true\" data-et=\"edge\" data-id=\"L_C_D_0\" data-points=\"W3sieCI6NjcyLjcxODc1LCJ5IjozNC4yNX0seyJ4Ijo2OTcuNzE4NzUsInkiOjM0LjI1fSx7IngiOjcyMi43MTg3NSwieSI6MzQuMjV9XQ==\" marker-end=\"url(#a3a-diagram-4_flowchart-v2-pointEnd)\"><\/path><path d=\"M904.328,34.25L908.495,34.25C912.661,34.25,920.995,34.25,928.661,34.25C936.328,34.25,943.328,34.25,946.828,34.25L950.328,34.25\" id=\"L_D_E_0\" class=\"edge-thickness-normal edge-pattern-solid edge-thickness-normal edge-pattern-solid flowchart-link\" style=\";\" data-edge=\"true\" data-et=\"edge\" data-id=\"L_D_E_0\" data-points=\"W3sieCI6OTA0LjMyODEyNSwieSI6MzQuMjV9LHsieCI6OTI5LjMyODEyNSwieSI6MzQuMjV9LHsieCI6OTU0LjMyODEyNSwieSI6MzQuMjV9XQ==\" marker-end=\"url(#a3a-diagram-4_flowchart-v2-pointEnd)\"><\/path><path d=\"M1154.438,34.25L1158.604,34.25C1162.771,34.25,1171.104,34.25,1178.771,34.25C1186.438,34.25,1193.438,34.25,1196.938,34.25L1200.438,34.25\" id=\"L_E_F_0\" class=\"edge-thickness-normal edge-pattern-solid edge-thickness-normal edge-pattern-solid flowchart-link\" style=\";\" data-edge=\"true\" data-et=\"edge\" data-id=\"L_E_F_0\" data-points=\"W3sieCI6MTE1NC40Mzc1LCJ5IjozNC4yNX0seyJ4IjoxMTc5LjQzNzUsInkiOjM0LjI1fSx7IngiOjEyMDQuNDM3NSwieSI6MzQuMjV9XQ==\" marker-end=\"url(#a3a-diagram-4_flowchart-v2-pointEnd)\"><\/path><path d=\"M1394.75,34.25L1398.917,34.25C1403.083,34.25,1411.417,34.25,1419.083,34.25C1426.75,34.25,1433.75,34.25,1437.25,34.25L1440.75,34.25\" id=\"L_F_G_0\" class=\"edge-thickness-normal edge-pattern-solid edge-thickness-normal edge-pattern-solid flowchart-link\" style=\";\" data-edge=\"true\" data-et=\"edge\" data-id=\"L_F_G_0\" data-points=\"W3sieCI6MTM5NC43NSwieSI6MzQuMjV9LHsieCI6MTQxOS43NSwieSI6MzQuMjV9LHsieCI6MTQ0NC43NSwieSI6MzQuMjV9XQ==\" marker-end=\"url(#a3a-diagram-4_flowchart-v2-pointEnd)\"><\/path><path d=\"M1613.313,34.25L1617.479,34.25C1621.646,34.25,1629.979,34.25,1637.646,34.25C1645.313,34.25,1652.313,34.25,1655.813,34.25L1659.313,34.25\" id=\"L_G_H_0\" class=\"edge-thickness-normal edge-pattern-solid edge-thickness-normal edge-pattern-solid flowchart-link\" style=\";\" data-edge=\"true\" data-et=\"edge\" data-id=\"L_G_H_0\" data-points=\"W3sieCI6MTYxMy4zMTI1LCJ5IjozNC4yNX0seyJ4IjoxNjM4LjMxMjUsInkiOjM0LjI1fSx7IngiOjE2NjMuMzEyNSwieSI6MzQuMjV9XQ==\" marker-end=\"url(#a3a-diagram-4_flowchart-v2-pointEnd)\"><\/path><\/g><g class=\"edgeLabels\"><g class=\"edgeLabel\"><g class=\"label\" data-id=\"L_A_B_0\" transform=\"translate(0, 0)\"><foreignObject width=\"0\" height=\"0\"><div xmlns=\"http:\/\/www.w3.org\/1999\/xhtml\" class=\"labelBkg\" style=\"display: table-cell; white-space: nowrap; line-height: 1.5; max-width: 200px; text-align: center;\"><span class=\"edgeLabel\"><\/span><\/div><\/foreignObject><\/g><\/g><g class=\"edgeLabel\"><g class=\"label\" data-id=\"L_B_C_0\" transform=\"translate(0, 0)\"><foreignObject width=\"0\" height=\"0\"><div xmlns=\"http:\/\/www.w3.org\/1999\/xhtml\" class=\"labelBkg\" style=\"display: table-cell; white-space: nowrap; line-height: 1.5; max-width: 200px; text-align: center;\"><span class=\"edgeLabel\"><\/span><\/div><\/foreignObject><\/g><\/g><g class=\"edgeLabel\"><g class=\"label\" data-id=\"L_C_D_0\" transform=\"translate(0, 0)\"><foreignObject width=\"0\" height=\"0\"><div xmlns=\"http:\/\/www.w3.org\/1999\/xhtml\" class=\"labelBkg\" style=\"display: table-cell; white-space: nowrap; line-height: 1.5; max-width: 200px; text-align: center;\"><span class=\"edgeLabel\"><\/span><\/div><\/foreignObject><\/g><\/g><g class=\"edgeLabel\"><g class=\"label\" data-id=\"L_D_E_0\" transform=\"translate(0, 0)\"><foreignObject width=\"0\" height=\"0\"><div xmlns=\"http:\/\/www.w3.org\/1999\/xhtml\" class=\"labelBkg\" style=\"display: table-cell; white-space: nowrap; line-height: 1.5; max-width: 200px; text-align: center;\"><span class=\"edgeLabel\"><\/span><\/div><\/foreignObject><\/g><\/g><g class=\"edgeLabel\"><g class=\"label\" data-id=\"L_E_F_0\" transform=\"translate(0, 0)\"><foreignObject width=\"0\" height=\"0\"><div xmlns=\"http:\/\/www.w3.org\/1999\/xhtml\" class=\"labelBkg\" style=\"display: table-cell; white-space: nowrap; line-height: 1.5; max-width: 200px; text-align: center;\"><span class=\"edgeLabel\"><\/span><\/div><\/foreignObject><\/g><\/g><g class=\"edgeLabel\"><g class=\"label\" data-id=\"L_F_G_0\" transform=\"translate(0, 0)\"><foreignObject width=\"0\" height=\"0\"><div xmlns=\"http:\/\/www.w3.org\/1999\/xhtml\" class=\"labelBkg\" style=\"display: table-cell; white-space: nowrap; line-height: 1.5; max-width: 200px; text-align: center;\"><span class=\"edgeLabel\"><\/span><\/div><\/foreignObject><\/g><\/g><g class=\"edgeLabel\"><g class=\"label\" data-id=\"L_G_H_0\" transform=\"translate(0, 0)\"><foreignObject width=\"0\" height=\"0\"><div xmlns=\"http:\/\/www.w3.org\/1999\/xhtml\" class=\"labelBkg\" style=\"display: table-cell; white-space: nowrap; line-height: 1.5; max-width: 200px; text-align: center;\"><span class=\"edgeLabel\"><\/span><\/div><\/foreignObject><\/g><\/g><\/g><g class=\"nodes\"><g class=\"node default\" id=\"flowchart-A-0\" transform=\"translate(73.40625, 34.25)\"><rect class=\"basic label-container\" style=\"\" x=\"-65.40625\" y=\"-26.25\" width=\"130.8125\" height=\"52.5\"><\/rect><g class=\"label\" style=\"\" transform=\"translate(-35.40625, -11.25)\"><rect><\/rect><foreignObject width=\"70.8125\" height=\"22.5\"><div xmlns=\"http:\/\/www.w3.org\/1999\/xhtml\" style=\"display: table-cell; white-space: nowrap; line-height: 1.5; max-width: 200px; text-align: center;\"><span class=\"nodeLabel\"><p>Necesidad<\/p><\/span><\/div><\/foreignObject><\/g><\/g><g class=\"node default\" id=\"flowchart-B-1\" transform=\"translate(305.53125, 34.25)\"><rect class=\"basic label-container\" style=\"\" x=\"-116.71875\" y=\"-26.25\" width=\"233.4375\" height=\"52.5\"><\/rect><g class=\"label\" style=\"\" transform=\"translate(-86.71875, -11.25)\"><rect><\/rect><foreignObject width=\"173.4375\" height=\"22.5\"><div xmlns=\"http:\/\/www.w3.org\/1999\/xhtml\" style=\"display: table-cell; white-space: nowrap; line-height: 1.5; max-width: 200px; text-align: center;\"><span class=\"nodeLabel\"><p>Requisitos y restricciones<\/p><\/span><\/div><\/foreignObject><\/g><\/g><g class=\"node default\" id=\"flowchart-C-2\" transform=\"translate(572.484375, 34.25)\"><rect class=\"basic label-container\" style=\"\" x=\"-100.234375\" y=\"-26.25\" width=\"200.46875\" height=\"52.5\"><\/rect><g class=\"label\" style=\"\" transform=\"translate(-70.234375, -11.25)\"><rect><\/rect><foreignObject width=\"140.46875\" height=\"22.5\"><div xmlns=\"http:\/\/www.w3.org\/1999\/xhtml\" style=\"display: table-cell; white-space: nowrap; line-height: 1.5; max-width: 200px; text-align: center;\"><span class=\"nodeLabel\"><p>Alternativas t\u00e9cnicas<\/p><\/span><\/div><\/foreignObject><\/g><\/g><g class=\"node default\" id=\"flowchart-D-3\" transform=\"translate(813.5234375, 34.25)\"><rect class=\"basic label-container\" style=\"\" x=\"-90.8046875\" y=\"-26.25\" width=\"181.609375\" height=\"52.5\"><\/rect><g class=\"label\" style=\"\" transform=\"translate(-60.8046875, -11.25)\"><rect><\/rect><foreignObject width=\"121.609375\" height=\"22.5\"><div xmlns=\"http:\/\/www.w3.org\/1999\/xhtml\" style=\"display: table-cell; white-space: nowrap; line-height: 1.5; max-width: 200px; text-align: center;\"><span class=\"nodeLabel\"><p>CAPEX OPEX plazo<\/p><\/span><\/div><\/foreignObject><\/g><\/g><g class=\"node default\" id=\"flowchart-E-4\" transform=\"translate(1054.3828125, 34.25)\"><rect class=\"basic label-container\" style=\"\" x=\"-100.0546875\" y=\"-26.25\" width=\"200.109375\" height=\"52.5\"><\/rect><g class=\"label\" style=\"\" transform=\"translate(-70.0546875, -11.25)\"><rect><\/rect><foreignObject width=\"140.109375\" height=\"22.5\"><div xmlns=\"http:\/\/www.w3.org\/1999\/xhtml\" style=\"display: table-cell; white-space: nowrap; line-height: 1.5; max-width: 200px; text-align: center;\"><span class=\"nodeLabel\"><p>Riesgos y escenarios<\/p><\/span><\/div><\/foreignObject><\/g><\/g><g class=\"node default\" id=\"flowchart-F-5\" transform=\"translate(1299.59375, 34.25)\"><rect class=\"basic label-container\" style=\"\" x=\"-95.15625\" y=\"-26.25\" width=\"190.3125\" height=\"52.5\"><\/rect><g class=\"label\" style=\"\" transform=\"translate(-65.15625, -11.25)\"><rect><\/rect><foreignObject width=\"130.3125\" height=\"22.5\"><div xmlns=\"http:\/\/www.w3.org\/1999\/xhtml\" style=\"display: table-cell; white-space: nowrap; line-height: 1.5; max-width: 200px; text-align: center;\"><span class=\"nodeLabel\"><p>An\u00e1lisis econ\u00f3mico<\/p><\/span><\/div><\/foreignObject><\/g><\/g><g class=\"node default\" id=\"flowchart-G-6\" transform=\"translate(1529.03125, 34.25)\"><rect class=\"basic label-container\" style=\"\" x=\"-84.28125\" y=\"-26.25\" width=\"168.5625\" height=\"52.5\"><\/rect><g class=\"label\" style=\"\" transform=\"translate(-54.28125, -11.25)\"><rect><\/rect><foreignObject width=\"108.5625\" height=\"22.5\"><div xmlns=\"http:\/\/www.w3.org\/1999\/xhtml\" style=\"display: table-cell; white-space: nowrap; line-height: 1.5; max-width: 200px; text-align: center;\"><span class=\"nodeLabel\"><p>Recomendaci\u00f3n<\/p><\/span><\/div><\/foreignObject><\/g><\/g><g class=\"node default\" id=\"flowchart-H-7\" transform=\"translate(1793.171875, 34.25)\"><rect class=\"basic label-container\" style=\"\" x=\"-129.859375\" y=\"-26.25\" width=\"259.71875\" height=\"52.5\"><\/rect><g class=\"label\" style=\"\" transform=\"translate(-99.859375, -11.25)\"><rect><\/rect><foreignObject width=\"199.71875\" height=\"22.5\"><div xmlns=\"http:\/\/www.w3.org\/1999\/xhtml\" style=\"display: table-cell; white-space: nowrap; line-height: 1.5; max-width: 200px; text-align: center;\"><span class=\"nodeLabel\"><p>Avanzar reformular o detener<\/p><\/span><\/div><\/foreignObject><\/g><\/g><\/g><\/g><\/g><\/svg><figcaption>Relaci\u00f3n entre viabilidad t\u00e9cnica, viabilidad econ\u00f3mica y decisi\u00f3n<\/figcaption><\/figure>\n\n\n\n<p class=\"wp-block-paragraph\">Un cambio de tecnolog\u00eda, por ejemplo, puede reducir CAPEX y aumentar OPEX. Una soluci\u00f3n redundante puede elevar la inversi\u00f3n y reducir el riesgo de indisponibilidad. Una implantaci\u00f3n por fases puede modificar cronograma, capacidad inicial y flujo de caja. El estudio debe capturar estas interdependencias.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Comenzar por la necesidad, no por la soluci\u00f3n preferida<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Uno de los errores m\u00e1s comunes es iniciar el estudio ya comprometido con una tecnolog\u00eda o proveedor. En ese caso, el trabajo tiende a justificar una elecci\u00f3n en lugar de poner a prueba alternativas.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">La Ingenier\u00eda debe formular el problema: qu\u00e9 capacidad es necesaria, qu\u00e9 desempe\u00f1o, qu\u00e9 restricciones, qu\u00e9 horizonte, qu\u00e9 interfaces y qu\u00e9 riesgos deben reducirse. A partir de ah\u00ed, pueden desarrollarse y compararse alternativas.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Programa de necesidades y requisitos<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">El programa de necesidades organiza las demandas del propietario. Los requisitos transforman esas demandas en criterios verificables de desempe\u00f1o, capacidad, disponibilidad, seguridad, operaci\u00f3n e integraci\u00f3n.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Sin esta base, las alternativas se comparan por caracter\u00edsticas diferentes y la decisi\u00f3n se vuelve vulnerable a preferencias subjetivas.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Definici\u00f3n de las alternativas<\/h2>\n\n\n\n<div class=\"wp-block-a3a-destaque\">\n<p class=\"wp-block-paragraph\">Cuando la decisi\u00f3n todav\u00eda est\u00e1 abierta, el estudio debe comparar alternativas y explicitar condicionantes \u2014 no limitarse a producir una justificaci\u00f3n para la soluci\u00f3n preferida.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><a href=\"https:\/\/a3aengenharia.com.br\/servicos\/levantamento-e-diagnostico\/analise-de-viabilidade-financeira\/\">Conozca el Estudio de Viabilidad T\u00e9cnica y Econ\u00f3mica<\/a><\/p>\n<\/div>\n\n\n\n<p class=\"wp-block-paragraph\">Un estudio \u00fatil debe considerar alternativas realmente distintas. Esto puede incluir tecnolog\u00edas, capacidades, ubicaciones, niveles de redundancia, implantaci\u00f3n greenfield o brownfield, fases de inversi\u00f3n e incluso la alternativa de no ejecutar el proyecto en ese momento.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">La alternativa \u201cdo nothing\u201d o escenario base es importante porque proporciona una referencia para medir beneficios y costos incrementales.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Criterios t\u00e9cnicos de comparaci\u00f3n<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Los criterios dependen del objeto, pero normalmente incluyen:<\/p>\n\n\n\n<ul class=\"wp-block-list\"><li>cumplimiento de los requisitos de capacidad;<\/li><li>desempe\u00f1o y disponibilidad;<\/li><li>madurez tecnol\u00f3gica;<\/li><li>compatibilidad con la infraestructura existente;<\/li><li>facilidad de ampliaci\u00f3n;<\/li><li>requisitos de operaci\u00f3n y mantenimiento;<\/li><li>disponibilidad de soporte y repuestos;<\/li><li>riesgos de integraci\u00f3n;<\/li><li>consumo de energ\u00eda y utilidades;<\/li><li>requisitos de espacio e implantaci\u00f3n;<\/li><li>restricciones ambientales y regulatorias;<\/li><li>plazo y constructibilidad.<\/li><\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">La comparaci\u00f3n debe separar criterios eliminatorios de criterios graduales. Si una alternativa no puede cumplir un requisito obligatorio, no tiene sentido compensar esa falla \u00fanicamente con un precio menor.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Levantamiento de la condici\u00f3n existente<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">En proyectos brownfield, la viabilidad depende de lo que realmente existe. La documentaci\u00f3n desactualizada puede distorsionar capacidad, interfaces y costo de adecuaci\u00f3n.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Site Survey, levantamiento cadastral, inspecciones y an\u00e1lisis documental ayudan a transformar premisas en evidencias. Cuanto mayor sea la dependencia de sistemas existentes, mayor ser\u00e1 la importancia de la calidad de este levantamiento.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Capacidad y demanda<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">La soluci\u00f3n debe dimensionarse para una demanda de referencia. Esto exige comprender situaci\u00f3n actual, crecimiento, estacionalidad, picos, contingencias y horizonte de planificaci\u00f3n.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">El sobredimensionamiento aumenta CAPEX y puede reducir la eficiencia. El subdimensionamiento crea cuellos de botella y anticipa nuevas inversiones. En muchos casos, alternativas modulares o una implantaci\u00f3n por fases ofrecen un mejor equilibrio.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">CAPEX<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">CAPEX representa las inversiones necesarias para poner una alternativa en condici\u00f3n de operaci\u00f3n. El estudio debe definir la base de la estimaci\u00f3n y el nivel de madurez de la informaci\u00f3n disponible.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Pueden incluirse equipos, materiales, construcci\u00f3n, montaje, ingenier\u00eda, gesti\u00f3n, comisionamiento, movilizaci\u00f3n, licencias, contingencias, infraestructura auxiliar y costos de integraci\u00f3n.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Una estimaci\u00f3n sin premisas registradas no permite actualizaci\u00f3n ni comparaci\u00f3n consistente.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">OPEX<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">OPEX considera los costos de operaci\u00f3n a lo largo del horizonte analizado. Energ\u00eda, mantenimiento, licencias, mano de obra, consumibles, contratos de soporte y reposici\u00f3n pueden modificar significativamente la decisi\u00f3n.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Una soluci\u00f3n de menor inversi\u00f3n inicial puede tener un costo total superior cuando se analiza por ciclo de vida.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Costo del ciclo de vida<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Life Cycle Cost ampl\u00eda la visi\u00f3n m\u00e1s all\u00e1 del CAPEX. El horizonte debe ser compatible con la vida econ\u00f3mica y t\u00e9cnica de los activos, considerando sustituciones relevantes y valor residual cuando corresponda.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">El an\u00e1lisis tambi\u00e9n debe explicitar inflaci\u00f3n, tasas, premisas de precios y base temporal utilizada, evitando mezclar valores nominales y reales sin un tratamiento consistente.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Beneficios y flujo de caja incremental<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Los beneficios pueden provenir del aumento de producci\u00f3n, reducci\u00f3n de p\u00e9rdidas, ahorro de energ\u00eda, reducci\u00f3n de mantenimiento, menor indisponibilidad, eliminaci\u00f3n de alquiler, reducci\u00f3n de riesgo u otros efectos medibles.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">El flujo de caja debe ser incremental: comparar lo que cambia con la ejecuci\u00f3n del proyecto respecto del escenario base.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">VAN, TIR, payback e \u00edndice de rentabilidad<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Los indicadores financieros ayudan a interpretar el proyecto, pero cada uno responde preguntas diferentes.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">El Valor Actual Neto mide creaci\u00f3n de valor considerando la tasa de descuento. La Tasa Interna de Retorno expresa la tasa que hace que el VAN sea igual a cero bajo determinadas premisas. Payback indica el tiempo para recuperar la inversi\u00f3n, pero por s\u00ed solo no captura valor despu\u00e9s del per\u00edodo de recuperaci\u00f3n. El \u00cdndice de Rentabilidad puede apoyar la priorizaci\u00f3n cuando el capital es limitado.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Ning\u00fan indicador debe sustituir el an\u00e1lisis t\u00e9cnico y de riesgos.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Tasa de descuento y costo de capital<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">La tasa de descuento afecta fuertemente a los proyectos de larga duraci\u00f3n. Debe reflejar la metodolog\u00eda financiera adoptada por la organizaci\u00f3n y no elegirse para producir el resultado deseado.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Cuando el estudio es t\u00e9cnico-consultivo, la Ingenier\u00eda puede estructurar escenarios y proporcionar los flujos, mientras los criterios corporativos de WACC y hurdle rate deben alinearse con finanzas o gobernanza de inversiones.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">An\u00e1lisis de sensibilidad<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">La viabilidad no debe depender de una \u00fanica proyecci\u00f3n. La sensibilidad muestra c\u00f3mo cambia la conclusi\u00f3n cuando var\u00edan premisas importantes.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Las variables t\u00edpicas incluyen CAPEX, precio de energ\u00eda, demanda, producci\u00f3n, plazo, disponibilidad, OPEX y tasa de descuento.<\/p>\n\n\n\n<figure class=\"a3a-mermaid\"><svg id=\"a3a-diagram-5\" width=\"100%\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" class=\"flowchart\" style=\"max-width:min(514.03125px, 100%);height:auto;display:block;margin:0 auto\" viewBox=\"0 0 514.03125 648.5\" role=\"graphics-document document\" aria-roledescription=\"flowchart-v2\" aria-labelledby=\"chart-title-a3a-diagram-5\"><title id=\"chart-title-a3a-diagram-5\">L\u00f3gica de an\u00e1lisis de sensibilidad de un estudio de viabilidad<\/title><style>#a3a-diagram-5{font-family:Roboto,sans-serif;font-size:15px;fill:var(--a3a-diag-text, #0a0a0a);}@keyframes edge-animation-frame{from{stroke-dashoffset:0;}}@keyframes dash{to{stroke-dashoffset:0;}}#a3a-diagram-5 .edge-animation-slow{stroke-dasharray:9,5!important;stroke-dashoffset:900;animation:dash 50s linear infinite;stroke-linecap:round;}#a3a-diagram-5 .edge-animation-fast{stroke-dasharray:9,5!important;stroke-dashoffset:900;animation:dash 20s linear infinite;stroke-linecap:round;}#a3a-diagram-5 .error-icon{fill:var(--a3a-diag-canvas, #ffffff);}#a3a-diagram-5 .error-text{fill:#000000;stroke:#000000;}#a3a-diagram-5 .edge-thickness-normal{stroke-width:1px;}#a3a-diagram-5 .edge-thickness-thick{stroke-width:3.5px;}#a3a-diagram-5 .edge-pattern-solid{stroke-dasharray:0;}#a3a-diagram-5 .edge-thickness-invisible{stroke-width:0;fill:none;}#a3a-diagram-5 .edge-pattern-dashed{stroke-dasharray:3;}#a3a-diagram-5 .edge-pattern-dotted{stroke-dasharray:2;}#a3a-diagram-5 .marker{fill:var(--a3a-diag-stroke, #2e42a2);stroke:var(--a3a-diag-stroke, #2e42a2);}#a3a-diagram-5 .marker.cross{stroke:var(--a3a-diag-stroke, #2e42a2);}#a3a-diagram-5 svg{font-family:Roboto,sans-serif;font-size:15px;}#a3a-diagram-5 p{margin:0;}#a3a-diagram-5 .label{font-family:Roboto,sans-serif;color:var(--a3a-diag-text, #0a0a0a);}#a3a-diagram-5 .cluster-label text{fill:var(--a3a-diag-title, #0124af);}#a3a-diagram-5 .cluster-label span{color:var(--a3a-diag-title, #0124af);}#a3a-diagram-5 .cluster-label span p{background-color:transparent;}#a3a-diagram-5 .label text,#a3a-diagram-5 span{fill:var(--a3a-diag-text, #0a0a0a);color:var(--a3a-diag-text, #0a0a0a);}#a3a-diagram-5 .node rect,#a3a-diagram-5 .node circle,#a3a-diagram-5 .node ellipse,#a3a-diagram-5 .node polygon,#a3a-diagram-5 .node path{fill:var(--a3a-diag-fill, #eef2fd);stroke:var(--a3a-diag-stroke, #2e42a2);stroke-width:1px;}#a3a-diagram-5 .rough-node .label text,#a3a-diagram-5 .node .label text,#a3a-diagram-5 .image-shape .label,#a3a-diagram-5 .icon-shape .label{text-anchor:middle;}#a3a-diagram-5 .node .katex path{fill:#000;stroke:#000;stroke-width:1px;}#a3a-diagram-5 .rough-node .label,#a3a-diagram-5 .node .label,#a3a-diagram-5 .image-shape .label,#a3a-diagram-5 .icon-shape .label{text-align:center;}#a3a-diagram-5 .node.clickable{cursor:pointer;}#a3a-diagram-5 .root .anchor path{fill:var(--a3a-diag-stroke, #2e42a2)!important;stroke-width:0;stroke:var(--a3a-diag-stroke, #2e42a2);}#a3a-diagram-5 .arrowheadPath{fill:var(--a3a-diag-stroke, #0b0b0b);}#a3a-diagram-5 .edgePath .path{stroke:var(--a3a-diag-stroke, #2e42a2);stroke-width:2.0px;}#a3a-diagram-5 .flowchart-link{stroke:var(--a3a-diag-stroke, #2e42a2);fill:none;}#a3a-diagram-5 .edgeLabel{background-color:var(--a3a-diag-canvas, #ffffff);text-align:center;}#a3a-diagram-5 .edgeLabel p{background-color:var(--a3a-diag-canvas, #ffffff);}#a3a-diagram-5 .edgeLabel rect{opacity:0.5;background-color:var(--a3a-diag-canvas, #ffffff);fill:var(--a3a-diag-canvas, #ffffff);}#a3a-diagram-5 .labelBkg{background-color:rgba(255, 255, 255, 0.5);}#a3a-diagram-5 .cluster rect{fill:var(--a3a-diag-surface, #f8f8f8);stroke:var(--a3a-diag-border, #e2e8f0);stroke-width:1px;}#a3a-diagram-5 .cluster text{fill:var(--a3a-diag-title, #0124af);}#a3a-diagram-5 .cluster span{color:var(--a3a-diag-title, #0124af);}#a3a-diagram-5 div.mermaidTooltip{position:absolute;text-align:center;max-width:200px;padding:2px;font-family:Roboto,sans-serif;font-size:12px;background:var(--a3a-diag-canvas, #ffffff);border:1px solid hsl(0, 0%, 90%);border-radius:2px;pointer-events:none;z-index:100;}#a3a-diagram-5 .flowchartTitleText{text-anchor:middle;font-size:18px;fill:var(--a3a-diag-text, #0a0a0a);}#a3a-diagram-5 rect.text{fill:none;stroke-width:0;}#a3a-diagram-5 .icon-shape,#a3a-diagram-5 .image-shape{background-color:var(--a3a-diag-canvas, #ffffff);text-align:center;}#a3a-diagram-5 .icon-shape p,#a3a-diagram-5 .image-shape p{background-color:var(--a3a-diag-canvas, #ffffff);padding:2px;}#a3a-diagram-5 .icon-shape rect,#a3a-diagram-5 .image-shape rect{opacity:0.5;background-color:var(--a3a-diag-canvas, #ffffff);fill:var(--a3a-diag-canvas, #ffffff);}#a3a-diagram-5 .label-icon{display:inline-block;height:1em;overflow:visible;vertical-align:-0.125em;}#a3a-diagram-5 .node .label-icon path{fill:currentColor;stroke:revert;stroke-width:revert;}#a3a-diagram-5 :root{--mermaid-font-family:Roboto,sans-serif;}<\/style><g><marker id=\"a3a-diagram-5_flowchart-v2-pointEnd\" class=\"marker flowchart-v2\" viewBox=\"0 0 10 10\" refX=\"5\" refY=\"5\" markerUnits=\"userSpaceOnUse\" markerWidth=\"8\" markerHeight=\"8\" orient=\"auto\"><path d=\"M 0 0 L 10 5 L 0 10 z\" class=\"arrowMarkerPath\" style=\"stroke-width: 1; stroke-dasharray: 1, 0;\"><\/path><\/marker><marker id=\"a3a-diagram-5_flowchart-v2-pointStart\" class=\"marker flowchart-v2\" viewBox=\"0 0 10 10\" refX=\"4.5\" refY=\"5\" markerUnits=\"userSpaceOnUse\" markerWidth=\"8\" markerHeight=\"8\" orient=\"auto\"><path d=\"M 0 5 L 10 10 L 10 0 z\" class=\"arrowMarkerPath\" style=\"stroke-width: 1; stroke-dasharray: 1, 0;\"><\/path><\/marker><marker id=\"a3a-diagram-5_flowchart-v2-circleEnd\" class=\"marker flowchart-v2\" viewBox=\"0 0 10 10\" refX=\"11\" refY=\"5\" markerUnits=\"userSpaceOnUse\" markerWidth=\"11\" markerHeight=\"11\" orient=\"auto\"><circle cx=\"5\" cy=\"5\" r=\"5\" class=\"arrowMarkerPath\" style=\"stroke-width: 1; stroke-dasharray: 1, 0;\"><\/circle><\/marker><marker id=\"a3a-diagram-5_flowchart-v2-circleStart\" class=\"marker flowchart-v2\" viewBox=\"0 0 10 10\" refX=\"-1\" refY=\"5\" markerUnits=\"userSpaceOnUse\" markerWidth=\"11\" markerHeight=\"11\" orient=\"auto\"><circle cx=\"5\" cy=\"5\" r=\"5\" class=\"arrowMarkerPath\" style=\"stroke-width: 1; stroke-dasharray: 1, 0;\"><\/circle><\/marker><marker id=\"a3a-diagram-5_flowchart-v2-crossEnd\" class=\"marker cross flowchart-v2\" viewBox=\"0 0 11 11\" refX=\"12\" refY=\"5.2\" markerUnits=\"userSpaceOnUse\" markerWidth=\"11\" markerHeight=\"11\" orient=\"auto\"><path d=\"M 1,1 l 9,9 M 10,1 l -9,9\" class=\"arrowMarkerPath\" style=\"stroke-width: 2; stroke-dasharray: 1, 0;\"><\/path><\/marker><marker id=\"a3a-diagram-5_flowchart-v2-crossStart\" class=\"marker cross flowchart-v2\" viewBox=\"0 0 11 11\" refX=\"-1\" refY=\"5.2\" markerUnits=\"userSpaceOnUse\" markerWidth=\"11\" markerHeight=\"11\" orient=\"auto\"><path d=\"M 1,1 l 9,9 M 10,1 l -9,9\" class=\"arrowMarkerPath\" style=\"stroke-width: 2; stroke-dasharray: 1, 0;\"><\/path><\/marker><g class=\"root\"><g class=\"clusters\"><\/g><g class=\"edgePaths\"><path d=\"M239.023,60.5L239.023,64.667C239.023,68.833,239.023,77.167,239.023,84.833C239.023,92.5,239.023,99.5,239.023,103L239.023,106.5\" id=\"L_A_B_0\" class=\"edge-thickness-normal edge-pattern-solid edge-thickness-normal edge-pattern-solid flowchart-link\" style=\";\" data-edge=\"true\" data-et=\"edge\" data-id=\"L_A_B_0\" data-points=\"W3sieCI6MjM5LjAyMzQzNzUsInkiOjYwLjV9LHsieCI6MjM5LjAyMzQzNzUsInkiOjg1LjV9LHsieCI6MjM5LjAyMzQzNzUsInkiOjExMC41fV0=\" marker-end=\"url(#a3a-diagram-5_flowchart-v2-pointEnd)\"><\/path><path d=\"M168.849,163L157.71,167.167C146.571,171.333,124.293,179.667,113.154,189.208C102.016,198.75,102.016,209.5,102.016,214.875L102.016,220.25\" id=\"L_B_C_0\" class=\"edge-thickness-normal edge-pattern-solid edge-thickness-normal edge-pattern-solid flowchart-link\" style=\";\" data-edge=\"true\" data-et=\"edge\" data-id=\"L_B_C_0\" data-points=\"W3sieCI6MTY4Ljg0ODcwNDI2ODI5MjcsInkiOjE2M30seyJ4IjoxMDIuMDE1NjI1LCJ5IjoxODh9LHsieCI6MTAyLjAxNTYyNSwieSI6MjI0LjI1fV0=\" marker-end=\"url(#a3a-diagram-5_flowchart-v2-pointEnd)\"><\/path><path d=\"M309.198,163L320.337,167.167C331.476,171.333,353.754,179.667,364.892,187.333C376.031,195,376.031,202,376.031,205.5L376.031,209\" id=\"L_B_D_0\" class=\"edge-thickness-normal edge-pattern-solid edge-thickness-normal edge-pattern-solid flowchart-link\" style=\";\" data-edge=\"true\" data-et=\"edge\" data-id=\"L_B_D_0\" data-points=\"W3sieCI6MzA5LjE5ODE3MDczMTcwNzMsInkiOjE2M30seyJ4IjozNzYuMDMxMjUsInkiOjE4OH0seyJ4IjozNzYuMDMxMjUsInkiOjIxM31d\" marker-end=\"url(#a3a-diagram-5_flowchart-v2-pointEnd)\"><\/path><path d=\"M102.016,276.75L102.016,282.792C102.016,288.833,102.016,300.917,110.543,310.848C119.07,320.78,136.125,328.56,144.652,332.45L153.18,336.34\" id=\"L_C_E_0\" class=\"edge-thickness-normal edge-pattern-solid edge-thickness-normal edge-pattern-solid flowchart-link\" style=\";\" data-edge=\"true\" data-et=\"edge\" data-id=\"L_C_E_0\" data-points=\"W3sieCI6MTAyLjAxNTYyNSwieSI6Mjc2Ljc1fSx7IngiOjEwMi4wMTU2MjUsInkiOjMxM30seyJ4IjoxNTYuODE4NzUsInkiOjMzOH1d\" marker-end=\"url(#a3a-diagram-5_flowchart-v2-pointEnd)\"><\/path><path d=\"M376.031,288L376.031,292.167C376.031,296.333,376.031,304.667,367.504,312.723C358.977,320.78,341.922,328.56,333.395,332.45L324.867,336.34\" id=\"L_D_E_0\" class=\"edge-thickness-normal edge-pattern-solid edge-thickness-normal edge-pattern-solid flowchart-link\" style=\";\" data-edge=\"true\" data-et=\"edge\" data-id=\"L_D_E_0\" data-points=\"W3sieCI6Mzc2LjAzMTI1LCJ5IjoyODh9LHsieCI6Mzc2LjAzMTI1LCJ5IjozMTN9LHsieCI6MzIxLjIyODEyNSwieSI6MzM4fV0=\" marker-end=\"url(#a3a-diagram-5_flowchart-v2-pointEnd)\"><\/path><path d=\"M239.023,413L239.023,417.167C239.023,421.333,239.023,429.667,239.023,437.333C239.023,445,239.023,452,239.023,455.5L239.023,459\" id=\"L_E_F_0\" class=\"edge-thickness-normal edge-pattern-solid edge-thickness-normal edge-pattern-solid flowchart-link\" style=\";\" data-edge=\"true\" data-et=\"edge\" data-id=\"L_E_F_0\" data-points=\"W3sieCI6MjM5LjAyMzQzNzUsInkiOjQxM30seyJ4IjoyMzkuMDIzNDM3NSwieSI6NDM4fSx7IngiOjIzOS4wMjM0Mzc1LCJ5Ijo0NjN9XQ==\" marker-end=\"url(#a3a-diagram-5_flowchart-v2-pointEnd)\"><\/path><path d=\"M239.023,515.5L239.023,519.667C239.023,523.833,239.023,532.167,239.023,539.833C239.023,547.5,239.023,554.5,239.023,558L239.023,561.5\" id=\"L_F_G_0\" class=\"edge-thickness-normal edge-pattern-solid edge-thickness-normal edge-pattern-solid flowchart-link\" style=\";\" data-edge=\"true\" data-et=\"edge\" data-id=\"L_F_G_0\" data-points=\"W3sieCI6MjM5LjAyMzQzNzUsInkiOjUxNS41fSx7IngiOjIzOS4wMjM0Mzc1LCJ5Ijo1NDAuNX0seyJ4IjoyMzkuMDIzNDM3NSwieSI6NTY1LjV9XQ==\" marker-end=\"url(#a3a-diagram-5_flowchart-v2-pointEnd)\"><\/path><\/g><g class=\"edgeLabels\"><g class=\"edgeLabel\"><g class=\"label\" data-id=\"L_A_B_0\" transform=\"translate(0, 0)\"><foreignObject width=\"0\" height=\"0\"><div xmlns=\"http:\/\/www.w3.org\/1999\/xhtml\" class=\"labelBkg\" style=\"display: table-cell; white-space: nowrap; line-height: 1.5; max-width: 200px; text-align: center;\"><span class=\"edgeLabel\"><\/span><\/div><\/foreignObject><\/g><\/g><g class=\"edgeLabel\"><g class=\"label\" data-id=\"L_B_C_0\" transform=\"translate(0, 0)\"><foreignObject width=\"0\" height=\"0\"><div xmlns=\"http:\/\/www.w3.org\/1999\/xhtml\" class=\"labelBkg\" style=\"display: table-cell; white-space: nowrap; line-height: 1.5; max-width: 200px; text-align: center;\"><span class=\"edgeLabel\"><\/span><\/div><\/foreignObject><\/g><\/g><g class=\"edgeLabel\"><g class=\"label\" data-id=\"L_B_D_0\" transform=\"translate(0, 0)\"><foreignObject width=\"0\" height=\"0\"><div xmlns=\"http:\/\/www.w3.org\/1999\/xhtml\" class=\"labelBkg\" style=\"display: table-cell; white-space: nowrap; line-height: 1.5; max-width: 200px; text-align: center;\"><span class=\"edgeLabel\"><\/span><\/div><\/foreignObject><\/g><\/g><g class=\"edgeLabel\"><g class=\"label\" data-id=\"L_C_E_0\" transform=\"translate(0, 0)\"><foreignObject width=\"0\" height=\"0\"><div xmlns=\"http:\/\/www.w3.org\/1999\/xhtml\" class=\"labelBkg\" style=\"display: table-cell; white-space: nowrap; line-height: 1.5; max-width: 200px; text-align: center;\"><span class=\"edgeLabel\"><\/span><\/div><\/foreignObject><\/g><\/g><g class=\"edgeLabel\"><g class=\"label\" data-id=\"L_D_E_0\" transform=\"translate(0, 0)\"><foreignObject width=\"0\" height=\"0\"><div xmlns=\"http:\/\/www.w3.org\/1999\/xhtml\" class=\"labelBkg\" style=\"display: table-cell; white-space: nowrap; line-height: 1.5; max-width: 200px; text-align: center;\"><span class=\"edgeLabel\"><\/span><\/div><\/foreignObject><\/g><\/g><g class=\"edgeLabel\"><g class=\"label\" data-id=\"L_E_F_0\" transform=\"translate(0, 0)\"><foreignObject width=\"0\" height=\"0\"><div xmlns=\"http:\/\/www.w3.org\/1999\/xhtml\" class=\"labelBkg\" style=\"display: table-cell; white-space: nowrap; line-height: 1.5; max-width: 200px; text-align: center;\"><span class=\"edgeLabel\"><\/span><\/div><\/foreignObject><\/g><\/g><g class=\"edgeLabel\"><g class=\"label\" data-id=\"L_F_G_0\" transform=\"translate(0, 0)\"><foreignObject width=\"0\" height=\"0\"><div xmlns=\"http:\/\/www.w3.org\/1999\/xhtml\" class=\"labelBkg\" style=\"display: table-cell; white-space: nowrap; line-height: 1.5; max-width: 200px; text-align: center;\"><span class=\"edgeLabel\"><\/span><\/div><\/foreignObject><\/g><\/g><\/g><g class=\"nodes\"><g class=\"node default\" id=\"flowchart-A-0\" transform=\"translate(239.0234375, 34.25)\"><rect class=\"basic label-container\" style=\"\" x=\"-63.9765625\" y=\"-26.25\" width=\"127.953125\" height=\"52.5\"><\/rect><g class=\"label\" style=\"\" transform=\"translate(-33.9765625, -11.25)\"><rect><\/rect><foreignObject width=\"67.953125\" height=\"22.5\"><div xmlns=\"http:\/\/www.w3.org\/1999\/xhtml\" style=\"display: table-cell; white-space: nowrap; line-height: 1.5; max-width: 200px; text-align: center;\"><span class=\"nodeLabel\"><p>Caso base<\/p><\/span><\/div><\/foreignObject><\/g><\/g><g class=\"node default\" id=\"flowchart-B-1\" transform=\"translate(239.0234375, 136.75)\"><rect class=\"basic label-container\" style=\"\" x=\"-128.4140625\" y=\"-26.25\" width=\"256.828125\" height=\"52.5\"><\/rect><g class=\"label\" style=\"\" transform=\"translate(-98.4140625, -11.25)\"><rect><\/rect><foreignObject width=\"196.828125\" height=\"22.5\"><div xmlns=\"http:\/\/www.w3.org\/1999\/xhtml\" style=\"display: table-cell; white-space: nowrap; line-height: 1.5; max-width: 200px; text-align: center;\"><span class=\"nodeLabel\"><p>Seleccionar premisas cr\u00edticas<\/p><\/span><\/div><\/foreignObject><\/g><\/g><g class=\"node default\" id=\"flowchart-C-3\" transform=\"translate(102.015625, 250.5)\"><rect class=\"basic label-container\" style=\"\" x=\"-94.015625\" y=\"-26.25\" width=\"188.03125\" height=\"52.5\"><\/rect><g class=\"label\" style=\"\" transform=\"translate(-64.015625, -11.25)\"><rect><\/rect><foreignObject width=\"128.03125\" height=\"22.5\"><div xmlns=\"http:\/\/www.w3.org\/1999\/xhtml\" style=\"display: table-cell; white-space: nowrap; line-height: 1.5; max-width: 200px; text-align: center;\"><span class=\"nodeLabel\"><p>Variar una premisa<\/p><\/span><\/div><\/foreignObject><\/g><\/g><g class=\"node default\" id=\"flowchart-D-5\" transform=\"translate(376.03125, 250.5)\"><rect class=\"basic label-container\" style=\"\" x=\"-130\" y=\"-37.5\" width=\"260\" height=\"75\"><\/rect><g class=\"label\" style=\"\" transform=\"translate(-100, -22.5)\"><rect><\/rect><foreignObject width=\"200\" height=\"45\"><div xmlns=\"http:\/\/www.w3.org\/1999\/xhtml\" style=\"display: table; white-space: break-spaces; line-height: 1.5; max-width: 200px; text-align: center; width: 200px;\"><span class=\"nodeLabel\"><p>Construir escenarios combinados<\/p><\/span><\/div><\/foreignObject><\/g><\/g><g class=\"node default\" id=\"flowchart-E-7\" transform=\"translate(239.0234375, 375.5)\"><rect class=\"basic label-container\" style=\"\" x=\"-130\" y=\"-37.5\" width=\"260\" height=\"75\"><\/rect><g class=\"label\" style=\"\" transform=\"translate(-100, -22.5)\"><rect><\/rect><foreignObject width=\"200\" height=\"45\"><div xmlns=\"http:\/\/www.w3.org\/1999\/xhtml\" style=\"display: table; white-space: break-spaces; line-height: 1.5; max-width: 200px; text-align: center; width: 200px;\"><span class=\"nodeLabel\"><p>Medir impacto en los indicadores<\/p><\/span><\/div><\/foreignObject><\/g><\/g><g class=\"node default\" id=\"flowchart-F-11\" transform=\"translate(239.0234375, 489.25)\"><rect class=\"basic label-container\" style=\"\" x=\"-122.4375\" y=\"-26.25\" width=\"244.875\" height=\"52.5\"><\/rect><g class=\"label\" style=\"\" transform=\"translate(-92.4375, -11.25)\"><rect><\/rect><foreignObject width=\"184.875\" height=\"22.5\"><div xmlns=\"http:\/\/www.w3.org\/1999\/xhtml\" style=\"display: table-cell; white-space: nowrap; line-height: 1.5; max-width: 200px; text-align: center;\"><span class=\"nodeLabel\"><p>Identificar switching values<\/p><\/span><\/div><\/foreignObject><\/g><\/g><g class=\"node default\" id=\"flowchart-G-13\" transform=\"translate(239.0234375, 603)\"><rect class=\"basic label-container\" style=\"\" x=\"-130\" y=\"-37.5\" width=\"260\" height=\"75\"><\/rect><g class=\"label\" style=\"\" transform=\"translate(-100, -22.5)\"><rect><\/rect><foreignObject width=\"200\" height=\"45\"><div xmlns=\"http:\/\/www.w3.org\/1999\/xhtml\" style=\"display: table; white-space: break-spaces; line-height: 1.5; max-width: 200px; text-align: center; width: 200px;\"><span class=\"nodeLabel\"><p>Evaluar robustez de la decisi\u00f3n<\/p><\/span><\/div><\/foreignObject><\/g><\/g><\/g><\/g><\/g><\/svg><figcaption>L\u00f3gica de an\u00e1lisis de sensibilidad de un estudio de viabilidad<\/figcaption><\/figure>\n\n\n\n<h2 class=\"wp-block-heading\">Escenarios<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Los escenarios combinan premisas coherentes. Un escenario conservador puede reunir menor demanda, mayor CAPEX y atraso; un escenario favorable puede utilizar premisas m\u00e1s positivas, siempre que sean t\u00e9cnicamente justificables.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">El objetivo no es adivinar el futuro, sino entender en qu\u00e9 condiciones la decisi\u00f3n contin\u00faa siendo racional.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Switching values<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Switching value es el punto en el que una premisa cambia la decisi\u00f3n. Saber que el proyecto deja de ser atractivo si el CAPEX aumenta una determinada proporci\u00f3n o si la demanda cae por debajo de cierto umbral es m\u00e1s \u00fatil que presentar solamente un valor esperado.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Esto orienta diligencias y negociaciones hacia las variables que realmente importan.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Riesgos t\u00e9cnicos<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Los riesgos t\u00e9cnicos pueden involucrar tecnolog\u00eda inmadura, interfaces desconocidas, capacidad de red, condici\u00f3n de activos existentes, dependencias de proveedores, indisponibilidad durante la migraci\u00f3n y requisitos todav\u00eda no cerrados.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">El estudio debe registrar probabilidad, impacto, mitigaci\u00f3n, responsable y efecto potencial sobre las alternativas.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Riesgos de plazo<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">El plazo puede ser un factor de viabilidad. Licenciamiento, equipos de largo plazo de suministro, ventanas de parada, acceso al sitio y recursos especializados pueden hacer que una alternativa t\u00e9cnicamente buena sea incompatible con la fecha requerida.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">El cronograma de viabilidad no necesita el detalle de la planificaci\u00f3n ejecutiva, pero debe capturar el camino cr\u00edtico conceptual y las restricciones clave.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Riesgos regulatorios y de conformidad<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Los requisitos legales, ambientales, normativos y de concesionarias pueden inviabilizar o condicionar una soluci\u00f3n. El an\u00e1lisis debe identificar qu\u00e9 autorizaciones y estudios son necesarios y qu\u00e9 premisas todav\u00eda dependen de confirmaci\u00f3n.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Viabilidad no significa obtener todas las licencias anticipadamente, pero no puede ignorar condicionantes capaces de modificar costo o plazo.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Riesgos operativos<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Una soluci\u00f3n debe encajar en la capacidad de operaci\u00f3n de la organizaci\u00f3n. Complejidad excesiva, falta de personal, requisitos de capacitaci\u00f3n, dependencia de soporte externo y dificultad de mantenimiento afectan el valor a lo largo de la vida \u00fatil.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">La evaluaci\u00f3n debe incluir disponibilidad de competencias y estrategia de soporte.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Matriz multicriterio<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">No toda decisi\u00f3n puede reducirse a dinero. MCDA y otros enfoques permiten ponderar criterios t\u00e9cnicos, econ\u00f3micos y estrat\u00e9gicos con transparencia.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Es importante evitar la falsa precisi\u00f3n. Los pesos y puntuaciones deben justificarse y probarse mediante sensibilidad. La matriz debe hacer la decisi\u00f3n m\u00e1s auditable, no ocultar preferencias previas.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Ingenier\u00eda de Valor en la viabilidad<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">La Ingenier\u00eda de Valor puede revisar funciones y buscar alternativas con mejor relaci\u00f3n entre desempe\u00f1o y costo. Es particularmente \u00fatil antes de que las definiciones se vuelvan costosas de cambiar.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Reducir costos eliminando un requisito esencial no es Ingenier\u00eda de Valor; es reducci\u00f3n de alcance.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Proyecto conceptual como soporte<\/h2>\n\n\n\n<div class=\"wp-block-a3a-destaque\">\n<p class=\"wp-block-paragraph\">La alternativa seleccionada necesita madurar t\u00e9cnicamente antes de la contrataci\u00f3n. El Proyecto Conceptual y el Front-End Planning reducen las incertidumbres identificadas por la viabilidad.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><a href=\"https:\/\/a3aengenharia.com.br\/servicos\/planejamento\/projeto-conceitual-de-engenharia\/\">Vea Proyecto Conceptual de Ingenier\u00eda<\/a><\/p>\n<\/div>\n\n\n\n<p class=\"wp-block-paragraph\">Muchos estudios de viabilidad necesitan suficiente ingenier\u00eda conceptual para dimensionar alternativas, identificar interfaces y estimar costos. El nivel de dise\u00f1o debe ser proporcional a la decisi\u00f3n.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Un proyecto excesivamente detallado antes del gate consume recursos en alternativas que pueden descartarse. Un proyecto insuficiente genera estimaciones sin base.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">FEL y Front-End Planning<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">En proyectos de capital, el estudio de viabilidad se relaciona con Front-End Loading. A medida que el proyecto madura, requisitos, alternativas, alcance, riesgos y estimaciones ganan definici\u00f3n antes de la autorizaci\u00f3n de ejecuci\u00f3n.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">La l\u00f3gica es simple: las decisiones tomadas temprano cuestan menos de cambiar y tienen una fuerte influencia sobre el desempe\u00f1o posterior.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">PDRI y madurez<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Herramientas de madurez como PDRI pueden ayudar a evaluar si el alcance est\u00e1 suficientemente definido para avanzar. No determinan la viabilidad financiera, pero revelan brechas que aumentan incertidumbre y riesgo.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Estudio de viabilidad x ETP<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">El Estudio T\u00e9cnico Preliminar (ETP) posee un contexto propio, especialmente en contrataciones p\u00fablicas. Analiza la necesidad y las alternativas para fundamentar la soluci\u00f3n y la contrataci\u00f3n.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Un estudio de viabilidad empresarial o de Ingenier\u00eda puede tener un alcance m\u00e1s amplio o diferente. Los documentos pueden apoyarse, pero no deben tratarse como equivalentes autom\u00e1ticos.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Estudio de viabilidad x Business Case<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">El Business Case conecta la propuesta con el valor para la organizaci\u00f3n y con la decisi\u00f3n de inversi\u00f3n. El estudio de viabilidad proporciona una parte importante de las evidencias t\u00e9cnicas y econ\u00f3micas que sustentan ese caso.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">En una gobernanza madura, ambos pueden estar integrados en el gate de aprobaci\u00f3n.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Fuentes de datos y calidad de las premisas<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Cada premisa relevante debe tener una fuente. Los datos pueden provenir de mediciones, historial operativo, cotizaciones, benchmarks, proyectos existentes, contratos, normas y estudios de mercado.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Debe registrarse la calidad de la fuente. Una premisa basada en un levantamiento real no debe recibir el mismo grado de confianza que un valor preliminar inferido.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Clases de estimaci\u00f3n e incertidumbre<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Cuanto menor sea la definici\u00f3n del proyecto, mayor tiende a ser la incertidumbre de la estimaci\u00f3n. Es inadecuado presentar un presupuesto conceptual con apariencia de precisi\u00f3n ejecutiva.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">El informe debe registrar base, exclusiones, contingencia, fecha base y rango de incertidumbre compatible con la etapa.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Contingencia<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">La contingencia no es un porcentaje arbitrario a\u00f1adido para \u201cgarantizar\u201d el presupuesto. Debe reflejar incertidumbres y riesgos todav\u00eda presentes, conforme a la metodolog\u00eda adoptada.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Separar contingencia de alcance conocido ayuda a preservar la transparencia.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">C\u00f3mo organizar el estudio<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Una estructura robusta normalmente contiene:<\/p>\n\n\n\n<ol class=\"wp-block-list\"><li>contexto y objetivo;<\/li><li>necesidades y requisitos;<\/li><li>premisas y restricciones;<\/li><li>condici\u00f3n existente;<\/li><li>alternativas;<\/li><li>an\u00e1lisis t\u00e9cnico;<\/li><li>CAPEX y OPEX;<\/li><li>cronograma conceptual;<\/li><li>riesgos;<\/li><li>an\u00e1lisis econ\u00f3mico;<\/li><li>sensibilidad y escenarios;<\/li><li>comparaci\u00f3n multicriterio;<\/li><li>recomendaci\u00f3n;<\/li><li>condicionantes para el pr\u00f3ximo gate.<\/li><\/ol>\n\n\n\n<h2 class=\"wp-block-heading\">Proceso de decisi\u00f3n<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">La recomendaci\u00f3n debe surgir de la comparaci\u00f3n, y no aparecer \u00fanicamente al final como una opini\u00f3n.<\/p>\n\n\n\n<figure class=\"a3a-mermaid\"><svg id=\"a3a-diagram-6\" width=\"100%\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" class=\"flowchart\" style=\"max-width:min(628.78125px, 100%);height:auto;display:block;margin:0 auto\" viewBox=\"0 0 628.78125 1051.234375\" role=\"graphics-document document\" aria-roledescription=\"flowchart-v2\" aria-labelledby=\"chart-title-a3a-diagram-6\"><title id=\"chart-title-a3a-diagram-6\">Gate de decisi\u00f3n despu\u00e9s del estudio de viabilidad<\/title><style>#a3a-diagram-6{font-family:Roboto,sans-serif;font-size:15px;fill:var(--a3a-diag-text, #0a0a0a);}@keyframes edge-animation-frame{from{stroke-dashoffset:0;}}@keyframes dash{to{stroke-dashoffset:0;}}#a3a-diagram-6 .edge-animation-slow{stroke-dasharray:9,5!important;stroke-dashoffset:900;animation:dash 50s linear infinite;stroke-linecap:round;}#a3a-diagram-6 .edge-animation-fast{stroke-dasharray:9,5!important;stroke-dashoffset:900;animation:dash 20s linear infinite;stroke-linecap:round;}#a3a-diagram-6 .error-icon{fill:var(--a3a-diag-canvas, #ffffff);}#a3a-diagram-6 .error-text{fill:#000000;stroke:#000000;}#a3a-diagram-6 .edge-thickness-normal{stroke-width:1px;}#a3a-diagram-6 .edge-thickness-thick{stroke-width:3.5px;}#a3a-diagram-6 .edge-pattern-solid{stroke-dasharray:0;}#a3a-diagram-6 .edge-thickness-invisible{stroke-width:0;fill:none;}#a3a-diagram-6 .edge-pattern-dashed{stroke-dasharray:3;}#a3a-diagram-6 .edge-pattern-dotted{stroke-dasharray:2;}#a3a-diagram-6 .marker{fill:var(--a3a-diag-stroke, #2e42a2);stroke:var(--a3a-diag-stroke, #2e42a2);}#a3a-diagram-6 .marker.cross{stroke:var(--a3a-diag-stroke, #2e42a2);}#a3a-diagram-6 svg{font-family:Roboto,sans-serif;font-size:15px;}#a3a-diagram-6 p{margin:0;}#a3a-diagram-6 .label{font-family:Roboto,sans-serif;color:var(--a3a-diag-text, #0a0a0a);}#a3a-diagram-6 .cluster-label text{fill:var(--a3a-diag-title, #0124af);}#a3a-diagram-6 .cluster-label span{color:var(--a3a-diag-title, #0124af);}#a3a-diagram-6 .cluster-label span p{background-color:transparent;}#a3a-diagram-6 .label text,#a3a-diagram-6 span{fill:var(--a3a-diag-text, #0a0a0a);color:var(--a3a-diag-text, #0a0a0a);}#a3a-diagram-6 .node rect,#a3a-diagram-6 .node circle,#a3a-diagram-6 .node ellipse,#a3a-diagram-6 .node polygon,#a3a-diagram-6 .node path{fill:var(--a3a-diag-fill, #eef2fd);stroke:var(--a3a-diag-stroke, #2e42a2);stroke-width:1px;}#a3a-diagram-6 .rough-node .label text,#a3a-diagram-6 .node .label text,#a3a-diagram-6 .image-shape .label,#a3a-diagram-6 .icon-shape .label{text-anchor:middle;}#a3a-diagram-6 .node .katex path{fill:#000;stroke:#000;stroke-width:1px;}#a3a-diagram-6 .rough-node .label,#a3a-diagram-6 .node .label,#a3a-diagram-6 .image-shape .label,#a3a-diagram-6 .icon-shape .label{text-align:center;}#a3a-diagram-6 .node.clickable{cursor:pointer;}#a3a-diagram-6 .root .anchor path{fill:var(--a3a-diag-stroke, #2e42a2)!important;stroke-width:0;stroke:var(--a3a-diag-stroke, #2e42a2);}#a3a-diagram-6 .arrowheadPath{fill:var(--a3a-diag-stroke, #0b0b0b);}#a3a-diagram-6 .edgePath .path{stroke:var(--a3a-diag-stroke, #2e42a2);stroke-width:2.0px;}#a3a-diagram-6 .flowchart-link{stroke:var(--a3a-diag-stroke, #2e42a2);fill:none;}#a3a-diagram-6 .edgeLabel{background-color:var(--a3a-diag-canvas, #ffffff);text-align:center;}#a3a-diagram-6 .edgeLabel p{background-color:var(--a3a-diag-canvas, #ffffff);}#a3a-diagram-6 .edgeLabel rect{opacity:0.5;background-color:var(--a3a-diag-canvas, #ffffff);fill:var(--a3a-diag-canvas, #ffffff);}#a3a-diagram-6 .labelBkg{background-color:rgba(255, 255, 255, 0.5);}#a3a-diagram-6 .cluster rect{fill:var(--a3a-diag-surface, #f8f8f8);stroke:var(--a3a-diag-border, #e2e8f0);stroke-width:1px;}#a3a-diagram-6 .cluster text{fill:var(--a3a-diag-title, #0124af);}#a3a-diagram-6 .cluster span{color:var(--a3a-diag-title, #0124af);}#a3a-diagram-6 div.mermaidTooltip{position:absolute;text-align:center;max-width:200px;padding:2px;font-family:Roboto,sans-serif;font-size:12px;background:var(--a3a-diag-canvas, #ffffff);border:1px solid hsl(0, 0%, 90%);border-radius:2px;pointer-events:none;z-index:100;}#a3a-diagram-6 .flowchartTitleText{text-anchor:middle;font-size:18px;fill:var(--a3a-diag-text, #0a0a0a);}#a3a-diagram-6 rect.text{fill:none;stroke-width:0;}#a3a-diagram-6 .icon-shape,#a3a-diagram-6 .image-shape{background-color:var(--a3a-diag-canvas, #ffffff);text-align:center;}#a3a-diagram-6 .icon-shape p,#a3a-diagram-6 .image-shape p{background-color:var(--a3a-diag-canvas, #ffffff);padding:2px;}#a3a-diagram-6 .icon-shape rect,#a3a-diagram-6 .image-shape rect{opacity:0.5;background-color:var(--a3a-diag-canvas, #ffffff);fill:var(--a3a-diag-canvas, #ffffff);}#a3a-diagram-6 .label-icon{display:inline-block;height:1em;overflow:visible;vertical-align:-0.125em;}#a3a-diagram-6 .node .label-icon path{fill:currentColor;stroke:revert;stroke-width:revert;}#a3a-diagram-6 :root{--mermaid-font-family:Roboto,sans-serif;}<\/style><g><marker id=\"a3a-diagram-6_flowchart-v2-pointEnd\" class=\"marker flowchart-v2\" viewBox=\"0 0 10 10\" refX=\"5\" refY=\"5\" markerUnits=\"userSpaceOnUse\" markerWidth=\"8\" markerHeight=\"8\" orient=\"auto\"><path d=\"M 0 0 L 10 5 L 0 10 z\" class=\"arrowMarkerPath\" style=\"stroke-width: 1; stroke-dasharray: 1, 0;\"><\/path><\/marker><marker id=\"a3a-diagram-6_flowchart-v2-pointStart\" class=\"marker flowchart-v2\" viewBox=\"0 0 10 10\" refX=\"4.5\" refY=\"5\" markerUnits=\"userSpaceOnUse\" markerWidth=\"8\" markerHeight=\"8\" orient=\"auto\"><path d=\"M 0 5 L 10 10 L 10 0 z\" class=\"arrowMarkerPath\" style=\"stroke-width: 1; stroke-dasharray: 1, 0;\"><\/path><\/marker><marker id=\"a3a-diagram-6_flowchart-v2-circleEnd\" class=\"marker flowchart-v2\" viewBox=\"0 0 10 10\" refX=\"11\" refY=\"5\" markerUnits=\"userSpaceOnUse\" markerWidth=\"11\" markerHeight=\"11\" orient=\"auto\"><circle cx=\"5\" cy=\"5\" r=\"5\" class=\"arrowMarkerPath\" style=\"stroke-width: 1; stroke-dasharray: 1, 0;\"><\/circle><\/marker><marker id=\"a3a-diagram-6_flowchart-v2-circleStart\" class=\"marker flowchart-v2\" viewBox=\"0 0 10 10\" refX=\"-1\" refY=\"5\" markerUnits=\"userSpaceOnUse\" markerWidth=\"11\" markerHeight=\"11\" orient=\"auto\"><circle cx=\"5\" cy=\"5\" r=\"5\" class=\"arrowMarkerPath\" style=\"stroke-width: 1; stroke-dasharray: 1, 0;\"><\/circle><\/marker><marker id=\"a3a-diagram-6_flowchart-v2-crossEnd\" class=\"marker cross flowchart-v2\" viewBox=\"0 0 11 11\" refX=\"12\" refY=\"5.2\" markerUnits=\"userSpaceOnUse\" markerWidth=\"11\" markerHeight=\"11\" orient=\"auto\"><path d=\"M 1,1 l 9,9 M 10,1 l -9,9\" class=\"arrowMarkerPath\" style=\"stroke-width: 2; stroke-dasharray: 1, 0;\"><\/path><\/marker><marker id=\"a3a-diagram-6_flowchart-v2-crossStart\" class=\"marker cross flowchart-v2\" viewBox=\"0 0 11 11\" refX=\"-1\" refY=\"5.2\" markerUnits=\"userSpaceOnUse\" markerWidth=\"11\" markerHeight=\"11\" orient=\"auto\"><path d=\"M 1,1 l 9,9 M 10,1 l -9,9\" class=\"arrowMarkerPath\" style=\"stroke-width: 2; stroke-dasharray: 1, 0;\"><\/path><\/marker><g class=\"root\"><g class=\"clusters\"><\/g><g class=\"edgePaths\"><path d=\"M241.754,60.5L241.754,64.667C241.754,68.833,241.754,77.167,241.754,84.833C241.754,92.5,241.754,99.5,241.754,103L241.754,106.5\" id=\"L_A_B_0\" class=\"edge-thickness-normal edge-pattern-solid edge-thickness-normal edge-pattern-solid flowchart-link\" style=\";\" data-edge=\"true\" data-et=\"edge\" data-id=\"L_A_B_0\" data-points=\"W3sieCI6MjQxLjc1MzkwNjI1LCJ5Ijo2MC41fSx7IngiOjI0MS43NTM5MDYyNSwieSI6ODUuNX0seyJ4IjoyNDEuNzUzOTA2MjUsInkiOjExMC41fV0=\" marker-end=\"url(#a3a-diagram-6_flowchart-v2-pointEnd)\"><\/path><path d=\"M190.32,264.003L175.591,278.617C160.863,293.231,131.406,322.459,116.678,366.032C101.949,409.604,101.949,467.521,101.949,525.438C101.949,583.354,101.949,641.271,103.826,686.467C105.703,731.662,109.456,764.137,111.333,780.375L113.21,796.612\" id=\"L_B_C_0\" class=\"edge-thickness-normal edge-pattern-solid edge-thickness-normal edge-pattern-solid flowchart-link\" style=\";\" data-edge=\"true\" data-et=\"edge\" data-id=\"L_B_C_0\" data-points=\"W3sieCI6MTkwLjMxOTc3MzA5MTA0MjMyLCJ5IjoyNjQuMDAzMzY2ODQxMDQyMzV9LHsieCI6MTAxLjk0OTIxODc1LCJ5IjozNTEuNjg3NX0seyJ4IjoxMDEuOTQ5MjE4NzUsInkiOjUyNS40Mzc1fSx7IngiOjEwMS45NDkyMTg3NSwieSI6Njk5LjE4NzV9LHsieCI6MTEzLjY2OTA4ODMzOTI0OTY1LCJ5Ijo4MDAuNTg1OTM3NX1d\" marker-end=\"url(#a3a-diagram-6_flowchart-v2-pointEnd)\"><\/path><path d=\"M286.421,270.771L296.842,284.257C307.263,297.743,328.106,324.715,338.528,343.576C348.949,362.438,348.949,373.188,348.949,378.563L348.949,383.938\" id=\"L_B_D_0\" class=\"edge-thickness-normal edge-pattern-solid edge-thickness-normal edge-pattern-solid flowchart-link\" style=\";\" data-edge=\"true\" data-et=\"edge\" data-id=\"L_B_D_0\" data-points=\"W3sieCI6Mjg2LjQyMDYwNjM0MDU0MjMsInkiOjI3MC43NzA3OTk5MDk0NTc3fSx7IngiOjM0OC45NDkyMTg3NSwieSI6MzUxLjY4NzV9LHsieCI6MzQ4Ljk0OTIxODc1LCJ5IjozODcuOTM3NX1d\" marker-end=\"url(#a3a-diagram-6_flowchart-v2-pointEnd)\"><\/path><path d=\"M291.404,605.393L280.153,621.025C268.902,636.658,246.4,667.923,221.386,699.944C196.372,731.966,168.846,764.744,155.083,781.134L141.319,797.523\" id=\"L_D_C_0\" class=\"edge-thickness-normal edge-pattern-solid edge-thickness-normal edge-pattern-solid flowchart-link\" style=\";\" data-edge=\"true\" data-et=\"edge\" data-id=\"L_D_C_0\" data-points=\"W3sieCI6MjkxLjQwNDI0NzMxNDcwNTMsInkiOjYwNS4zOTI1Mjg1NjQ3MDUyfSx7IngiOjIyMy44OTg0Mzc1LCJ5Ijo2OTkuMTg3NX0seyJ4IjoxMzguNzQ3MDg0MjM4NjMxNSwieSI6ODAwLjU4NTkzNzV9XQ==\" marker-end=\"url(#a3a-diagram-6_flowchart-v2-pointEnd)\"><\/path><path d=\"M361.763,650.124L362.603,658.301C363.443,666.479,365.124,682.833,365.964,696.385C366.805,709.938,366.805,720.688,366.805,726.063L366.805,731.438\" id=\"L_D_E_0\" class=\"edge-thickness-normal edge-pattern-solid edge-thickness-normal edge-pattern-solid flowchart-link\" style=\";\" data-edge=\"true\" data-et=\"edge\" data-id=\"L_D_E_0\" data-points=\"W3sieCI6MzYxLjc2MjY2ODAxNzA4OTM3LCJ5Ijo2NTAuMTI0MDUwNzMyOTEwNn0seyJ4IjozNjYuODA0Njg3NSwieSI6Njk5LjE4NzV9LHsieCI6MzY2LjgwNDY4NzUsInkiOjczNS40Mzc1fV0=\" marker-end=\"url(#a3a-diagram-6_flowchart-v2-pointEnd)\"><\/path><path d=\"M318.598,870.028L302.888,884.104C287.177,898.18,255.757,926.332,240.046,945.783C224.336,965.234,224.336,975.984,224.336,981.359L224.336,986.734\" id=\"L_E_F_0\" class=\"edge-thickness-normal edge-pattern-solid edge-thickness-normal edge-pattern-solid flowchart-link\" style=\";\" data-edge=\"true\" data-et=\"edge\" data-id=\"L_E_F_0\" data-points=\"W3sieCI6MzE4LjU5ODEyNDc3NDA0MTkzLCJ5Ijo4NzAuMDI3ODEyMjc0MDQxOX0seyJ4IjoyMjQuMzM1OTM3NSwieSI6OTU0LjQ4NDM3NX0seyJ4IjoyMjQuMzM1OTM3NSwieSI6OTkwLjczNDM3NX1d\" marker-end=\"url(#a3a-diagram-6_flowchart-v2-pointEnd)\"><\/path><path d=\"M415.011,870.028L430.722,884.104C446.432,898.18,477.853,926.332,493.563,945.783C509.273,965.234,509.273,975.984,509.273,981.359L509.273,986.734\" id=\"L_E_G_0\" class=\"edge-thickness-normal edge-pattern-solid edge-thickness-normal edge-pattern-solid flowchart-link\" style=\";\" data-edge=\"true\" data-et=\"edge\" data-id=\"L_E_G_0\" data-points=\"W3sieCI6NDE1LjAxMTI1MDIyNTk1ODA3LCJ5Ijo4NzAuMDI3ODEyMjc0MDQxOX0seyJ4Ijo1MDkuMjczNDM3NSwieSI6OTU0LjQ4NDM3NX0seyJ4Ijo1MDkuMjczNDM3NSwieSI6OTkwLjczNDM3NX1d\" marker-end=\"url(#a3a-diagram-6_flowchart-v2-pointEnd)\"><\/path><\/g><g class=\"edgeLabels\"><g class=\"edgeLabel\"><g class=\"label\" data-id=\"L_A_B_0\" transform=\"translate(0, 0)\"><foreignObject width=\"0\" height=\"0\"><div xmlns=\"http:\/\/www.w3.org\/1999\/xhtml\" class=\"labelBkg\" style=\"display: table-cell; white-space: nowrap; line-height: 1.5; max-width: 200px; text-align: center;\"><span class=\"edgeLabel\"><\/span><\/div><\/foreignObject><\/g><\/g><g class=\"edgeLabel\" transform=\"translate(101.94921875, 525.4375)\"><g class=\"label\" data-id=\"L_B_C_0\" transform=\"translate(-9.5078125, -11.25)\"><foreignObject width=\"19.015625\" height=\"22.5\"><div xmlns=\"http:\/\/www.w3.org\/1999\/xhtml\" class=\"labelBkg\" style=\"display: table-cell; white-space: nowrap; line-height: 1.5; max-width: 200px; text-align: center;\"><span class=\"edgeLabel\"><p>No<\/p><\/span><\/div><\/foreignObject><\/g><\/g><g class=\"edgeLabel\" transform=\"translate(348.94921875, 351.6875)\"><g class=\"label\" data-id=\"L_B_D_0\" transform=\"translate(-6.203125, -11.25)\"><foreignObject width=\"12.40625\" height=\"22.5\"><div xmlns=\"http:\/\/www.w3.org\/1999\/xhtml\" class=\"labelBkg\" style=\"display: table-cell; white-space: nowrap; line-height: 1.5; max-width: 200px; text-align: center;\"><span class=\"edgeLabel\"><p>S\u00ed<\/p><\/span><\/div><\/foreignObject><\/g><\/g><g class=\"edgeLabel\" transform=\"translate(218.48101, 705.63859)\"><g class=\"label\" data-id=\"L_D_C_0\" transform=\"translate(-9.5078125, -11.25)\"><foreignObject width=\"19.015625\" height=\"22.5\"><div xmlns=\"http:\/\/www.w3.org\/1999\/xhtml\" class=\"labelBkg\" style=\"display: table-cell; white-space: nowrap; line-height: 1.5; max-width: 200px; text-align: center;\"><span class=\"edgeLabel\"><p>No<\/p><\/span><\/div><\/foreignObject><\/g><\/g><g class=\"edgeLabel\" transform=\"translate(366.8046875, 699.1875)\"><g class=\"label\" data-id=\"L_D_E_0\" transform=\"translate(-6.203125, -11.25)\"><foreignObject width=\"12.40625\" height=\"22.5\"><div xmlns=\"http:\/\/www.w3.org\/1999\/xhtml\" class=\"labelBkg\" style=\"display: table-cell; white-space: nowrap; line-height: 1.5; max-width: 200px; text-align: center;\"><span class=\"edgeLabel\"><p>S\u00ed<\/p><\/span><\/div><\/foreignObject><\/g><\/g><g class=\"edgeLabel\" transform=\"translate(224.3359375, 954.484375)\"><g class=\"label\" data-id=\"L_E_F_0\" transform=\"translate(-9.5078125, -11.25)\"><foreignObject width=\"19.015625\" height=\"22.5\"><div xmlns=\"http:\/\/www.w3.org\/1999\/xhtml\" class=\"labelBkg\" style=\"display: table-cell; white-space: nowrap; line-height: 1.5; max-width: 200px; text-align: center;\"><span class=\"edgeLabel\"><p>No<\/p><\/span><\/div><\/foreignObject><\/g><\/g><g class=\"edgeLabel\" transform=\"translate(509.2734375, 954.484375)\"><g class=\"label\" data-id=\"L_E_G_0\" transform=\"translate(-6.203125, -11.25)\"><foreignObject width=\"12.40625\" height=\"22.5\"><div xmlns=\"http:\/\/www.w3.org\/1999\/xhtml\" class=\"labelBkg\" style=\"display: table-cell; white-space: nowrap; line-height: 1.5; max-width: 200px; text-align: center;\"><span class=\"edgeLabel\"><p>S\u00ed<\/p><\/span><\/div><\/foreignObject><\/g><\/g><\/g><g class=\"nodes\"><g class=\"node default\" id=\"flowchart-A-0\" transform=\"translate(241.75390625, 34.25)\"><rect class=\"basic label-container\" style=\"\" x=\"-90.859375\" y=\"-26.25\" width=\"181.71875\" height=\"52.5\"><\/rect><g class=\"label\" style=\"\" transform=\"translate(-60.859375, -11.25)\"><rect><\/rect><foreignObject width=\"121.71875\" height=\"22.5\"><div xmlns=\"http:\/\/www.w3.org\/1999\/xhtml\" style=\"display: table-cell; white-space: nowrap; line-height: 1.5; max-width: 200px; text-align: center;\"><span class=\"nodeLabel\"><p>Estudio concluido<\/p><\/span><\/div><\/foreignObject><\/g><\/g><g class=\"node default\" id=\"flowchart-B-1\" transform=\"translate(241.75390625, 212.96875)\"><polygon points=\"102.46875,0 204.9375,-102.46875 102.46875,-204.9375 0,-102.46875\" class=\"label-container\" transform=\"translate(-101.96875, 102.46875)\"><\/polygon><g class=\"label\" style=\"\" transform=\"translate(-76.21875, -11.25)\"><rect><\/rect><foreignObject width=\"152.4375\" height=\"22.5\"><div xmlns=\"http:\/\/www.w3.org\/1999\/xhtml\" style=\"display: table-cell; white-space: nowrap; line-height: 1.5; max-width: 200px; text-align: center;\"><span class=\"nodeLabel\"><p>Requisitos cumplidos?<\/p><\/span><\/div><\/foreignObject><\/g><\/g><g class=\"node default\" id=\"flowchart-C-3\" transform=\"translate(116.703125, 826.8359375)\"><rect class=\"basic label-container\" style=\"\" x=\"-108.703125\" y=\"-26.25\" width=\"217.40625\" height=\"52.5\"><\/rect><g class=\"label\" style=\"\" transform=\"translate(-78.703125, -11.25)\"><rect><\/rect><foreignObject width=\"157.40625\" height=\"22.5\"><div xmlns=\"http:\/\/www.w3.org\/1999\/xhtml\" style=\"display: table-cell; white-space: nowrap; line-height: 1.5; max-width: 200px; text-align: center;\"><span class=\"nodeLabel\"><p>Reformular o descartar<\/p><\/span><\/div><\/foreignObject><\/g><\/g><g class=\"node default\" id=\"flowchart-D-5\" transform=\"translate(348.94921875, 525.4375)\"><polygon points=\"137.5,0 275,-137.5 137.5,-275 0,-137.5\" class=\"label-container\" transform=\"translate(-137, 137.5)\"><\/polygon><g class=\"label\" style=\"\" transform=\"translate(-100, -22.5)\"><rect><\/rect><foreignObject width=\"200\" height=\"45\"><div xmlns=\"http:\/\/www.w3.org\/1999\/xhtml\" style=\"display: table; white-space: break-spaces; line-height: 1.5; max-width: 200px; text-align: center; width: 200px;\"><span class=\"nodeLabel\"><p>Econom\u00eda y riesgos aceptables?<\/p><\/span><\/div><\/foreignObject><\/g><\/g><g class=\"node default\" id=\"flowchart-E-9\" transform=\"translate(366.8046875, 826.8359375)\"><polygon points=\"91.3984375,0 182.796875,-91.3984375 91.3984375,-182.796875 0,-91.3984375\" class=\"label-container\" transform=\"translate(-90.8984375, 91.3984375)\"><\/polygon><g class=\"label\" style=\"\" transform=\"translate(-65.1484375, -11.25)\"><rect><\/rect><foreignObject width=\"130.296875\" height=\"22.5\"><div xmlns=\"http:\/\/www.w3.org\/1999\/xhtml\" style=\"display: table-cell; white-space: nowrap; line-height: 1.5; max-width: 200px; text-align: center;\"><span class=\"nodeLabel\"><p>Premisas maduras?<\/p><\/span><\/div><\/foreignObject><\/g><\/g><g class=\"node default\" id=\"flowchart-F-11\" transform=\"translate(224.3359375, 1016.984375)\"><rect class=\"basic label-container\" style=\"\" x=\"-123.4296875\" y=\"-26.25\" width=\"246.859375\" height=\"52.5\"><\/rect><g class=\"label\" style=\"\" transform=\"translate(-93.4296875, -11.25)\"><rect><\/rect><foreignObject width=\"186.859375\" height=\"22.5\"><div xmlns=\"http:\/\/www.w3.org\/1999\/xhtml\" style=\"display: table-cell; white-space: nowrap; line-height: 1.5; max-width: 200px; text-align: center;\"><span class=\"nodeLabel\"><p>Investigaciones adicionales<\/p><\/span><\/div><\/foreignObject><\/g><\/g><g class=\"node default\" id=\"flowchart-G-13\" transform=\"translate(509.2734375, 1016.984375)\"><rect class=\"basic label-container\" style=\"\" x=\"-111.5078125\" y=\"-26.25\" width=\"223.015625\" height=\"52.5\"><\/rect><g class=\"label\" style=\"\" transform=\"translate(-81.5078125, -11.25)\"><rect><\/rect><foreignObject width=\"163.015625\" height=\"22.5\"><div xmlns=\"http:\/\/www.w3.org\/1999\/xhtml\" style=\"display: table-cell; white-space: nowrap; line-height: 1.5; max-width: 200px; text-align: center;\"><span class=\"nodeLabel\"><p>Aprobar siguiente etapa<\/p><\/span><\/div><\/foreignObject><\/g><\/g><\/g><\/g><\/g><\/svg><figcaption>Gate de decisi\u00f3n despu\u00e9s del estudio de viabilidad<\/figcaption><\/figure>\n\n\n\n<h2 class=\"wp-block-heading\">Criterios de go, hold y no-go<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">La gobernanza puede definir resultados como go, hold, rework o no-go. Esto evita forzar todos los proyectos hacia una decisi\u00f3n binaria cuando todav\u00eda existen condicionantes relevantes.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Hold puede ser la respuesta correcta si falta una licencia cr\u00edtica, confirmaci\u00f3n de demanda o investigaci\u00f3n de campo.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Independencia del an\u00e1lisis<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Cuando el proveedor de una alternativa tambi\u00e9n produce el estudio de viabilidad, existe riesgo de sesgo. Esto no invalida los datos t\u00e9cnicos del fabricante, pero recomienda gobernanza independiente en la definici\u00f3n de criterios y comparaci\u00f3n.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">La Ingenier\u00eda Consultiva act\u00faa precisamente en esta separaci\u00f3n entre la necesidad del propietario y la soluci\u00f3n comercial.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Revisi\u00f3n por especialistas<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Los proyectos multidisciplinarios pueden exigir especialistas en el\u00e9ctrica, automatizaci\u00f3n, telecomunicaciones, civil, mec\u00e1nica, procesos, seguridad, costos y operaci\u00f3n. La coordinaci\u00f3n debe integrar las conclusiones en una \u00fanica recomendaci\u00f3n.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Evidencias y trazabilidad<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Hojas de c\u00e1lculo, memorias de c\u00e1lculo, cotizaciones, planos, actas y premisas deben ser trazables. Si la decisi\u00f3n se revisa meses despu\u00e9s, la organizaci\u00f3n necesita entender por qu\u00e9 se eligi\u00f3 una alternativa.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Actualizaci\u00f3n del estudio<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">La viabilidad tiene una validez condicionada a sus premisas. Cambios relevantes en precios, demanda, alcance, legislaci\u00f3n, tecnolog\u00eda o plazo pueden exigir una actualizaci\u00f3n.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">No significa rehacer todo. Deben identificarse las partes afectadas y verificar si la conclusi\u00f3n contin\u00faa siendo robusta.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Errores comunes<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Los errores recurrentes incluyen:<\/p>\n\n\n\n<ul class=\"wp-block-list\"><li>definir la soluci\u00f3n antes de la necesidad;<\/li><li>comparar alternativas con alcances diferentes;<\/li><li>usar CAPEX sin base t\u00e9cnica;<\/li><li>ignorar OPEX y ciclo de vida;<\/li><li>tratar el riesgo solamente de forma cualitativa y sin impacto sobre la decisi\u00f3n;<\/li><li>presentar una \u00fanica previsi\u00f3n como certeza;<\/li><li>omitir el escenario base;<\/li><li>usar indicadores financieros aislados;<\/li><li>no registrar fuentes y premisas;<\/li><li>avanzar a proyecto detallado sin cerrar condicionantes cr\u00edticos.<\/li><\/ul>\n\n\n\n<h2 class=\"wp-block-heading\">El papel de la Ingenier\u00eda Consultiva<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">La Ingenier\u00eda Consultiva estructura la decisi\u00f3n, organiza requisitos, coordina especialistas, desarrolla alternativas, valida premisas, integra riesgos y produce una recomendaci\u00f3n independiente.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">No sustituye al decisor. Su funci\u00f3n es mejorar la calidad de la informaci\u00f3n y explicitar consecuencias para que la gobernanza pueda decidir de forma consciente.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Cu\u00e1ndo avanzar a proyecto conceptual, b\u00e1sico o FEED<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Despu\u00e9s de seleccionar la alternativa, la siguiente etapa depende del tipo y madurez del emprendimiento. Puede ser necesario profundizar proyecto conceptual, FEL, FEED, Proyecto B\u00e1sico u otra fase de definici\u00f3n.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">El estudio debe terminar dejando claro qu\u00e9 entregables son necesarios para reducir la siguiente capa de incertidumbre.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Checklist para un estudio defendible<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Antes de la aprobaci\u00f3n, verifique:<\/p>\n\n\n\n<ul class=\"wp-block-list\"><li>\u00bfla necesidad fue definida sin vincularla a un proveedor?<\/li><li>\u00bfexiste escenario base?<\/li><li>\u00bflas alternativas son realmente comparables?<\/li><li>\u00bflos requisitos eliminatorios est\u00e1n claros?<\/li><li>\u00bfCAPEX y OPEX tienen memoria de premisas?<\/li><li>\u00bflos riesgos y restricciones fueron incorporados?<\/li><li>\u00bfla sensibilidad prueba variables cr\u00edticas?<\/li><li>\u00bflos indicadores econ\u00f3micos utilizan una metodolog\u00eda coherente?<\/li><li>\u00bfla recomendaci\u00f3n explica trade-offs?<\/li><li>\u00bflos condicionantes para avanzar est\u00e1n registrados?<\/li><li>\u00bflos documentos y fuentes son trazables?<\/li><\/ul>\n\n\n\n<h2 class=\"wp-block-heading\">Consideraciones finales<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">El estudio de viabilidad es una herramienta de decisi\u00f3n de Ingenier\u00eda. Su valor est\u00e1 en evitar que la organizaci\u00f3n avance con una soluci\u00f3n mal definida, econ\u00f3micamente fr\u00e1gil o incompatible con restricciones t\u00e9cnicas y operativas.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Un estudio maduro integra necesidad, requisitos, alternativas, condici\u00f3n existente, CAPEX, OPEX, plazo, riesgos, econom\u00eda y escenarios. La mejor conclusi\u00f3n no es necesariamente aprobar el proyecto; es producir evidencia suficiente para elegir conscientemente entre avanzar, reformular, investigar m\u00e1s o interrumpir la inversi\u00f3n.<\/p>\n\n\n\n<div class=\"wp-block-a3a-destaque\">\n<p class=\"wp-block-paragraph\">Una decisi\u00f3n de inversi\u00f3n compleja gana calidad cuando requisitos, riesgos, costos y trade-offs son organizados por una ingenier\u00eda independiente del proveedor de la soluci\u00f3n.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><a href=\"https:\/\/a3aengenharia.com.br\/servicos\/servicos-transversais\/consultoria-tecnica\/\">Conozca la Consultor\u00eda T\u00e9cnica de Ingenier\u00eda<\/a><\/p>\n<\/div>\n\n\n\n<details class=\"wp-block-details is-layout-flow wp-block-details-is-layout-flow\"><summary>Referencias t\u00e9cnicas<\/summary>\n<p class=\"wp-block-paragraph\">[1] 1. INTERNATIONAL ORGANIZATION FOR STANDARDIZATION. ISO 31000 \u2014 Risk management. Disponible en: <a href=\"https:\/\/www.iso.org\/iso-31000-risk-management.html\">https:\/\/www.iso.org\/iso-31000-risk-management.html<\/a><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">[2] 2. PROJECT MANAGEMENT INSTITUTE. Standards and PMBOK Guide. Disponible en: <a href=\"https:\/\/www.pmi.org\/pmbok-guide-standards\">https:\/\/www.pmi.org\/pmbok-guide-standards<\/a><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">[3] 3. WORLD BANK. Public-Private Partnership Resource Center \u2014 Project Assessment and Feasibility. Disponible en: <a href=\"https:\/\/ppp.worldbank.org\/\">https:\/\/ppp.worldbank.org\/<\/a><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">[4] 4. AACE INTERNATIONAL. Recommended Practices and technical resources for cost engineering. Disponible en: <a href=\"https:\/\/web.aacei.org\/resources\/publications\/recommended-practices\">https:\/\/web.aacei.org\/resources\/publications\/recommended-practices<\/a><\/p>\n<\/details>\n\n\n\n<details class=\"wp-block-details is-layout-flow wp-block-details-is-layout-flow\"><summary>Preguntas frecuentes<\/summary>\n<div class=\"schema-faq wp-block-yoast-faq-block\"><div class=\"schema-faq-section\" id=\"faq-question-o-que-estudo-de-viabilidade-em-engenharia-027101e8\"><strong class=\"schema-faq-question\">\u00bfQu\u00e9 es un estudio de viabilidad en Ingenier\u00eda?<\/strong> <p class=\"schema-faq-answer\">Es el an\u00e1lisis estructurado de alternativas t\u00e9cnicas, econ\u00f3micas, operativas, de plazo y riesgo utilizado para decidir si una inversi\u00f3n debe avanzar, reformularse o descartarse.<\/p><\/div><div class=\"schema-faq-section\" id=\"faq-question-qual-a-diferen-a-entre-viabilidade-t-cnica-e-eco-7566f67c\"><strong class=\"schema-faq-question\">\u00bfCu\u00e1l es la diferencia entre viabilidad t\u00e9cnica y econ\u00f3mica?<\/strong> <p class=\"schema-faq-answer\">La t\u00e9cnica verifica el cumplimiento de requisitos y restricciones; la econ\u00f3mica eval\u00faa costos, beneficios y retorno. En un estudio robusto, ambas est\u00e1n integradas porque una determina premisas de la otra.<\/p><\/div><div class=\"schema-faq-section\" id=\"faq-question-estudo-de-viabilidade-igual-a-etp-a0a6c236\"><strong class=\"schema-faq-question\">\u00bfUn estudio de viabilidad es igual a un ETP?<\/strong> <p class=\"schema-faq-answer\">No. El Estudio T\u00e9cnico Preliminar (ETP) tiene una funci\u00f3n propia en la preparaci\u00f3n de contrataciones, especialmente p\u00fablicas. Un estudio de viabilidad puede tener un alcance m\u00e1s amplio y una estructura diferente, aunque puedan compartir an\u00e1lisis.<\/p><\/div><div class=\"schema-faq-section\" id=\"faq-question-quais-indicadores-financeiros-podem-ser-usados-4667d0d0\"><strong class=\"schema-faq-question\">\u00bfQu\u00e9 indicadores financieros pueden utilizarse?<\/strong> <p class=\"schema-faq-answer\">VAN, TIR, payback, \u00edndice de rentabilidad y otros, conforme a la gobernanza de la organizaci\u00f3n. Ninguno debe interpretarse sin premisas t\u00e9cnicas, riesgos y an\u00e1lisis de sensibilidad.<\/p><\/div><div class=\"schema-faq-section\" id=\"faq-question-quando-atualizar-um-estudo-de-viabilidade-c71fb8c1\"><strong class=\"schema-faq-question\">\u00bfCu\u00e1ndo actualizar un estudio de viabilidad?<\/strong> <p class=\"schema-faq-answer\">Cuando cambios relevantes de alcance, demanda, precios, tecnolog\u00eda, plazo, regulaci\u00f3n o condici\u00f3n existente alteren premisas cr\u00edticas de la decisi\u00f3n.<\/p><\/div><\/div>\n<\/details>\n\n\n\n<details class=\"wp-block-details is-layout-flow wp-block-details-is-layout-flow\"><summary>Materiales t\u00e9cnicos complementarios<\/summary>\n<h4 class=\"wp-block-heading\">Soluciones relacionadas<\/h4>\n\n<ul class=\"wp-block-list\"><li><a href=\"https:\/\/a3aengenharia.com.br\/solucoes\/gestao-e-governanca-de-engenharia\/governanca-de-projetos-programas-e-portfolios\/\">Gobernanza de Proyectos, Programas y Portafolios<\/a><\/li><\/ul>\n\n<h4 class=\"wp-block-heading\">Servicios relacionados<\/h4>\n\n<ul class=\"wp-block-list\"><li><a href=\"https:\/\/a3aengenharia.com.br\/servicos\/levantamento-e-diagnostico\/analise-de-viabilidade-financeira\/\">Estudio de Viabilidad T\u00e9cnica y Econ\u00f3mica: alternativas, riesgos y decisi\u00f3n<\/a><\/li><li><a href=\"https:\/\/a3aengenharia.com.br\/servicos\/planejamento\/projeto-conceitual-de-engenharia\/\">Proyecto Conceptual de Ingenier\u00eda: alternativas, arquitectura y definici\u00f3n de la soluci\u00f3n<\/a><\/li><li><a href=\"https:\/\/a3aengenharia.com.br\/servicos\/contratacao-integrada\/front-end-loading\/\">FEL (Front-End Loading): maduraci\u00f3n, viabilidad y definici\u00f3n de proyectos<\/a><\/li><\/ul>\n\n<h4 class=\"wp-block-heading\">Contenidos principales sobre el tema<\/h4>\n\n<ul class=\"wp-block-list\"><li><a href=\"https:\/\/a3aengenharia.com.br\/conteudo\/artigos-tecnicos\/business-case-projetos-engenharia-decisao-investimento\/\">Business Case en Proyectos de Ingenier\u00eda: c\u00f3mo justificar una decisi\u00f3n de inversi\u00f3n<\/a><\/li><\/ul>\n\n<h4 class=\"wp-block-heading\">Contenidos t\u00e9cnicos relacionados<\/h4>\n\n<ul class=\"wp-block-list\"><li><a href=\"https:\/\/a3aengenharia.com.br\/conteudo\/artigos-tecnicos\/analise-multicriterio-mcda-projetos-engenharia\/\">An\u00e1lisis Multicriterio (MCDA) en Proyectos de Ingenier\u00eda: c\u00f3mo comparar alternativas t\u00e9cnicas<\/a><\/li><li><a href=\"https:\/\/a3aengenharia.com.br\/conteudo\/artigos-tecnicos\/analise-sensibilidade-cenarios-projetos-engenharia\/\">An\u00e1lisis de Sensibilidad y Escenarios en Proyectos de Ingenier\u00eda: premisas, switching values y decisi\u00f3n<\/a><\/li><li><a href=\"https:\/\/a3aengenharia.com.br\/conteudo\/artigos-tecnicos\/pdri-project-definition-rating-index-engenharia\/\">PDRI \u2014 Project Definition Rating Index en Ingenier\u00eda: c\u00f3mo medir la madurez del alcance antes de avanzar<\/a><\/li><li><a href=\"https:\/\/a3aengenharia.com.br\/conteudo\/artigos-tecnicos\/project-readiness-engenharia-avaliacao-prontidao-projeto\/\">Project Readiness en Ingenier\u00eda: c\u00f3mo evaluar si el proyecto est\u00e1 listo para avanzar<\/a><\/li><\/ul>\n<\/details>\n","protected":false},"excerpt":{"rendered":"<p>Entienda c\u00f3mo funciona un estudio de viabilidad en Ingenier\u00eda: alternativas, requisitos, CAPEX, OPEX, riesgos, VAN, TIR, escenarios, sensibilidad y decisi\u00f3n.<\/p>\n","protected":false},"author":1,"featured_media":0,"parent":0,"template":"","meta":{"_a3a_global_related_solutions":[],"_a3a_global_related_services":[],"_a3a_global_related_materials":[],"_a3a_post_lang":"es-es","_a3a_translation_group_id":"1181d0fa-0d04-40c7-82c3-d98f0049ee28","_a3a_i18n_canonical_slug":"estudio-viabilidad-ingenieria-analisis-tecnico-economico-riesgos"},"categories":[],"segments":[],"mercados":[],"etapas":[],"class_list":["post-73931","articles","type-articles","status-publish","hentry"],"_links":{"self":[{"href":"https:\/\/a3aengenharia.com\/es-es\/wp-json\/wp\/v2\/articles\/73931","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/a3aengenharia.com\/es-es\/wp-json\/wp\/v2\/articles"}],"about":[{"href":"https:\/\/a3aengenharia.com\/es-es\/wp-json\/wp\/v2\/types\/articles"}],"author":[{"embeddable":true,"href":"https:\/\/a3aengenharia.com\/es-es\/wp-json\/wp\/v2\/users\/1"}],"version-history":[{"count":6,"href":"https:\/\/a3aengenharia.com\/es-es\/wp-json\/wp\/v2\/articles\/73931\/revisions"}],"predecessor-version":[{"id":73946,"href":"https:\/\/a3aengenharia.com\/es-es\/wp-json\/wp\/v2\/articles\/73931\/revisions\/73946"}],"wp:attachment":[{"href":"https:\/\/a3aengenharia.com\/es-es\/wp-json\/wp\/v2\/media?parent=73931"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/a3aengenharia.com\/es-es\/wp-json\/wp\/v2\/categories?post=73931"},{"taxonomy":"segments","embeddable":true,"href":"https:\/\/a3aengenharia.com\/es-es\/wp-json\/wp\/v2\/segments?post=73931"},{"taxonomy":"mercados","embeddable":true,"href":"https:\/\/a3aengenharia.com\/es-es\/wp-json\/wp\/v2\/mercados?post=73931"},{"taxonomy":"etapas","embeddable":true,"href":"https:\/\/a3aengenharia.com\/es-es\/wp-json\/wp\/v2\/etapas?post=73931"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}