{"id":73571,"date":"2026-08-31T21:01:02","date_gmt":"2026-09-01T00:01:02","guid":{"rendered":"https:\/\/a3aengenharia.com\/?post_type=articles&#038;p=73571"},"modified":"2026-08-31T21:01:02","modified_gmt":"2026-09-01T00:01:02","slug":"contratacion-epc-ingenieria-requisitos-alcance-criterios","status":"publish","type":"articles","link":"https:\/\/a3aengenharia.com\/es-es\/contenido\/articulos-tecnicos\/contratacion-epc-ingenieria-requisitos-alcance-criterios\/","title":{"rendered":"Contrataci\u00f3n EPC en Ingenier\u00eda: c\u00f3mo definir requisitos, alcance y criterios de contrataci\u00f3n"},"content":{"rendered":"\n<p class=\"wp-block-paragraph\">Una <strong>contrataci\u00f3n EPC en Ingenier\u00eda<\/strong> debe transformar una necesidad de negocio en un paquete t\u00e9cnico y comercial suficientemente claro para que empresas capaces de asumir Engineering, Procurement and Construction compitan por el mismo objeto sobre bases comparables. El proceso no comienza enviando una planilla a algunos proveedores. Comienza con la decisi\u00f3n de que EPC es realmente el modelo adecuado, con la maduraci\u00f3n de los requisitos y con la definici\u00f3n de qu\u00e9 responsabilidades, riesgos, interfaces, desempe\u00f1os y evidencias ser\u00e1n transferidos al contratista.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Contratar EPC exige equilibrio. Si el Owner define poco, cada proponente interpreta el objeto de forma diferente e incorpora contingencias, exclusiones o calificaciones; si define en exceso, puede limitar soluciones, interferir en la responsabilidad del contratista EPC y reducir los beneficios de la contrataci\u00f3n integrada. La ingenier\u00eda de referencia debe proporcionar base suficiente para precio, plazo, interfaces y aceptaci\u00f3n, preservando la libertad t\u00e9cnica que el modelo pretende conceder.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Un proceso robusto normalmente pasa por readiness, requisitos, ingenier\u00eda de referencia, estrategia de contrataci\u00f3n, market sounding, precalificaci\u00f3n, RFP, aclaraciones, TBE, igualaci\u00f3n comercial, an\u00e1lisis de riesgos residuales, negociaci\u00f3n, consolidaci\u00f3n de anexos y award. La calidad de la contrataci\u00f3n se mide menos por la cantidad de documentos emitidos y m\u00e1s por la capacidad de producir propuestas t\u00e9cnicamente equivalentes y un contrato ejecutable sin zonas grises relevantes.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Primero: confirmar si EPC es el modelo correcto<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Antes de preparar la RFP, el Owner debe verificar si la concentraci\u00f3n de responsabilidad agrega valor. EPC tiende a ser adecuado cuando los requisitos son suficientemente estables, las interfaces internas pueden transferirse a un integrador, existe mercado capaz de asumir el paquete y el desempe\u00f1o puede especificarse y probarse.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Si el proyecto todav\u00eda est\u00e1 en fuerte evoluci\u00f3n, si el Owner desea contratar directamente a muchos proveedores o si las condiciones existentes presentan grandes incertidumbres, EPCM, m\u00faltiples paquetes o una fase adicional de definici\u00f3n pueden ser mejores alternativas.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">El comparativo <a href=\"https:\/\/a3aengenharia.com.br\/conteudo\/artigos-tecnicos\/contrato-epc-x-epcm-diferencas\/\">EPC vs. EPCM<\/a> debe analizarse antes de la RFP cuando la estrategia de entrega a\u00fan no est\u00e1 decidida. La <a href=\"https:\/\/a3aengenharia.com.br\/conteudo\/artigos-tecnicos\/estrategia-contratacao-engenharia-procurement-pacotes-riscos\/\">Estrategia de Contrataci\u00f3n en Ingenier\u00eda<\/a> ampl\u00eda el an\u00e1lisis hacia paquetes, riesgos y modelos contractuales.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Criterios de decisi\u00f3n<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Una decisi\u00f3n estructurada debe considerar:<\/p>\n\n\n\n<ul class=\"wp-block-list\"><li>madurez de los requisitos;<\/li><li>cantidad y naturaleza de las interfaces;<\/li><li>capacidad interna del Owner;<\/li><li>necesidad de flexibilidad durante la implantaci\u00f3n;<\/li><li>disponibilidad de contratistas EPC calificados;<\/li><li>criticidad de precio y plazo;<\/li><li>condiciones del sitio y riesgos brownfield;<\/li><li>estrategia de financiaci\u00f3n y flujo de caja;<\/li><li>necesidad de transparencia sobre costes de proveedores;<\/li><li>capacidad para definir pruebas y desempe\u00f1o.<\/li><\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">La elecci\u00f3n deber\u00eda registrarse antes de iniciar la competencia para evitar modificar las reglas despu\u00e9s de que el mercado ya haya formado precio.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Project Readiness: \u00bfel proyecto est\u00e1 listo para ser contratado?<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Readiness verifica si el Owner dispone de informaci\u00f3n y decisiones suficientes para transferir responsabilidad de forma racional. La <a href=\"https:\/\/a3aengenharia.com.br\/conteudo\/artigos-tecnicos\/project-readiness-engenharia-avaliacao-prontidao-projeto\/\">Project Readiness en Ingenier\u00eda<\/a> eval\u00faa alcance, interfaces, riesgos, documentaci\u00f3n, decisiones y recursos antes de avanzar.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Para una contrataci\u00f3n EPC, algunas preguntas relevantes son: \u00bflos requisitos est\u00e1n aprobados? \u00bfLos datos del sitio fueron validados? \u00bfLas interfaces externas est\u00e1n identificadas? \u00bfEl Owner sabe qu\u00e9 suministrar\u00e1? \u00bfEl desempe\u00f1o y la aceptaci\u00f3n pueden medirse? \u00bfLos principales riesgos fueron discutidos? \u00bfEl mercado conoce el tipo de soluci\u00f3n?<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">El <a href=\"https:\/\/a3aengenharia.com.br\/conteudo\/artigos-tecnicos\/pdri-project-definition-rating-index-engenharia\/\">PDRI \u2014 Project Definition Rating Index<\/a> tambi\u00e9n puede apoyar la evaluaci\u00f3n de madurez de definici\u00f3n. El objetivo no es alcanzar la perfecci\u00f3n antes de la contrataci\u00f3n, sino conocer expl\u00edcitamente qu\u00e9 contin\u00faa abierto y decidir si el riesgo de avanzar es aceptable.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Readiness no es solo documentaci\u00f3n<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Un proyecto puede tener muchos documentos y aun as\u00ed estar inmaduro. Si existen decisiones cr\u00edticas pendientes, interfaces sin responsables o premisas que contradicen levantamientos de campo, la cantidad de archivos no reduce el riesgo.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">La evaluaci\u00f3n debe observar calidad, coherencia y gobernanza de la informaci\u00f3n. Un paquete menor y consistente puede ser m\u00e1s contratable que un gran volumen documental con versiones conflictivas.<\/p>\n\n\n\n<figure class=\"a3a-mermaid\"><svg id=\"a3a-diagram-1\" width=\"100%\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" class=\"flowchart\" style=\"max-width:min(477.796875px, 100%);height:auto;display:block;margin:0 auto\" viewBox=\"0 0 477.796875 940.28125\" role=\"graphics-document document\" aria-roledescription=\"flowchart-v2\" aria-labelledby=\"chart-title-a3a-diagram-1\"><title id=\"chart-title-a3a-diagram-1\">Gate de preparaci\u00f3n antes de lanzar una contrataci\u00f3n EPC<\/title><style>#a3a-diagram-1{font-family:Roboto,sans-serif;font-size:15px;fill:var(--a3a-diag-text, #0a0a0a);}@keyframes edge-animation-frame{from{stroke-dashoffset:0;}}@keyframes dash{to{stroke-dashoffset:0;}}#a3a-diagram-1 .edge-animation-slow{stroke-dasharray:9,5!important;stroke-dashoffset:900;animation:dash 50s linear infinite;stroke-linecap:round;}#a3a-diagram-1 .edge-animation-fast{stroke-dasharray:9,5!important;stroke-dashoffset:900;animation:dash 20s linear infinite;stroke-linecap:round;}#a3a-diagram-1 .error-icon{fill:var(--a3a-diag-canvas, #ffffff);}#a3a-diagram-1 .error-text{fill:#000000;stroke:#000000;}#a3a-diagram-1 .edge-thickness-normal{stroke-width:1px;}#a3a-diagram-1 .edge-thickness-thick{stroke-width:3.5px;}#a3a-diagram-1 .edge-pattern-solid{stroke-dasharray:0;}#a3a-diagram-1 .edge-thickness-invisible{stroke-width:0;fill:none;}#a3a-diagram-1 .edge-pattern-dashed{stroke-dasharray:3;}#a3a-diagram-1 .edge-pattern-dotted{stroke-dasharray:2;}#a3a-diagram-1 .marker{fill:var(--a3a-diag-stroke, #2e42a2);stroke:var(--a3a-diag-stroke, #2e42a2);}#a3a-diagram-1 .marker.cross{stroke:var(--a3a-diag-stroke, #2e42a2);}#a3a-diagram-1 svg{font-family:Roboto,sans-serif;font-size:15px;}#a3a-diagram-1 p{margin:0;}#a3a-diagram-1 .label{font-family:Roboto,sans-serif;color:var(--a3a-diag-text, #0a0a0a);}#a3a-diagram-1 .cluster-label text{fill:var(--a3a-diag-title, #0124af);}#a3a-diagram-1 .cluster-label span{color:var(--a3a-diag-title, #0124af);}#a3a-diagram-1 .cluster-label span p{background-color:transparent;}#a3a-diagram-1 .label text,#a3a-diagram-1 span{fill:var(--a3a-diag-text, #0a0a0a);color:var(--a3a-diag-text, #0a0a0a);}#a3a-diagram-1 .node rect,#a3a-diagram-1 .node circle,#a3a-diagram-1 .node ellipse,#a3a-diagram-1 .node polygon,#a3a-diagram-1 .node path{fill:var(--a3a-diag-fill, #eef2fd);stroke:var(--a3a-diag-stroke, #2e42a2);stroke-width:1px;}#a3a-diagram-1 .rough-node .label text,#a3a-diagram-1 .node .label text,#a3a-diagram-1 .image-shape .label,#a3a-diagram-1 .icon-shape .label{text-anchor:middle;}#a3a-diagram-1 .node .katex path{fill:#000;stroke:#000;stroke-width:1px;}#a3a-diagram-1 .rough-node .label,#a3a-diagram-1 .node .label,#a3a-diagram-1 .image-shape .label,#a3a-diagram-1 .icon-shape .label{text-align:center;}#a3a-diagram-1 .node.clickable{cursor:pointer;}#a3a-diagram-1 .root .anchor path{fill:var(--a3a-diag-stroke, #2e42a2)!important;stroke-width:0;stroke:var(--a3a-diag-stroke, #2e42a2);}#a3a-diagram-1 .arrowheadPath{fill:var(--a3a-diag-stroke, #0b0b0b);}#a3a-diagram-1 .edgePath .path{stroke:var(--a3a-diag-stroke, #2e42a2);stroke-width:2.0px;}#a3a-diagram-1 .flowchart-link{stroke:var(--a3a-diag-stroke, #2e42a2);fill:none;}#a3a-diagram-1 .edgeLabel{background-color:var(--a3a-diag-canvas, #ffffff);text-align:center;}#a3a-diagram-1 .edgeLabel p{background-color:var(--a3a-diag-canvas, #ffffff);}#a3a-diagram-1 .edgeLabel rect{opacity:0.5;background-color:var(--a3a-diag-canvas, #ffffff);fill:var(--a3a-diag-canvas, #ffffff);}#a3a-diagram-1 .labelBkg{background-color:rgba(255, 255, 255, 0.5);}#a3a-diagram-1 .cluster rect{fill:var(--a3a-diag-surface, #f8f8f8);stroke:var(--a3a-diag-border, #e2e8f0);stroke-width:1px;}#a3a-diagram-1 .cluster text{fill:var(--a3a-diag-title, #0124af);}#a3a-diagram-1 .cluster span{color:var(--a3a-diag-title, #0124af);}#a3a-diagram-1 div.mermaidTooltip{position:absolute;text-align:center;max-width:200px;padding:2px;font-family:Roboto,sans-serif;font-size:12px;background:var(--a3a-diag-canvas, #ffffff);border:1px solid hsl(0, 0%, 90%);border-radius:2px;pointer-events:none;z-index:100;}#a3a-diagram-1 .flowchartTitleText{text-anchor:middle;font-size:18px;fill:var(--a3a-diag-text, #0a0a0a);}#a3a-diagram-1 rect.text{fill:none;stroke-width:0;}#a3a-diagram-1 .icon-shape,#a3a-diagram-1 .image-shape{background-color:var(--a3a-diag-canvas, #ffffff);text-align:center;}#a3a-diagram-1 .icon-shape p,#a3a-diagram-1 .image-shape p{background-color:var(--a3a-diag-canvas, #ffffff);padding:2px;}#a3a-diagram-1 .icon-shape rect,#a3a-diagram-1 .image-shape rect{opacity:0.5;background-color:var(--a3a-diag-canvas, #ffffff);fill:var(--a3a-diag-canvas, #ffffff);}#a3a-diagram-1 .label-icon{display:inline-block;height:1em;overflow:visible;vertical-align:-0.125em;}#a3a-diagram-1 .node .label-icon path{fill:currentColor;stroke:revert;stroke-width:revert;}#a3a-diagram-1 :root{--mermaid-font-family:Roboto,sans-serif;}<\/style><g><marker id=\"a3a-diagram-1_flowchart-v2-pointEnd\" class=\"marker flowchart-v2\" viewBox=\"0 0 10 10\" refX=\"5\" refY=\"5\" markerUnits=\"userSpaceOnUse\" markerWidth=\"8\" markerHeight=\"8\" orient=\"auto\"><path d=\"M 0 0 L 10 5 L 0 10 z\" class=\"arrowMarkerPath\" style=\"stroke-width: 1; stroke-dasharray: 1, 0;\"><\/path><\/marker><marker id=\"a3a-diagram-1_flowchart-v2-pointStart\" class=\"marker flowchart-v2\" viewBox=\"0 0 10 10\" refX=\"4.5\" refY=\"5\" markerUnits=\"userSpaceOnUse\" markerWidth=\"8\" markerHeight=\"8\" orient=\"auto\"><path d=\"M 0 5 L 10 10 L 10 0 z\" class=\"arrowMarkerPath\" style=\"stroke-width: 1; stroke-dasharray: 1, 0;\"><\/path><\/marker><marker id=\"a3a-diagram-1_flowchart-v2-circleEnd\" class=\"marker flowchart-v2\" viewBox=\"0 0 10 10\" refX=\"11\" refY=\"5\" markerUnits=\"userSpaceOnUse\" markerWidth=\"11\" markerHeight=\"11\" orient=\"auto\"><circle cx=\"5\" cy=\"5\" r=\"5\" class=\"arrowMarkerPath\" style=\"stroke-width: 1; stroke-dasharray: 1, 0;\"><\/circle><\/marker><marker id=\"a3a-diagram-1_flowchart-v2-circleStart\" class=\"marker flowchart-v2\" viewBox=\"0 0 10 10\" refX=\"-1\" refY=\"5\" markerUnits=\"userSpaceOnUse\" markerWidth=\"11\" markerHeight=\"11\" orient=\"auto\"><circle cx=\"5\" cy=\"5\" r=\"5\" class=\"arrowMarkerPath\" style=\"stroke-width: 1; stroke-dasharray: 1, 0;\"><\/circle><\/marker><marker id=\"a3a-diagram-1_flowchart-v2-crossEnd\" class=\"marker cross flowchart-v2\" viewBox=\"0 0 11 11\" refX=\"12\" refY=\"5.2\" markerUnits=\"userSpaceOnUse\" markerWidth=\"11\" markerHeight=\"11\" orient=\"auto\"><path d=\"M 1,1 l 9,9 M 10,1 l -9,9\" class=\"arrowMarkerPath\" style=\"stroke-width: 2; stroke-dasharray: 1, 0;\"><\/path><\/marker><marker id=\"a3a-diagram-1_flowchart-v2-crossStart\" class=\"marker cross flowchart-v2\" viewBox=\"0 0 11 11\" refX=\"-1\" refY=\"5.2\" markerUnits=\"userSpaceOnUse\" markerWidth=\"11\" markerHeight=\"11\" orient=\"auto\"><path d=\"M 1,1 l 9,9 M 10,1 l -9,9\" class=\"arrowMarkerPath\" style=\"stroke-width: 2; stroke-dasharray: 1, 0;\"><\/path><\/marker><g class=\"root\"><g class=\"clusters\"><\/g><g class=\"edgePaths\"><path d=\"M230.184,60.5L230.184,64.667C230.184,68.833,230.184,77.167,230.184,84.833C230.184,92.5,230.184,99.5,230.184,103L230.184,106.5\" id=\"L_A_B_0\" class=\"edge-thickness-normal edge-pattern-solid edge-thickness-normal edge-pattern-solid flowchart-link\" style=\";\" data-edge=\"true\" data-et=\"edge\" data-id=\"L_A_B_0\" data-points=\"W3sieCI6MjMwLjE4MzU5Mzc1LCJ5Ijo2MC41fSx7IngiOjIzMC4xODM1OTM3NSwieSI6ODUuNX0seyJ4IjoyMzAuMTgzNTkzNzUsInkiOjExMC41fV0=\" marker-end=\"url(#a3a-diagram-1_flowchart-v2-pointEnd)\"><\/path><path d=\"M230.184,163L230.184,167.167C230.184,171.333,230.184,179.667,230.184,187.333C230.184,195,230.184,202,230.184,205.5L230.184,209\" id=\"L_B_C_0\" class=\"edge-thickness-normal edge-pattern-solid edge-thickness-normal edge-pattern-solid flowchart-link\" style=\";\" data-edge=\"true\" data-et=\"edge\" data-id=\"L_B_C_0\" data-points=\"W3sieCI6MjMwLjE4MzU5Mzc1LCJ5IjoxNjN9LHsieCI6MjMwLjE4MzU5Mzc1LCJ5IjoxODh9LHsieCI6MjMwLjE4MzU5Mzc1LCJ5IjoyMTN9XQ==\" marker-end=\"url(#a3a-diagram-1_flowchart-v2-pointEnd)\"><\/path><path d=\"M230.184,265.5L230.184,269.667C230.184,273.833,230.184,282.167,230.184,289.833C230.184,297.5,230.184,304.5,230.184,308L230.184,311.5\" id=\"L_C_D_0\" class=\"edge-thickness-normal edge-pattern-solid edge-thickness-normal edge-pattern-solid flowchart-link\" style=\";\" data-edge=\"true\" data-et=\"edge\" data-id=\"L_C_D_0\" data-points=\"W3sieCI6MjMwLjE4MzU5Mzc1LCJ5IjoyNjUuNX0seyJ4IjoyMzAuMTgzNTkzNzUsInkiOjI5MC41fSx7IngiOjIzMC4xODM1OTM3NSwieSI6MzE1LjV9XQ==\" marker-end=\"url(#a3a-diagram-1_flowchart-v2-pointEnd)\"><\/path><path d=\"M230.184,368L230.184,372.167C230.184,376.333,230.184,384.667,230.184,392.333C230.184,400,230.184,407,230.184,410.5L230.184,414\" id=\"L_D_E_0\" class=\"edge-thickness-normal edge-pattern-solid edge-thickness-normal edge-pattern-solid flowchart-link\" style=\";\" data-edge=\"true\" data-et=\"edge\" data-id=\"L_D_E_0\" data-points=\"W3sieCI6MjMwLjE4MzU5Mzc1LCJ5IjozNjh9LHsieCI6MjMwLjE4MzU5Mzc1LCJ5IjozOTN9LHsieCI6MjMwLjE4MzU5Mzc1LCJ5Ijo0MTh9XQ==\" marker-end=\"url(#a3a-diagram-1_flowchart-v2-pointEnd)\"><\/path><path d=\"M230.184,470.5L230.184,474.667C230.184,478.833,230.184,487.167,230.184,494.833C230.184,502.5,230.184,509.5,230.184,513L230.184,516.5\" id=\"L_E_F_0\" class=\"edge-thickness-normal edge-pattern-solid edge-thickness-normal edge-pattern-solid flowchart-link\" style=\";\" data-edge=\"true\" data-et=\"edge\" data-id=\"L_E_F_0\" data-points=\"W3sieCI6MjMwLjE4MzU5Mzc1LCJ5Ijo0NzAuNX0seyJ4IjoyMzAuMTgzNTkzNzUsInkiOjQ5NS41fSx7IngiOjIzMC4xODM1OTM3NSwieSI6NTIwLjV9XQ==\" marker-end=\"url(#a3a-diagram-1_flowchart-v2-pointEnd)\"><\/path><path d=\"M230.184,595.5L230.184,599.667C230.184,603.833,230.184,612.167,230.184,619.833C230.184,627.5,230.184,634.5,230.184,638L230.184,641.5\" id=\"L_F_G_0\" class=\"edge-thickness-normal edge-pattern-solid edge-thickness-normal edge-pattern-solid flowchart-link\" style=\";\" data-edge=\"true\" data-et=\"edge\" data-id=\"L_F_G_0\" data-points=\"W3sieCI6MjMwLjE4MzU5Mzc1LCJ5Ijo1OTUuNX0seyJ4IjoyMzAuMTgzNTkzNzUsInkiOjYyMC41fSx7IngiOjIzMC4xODM1OTM3NSwieSI6NjQ1LjV9XQ==\" marker-end=\"url(#a3a-diagram-1_flowchart-v2-pointEnd)\"><\/path><path d=\"M187.955,765.052L173.668,778.132C159.381,791.212,130.808,817.372,116.521,835.826C102.234,854.281,102.234,865.031,102.234,870.406L102.234,875.781\" id=\"L_G_H_0\" class=\"edge-thickness-normal edge-pattern-solid edge-thickness-normal edge-pattern-solid flowchart-link\" style=\";\" data-edge=\"true\" data-et=\"edge\" data-id=\"L_G_H_0\" data-points=\"W3sieCI6MTg3Ljk1NDYyMTI0NTA5OTA1LCJ5Ijo3NjUuMDUyMjc3NDk1MDk5fSx7IngiOjEwMi4yMzQzNzUsInkiOjg0My41MzEyNX0seyJ4IjoxMDIuMjM0Mzc1LCJ5Ijo4NzkuNzgxMjV9XQ==\" marker-end=\"url(#a3a-diagram-1_flowchart-v2-pointEnd)\"><\/path><path d=\"M272.413,765.052L286.699,778.132C300.986,791.212,329.559,817.372,343.846,835.826C358.133,854.281,358.133,865.031,358.133,870.406L358.133,875.781\" id=\"L_G_I_0\" class=\"edge-thickness-normal edge-pattern-solid edge-thickness-normal edge-pattern-solid flowchart-link\" style=\";\" data-edge=\"true\" data-et=\"edge\" data-id=\"L_G_I_0\" data-points=\"W3sieCI6MjcyLjQxMjU2NjI1NDkwMDksInkiOjc2NS4wNTIyNzc0OTUwOTl9LHsieCI6MzU4LjEzMjgxMjUsInkiOjg0My41MzEyNX0seyJ4IjozNTguMTMyODEyNSwieSI6ODc5Ljc4MTI1fV0=\" marker-end=\"url(#a3a-diagram-1_flowchart-v2-pointEnd)\"><\/path><\/g><g class=\"edgeLabels\"><g class=\"edgeLabel\"><g class=\"label\" data-id=\"L_A_B_0\" transform=\"translate(0, 0)\"><foreignObject width=\"0\" height=\"0\"><div xmlns=\"http:\/\/www.w3.org\/1999\/xhtml\" class=\"labelBkg\" style=\"display: table-cell; white-space: nowrap; line-height: 1.5; max-width: 200px; text-align: center;\"><span class=\"edgeLabel\"><\/span><\/div><\/foreignObject><\/g><\/g><g class=\"edgeLabel\"><g class=\"label\" data-id=\"L_B_C_0\" transform=\"translate(0, 0)\"><foreignObject width=\"0\" height=\"0\"><div xmlns=\"http:\/\/www.w3.org\/1999\/xhtml\" class=\"labelBkg\" style=\"display: table-cell; white-space: nowrap; line-height: 1.5; max-width: 200px; text-align: center;\"><span class=\"edgeLabel\"><\/span><\/div><\/foreignObject><\/g><\/g><g class=\"edgeLabel\"><g class=\"label\" data-id=\"L_C_D_0\" transform=\"translate(0, 0)\"><foreignObject width=\"0\" height=\"0\"><div xmlns=\"http:\/\/www.w3.org\/1999\/xhtml\" class=\"labelBkg\" style=\"display: table-cell; white-space: nowrap; line-height: 1.5; max-width: 200px; text-align: center;\"><span class=\"edgeLabel\"><\/span><\/div><\/foreignObject><\/g><\/g><g class=\"edgeLabel\"><g class=\"label\" data-id=\"L_D_E_0\" transform=\"translate(0, 0)\"><foreignObject width=\"0\" height=\"0\"><div xmlns=\"http:\/\/www.w3.org\/1999\/xhtml\" class=\"labelBkg\" style=\"display: table-cell; white-space: nowrap; line-height: 1.5; max-width: 200px; text-align: center;\"><span class=\"edgeLabel\"><\/span><\/div><\/foreignObject><\/g><\/g><g class=\"edgeLabel\"><g class=\"label\" data-id=\"L_E_F_0\" transform=\"translate(0, 0)\"><foreignObject width=\"0\" height=\"0\"><div xmlns=\"http:\/\/www.w3.org\/1999\/xhtml\" class=\"labelBkg\" style=\"display: table-cell; white-space: nowrap; line-height: 1.5; max-width: 200px; text-align: center;\"><span class=\"edgeLabel\"><\/span><\/div><\/foreignObject><\/g><\/g><g class=\"edgeLabel\"><g class=\"label\" data-id=\"L_F_G_0\" transform=\"translate(0, 0)\"><foreignObject width=\"0\" height=\"0\"><div xmlns=\"http:\/\/www.w3.org\/1999\/xhtml\" class=\"labelBkg\" style=\"display: table-cell; white-space: nowrap; line-height: 1.5; max-width: 200px; text-align: center;\"><span class=\"edgeLabel\"><\/span><\/div><\/foreignObject><\/g><\/g><g class=\"edgeLabel\" transform=\"translate(102.234375, 843.53125)\"><g class=\"label\" data-id=\"L_G_H_0\" transform=\"translate(-9.5078125, -11.25)\"><foreignObject width=\"19.015625\" height=\"22.5\"><div xmlns=\"http:\/\/www.w3.org\/1999\/xhtml\" class=\"labelBkg\" style=\"display: table-cell; white-space: nowrap; line-height: 1.5; max-width: 200px; text-align: center;\"><span class=\"edgeLabel\"><p>No<\/p><\/span><\/div><\/foreignObject><\/g><\/g><g class=\"edgeLabel\" transform=\"translate(358.1328125, 843.53125)\"><g class=\"label\" data-id=\"L_G_I_0\" transform=\"translate(-6.203125, -11.25)\"><foreignObject width=\"12.40625\" height=\"22.5\"><div xmlns=\"http:\/\/www.w3.org\/1999\/xhtml\" class=\"labelBkg\" style=\"display: table-cell; white-space: nowrap; line-height: 1.5; max-width: 200px; text-align: center;\"><span class=\"edgeLabel\"><p>S\u00ed<\/p><\/span><\/div><\/foreignObject><\/g><\/g><\/g><g class=\"nodes\"><g class=\"node default\" id=\"flowchart-A-0\" transform=\"translate(230.18359375, 34.25)\"><rect class=\"basic label-container\" style=\"\" x=\"-65.40625\" y=\"-26.25\" width=\"130.8125\" height=\"52.5\"><\/rect><g class=\"label\" style=\"\" transform=\"translate(-35.40625, -11.25)\"><rect><\/rect><foreignObject width=\"70.8125\" height=\"22.5\"><div xmlns=\"http:\/\/www.w3.org\/1999\/xhtml\" style=\"display: table-cell; white-space: nowrap; line-height: 1.5; max-width: 200px; text-align: center;\"><span class=\"nodeLabel\"><p>Necesidad<\/p><\/span><\/div><\/foreignObject><\/g><\/g><g class=\"node default\" id=\"flowchart-B-1\" transform=\"translate(230.18359375, 136.75)\"><rect class=\"basic label-container\" style=\"\" x=\"-99.328125\" y=\"-26.25\" width=\"198.65625\" height=\"52.5\"><\/rect><g class=\"label\" style=\"\" transform=\"translate(-69.328125, -11.25)\"><rect><\/rect><foreignObject width=\"138.65625\" height=\"22.5\"><div xmlns=\"http:\/\/www.w3.org\/1999\/xhtml\" style=\"display: table-cell; white-space: nowrap; line-height: 1.5; max-width: 200px; text-align: center;\"><span class=\"nodeLabel\"><p>Requisitos definidos<\/p><\/span><\/div><\/foreignObject><\/g><\/g><g class=\"node default\" id=\"flowchart-C-3\" transform=\"translate(230.18359375, 239.25)\"><rect class=\"basic label-container\" style=\"\" x=\"-113.6875\" y=\"-26.25\" width=\"227.375\" height=\"52.5\"><\/rect><g class=\"label\" style=\"\" transform=\"translate(-83.6875, -11.25)\"><rect><\/rect><foreignObject width=\"167.375\" height=\"22.5\"><div xmlns=\"http:\/\/www.w3.org\/1999\/xhtml\" style=\"display: table-cell; white-space: nowrap; line-height: 1.5; max-width: 200px; text-align: center;\"><span class=\"nodeLabel\"><p>Datos del sitio validados<\/p><\/span><\/div><\/foreignObject><\/g><\/g><g class=\"node default\" id=\"flowchart-D-5\" transform=\"translate(230.18359375, 341.75)\"><rect class=\"basic label-container\" style=\"\" x=\"-100.6796875\" y=\"-26.25\" width=\"201.359375\" height=\"52.5\"><\/rect><g class=\"label\" style=\"\" transform=\"translate(-70.6796875, -11.25)\"><rect><\/rect><foreignObject width=\"141.359375\" height=\"22.5\"><div xmlns=\"http:\/\/www.w3.org\/1999\/xhtml\" style=\"display: table-cell; white-space: nowrap; line-height: 1.5; max-width: 200px; text-align: center;\"><span class=\"nodeLabel\"><p>Interfaces mapeadas<\/p><\/span><\/div><\/foreignObject><\/g><\/g><g class=\"node default\" id=\"flowchart-E-7\" transform=\"translate(230.18359375, 444.25)\"><rect class=\"basic label-container\" style=\"\" x=\"-94.3046875\" y=\"-26.25\" width=\"188.609375\" height=\"52.5\"><\/rect><g class=\"label\" style=\"\" transform=\"translate(-64.3046875, -11.25)\"><rect><\/rect><foreignObject width=\"128.609375\" height=\"22.5\"><div xmlns=\"http:\/\/www.w3.org\/1999\/xhtml\" style=\"display: table-cell; white-space: nowrap; line-height: 1.5; max-width: 200px; text-align: center;\"><span class=\"nodeLabel\"><p>Riesgos analizados<\/p><\/span><\/div><\/foreignObject><\/g><\/g><g class=\"node default\" id=\"flowchart-F-9\" transform=\"translate(230.18359375, 558)\"><rect class=\"basic label-container\" style=\"\" x=\"-130\" y=\"-37.5\" width=\"260\" height=\"75\"><\/rect><g class=\"label\" style=\"\" transform=\"translate(-100, -22.5)\"><rect><\/rect><foreignObject width=\"200\" height=\"45\"><div xmlns=\"http:\/\/www.w3.org\/1999\/xhtml\" style=\"display: table; white-space: break-spaces; line-height: 1.5; max-width: 200px; text-align: center; width: 200px;\"><span class=\"nodeLabel\"><p>Desempe\u00f1o y aceptaci\u00f3n definidos<\/p><\/span><\/div><\/foreignObject><\/g><\/g><g class=\"node default\" id=\"flowchart-G-11\" transform=\"translate(230.18359375, 726.390625)\"><polygon points=\"80.890625,0 161.78125,-80.890625 80.890625,-161.78125 0,-80.890625\" class=\"label-container\" transform=\"translate(-80.390625, 80.890625)\"><\/polygon><g class=\"label\" style=\"\" transform=\"translate(-54.640625, -11.25)\"><rect><\/rect><foreignObject width=\"109.28125\" height=\"22.5\"><div xmlns=\"http:\/\/www.w3.org\/1999\/xhtml\" style=\"display: table-cell; white-space: nowrap; line-height: 1.5; max-width: 200px; text-align: center;\"><span class=\"nodeLabel\"><p>\u00bfListo para RFP?<\/p><\/span><\/div><\/foreignObject><\/g><\/g><g class=\"node default\" id=\"flowchart-H-13\" transform=\"translate(102.234375, 906.03125)\"><rect class=\"basic label-container\" style=\"\" x=\"-94.234375\" y=\"-26.25\" width=\"188.46875\" height=\"52.5\"><\/rect><g class=\"label\" style=\"\" transform=\"translate(-64.234375, -11.25)\"><rect><\/rect><foreignObject width=\"128.46875\" height=\"22.5\"><div xmlns=\"http:\/\/www.w3.org\/1999\/xhtml\" style=\"display: table-cell; white-space: nowrap; line-height: 1.5; max-width: 200px; text-align: center;\"><span class=\"nodeLabel\"><p>Madurar definici\u00f3n<\/p><\/span><\/div><\/foreignObject><\/g><\/g><g class=\"node default\" id=\"flowchart-I-15\" transform=\"translate(358.1328125, 906.03125)\"><rect class=\"basic label-container\" style=\"\" x=\"-111.6640625\" y=\"-26.25\" width=\"223.328125\" height=\"52.5\"><\/rect><g class=\"label\" style=\"\" transform=\"translate(-81.6640625, -11.25)\"><rect><\/rect><foreignObject width=\"163.328125\" height=\"22.5\"><div xmlns=\"http:\/\/www.w3.org\/1999\/xhtml\" style=\"display: table-cell; white-space: nowrap; line-height: 1.5; max-width: 200px; text-align: center;\"><span class=\"nodeLabel\"><p>Lanzar contrataci\u00f3n EPC<\/p><\/span><\/div><\/foreignObject><\/g><\/g><\/g><\/g><\/g><\/svg><figcaption>Gate de preparaci\u00f3n antes de lanzar una contrataci\u00f3n EPC<\/figcaption><\/figure>\n\n\n\n<div class=\"wp-block-a3a-destaque\">\n<p class=\"wp-block-paragraph\">Antes de lanzar una RFP EPC, el Owner necesita saber si el proyecto est\u00e1 suficientemente definido para recibir precio, plazo y riesgo. Readiness eval\u00faa no solo documentos disponibles, sino tambi\u00e9n decisiones pendientes, interfaces, datos del sitio, premisas, riesgos y condiciones que pueden alterar materialmente las propuestas.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><a href=\"https:\/\/a3aengenharia.com.br\/conteudo\/artigos-tecnicos\/project-readiness-engenharia-avaliacao-prontidao-projeto\/\">Eval\u00fae el Project Readiness antes de abrir la contrataci\u00f3n<\/a><\/p>\n<\/div>\n\n\n\n<h2 class=\"wp-block-heading\">Definir los requisitos del Owner<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Los requisitos del Owner son la referencia del resultado requerido. Deben indicar qu\u00e9 debe hacer el proyecto, en qu\u00e9 condiciones, con qu\u00e9 desempe\u00f1o y bajo qu\u00e9 restricciones.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">La <a href=\"https:\/\/a3aengenharia.com.br\/conteudo\/artigos-tecnicos\/gestao-requisitos-engenharia-definicao-rastreabilidade-mudancas-aceite\/\">Gesti\u00f3n de Requisitos en Ingenier\u00eda<\/a> permite organizar requisitos funcionales, t\u00e9cnicos, de seguridad, mantenimiento, integraci\u00f3n, documentaci\u00f3n y operaci\u00f3n. Cada requisito relevante debe contar con un m\u00e9todo de verificaci\u00f3n compatible.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Especificar resultados, no adjetivos<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Expresiones como \u201calta calidad\u201d, \u201csistema robusto\u201d o \u201cmejor tecnolog\u00eda\u201d no orientan una competencia t\u00e9cnica. Los requisitos deben transformarse en par\u00e1metros, arquitecturas m\u00ednimas, comportamientos, normas aplicables, tolerancias y criterios de prueba.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Al mismo tiempo, especificar un \u00fanico modelo o soluci\u00f3n sin necesidad puede limitar la competencia y retirar al contratista EPC parte de la autonom\u00eda que justifica el modelo. El equilibrio depende del riesgo y de la estrategia del Owner.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Requisitos de operaci\u00f3n y mantenimiento<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">La contrataci\u00f3n EPC debe considerar el per\u00edodo posterior al handover. Accesibilidad, repuestos, documentaci\u00f3n, licencias, capacitaci\u00f3n, herramientas, backups, estrategia de mantenimiento y estandarizaci\u00f3n pueden afectar el coste del ciclo de vida y deben entrar en la definici\u00f3n.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Desarrollar una ingenier\u00eda de referencia compatible<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">La ingenier\u00eda de referencia crea el puente entre requisitos y propuesta EPC. Puede incluir estudios, bases de dise\u00f1o, levantamientos, memorias, diagramas, layouts, especificaciones, anteproyecto, Proyecto B\u00e1sico o FEED.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">El <a href=\"https:\/\/a3aengenharia.com.br\/conteudo\/artigos-tecnicos\/feed-engenharia-etapas-entregaveis\/\">FEED en Ingenier\u00eda<\/a> es especialmente \u00fatil en proyectos industriales y multidisciplinares porque madura bases, alternativas, equipos principales, interfaces, cronograma y estimaciones.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">La ingenier\u00eda de referencia debe dejar claro qu\u00e9 es <strong>mandatorio<\/strong>, qu\u00e9 es <strong>referencial<\/strong> y d\u00f3nde el contratista EPC tiene libertad para optimizar. Si esta distinci\u00f3n no existe, los proponentes pueden interpretar un dibujo conceptual como requisito obligatorio o, en el extremo opuesto, ignorar decisiones que el Owner pretend\u00eda preservar.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Datos del sitio<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Topograf\u00eda, interferencias, capacidad de infraestructura, redes existentes, accesos, caracter\u00edsticas ambientales, ventanas de parada y dem\u00e1s condiciones relevantes deben verificarse en la medida necesaria.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">En brownfield, la diligencia de campo es especialmente importante. Transferir indiscriminadamente al contratista EPC el riesgo por toda condici\u00f3n desconocida puede encarecer las propuestas o generar una disputa futura.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Delimitar el Scope of Work y los battery limits<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">El <a href=\"https:\/\/a3aengenharia.com.br\/conteudo\/artigos-tecnicos\/scope-of-work-sow-escopo-trabalho-engenharia\/\">Scope of Work en Ingenier\u00eda<\/a> debe describir actividades y entregables. Los battery limits y la matriz de interfaces definen las fronteras.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Para cada punto de interfaz, la RFP debe indicar qui\u00e9n suministra informaci\u00f3n, equipo, energ\u00eda, acceso, conexi\u00f3n, pruebas y aceptaci\u00f3n. Esto reduce la cl\u00e1sica laguna de \u201cno est\u00e1 en mi alcance\u201d.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Las inclusiones, exclusiones y premisas tambi\u00e9n deben tratarse. El <a href=\"https:\/\/a3aengenharia.com.br\/conteudo\/artigos-tecnicos\/escopo-contratual-engenharia-inclusoes-exclusoes-premissas\/\">Alcance Contractual en Ingenier\u00eda<\/a> profundiza en c\u00f3mo estas categor\u00edas afectan el precio y los cambios.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Regla de completitud<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Cuando sea t\u00e9cnicamente aplicable, el paquete puede establecer que accesorios y servicios normalmente necesarios para la funci\u00f3n final forman parte del alcance aunque no est\u00e9n listados individualmente. Esta regla debe equilibrarse con l\u00edmites claros para no convertir el contrato en una obligaci\u00f3n indefinida.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Construir la matriz de responsabilidades<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">La matriz organiza al Owner, contratista EPC, terceros, utilities y proveedores nominados. Puede utilizar RACI o un modelo equivalente.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Adem\u00e1s de \u201cqui\u00e9n hace\u201d, debe indicar qui\u00e9n suministra datos, qui\u00e9n aprueba, qui\u00e9n presencia pruebas y qui\u00e9n acepta. Las responsabilidades del Owner necesitan plazos, ya que una aprobaci\u00f3n o liberaci\u00f3n tard\u00eda puede entrar en el camino cr\u00edtico.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">La matriz tambi\u00e9n ayuda a separar aprobaci\u00f3n de responsabilidad t\u00e9cnica. El hecho de que el Owner revise un documento no significa autom\u00e1ticamente que pase a responder por el dise\u00f1o del contratista EPC.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Identificar y asignar riesgos antes de la RFP<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Los riesgos deben discutirse antes de que el mercado los valorice. La matriz puede incluir condiciones existentes, interfaces externas, productividad, log\u00edstica, licenciamiento, tipo de cambio, cambios regulatorios, utilities, datos suministrados y eventos de terceros.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">El principio es asignar el riesgo a la parte que posee mejor capacidad para controlar o mitigar el evento. La transferencia arbitraria aumenta contingencias y puede reducir la competencia.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">La matriz tambi\u00e9n debe indicar qu\u00e9 riesgos generan cambio, extensi\u00f3n de plazo o mecanismo espec\u00edfico. Sin este puente hacia el contrato, la discusi\u00f3n de riesgos permanece \u00fanicamente en el plano gerencial.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Definir desempe\u00f1o, pruebas y aceptaci\u00f3n antes de la competencia<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">El Owner debe definir qu\u00e9 se medir\u00e1 para aceptar el resultado. Las garant\u00edas de capacidad, disponibilidad, eficiencia u otro desempe\u00f1o deben contar con m\u00e9todo de verificaci\u00f3n.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">El plan de pruebas puede prever FAT, SAT, pruebas funcionales, integradas y de desempe\u00f1o. La estrategia de <a href=\"https:\/\/a3aengenharia.com.br\/conteudo\/guias-tecnicos\/guia-completo-sobre-comissionamento\/\">Puesta en Marcha<\/a> debe influir en la RFP para que los proponentes incluyan recursos, instrumentos, software, consumibles y soporte necesarios.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">La documentaci\u00f3n tambi\u00e9n integra la aceptaci\u00f3n: As-Built, manuales, informes, certificados, capacitaci\u00f3n, backups, licencias y data books deben aparecer en el paquete.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Realizar market sounding y mapear contratistas EPC<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Antes de la RFP formal, el Owner puede evaluar la capacidad del mercado. El objetivo no es negociar el contrato anticipadamente, sino verificar si existen empresas capaces de asumir el paquete, qu\u00e9 riesgos considera cr\u00edticos el mercado y si la estrategia propuesta es competitiva.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">El market sounding puede revelar que el alcance es demasiado grande para un \u00fanico integrador, que determinado equipo exige un proveedor especializado o que una interfaz debe retirarse del paquete. Estas informaciones ayudan a ajustar la estrategia antes de congelar la contrataci\u00f3n.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">El proceso debe preservar la igualdad de trato cuando corresponda. Las informaciones relevantes obtenidas e incorporadas al objeto deben ponerse a disposici\u00f3n de los participantes de forma coherente.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Precalificaci\u00f3n: qui\u00e9n puede realmente asumir el EPC<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">La precalificaci\u00f3n reduce el riesgo de recibir propuestas de empresas sin capacidad suficiente. El criterio debe reflejar la complejidad del proyecto, no solo la facturaci\u00f3n o la existencia formal de la empresa.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Pueden evaluarse:<\/p>\n\n\n\n<ul class=\"wp-block-list\"><li>experiencia en alcances comparables;<\/li><li>capacidad de ingenier\u00eda multidisciplinaria;<\/li><li>gesti\u00f3n de Procurement y proveedores;<\/li><li>construcci\u00f3n y gesti\u00f3n de subcontratistas;<\/li><li>Project Controls;<\/li><li>QA\/QC;<\/li><li>puesta en marcha e integraci\u00f3n;<\/li><li>salud financiera;<\/li><li>equipo clave;<\/li><li>sistemas de gesti\u00f3n documental;<\/li><li>historial de seguridad y calidad;<\/li><li>capacidad de garant\u00edas y seguros.<\/li><\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">La exigencia debe ser proporcional. Restricciones excesivas pueden reducir la competencia sin beneficio real; requisitos bajos pueden permitir que empresas incapaces lleguen a la etapa de propuesta.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Estructurar la RFP EPC<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">La <a href=\"https:\/\/a3aengenharia.com.br\/conteudo\/artigos-tecnicos\/rfp-engenharia-escopo-requisitos-criterios-selecao\/\">RFP en Ingenier\u00eda<\/a> organiza alcance, requisitos y criterios de selecci\u00f3n. En EPC, debe formar un paquete consistente entre documentos t\u00e9cnicos y comerciales.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Una estructura t\u00edpica puede incluir:<\/p>\n\n\n\n<ol class=\"wp-block-list\"><li>instrucciones a los proponentes;<\/li><li>requisitos del Owner;<\/li><li>Scope of Work;<\/li><li>ingenier\u00eda de referencia;<\/li><li>battery limits e interfaces;<\/li><li>matriz de responsabilidades;<\/li><li>matriz de riesgos;<\/li><li>cronograma e hitos;<\/li><li>requisitos de Procurement;<\/li><li>calidad e inspecciones;<\/li><li>puesta en marcha y desempe\u00f1o;<\/li><li>documentaci\u00f3n y handover;<\/li><li>propuesta de precio y condiciones comerciales;<\/li><li>minuta contractual;<\/li><li>criterios de evaluaci\u00f3n.<\/li><\/ol>\n\n\n\n<p class=\"wp-block-paragraph\">La RFP debe exigir que las desviaciones y excepciones se presenten en formato estructurado. Las propuestas que ocultan calificaciones en el cuerpo de cartas comerciales son dif\u00edciles de igualar.<\/p>\n\n\n\n<figure class=\"a3a-mermaid\"><svg id=\"a3a-diagram-2\" width=\"100%\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" class=\"flowchart\" style=\"max-width:min(1686.8125px, 100%);height:auto;display:block;margin:0 auto\" viewBox=\"0 0 1686.8125 68.5\" role=\"graphics-document document\" aria-roledescription=\"flowchart-v2\" aria-labelledby=\"chart-title-a3a-diagram-2\"><title id=\"chart-title-a3a-diagram-2\">Estructura l\u00f3gica de una RFP para contrataci\u00f3n EPC<\/title><style>#a3a-diagram-2{font-family:Roboto,sans-serif;font-size:15px;fill:var(--a3a-diag-text, #0a0a0a);}@keyframes edge-animation-frame{from{stroke-dashoffset:0;}}@keyframes dash{to{stroke-dashoffset:0;}}#a3a-diagram-2 .edge-animation-slow{stroke-dasharray:9,5!important;stroke-dashoffset:900;animation:dash 50s linear infinite;stroke-linecap:round;}#a3a-diagram-2 .edge-animation-fast{stroke-dasharray:9,5!important;stroke-dashoffset:900;animation:dash 20s linear infinite;stroke-linecap:round;}#a3a-diagram-2 .error-icon{fill:var(--a3a-diag-canvas, #ffffff);}#a3a-diagram-2 .error-text{fill:#000000;stroke:#000000;}#a3a-diagram-2 .edge-thickness-normal{stroke-width:1px;}#a3a-diagram-2 .edge-thickness-thick{stroke-width:3.5px;}#a3a-diagram-2 .edge-pattern-solid{stroke-dasharray:0;}#a3a-diagram-2 .edge-thickness-invisible{stroke-width:0;fill:none;}#a3a-diagram-2 .edge-pattern-dashed{stroke-dasharray:3;}#a3a-diagram-2 .edge-pattern-dotted{stroke-dasharray:2;}#a3a-diagram-2 .marker{fill:var(--a3a-diag-stroke, #2e42a2);stroke:var(--a3a-diag-stroke, #2e42a2);}#a3a-diagram-2 .marker.cross{stroke:var(--a3a-diag-stroke, #2e42a2);}#a3a-diagram-2 svg{font-family:Roboto,sans-serif;font-size:15px;}#a3a-diagram-2 p{margin:0;}#a3a-diagram-2 .label{font-family:Roboto,sans-serif;color:var(--a3a-diag-text, #0a0a0a);}#a3a-diagram-2 .cluster-label text{fill:var(--a3a-diag-title, #0124af);}#a3a-diagram-2 .cluster-label span{color:var(--a3a-diag-title, #0124af);}#a3a-diagram-2 .cluster-label span p{background-color:transparent;}#a3a-diagram-2 .label text,#a3a-diagram-2 span{fill:var(--a3a-diag-text, #0a0a0a);color:var(--a3a-diag-text, #0a0a0a);}#a3a-diagram-2 .node rect,#a3a-diagram-2 .node circle,#a3a-diagram-2 .node ellipse,#a3a-diagram-2 .node polygon,#a3a-diagram-2 .node path{fill:var(--a3a-diag-fill, #eef2fd);stroke:var(--a3a-diag-stroke, #2e42a2);stroke-width:1px;}#a3a-diagram-2 .rough-node .label text,#a3a-diagram-2 .node .label text,#a3a-diagram-2 .image-shape .label,#a3a-diagram-2 .icon-shape .label{text-anchor:middle;}#a3a-diagram-2 .node .katex path{fill:#000;stroke:#000;stroke-width:1px;}#a3a-diagram-2 .rough-node .label,#a3a-diagram-2 .node .label,#a3a-diagram-2 .image-shape .label,#a3a-diagram-2 .icon-shape .label{text-align:center;}#a3a-diagram-2 .node.clickable{cursor:pointer;}#a3a-diagram-2 .root .anchor path{fill:var(--a3a-diag-stroke, #2e42a2)!important;stroke-width:0;stroke:var(--a3a-diag-stroke, #2e42a2);}#a3a-diagram-2 .arrowheadPath{fill:var(--a3a-diag-stroke, #0b0b0b);}#a3a-diagram-2 .edgePath .path{stroke:var(--a3a-diag-stroke, #2e42a2);stroke-width:2.0px;}#a3a-diagram-2 .flowchart-link{stroke:var(--a3a-diag-stroke, #2e42a2);fill:none;}#a3a-diagram-2 .edgeLabel{background-color:var(--a3a-diag-canvas, #ffffff);text-align:center;}#a3a-diagram-2 .edgeLabel p{background-color:var(--a3a-diag-canvas, #ffffff);}#a3a-diagram-2 .edgeLabel rect{opacity:0.5;background-color:var(--a3a-diag-canvas, #ffffff);fill:var(--a3a-diag-canvas, #ffffff);}#a3a-diagram-2 .labelBkg{background-color:rgba(255, 255, 255, 0.5);}#a3a-diagram-2 .cluster rect{fill:var(--a3a-diag-surface, #f8f8f8);stroke:var(--a3a-diag-border, #e2e8f0);stroke-width:1px;}#a3a-diagram-2 .cluster text{fill:var(--a3a-diag-title, #0124af);}#a3a-diagram-2 .cluster span{color:var(--a3a-diag-title, #0124af);}#a3a-diagram-2 div.mermaidTooltip{position:absolute;text-align:center;max-width:200px;padding:2px;font-family:Roboto,sans-serif;font-size:12px;background:var(--a3a-diag-canvas, #ffffff);border:1px solid hsl(0, 0%, 90%);border-radius:2px;pointer-events:none;z-index:100;}#a3a-diagram-2 .flowchartTitleText{text-anchor:middle;font-size:18px;fill:var(--a3a-diag-text, #0a0a0a);}#a3a-diagram-2 rect.text{fill:none;stroke-width:0;}#a3a-diagram-2 .icon-shape,#a3a-diagram-2 .image-shape{background-color:var(--a3a-diag-canvas, #ffffff);text-align:center;}#a3a-diagram-2 .icon-shape p,#a3a-diagram-2 .image-shape p{background-color:var(--a3a-diag-canvas, #ffffff);padding:2px;}#a3a-diagram-2 .icon-shape rect,#a3a-diagram-2 .image-shape rect{opacity:0.5;background-color:var(--a3a-diag-canvas, #ffffff);fill:var(--a3a-diag-canvas, #ffffff);}#a3a-diagram-2 .label-icon{display:inline-block;height:1em;overflow:visible;vertical-align:-0.125em;}#a3a-diagram-2 .node .label-icon path{fill:currentColor;stroke:revert;stroke-width:revert;}#a3a-diagram-2 :root{--mermaid-font-family:Roboto,sans-serif;}<\/style><g><marker id=\"a3a-diagram-2_flowchart-v2-pointEnd\" class=\"marker flowchart-v2\" viewBox=\"0 0 10 10\" refX=\"5\" refY=\"5\" markerUnits=\"userSpaceOnUse\" markerWidth=\"8\" markerHeight=\"8\" orient=\"auto\"><path d=\"M 0 0 L 10 5 L 0 10 z\" class=\"arrowMarkerPath\" style=\"stroke-width: 1; stroke-dasharray: 1, 0;\"><\/path><\/marker><marker id=\"a3a-diagram-2_flowchart-v2-pointStart\" class=\"marker flowchart-v2\" viewBox=\"0 0 10 10\" refX=\"4.5\" refY=\"5\" markerUnits=\"userSpaceOnUse\" markerWidth=\"8\" markerHeight=\"8\" orient=\"auto\"><path d=\"M 0 5 L 10 10 L 10 0 z\" class=\"arrowMarkerPath\" style=\"stroke-width: 1; stroke-dasharray: 1, 0;\"><\/path><\/marker><marker id=\"a3a-diagram-2_flowchart-v2-circleEnd\" class=\"marker flowchart-v2\" viewBox=\"0 0 10 10\" refX=\"11\" refY=\"5\" markerUnits=\"userSpaceOnUse\" markerWidth=\"11\" markerHeight=\"11\" orient=\"auto\"><circle cx=\"5\" cy=\"5\" r=\"5\" class=\"arrowMarkerPath\" style=\"stroke-width: 1; stroke-dasharray: 1, 0;\"><\/circle><\/marker><marker id=\"a3a-diagram-2_flowchart-v2-circleStart\" class=\"marker flowchart-v2\" viewBox=\"0 0 10 10\" refX=\"-1\" refY=\"5\" markerUnits=\"userSpaceOnUse\" markerWidth=\"11\" markerHeight=\"11\" orient=\"auto\"><circle cx=\"5\" cy=\"5\" r=\"5\" class=\"arrowMarkerPath\" style=\"stroke-width: 1; stroke-dasharray: 1, 0;\"><\/circle><\/marker><marker id=\"a3a-diagram-2_flowchart-v2-crossEnd\" class=\"marker cross flowchart-v2\" viewBox=\"0 0 11 11\" refX=\"12\" refY=\"5.2\" markerUnits=\"userSpaceOnUse\" markerWidth=\"11\" markerHeight=\"11\" orient=\"auto\"><path d=\"M 1,1 l 9,9 M 10,1 l -9,9\" class=\"arrowMarkerPath\" style=\"stroke-width: 2; stroke-dasharray: 1, 0;\"><\/path><\/marker><marker id=\"a3a-diagram-2_flowchart-v2-crossStart\" class=\"marker cross flowchart-v2\" viewBox=\"0 0 11 11\" refX=\"-1\" refY=\"5.2\" markerUnits=\"userSpaceOnUse\" markerWidth=\"11\" markerHeight=\"11\" orient=\"auto\"><path d=\"M 1,1 l 9,9 M 10,1 l -9,9\" class=\"arrowMarkerPath\" style=\"stroke-width: 2; stroke-dasharray: 1, 0;\"><\/path><\/marker><g class=\"root\"><g class=\"clusters\"><\/g><g class=\"edgePaths\"><path d=\"M139.156,34.25L143.323,34.25C147.49,34.25,155.823,34.25,163.49,34.25C171.156,34.25,178.156,34.25,181.656,34.25L185.156,34.25\" id=\"L_A_B_0\" class=\"edge-thickness-normal edge-pattern-solid edge-thickness-normal edge-pattern-solid flowchart-link\" style=\";\" data-edge=\"true\" data-et=\"edge\" data-id=\"L_A_B_0\" data-points=\"W3sieCI6MTM5LjE1NjI1LCJ5IjozNC4yNX0seyJ4IjoxNjQuMTU2MjUsInkiOjM0LjI1fSx7IngiOjE4OS4xNTYyNSwieSI6MzQuMjV9XQ==\" marker-end=\"url(#a3a-diagram-2_flowchart-v2-pointEnd)\"><\/path><path d=\"M384.297,34.25L388.464,34.25C392.63,34.25,400.964,34.25,408.63,34.25C416.297,34.25,423.297,34.25,426.797,34.25L430.297,34.25\" id=\"L_B_C_0\" class=\"edge-thickness-normal edge-pattern-solid edge-thickness-normal edge-pattern-solid flowchart-link\" style=\";\" data-edge=\"true\" data-et=\"edge\" data-id=\"L_B_C_0\" data-points=\"W3sieCI6Mzg0LjI5Njg3NSwieSI6MzQuMjV9LHsieCI6NDA5LjI5Njg3NSwieSI6MzQuMjV9LHsieCI6NDM0LjI5Njg3NSwieSI6MzQuMjV9XQ==\" marker-end=\"url(#a3a-diagram-2_flowchart-v2-pointEnd)\"><\/path><path d=\"M546.109,34.25L550.276,34.25C554.443,34.25,562.776,34.25,570.443,34.25C578.109,34.25,585.109,34.25,588.609,34.25L592.109,34.25\" id=\"L_C_D_0\" class=\"edge-thickness-normal edge-pattern-solid edge-thickness-normal edge-pattern-solid flowchart-link\" style=\";\" data-edge=\"true\" data-et=\"edge\" data-id=\"L_C_D_0\" data-points=\"W3sieCI6NTQ2LjEwOTM3NSwieSI6MzQuMjV9LHsieCI6NTcxLjEwOTM3NSwieSI6MzQuMjV9LHsieCI6NTk2LjEwOTM3NSwieSI6MzQuMjV9XQ==\" marker-end=\"url(#a3a-diagram-2_flowchart-v2-pointEnd)\"><\/path><path d=\"M807.328,34.25L811.495,34.25C815.661,34.25,823.995,34.25,831.661,34.25C839.328,34.25,846.328,34.25,849.828,34.25L853.328,34.25\" id=\"L_D_E_0\" class=\"edge-thickness-normal edge-pattern-solid edge-thickness-normal edge-pattern-solid flowchart-link\" style=\";\" data-edge=\"true\" data-et=\"edge\" data-id=\"L_D_E_0\" data-points=\"W3sieCI6ODA3LjMyODEyNSwieSI6MzQuMjV9LHsieCI6ODMyLjMyODEyNSwieSI6MzQuMjV9LHsieCI6ODU3LjMyODEyNSwieSI6MzQuMjV9XQ==\" marker-end=\"url(#a3a-diagram-2_flowchart-v2-pointEnd)\"><\/path><path d=\"M999.406,34.25L1003.573,34.25C1007.74,34.25,1016.073,34.25,1023.74,34.25C1031.406,34.25,1038.406,34.25,1041.906,34.25L1045.406,34.25\" id=\"L_E_F_0\" class=\"edge-thickness-normal edge-pattern-solid edge-thickness-normal edge-pattern-solid flowchart-link\" style=\";\" data-edge=\"true\" data-et=\"edge\" data-id=\"L_E_F_0\" data-points=\"W3sieCI6OTk5LjQwNjI1LCJ5IjozNC4yNX0seyJ4IjoxMDI0LjQwNjI1LCJ5IjozNC4yNX0seyJ4IjoxMDQ5LjQwNjI1LCJ5IjozNC4yNX1d\" marker-end=\"url(#a3a-diagram-2_flowchart-v2-pointEnd)\"><\/path><path d=\"M1248.578,34.25L1252.745,34.25C1256.911,34.25,1265.245,34.25,1272.911,34.25C1280.578,34.25,1287.578,34.25,1291.078,34.25L1294.578,34.25\" id=\"L_F_G_0\" class=\"edge-thickness-normal edge-pattern-solid edge-thickness-normal edge-pattern-solid flowchart-link\" style=\";\" data-edge=\"true\" data-et=\"edge\" data-id=\"L_F_G_0\" data-points=\"W3sieCI6MTI0OC41NzgxMjUsInkiOjM0LjI1fSx7IngiOjEyNzMuNTc4MTI1LCJ5IjozNC4yNX0seyJ4IjoxMjk4LjU3ODEyNSwieSI6MzQuMjV9XQ==\" marker-end=\"url(#a3a-diagram-2_flowchart-v2-pointEnd)\"><\/path><path d=\"M1514.531,34.25L1518.698,34.25C1522.865,34.25,1531.198,34.25,1538.865,34.25C1546.531,34.25,1553.531,34.25,1557.031,34.25L1560.531,34.25\" id=\"L_G_H_0\" class=\"edge-thickness-normal edge-pattern-solid edge-thickness-normal edge-pattern-solid flowchart-link\" style=\";\" data-edge=\"true\" data-et=\"edge\" data-id=\"L_G_H_0\" data-points=\"W3sieCI6MTUxNC41MzEyNSwieSI6MzQuMjV9LHsieCI6MTUzOS41MzEyNSwieSI6MzQuMjV9LHsieCI6MTU2NC41MzEyNSwieSI6MzQuMjV9XQ==\" marker-end=\"url(#a3a-diagram-2_flowchart-v2-pointEnd)\"><\/path><\/g><g class=\"edgeLabels\"><g class=\"edgeLabel\"><g class=\"label\" data-id=\"L_A_B_0\" transform=\"translate(0, 0)\"><foreignObject width=\"0\" height=\"0\"><div xmlns=\"http:\/\/www.w3.org\/1999\/xhtml\" class=\"labelBkg\" style=\"display: table-cell; white-space: nowrap; line-height: 1.5; max-width: 200px; text-align: center;\"><span class=\"edgeLabel\"><\/span><\/div><\/foreignObject><\/g><\/g><g class=\"edgeLabel\"><g class=\"label\" data-id=\"L_B_C_0\" transform=\"translate(0, 0)\"><foreignObject width=\"0\" height=\"0\"><div xmlns=\"http:\/\/www.w3.org\/1999\/xhtml\" class=\"labelBkg\" style=\"display: table-cell; white-space: nowrap; line-height: 1.5; max-width: 200px; text-align: center;\"><span class=\"edgeLabel\"><\/span><\/div><\/foreignObject><\/g><\/g><g class=\"edgeLabel\"><g class=\"label\" data-id=\"L_C_D_0\" transform=\"translate(0, 0)\"><foreignObject width=\"0\" height=\"0\"><div xmlns=\"http:\/\/www.w3.org\/1999\/xhtml\" class=\"labelBkg\" style=\"display: table-cell; white-space: nowrap; line-height: 1.5; max-width: 200px; text-align: center;\"><span class=\"edgeLabel\"><\/span><\/div><\/foreignObject><\/g><\/g><g class=\"edgeLabel\"><g class=\"label\" data-id=\"L_D_E_0\" transform=\"translate(0, 0)\"><foreignObject width=\"0\" height=\"0\"><div xmlns=\"http:\/\/www.w3.org\/1999\/xhtml\" class=\"labelBkg\" style=\"display: table-cell; white-space: nowrap; line-height: 1.5; max-width: 200px; text-align: center;\"><span class=\"edgeLabel\"><\/span><\/div><\/foreignObject><\/g><\/g><g class=\"edgeLabel\"><g class=\"label\" data-id=\"L_E_F_0\" transform=\"translate(0, 0)\"><foreignObject width=\"0\" height=\"0\"><div xmlns=\"http:\/\/www.w3.org\/1999\/xhtml\" class=\"labelBkg\" style=\"display: table-cell; white-space: nowrap; line-height: 1.5; max-width: 200px; text-align: center;\"><span class=\"edgeLabel\"><\/span><\/div><\/foreignObject><\/g><\/g><g class=\"edgeLabel\"><g class=\"label\" data-id=\"L_F_G_0\" transform=\"translate(0, 0)\"><foreignObject width=\"0\" height=\"0\"><div xmlns=\"http:\/\/www.w3.org\/1999\/xhtml\" class=\"labelBkg\" style=\"display: table-cell; white-space: nowrap; line-height: 1.5; max-width: 200px; text-align: center;\"><span class=\"edgeLabel\"><\/span><\/div><\/foreignObject><\/g><\/g><g class=\"edgeLabel\"><g class=\"label\" data-id=\"L_G_H_0\" transform=\"translate(0, 0)\"><foreignObject width=\"0\" height=\"0\"><div xmlns=\"http:\/\/www.w3.org\/1999\/xhtml\" class=\"labelBkg\" style=\"display: table-cell; white-space: nowrap; line-height: 1.5; max-width: 200px; text-align: center;\"><span class=\"edgeLabel\"><\/span><\/div><\/foreignObject><\/g><\/g><\/g><g class=\"nodes\"><g class=\"node default\" id=\"flowchart-A-0\" transform=\"translate(73.578125, 34.25)\"><rect class=\"basic label-container\" style=\"\" x=\"-65.578125\" y=\"-26.25\" width=\"131.15625\" height=\"52.5\"><\/rect><g class=\"label\" style=\"\" transform=\"translate(-35.578125, -11.25)\"><rect><\/rect><foreignObject width=\"71.15625\" height=\"22.5\"><div xmlns=\"http:\/\/www.w3.org\/1999\/xhtml\" style=\"display: table-cell; white-space: nowrap; line-height: 1.5; max-width: 200px; text-align: center;\"><span class=\"nodeLabel\"><p>Requisitos<\/p><\/span><\/div><\/foreignObject><\/g><\/g><g class=\"node default\" id=\"flowchart-B-1\" transform=\"translate(286.7265625, 34.25)\"><rect class=\"basic label-container\" style=\"\" x=\"-97.5703125\" y=\"-26.25\" width=\"195.140625\" height=\"52.5\"><\/rect><g class=\"label\" style=\"\" transform=\"translate(-67.5703125, -11.25)\"><rect><\/rect><foreignObject width=\"135.140625\" height=\"22.5\"><div xmlns=\"http:\/\/www.w3.org\/1999\/xhtml\" style=\"display: table-cell; white-space: nowrap; line-height: 1.5; max-width: 200px; text-align: center;\"><span class=\"nodeLabel\"><p>Alcance e interfaces<\/p><\/span><\/div><\/foreignObject><\/g><\/g><g class=\"node default\" id=\"flowchart-C-3\" transform=\"translate(490.203125, 34.25)\"><rect class=\"basic label-container\" style=\"\" x=\"-55.90625\" y=\"-26.25\" width=\"111.8125\" height=\"52.5\"><\/rect><g class=\"label\" style=\"\" transform=\"translate(-25.90625, -11.25)\"><rect><\/rect><foreignObject width=\"51.8125\" height=\"22.5\"><div xmlns=\"http:\/\/www.w3.org\/1999\/xhtml\" style=\"display: table-cell; white-space: nowrap; line-height: 1.5; max-width: 200px; text-align: center;\"><span class=\"nodeLabel\"><p>Riesgos<\/p><\/span><\/div><\/foreignObject><\/g><\/g><g class=\"node default\" id=\"flowchart-D-5\" transform=\"translate(701.71875, 34.25)\"><rect class=\"basic label-container\" style=\"\" x=\"-105.609375\" y=\"-26.25\" width=\"211.21875\" height=\"52.5\"><\/rect><g class=\"label\" style=\"\" transform=\"translate(-75.609375, -11.25)\"><rect><\/rect><foreignObject width=\"151.21875\" height=\"22.5\"><div xmlns=\"http:\/\/www.w3.org\/1999\/xhtml\" style=\"display: table-cell; white-space: nowrap; line-height: 1.5; max-width: 200px; text-align: center;\"><span class=\"nodeLabel\"><p>Desempe\u00f1o y pruebas<\/p><\/span><\/div><\/foreignObject><\/g><\/g><g class=\"node default\" id=\"flowchart-E-7\" transform=\"translate(928.3671875, 34.25)\"><rect class=\"basic label-container\" style=\"\" x=\"-71.0390625\" y=\"-26.25\" width=\"142.078125\" height=\"52.5\"><\/rect><g class=\"label\" style=\"\" transform=\"translate(-41.0390625, -11.25)\"><rect><\/rect><foreignObject width=\"82.078125\" height=\"22.5\"><div xmlns=\"http:\/\/www.w3.org\/1999\/xhtml\" style=\"display: table-cell; white-space: nowrap; line-height: 1.5; max-width: 200px; text-align: center;\"><span class=\"nodeLabel\"><p>Cronograma<\/p><\/span><\/div><\/foreignObject><\/g><\/g><g class=\"node default\" id=\"flowchart-F-9\" transform=\"translate(1148.9921875, 34.25)\"><rect class=\"basic label-container\" style=\"\" x=\"-99.5859375\" y=\"-26.25\" width=\"199.171875\" height=\"52.5\"><\/rect><g class=\"label\" style=\"\" transform=\"translate(-69.5859375, -11.25)\"><rect><\/rect><foreignObject width=\"139.171875\" height=\"22.5\"><div xmlns=\"http:\/\/www.w3.org\/1999\/xhtml\" style=\"display: table-cell; white-space: nowrap; line-height: 1.5; max-width: 200px; text-align: center;\"><span class=\"nodeLabel\"><p>Precio y condiciones<\/p><\/span><\/div><\/foreignObject><\/g><\/g><g class=\"node default\" id=\"flowchart-G-11\" transform=\"translate(1406.5546875, 34.25)\"><rect class=\"basic label-container\" style=\"\" x=\"-107.9765625\" y=\"-26.25\" width=\"215.953125\" height=\"52.5\"><\/rect><g class=\"label\" style=\"\" transform=\"translate(-77.9765625, -11.25)\"><rect><\/rect><foreignObject width=\"155.953125\" height=\"22.5\"><div xmlns=\"http:\/\/www.w3.org\/1999\/xhtml\" style=\"display: table-cell; white-space: nowrap; line-height: 1.5; max-width: 200px; text-align: center;\"><span class=\"nodeLabel\"><p>Criterios de evaluaci\u00f3n<\/p><\/span><\/div><\/foreignObject><\/g><\/g><g class=\"node default\" id=\"flowchart-H-13\" transform=\"translate(1621.671875, 34.25)\"><rect class=\"basic label-container\" style=\"\" x=\"-57.140625\" y=\"-26.25\" width=\"114.28125\" height=\"52.5\"><\/rect><g class=\"label\" style=\"\" transform=\"translate(-27.140625, -11.25)\"><rect><\/rect><foreignObject width=\"54.28125\" height=\"22.5\"><div xmlns=\"http:\/\/www.w3.org\/1999\/xhtml\" style=\"display: table-cell; white-space: nowrap; line-height: 1.5; max-width: 200px; text-align: center;\"><span class=\"nodeLabel\"><p>RFP EPC<\/p><\/span><\/div><\/foreignObject><\/g><\/g><\/g><\/g><\/g><\/svg><figcaption>Estructura l\u00f3gica de una RFP para contrataci\u00f3n EPC<\/figcaption><\/figure>\n\n\n\n<h2 class=\"wp-block-heading\">Conducir aclaraciones sin perder el control de versi\u00f3n<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Durante la competencia, los proveedores presentan preguntas, solicitudes de aclaraci\u00f3n y alternativas. Las respuestas del Owner pueden modificar la interpretaci\u00f3n del objeto y deben ser controladas.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Una aclaraci\u00f3n relevante debe emitirse a todos los participantes conforme a las reglas de la competencia e incorporarse a la baseline de contrataci\u00f3n. Cuando la respuesta modifica alcance, plazo o riesgo, puede ser necesario emitir una adenda y permitir la revisi\u00f3n de las propuestas.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Las reuniones t\u00e9cnicas tambi\u00e9n deben generar registros. Las decisiones verbales no deben sustituir el paquete formal que ser\u00e1 incorporado al contrato.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Evaluaci\u00f3n t\u00e9cnica: TBE e igualaci\u00f3n<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">La <a href=\"https:\/\/a3aengenharia.com.br\/conteudo\/artigos-tecnicos\/tbe-technical-bid-evaluation-engenharia\/\">Technical Bid Evaluation \u2014 TBE<\/a> compara las propuestas con los requisitos y registra desviaciones. El objetivo es determinar si cada empresa est\u00e1 ofreciendo la misma obligaci\u00f3n de resultado.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">El an\u00e1lisis debe observar arquitectura, equipos, ingenier\u00eda, metodolog\u00eda, cronograma, proveedores cr\u00edticos, calidad, puesta en marcha, documentaci\u00f3n y calificaciones contractuales.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Una propuesta t\u00e9cnicamente \u201caceptable\u201d puede contener todav\u00eda desviaciones con impacto econ\u00f3mico. Por ello, la TBE debe alimentar la igualaci\u00f3n comercial.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">No comparar precio antes de igualar el alcance<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Si un proponente excluye integraci\u00f3n y otro la incluye; si uno prev\u00e9 tres FAT y otro ninguno; si uno incluye capacitaci\u00f3n y otro no, los precios no representan el mismo objeto.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">La igualaci\u00f3n puede atribuir costes estimados a las diferencias, exigir revisiones o solicitar una Best and Final Offer despu\u00e9s del alineamiento t\u00e9cnico.<\/p>\n\n\n\n<figure class=\"a3a-mermaid\"><svg id=\"a3a-diagram-3\" width=\"100%\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" class=\"flowchart\" style=\"max-width:min(249.265625px, 100%);height:auto;display:block;margin:0 auto\" viewBox=\"0 0 249.265625 888.5\" role=\"graphics-document document\" aria-roledescription=\"flowchart-v2\" aria-labelledby=\"chart-title-a3a-diagram-3\"><title id=\"chart-title-a3a-diagram-3\">Embudo de evaluaci\u00f3n de propuestas en una contrataci\u00f3n EPC<\/title><style>#a3a-diagram-3{font-family:Roboto,sans-serif;font-size:15px;fill:var(--a3a-diag-text, #0a0a0a);}@keyframes edge-animation-frame{from{stroke-dashoffset:0;}}@keyframes dash{to{stroke-dashoffset:0;}}#a3a-diagram-3 .edge-animation-slow{stroke-dasharray:9,5!important;stroke-dashoffset:900;animation:dash 50s linear infinite;stroke-linecap:round;}#a3a-diagram-3 .edge-animation-fast{stroke-dasharray:9,5!important;stroke-dashoffset:900;animation:dash 20s linear infinite;stroke-linecap:round;}#a3a-diagram-3 .error-icon{fill:var(--a3a-diag-canvas, #ffffff);}#a3a-diagram-3 .error-text{fill:#000000;stroke:#000000;}#a3a-diagram-3 .edge-thickness-normal{stroke-width:1px;}#a3a-diagram-3 .edge-thickness-thick{stroke-width:3.5px;}#a3a-diagram-3 .edge-pattern-solid{stroke-dasharray:0;}#a3a-diagram-3 .edge-thickness-invisible{stroke-width:0;fill:none;}#a3a-diagram-3 .edge-pattern-dashed{stroke-dasharray:3;}#a3a-diagram-3 .edge-pattern-dotted{stroke-dasharray:2;}#a3a-diagram-3 .marker{fill:var(--a3a-diag-stroke, #2e42a2);stroke:var(--a3a-diag-stroke, #2e42a2);}#a3a-diagram-3 .marker.cross{stroke:var(--a3a-diag-stroke, #2e42a2);}#a3a-diagram-3 svg{font-family:Roboto,sans-serif;font-size:15px;}#a3a-diagram-3 p{margin:0;}#a3a-diagram-3 .label{font-family:Roboto,sans-serif;color:var(--a3a-diag-text, #0a0a0a);}#a3a-diagram-3 .cluster-label text{fill:var(--a3a-diag-title, #0124af);}#a3a-diagram-3 .cluster-label span{color:var(--a3a-diag-title, #0124af);}#a3a-diagram-3 .cluster-label span p{background-color:transparent;}#a3a-diagram-3 .label text,#a3a-diagram-3 span{fill:var(--a3a-diag-text, #0a0a0a);color:var(--a3a-diag-text, #0a0a0a);}#a3a-diagram-3 .node rect,#a3a-diagram-3 .node circle,#a3a-diagram-3 .node ellipse,#a3a-diagram-3 .node polygon,#a3a-diagram-3 .node path{fill:var(--a3a-diag-fill, #eef2fd);stroke:var(--a3a-diag-stroke, #2e42a2);stroke-width:1px;}#a3a-diagram-3 .rough-node .label text,#a3a-diagram-3 .node .label text,#a3a-diagram-3 .image-shape .label,#a3a-diagram-3 .icon-shape .label{text-anchor:middle;}#a3a-diagram-3 .node .katex path{fill:#000;stroke:#000;stroke-width:1px;}#a3a-diagram-3 .rough-node .label,#a3a-diagram-3 .node .label,#a3a-diagram-3 .image-shape .label,#a3a-diagram-3 .icon-shape .label{text-align:center;}#a3a-diagram-3 .node.clickable{cursor:pointer;}#a3a-diagram-3 .root .anchor path{fill:var(--a3a-diag-stroke, #2e42a2)!important;stroke-width:0;stroke:var(--a3a-diag-stroke, #2e42a2);}#a3a-diagram-3 .arrowheadPath{fill:var(--a3a-diag-stroke, #0b0b0b);}#a3a-diagram-3 .edgePath .path{stroke:var(--a3a-diag-stroke, #2e42a2);stroke-width:2.0px;}#a3a-diagram-3 .flowchart-link{stroke:var(--a3a-diag-stroke, #2e42a2);fill:none;}#a3a-diagram-3 .edgeLabel{background-color:var(--a3a-diag-canvas, #ffffff);text-align:center;}#a3a-diagram-3 .edgeLabel p{background-color:var(--a3a-diag-canvas, #ffffff);}#a3a-diagram-3 .edgeLabel rect{opacity:0.5;background-color:var(--a3a-diag-canvas, #ffffff);fill:var(--a3a-diag-canvas, #ffffff);}#a3a-diagram-3 .labelBkg{background-color:rgba(255, 255, 255, 0.5);}#a3a-diagram-3 .cluster rect{fill:var(--a3a-diag-surface, #f8f8f8);stroke:var(--a3a-diag-border, #e2e8f0);stroke-width:1px;}#a3a-diagram-3 .cluster text{fill:var(--a3a-diag-title, #0124af);}#a3a-diagram-3 .cluster span{color:var(--a3a-diag-title, #0124af);}#a3a-diagram-3 div.mermaidTooltip{position:absolute;text-align:center;max-width:200px;padding:2px;font-family:Roboto,sans-serif;font-size:12px;background:var(--a3a-diag-canvas, #ffffff);border:1px solid hsl(0, 0%, 90%);border-radius:2px;pointer-events:none;z-index:100;}#a3a-diagram-3 .flowchartTitleText{text-anchor:middle;font-size:18px;fill:var(--a3a-diag-text, #0a0a0a);}#a3a-diagram-3 rect.text{fill:none;stroke-width:0;}#a3a-diagram-3 .icon-shape,#a3a-diagram-3 .image-shape{background-color:var(--a3a-diag-canvas, #ffffff);text-align:center;}#a3a-diagram-3 .icon-shape p,#a3a-diagram-3 .image-shape p{background-color:var(--a3a-diag-canvas, #ffffff);padding:2px;}#a3a-diagram-3 .icon-shape rect,#a3a-diagram-3 .image-shape rect{opacity:0.5;background-color:var(--a3a-diag-canvas, #ffffff);fill:var(--a3a-diag-canvas, #ffffff);}#a3a-diagram-3 .label-icon{display:inline-block;height:1em;overflow:visible;vertical-align:-0.125em;}#a3a-diagram-3 .node .label-icon path{fill:currentColor;stroke:revert;stroke-width:revert;}#a3a-diagram-3 :root{--mermaid-font-family:Roboto,sans-serif;}<\/style><g><marker id=\"a3a-diagram-3_flowchart-v2-pointEnd\" class=\"marker flowchart-v2\" viewBox=\"0 0 10 10\" refX=\"5\" refY=\"5\" markerUnits=\"userSpaceOnUse\" markerWidth=\"8\" markerHeight=\"8\" orient=\"auto\"><path d=\"M 0 0 L 10 5 L 0 10 z\" class=\"arrowMarkerPath\" style=\"stroke-width: 1; stroke-dasharray: 1, 0;\"><\/path><\/marker><marker id=\"a3a-diagram-3_flowchart-v2-pointStart\" class=\"marker flowchart-v2\" viewBox=\"0 0 10 10\" refX=\"4.5\" refY=\"5\" markerUnits=\"userSpaceOnUse\" markerWidth=\"8\" markerHeight=\"8\" orient=\"auto\"><path d=\"M 0 5 L 10 10 L 10 0 z\" class=\"arrowMarkerPath\" style=\"stroke-width: 1; stroke-dasharray: 1, 0;\"><\/path><\/marker><marker id=\"a3a-diagram-3_flowchart-v2-circleEnd\" class=\"marker flowchart-v2\" viewBox=\"0 0 10 10\" refX=\"11\" refY=\"5\" markerUnits=\"userSpaceOnUse\" markerWidth=\"11\" markerHeight=\"11\" orient=\"auto\"><circle cx=\"5\" cy=\"5\" r=\"5\" class=\"arrowMarkerPath\" style=\"stroke-width: 1; stroke-dasharray: 1, 0;\"><\/circle><\/marker><marker id=\"a3a-diagram-3_flowchart-v2-circleStart\" class=\"marker flowchart-v2\" viewBox=\"0 0 10 10\" refX=\"-1\" refY=\"5\" markerUnits=\"userSpaceOnUse\" markerWidth=\"11\" markerHeight=\"11\" orient=\"auto\"><circle cx=\"5\" cy=\"5\" r=\"5\" class=\"arrowMarkerPath\" style=\"stroke-width: 1; stroke-dasharray: 1, 0;\"><\/circle><\/marker><marker id=\"a3a-diagram-3_flowchart-v2-crossEnd\" class=\"marker cross flowchart-v2\" viewBox=\"0 0 11 11\" refX=\"12\" refY=\"5.2\" markerUnits=\"userSpaceOnUse\" markerWidth=\"11\" markerHeight=\"11\" orient=\"auto\"><path d=\"M 1,1 l 9,9 M 10,1 l -9,9\" class=\"arrowMarkerPath\" style=\"stroke-width: 2; stroke-dasharray: 1, 0;\"><\/path><\/marker><marker id=\"a3a-diagram-3_flowchart-v2-crossStart\" class=\"marker cross flowchart-v2\" viewBox=\"0 0 11 11\" refX=\"-1\" refY=\"5.2\" markerUnits=\"userSpaceOnUse\" markerWidth=\"11\" markerHeight=\"11\" orient=\"auto\"><path d=\"M 1,1 l 9,9 M 10,1 l -9,9\" class=\"arrowMarkerPath\" style=\"stroke-width: 2; stroke-dasharray: 1, 0;\"><\/path><\/marker><g class=\"root\"><g class=\"clusters\"><\/g><g class=\"edgePaths\"><path d=\"M124.633,60.5L124.633,64.667C124.633,68.833,124.633,77.167,124.633,84.833C124.633,92.5,124.633,99.5,124.633,103L124.633,106.5\" id=\"L_A_B_0\" class=\"edge-thickness-normal edge-pattern-solid edge-thickness-normal edge-pattern-solid flowchart-link\" style=\";\" data-edge=\"true\" data-et=\"edge\" data-id=\"L_A_B_0\" data-points=\"W3sieCI6MTI0LjYzMjgxMjUsInkiOjYwLjV9LHsieCI6MTI0LjYzMjgxMjUsInkiOjg1LjV9LHsieCI6MTI0LjYzMjgxMjUsInkiOjExMC41fV0=\" marker-end=\"url(#a3a-diagram-3_flowchart-v2-pointEnd)\"><\/path><path d=\"M124.633,163L124.633,167.167C124.633,171.333,124.633,179.667,124.633,187.333C124.633,195,124.633,202,124.633,205.5L124.633,209\" id=\"L_B_C_0\" class=\"edge-thickness-normal edge-pattern-solid edge-thickness-normal edge-pattern-solid flowchart-link\" style=\";\" data-edge=\"true\" data-et=\"edge\" data-id=\"L_B_C_0\" data-points=\"W3sieCI6MTI0LjYzMjgxMjUsInkiOjE2M30seyJ4IjoxMjQuNjMyODEyNSwieSI6MTg4fSx7IngiOjEyNC42MzI4MTI1LCJ5IjoyMTN9XQ==\" marker-end=\"url(#a3a-diagram-3_flowchart-v2-pointEnd)\"><\/path><path d=\"M124.633,265.5L124.633,269.667C124.633,273.833,124.633,282.167,124.633,289.833C124.633,297.5,124.633,304.5,124.633,308L124.633,311.5\" id=\"L_C_D_0\" class=\"edge-thickness-normal edge-pattern-solid edge-thickness-normal edge-pattern-solid flowchart-link\" style=\";\" data-edge=\"true\" data-et=\"edge\" data-id=\"L_C_D_0\" data-points=\"W3sieCI6MTI0LjYzMjgxMjUsInkiOjI2NS41fSx7IngiOjEyNC42MzI4MTI1LCJ5IjoyOTAuNX0seyJ4IjoxMjQuNjMyODEyNSwieSI6MzE1LjV9XQ==\" marker-end=\"url(#a3a-diagram-3_flowchart-v2-pointEnd)\"><\/path><path d=\"M124.633,368L124.633,372.167C124.633,376.333,124.633,384.667,124.633,392.333C124.633,400,124.633,407,124.633,410.5L124.633,414\" id=\"L_D_E_0\" class=\"edge-thickness-normal edge-pattern-solid edge-thickness-normal edge-pattern-solid flowchart-link\" style=\";\" data-edge=\"true\" data-et=\"edge\" data-id=\"L_D_E_0\" data-points=\"W3sieCI6MTI0LjYzMjgxMjUsInkiOjM2OH0seyJ4IjoxMjQuNjMyODEyNSwieSI6MzkzfSx7IngiOjEyNC42MzI4MTI1LCJ5Ijo0MTh9XQ==\" marker-end=\"url(#a3a-diagram-3_flowchart-v2-pointEnd)\"><\/path><path d=\"M124.633,470.5L124.633,474.667C124.633,478.833,124.633,487.167,124.633,494.833C124.633,502.5,124.633,509.5,124.633,513L124.633,516.5\" id=\"L_E_F_0\" class=\"edge-thickness-normal edge-pattern-solid edge-thickness-normal edge-pattern-solid flowchart-link\" style=\";\" data-edge=\"true\" data-et=\"edge\" data-id=\"L_E_F_0\" data-points=\"W3sieCI6MTI0LjYzMjgxMjUsInkiOjQ3MC41fSx7IngiOjEyNC42MzI4MTI1LCJ5Ijo0OTUuNX0seyJ4IjoxMjQuNjMyODEyNSwieSI6NTIwLjV9XQ==\" marker-end=\"url(#a3a-diagram-3_flowchart-v2-pointEnd)\"><\/path><path d=\"M124.633,573L124.633,577.167C124.633,581.333,124.633,589.667,124.633,597.333C124.633,605,124.633,612,124.633,615.5L124.633,619\" id=\"L_F_G_0\" class=\"edge-thickness-normal edge-pattern-solid edge-thickness-normal edge-pattern-solid flowchart-link\" style=\";\" data-edge=\"true\" data-et=\"edge\" data-id=\"L_F_G_0\" data-points=\"W3sieCI6MTI0LjYzMjgxMjUsInkiOjU3M30seyJ4IjoxMjQuNjMyODEyNSwieSI6NTk4fSx7IngiOjEyNC42MzI4MTI1LCJ5Ijo2MjN9XQ==\" marker-end=\"url(#a3a-diagram-3_flowchart-v2-pointEnd)\"><\/path><path d=\"M124.633,675.5L124.633,679.667C124.633,683.833,124.633,692.167,124.633,699.833C124.633,707.5,124.633,714.5,124.633,718L124.633,721.5\" id=\"L_G_H_0\" class=\"edge-thickness-normal edge-pattern-solid edge-thickness-normal edge-pattern-solid flowchart-link\" style=\";\" data-edge=\"true\" data-et=\"edge\" data-id=\"L_G_H_0\" data-points=\"W3sieCI6MTI0LjYzMjgxMjUsInkiOjY3NS41fSx7IngiOjEyNC42MzI4MTI1LCJ5Ijo3MDAuNX0seyJ4IjoxMjQuNjMyODEyNSwieSI6NzI1LjV9XQ==\" marker-end=\"url(#a3a-diagram-3_flowchart-v2-pointEnd)\"><\/path><path d=\"M124.633,778L124.633,782.167C124.633,786.333,124.633,794.667,124.633,802.333C124.633,810,124.633,817,124.633,820.5L124.633,824\" id=\"L_H_I_0\" class=\"edge-thickness-normal edge-pattern-solid edge-thickness-normal edge-pattern-solid flowchart-link\" style=\";\" data-edge=\"true\" data-et=\"edge\" data-id=\"L_H_I_0\" data-points=\"W3sieCI6MTI0LjYzMjgxMjUsInkiOjc3OH0seyJ4IjoxMjQuNjMyODEyNSwieSI6ODAzfSx7IngiOjEyNC42MzI4MTI1LCJ5Ijo4Mjh9XQ==\" marker-end=\"url(#a3a-diagram-3_flowchart-v2-pointEnd)\"><\/path><\/g><g class=\"edgeLabels\"><g class=\"edgeLabel\"><g class=\"label\" data-id=\"L_A_B_0\" transform=\"translate(0, 0)\"><foreignObject width=\"0\" height=\"0\"><div xmlns=\"http:\/\/www.w3.org\/1999\/xhtml\" class=\"labelBkg\" style=\"display: table-cell; white-space: nowrap; line-height: 1.5; max-width: 200px; text-align: center;\"><span class=\"edgeLabel\"><\/span><\/div><\/foreignObject><\/g><\/g><g class=\"edgeLabel\"><g class=\"label\" data-id=\"L_B_C_0\" transform=\"translate(0, 0)\"><foreignObject width=\"0\" height=\"0\"><div xmlns=\"http:\/\/www.w3.org\/1999\/xhtml\" class=\"labelBkg\" style=\"display: table-cell; white-space: nowrap; line-height: 1.5; max-width: 200px; text-align: center;\"><span class=\"edgeLabel\"><\/span><\/div><\/foreignObject><\/g><\/g><g class=\"edgeLabel\"><g class=\"label\" data-id=\"L_C_D_0\" transform=\"translate(0, 0)\"><foreignObject width=\"0\" height=\"0\"><div xmlns=\"http:\/\/www.w3.org\/1999\/xhtml\" class=\"labelBkg\" style=\"display: table-cell; white-space: nowrap; line-height: 1.5; max-width: 200px; text-align: center;\"><span class=\"edgeLabel\"><\/span><\/div><\/foreignObject><\/g><\/g><g class=\"edgeLabel\"><g class=\"label\" data-id=\"L_D_E_0\" transform=\"translate(0, 0)\"><foreignObject width=\"0\" height=\"0\"><div xmlns=\"http:\/\/www.w3.org\/1999\/xhtml\" class=\"labelBkg\" style=\"display: table-cell; white-space: nowrap; line-height: 1.5; max-width: 200px; text-align: center;\"><span class=\"edgeLabel\"><\/span><\/div><\/foreignObject><\/g><\/g><g class=\"edgeLabel\"><g class=\"label\" data-id=\"L_E_F_0\" transform=\"translate(0, 0)\"><foreignObject width=\"0\" height=\"0\"><div xmlns=\"http:\/\/www.w3.org\/1999\/xhtml\" class=\"labelBkg\" style=\"display: table-cell; white-space: nowrap; line-height: 1.5; max-width: 200px; text-align: center;\"><span class=\"edgeLabel\"><\/span><\/div><\/foreignObject><\/g><\/g><g class=\"edgeLabel\"><g class=\"label\" data-id=\"L_F_G_0\" transform=\"translate(0, 0)\"><foreignObject width=\"0\" height=\"0\"><div xmlns=\"http:\/\/www.w3.org\/1999\/xhtml\" class=\"labelBkg\" style=\"display: table-cell; white-space: nowrap; line-height: 1.5; max-width: 200px; text-align: center;\"><span class=\"edgeLabel\"><\/span><\/div><\/foreignObject><\/g><\/g><g class=\"edgeLabel\"><g class=\"label\" data-id=\"L_G_H_0\" transform=\"translate(0, 0)\"><foreignObject width=\"0\" height=\"0\"><div xmlns=\"http:\/\/www.w3.org\/1999\/xhtml\" class=\"labelBkg\" style=\"display: table-cell; white-space: nowrap; line-height: 1.5; max-width: 200px; text-align: center;\"><span class=\"edgeLabel\"><\/span><\/div><\/foreignObject><\/g><\/g><g class=\"edgeLabel\"><g class=\"label\" data-id=\"L_H_I_0\" transform=\"translate(0, 0)\"><foreignObject width=\"0\" height=\"0\"><div xmlns=\"http:\/\/www.w3.org\/1999\/xhtml\" class=\"labelBkg\" style=\"display: table-cell; white-space: nowrap; line-height: 1.5; max-width: 200px; text-align: center;\"><span class=\"edgeLabel\"><\/span><\/div><\/foreignObject><\/g><\/g><\/g><g class=\"nodes\"><g class=\"node default\" id=\"flowchart-A-0\" transform=\"translate(124.6328125, 34.25)\"><rect class=\"basic label-container\" style=\"\" x=\"-100.84375\" y=\"-26.25\" width=\"201.6875\" height=\"52.5\"><\/rect><g class=\"label\" style=\"\" transform=\"translate(-70.84375, -11.25)\"><rect><\/rect><foreignObject width=\"141.6875\" height=\"22.5\"><div xmlns=\"http:\/\/www.w3.org\/1999\/xhtml\" style=\"display: table-cell; white-space: nowrap; line-height: 1.5; max-width: 200px; text-align: center;\"><span class=\"nodeLabel\"><p>Propuestas recibidas<\/p><\/span><\/div><\/foreignObject><\/g><\/g><g class=\"node default\" id=\"flowchart-B-1\" transform=\"translate(124.6328125, 136.75)\"><rect class=\"basic label-container\" style=\"\" x=\"-116.6328125\" y=\"-26.25\" width=\"233.265625\" height=\"52.5\"><\/rect><g class=\"label\" style=\"\" transform=\"translate(-86.6328125, -11.25)\"><rect><\/rect><foreignObject width=\"173.265625\" height=\"22.5\"><div xmlns=\"http:\/\/www.w3.org\/1999\/xhtml\" style=\"display: table-cell; white-space: nowrap; line-height: 1.5; max-width: 200px; text-align: center;\"><span class=\"nodeLabel\"><p>Conformidad documental<\/p><\/span><\/div><\/foreignObject><\/g><\/g><g class=\"node default\" id=\"flowchart-C-3\" transform=\"translate(124.6328125, 239.25)\"><rect class=\"basic label-container\" style=\"\" x=\"-42.453125\" y=\"-26.25\" width=\"84.90625\" height=\"52.5\"><\/rect><g class=\"label\" style=\"\" transform=\"translate(-12.453125, -11.25)\"><rect><\/rect><foreignObject width=\"24.90625\" height=\"22.5\"><div xmlns=\"http:\/\/www.w3.org\/1999\/xhtml\" style=\"display: table-cell; white-space: nowrap; line-height: 1.5; max-width: 200px; text-align: center;\"><span class=\"nodeLabel\"><p>TBE<\/p><\/span><\/div><\/foreignObject><\/g><\/g><g class=\"node default\" id=\"flowchart-D-5\" transform=\"translate(124.6328125, 341.75)\"><rect class=\"basic label-container\" style=\"\" x=\"-72.90625\" y=\"-26.25\" width=\"145.8125\" height=\"52.5\"><\/rect><g class=\"label\" style=\"\" transform=\"translate(-42.90625, -11.25)\"><rect><\/rect><foreignObject width=\"85.8125\" height=\"22.5\"><div xmlns=\"http:\/\/www.w3.org\/1999\/xhtml\" style=\"display: table-cell; white-space: nowrap; line-height: 1.5; max-width: 200px; text-align: center;\"><span class=\"nodeLabel\"><p>Aclaraciones<\/p><\/span><\/div><\/foreignObject><\/g><\/g><g class=\"node default\" id=\"flowchart-E-7\" transform=\"translate(124.6328125, 444.25)\"><rect class=\"basic label-container\" style=\"\" x=\"-91.484375\" y=\"-26.25\" width=\"182.96875\" height=\"52.5\"><\/rect><g class=\"label\" style=\"\" transform=\"translate(-61.484375, -11.25)\"><rect><\/rect><foreignObject width=\"122.96875\" height=\"22.5\"><div xmlns=\"http:\/\/www.w3.org\/1999\/xhtml\" style=\"display: table-cell; white-space: nowrap; line-height: 1.5; max-width: 200px; text-align: center;\"><span class=\"nodeLabel\"><p>Igualaci\u00f3n t\u00e9cnica<\/p><\/span><\/div><\/foreignObject><\/g><\/g><g class=\"node default\" id=\"flowchart-F-9\" transform=\"translate(124.6328125, 546.75)\"><rect class=\"basic label-container\" style=\"\" x=\"-100.015625\" y=\"-26.25\" width=\"200.03125\" height=\"52.5\"><\/rect><g class=\"label\" style=\"\" transform=\"translate(-70.015625, -11.25)\"><rect><\/rect><foreignObject width=\"140.03125\" height=\"22.5\"><div xmlns=\"http:\/\/www.w3.org\/1999\/xhtml\" style=\"display: table-cell; white-space: nowrap; line-height: 1.5; max-width: 200px; text-align: center;\"><span class=\"nodeLabel\"><p>Igualaci\u00f3n comercial<\/p><\/span><\/div><\/foreignObject><\/g><\/g><g class=\"node default\" id=\"flowchart-G-11\" transform=\"translate(124.6328125, 649.25)\"><rect class=\"basic label-container\" style=\"\" x=\"-81.8203125\" y=\"-26.25\" width=\"163.640625\" height=\"52.5\"><\/rect><g class=\"label\" style=\"\" transform=\"translate(-51.8203125, -11.25)\"><rect><\/rect><foreignObject width=\"103.640625\" height=\"22.5\"><div xmlns=\"http:\/\/www.w3.org\/1999\/xhtml\" style=\"display: table-cell; white-space: nowrap; line-height: 1.5; max-width: 200px; text-align: center;\"><span class=\"nodeLabel\"><p>Riesgo residual<\/p><\/span><\/div><\/foreignObject><\/g><\/g><g class=\"node default\" id=\"flowchart-H-13\" transform=\"translate(124.6328125, 751.75)\"><rect class=\"basic label-container\" style=\"\" x=\"-71.6328125\" y=\"-26.25\" width=\"143.265625\" height=\"52.5\"><\/rect><g class=\"label\" style=\"\" transform=\"translate(-41.6328125, -11.25)\"><rect><\/rect><foreignObject width=\"83.265625\" height=\"22.5\"><div xmlns=\"http:\/\/www.w3.org\/1999\/xhtml\" style=\"display: table-cell; white-space: nowrap; line-height: 1.5; max-width: 200px; text-align: center;\"><span class=\"nodeLabel\"><p>Negociaci\u00f3n<\/p><\/span><\/div><\/foreignObject><\/g><\/g><g class=\"node default\" id=\"flowchart-I-15\" transform=\"translate(124.6328125, 854.25)\"><rect class=\"basic label-container\" style=\"\" x=\"-50.8203125\" y=\"-26.25\" width=\"101.640625\" height=\"52.5\"><\/rect><g class=\"label\" style=\"\" transform=\"translate(-20.8203125, -11.25)\"><rect><\/rect><foreignObject width=\"41.640625\" height=\"22.5\"><div xmlns=\"http:\/\/www.w3.org\/1999\/xhtml\" style=\"display: table-cell; white-space: nowrap; line-height: 1.5; max-width: 200px; text-align: center;\"><span class=\"nodeLabel\"><p>Award<\/p><\/span><\/div><\/foreignObject><\/g><\/g><\/g><\/g><\/g><\/svg><figcaption>Embudo de evaluaci\u00f3n de propuestas en una contrataci\u00f3n EPC<\/figcaption><\/figure>\n\n\n\n<div class=\"wp-block-a3a-destaque\">\n<p class=\"wp-block-paragraph\">La comparaci\u00f3n comercial solo adquiere significado despu\u00e9s de la igualaci\u00f3n t\u00e9cnica. Desviaciones, exclusiones, alternativas, proveedores considerados, documentaci\u00f3n, pruebas e interfaces deben normalizarse para que el menor precio no represente simplemente un alcance menor o un riesgo transferido de regreso al Owner.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><a href=\"https:\/\/a3aengenharia.com.br\/servicos\/implementacao\/procurement\/\">Apoye la competencia con Procurement T\u00e9cnico e igualaci\u00f3n<\/a><\/p>\n<\/div>\n\n\n\n<h2 class=\"wp-block-heading\">Evaluaci\u00f3n comercial y coste total<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Despu\u00e9s de la igualaci\u00f3n t\u00e9cnica entran precio, condiciones de pago, impuestos, reajuste, tipo de cambio, garant\u00edas, seguros, flujo de caja y exposici\u00f3n a cambios.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">El menor precio nominal no siempre representa el menor coste esperado. Una propuesta con muchas calificaciones puede generar change orders durante la ejecuci\u00f3n. Una propuesta m\u00e1s alta, pero completa y con riesgo bien definido, puede ofrecer mayor previsibilidad.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">El an\u00e1lisis tambi\u00e9n debe observar las condiciones de pago. Adelantos elevados, hitos front-loaded o pagos no vinculados a evidencias pueden aumentar la exposici\u00f3n financiera del Owner.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Analizar el cronograma y la capacidad de ejecuci\u00f3n<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">El cronograma de la propuesta debe ser t\u00e9cnicamente coherente. Las fechas agresivas no tienen valor si dependen de ingenier\u00eda, vendor data o entregas incompatibles con lead times reales.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">El equipo de <a href=\"https:\/\/a3aengenharia.com.br\/servicos\/implementacao\/gestao-de-projetos\/\">Project Controls<\/a> puede verificar camino cr\u00edtico, interfaces, long lead items, l\u00f3gica de construcci\u00f3n, secuencia de puesta en marcha y disponibilidad de recursos.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Un cronograma cre\u00edble debe relacionar ingenier\u00eda, Procurement, fabricaci\u00f3n, log\u00edstica, construcci\u00f3n, completaci\u00f3n y pruebas. La falta de integraci\u00f3n entre estas redes es una se\u00f1al de riesgo.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Evaluar los riesgos residuales de cada propuesta<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Incluso despu\u00e9s de la igualaci\u00f3n, las propuestas pueden distribuir riesgos de forma diferente. Un contratista EPC puede aceptar determinada condici\u00f3n y otro solicitar una exclusi\u00f3n; uno puede asumir el plazo del proveedor y otro condicionarlo.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">La decisi\u00f3n debe registrar los riesgos residuales y su impacto potencial. Una matriz de decisi\u00f3n puede considerar precio, t\u00e9cnica, plazo, riesgo y capacidad de ejecuci\u00f3n con pesos definidos antes del resultado siempre que sea posible.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">La <a href=\"https:\/\/a3aengenharia.com.br\/conteudo\/artigos-tecnicos\/matriz-decisao-projetos-engenharia\/\">Matriz de Decisi\u00f3n en Proyectos de Ingenier\u00eda<\/a> puede apoyar procesos multicriterio cuando la elecci\u00f3n no est\u00e1 determinada por un \u00fanico factor.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Negociaci\u00f3n: cerrar brechas, no reabrir todo el objeto<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">La negociaci\u00f3n final debe consolidar desviaciones, premisas, garant\u00edas, cronograma, precio, responsabilidades y riesgos. El objetivo es cerrar las brechas identificadas durante la igualaci\u00f3n.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Cualquier concesi\u00f3n t\u00e9cnica debe reflejarse en los documentos correspondientes. Modificar \u00fanicamente una cl\u00e1usula comercial sin actualizar la especificaci\u00f3n o la matriz de responsabilidades puede crear contradicciones.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Tambi\u00e9n es necesario consolidar la lista de documentos que forman el contrato y el orden de prevalencia. La propuesta final, las aclaraciones y las adendas deben incorporarse de forma controlada.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Award y transici\u00f3n de la contrataci\u00f3n a la ejecuci\u00f3n<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">El award no termina el trabajo de Procurement; inicia la ejecuci\u00f3n contractual. El equipo que negoci\u00f3 debe transferir al equipo de proyecto todas las premisas, desviaciones aceptadas, riesgos, compromisos y aclaraciones.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Un handover interno puede incluir contrato, anexos, TBE final, matriz de riesgos, cronograma, lista de interfaces, pendientes pre-NTP y obligaciones del Owner.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Sin esta transferencia, el equipo de ejecuci\u00f3n puede administrar el contrato como si fuera el paquete original de la RFP e ignorar acuerdos de la negociaci\u00f3n.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Qu\u00e9 exigir al contratista EPC inmediatamente despu\u00e9s de la contrataci\u00f3n<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Los primeros entregables ayudan a transformar la propuesta en un plan ejecutable. Seg\u00fan el proyecto, pueden incluir:<\/p>\n\n\n\n<ul class=\"wp-block-list\"><li>Project Execution Plan;<\/li><li>cronograma detallado y baseline;<\/li><li>lista maestra de documentos;<\/li><li>plan de Procurement;<\/li><li>vendor list;<\/li><li>plan de calidad;<\/li><li>matriz de interfaces;<\/li><li>plan de riesgos;<\/li><li>plan de construcci\u00f3n;<\/li><li>plan de puesta en marcha;<\/li><li>estrategia de documentaci\u00f3n y handover;<\/li><li>organizaci\u00f3n y matriz de responsabilidades.<\/li><\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">Estos documentos deben ser coherentes con el contrato y establecer la gobernanza operativa.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">C\u00f3mo debe gobernar el Owner despu\u00e9s del award<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">La contrataci\u00f3n integrada no elimina el seguimiento. El Owner necesita administrar sus propias obligaciones, controlar interfaces externas, revisar submittals, acompa\u00f1ar riesgos, verificar avance y preparar la aceptaci\u00f3n.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">La <a href=\"https:\/\/a3aengenharia.com.br\/servicos\/contratacao-integrada\/engenharia-do-proprietario\/\">Owner\u2019s Engineering<\/a> puede apoyar desde la preparaci\u00f3n de la RFP hasta la recepci\u00f3n final. Durante la ejecuci\u00f3n, la actuaci\u00f3n puede incluir Design Review, Procurement, fiscalizaci\u00f3n t\u00e9cnica, Project Controls, gesti\u00f3n de cambios, puesta en marcha y documentaci\u00f3n.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">El <a href=\"https:\/\/a3aengenharia.com.br\/conteudo\/artigos-tecnicos\/contrato-epc-engenharia-escopo-responsabilidades-riscos\/\">Contrato EPC en Ingenier\u00eda<\/a> debe tratarse como baseline: las modificaciones deben seguir un proceso formal y mantener trazabilidad con requisitos y riesgos.<\/p>\n\n\n\n<div class=\"wp-block-a3a-destaque\">\n<p class=\"wp-block-paragraph\">Despu\u00e9s del award, el Owner deja de estar en una competencia y pasa a administrar una obligaci\u00f3n de resultado. La gobernanza debe acompa\u00f1ar requisitos, submittals, interfaces, cambios, cronograma, calidad, Procurement, pruebas y evidencias sin asumir las responsabilidades que pertenecen al contratista EPC.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><a href=\"https:\/\/a3aengenharia.com.br\/servicos\/contratacao-integrada\/engenharia-do-proprietario\/\">Estructure Owner\u2019s Engineering para la fase de ejecuci\u00f3n<\/a><\/p>\n<\/div>\n\n\n\n<h2 class=\"wp-block-heading\">C\u00f3mo contratar prevenci\u00f3n en lugar de correcci\u00f3n<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Una contrataci\u00f3n EPC de alta calidad invierte m\u00e1s esfuerzo antes del award para reducir el coste de resolver ambig\u00fcedades durante la ejecuci\u00f3n. Esto no significa eliminar los cambios, sino disminuir cambios previsibles provocados por un alcance d\u00e9bil, interfaces no mapeadas y criterios de aceptaci\u00f3n tard\u00edos.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">La combinaci\u00f3n de FEED, requisitos, estrategia de contrataci\u00f3n, TBE, Owner\u2019s Engineering y puesta en marcha crea una jornada de prevenci\u00f3n. Cada herramienta act\u00faa en un punto diferente: definici\u00f3n, selecci\u00f3n, gobernanza y verificaci\u00f3n.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Cuando estos mecanismos se tratan como partes de un \u00fanico proceso, el Owner deja de reaccionar a problemas de campo y pasa a controlar el proyecto desde el origen de las decisiones.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Checklist de contrataci\u00f3n EPC<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Antes del award, el Owner deber\u00eda poder responder objetivamente:<\/p>\n\n\n\n<ol class=\"wp-block-list\"><li>\u00bfPor qu\u00e9 EPC es el modelo elegido?<\/li><li>\u00bfQu\u00e9 requisitos son obligatorios?<\/li><li>\u00bfQu\u00e9 ingenier\u00eda es referencial y cu\u00e1l es prescriptiva?<\/li><li>\u00bfD\u00f3nde est\u00e1n los battery limits?<\/li><li>\u00bfQui\u00e9n responde por cada interfaz?<\/li><li>\u00bfQu\u00e9 riesgos fueron transferidos y cu\u00e1les permanecen con el Owner?<\/li><li>\u00bfC\u00f3mo se formaron el precio y el plazo?<\/li><li>\u00bfQu\u00e9 long lead items afectan el camino cr\u00edtico?<\/li><li>\u00bfQu\u00e9 vendors son cr\u00edticos?<\/li><li>\u00bfC\u00f3mo se verificar\u00e1n la calidad y las inspecciones?<\/li><li>\u00bfQu\u00e9 pruebas demuestran el desempe\u00f1o?<\/li><li>\u00bfQu\u00e9 significan mechanical completion y ready for commissioning?<\/li><li>\u00bfQu\u00e9 documentos son condici\u00f3n de handover?<\/li><li>\u00bfC\u00f3mo se tratar\u00e1n los cambios y claims?<\/li><li>\u00bfQu\u00e9 garant\u00edas permanecen despu\u00e9s de la aceptaci\u00f3n?<\/li><li>\u00bfQu\u00e9 obligaciones del Owner pueden afectar el cronograma?<\/li><li>\u00bfTodas las calificaciones de la propuesta final fueron consolidadas en el contrato?<\/li><\/ol>\n\n\n\n<p class=\"wp-block-paragraph\">Si varias respuestas permanecen indefinidas, el proceso todav\u00eda no est\u00e1 listo para award, aunque exista una propuesta comercial aparentemente atractiva.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Consideraciones finales<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">La contrataci\u00f3n EPC es un proceso de ingenier\u00eda, Procurement y gobernanza antes de ser una negociaci\u00f3n de precio. El Owner necesita transformar la necesidad en requisitos, madurar interfaces y riesgos, definir desempe\u00f1o y construir una RFP que produzca propuestas comparables.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">La precalificaci\u00f3n, la TBE y la igualaci\u00f3n son esenciales porque el precio solo tiene significado cuando las empresas ofrecen obligaciones equivalentes. Las calificaciones, exclusiones y premisas deben consolidarse antes del award para que el contrato final represente aquello que fue efectivamente negociado.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Despu\u00e9s de la firma, la gobernanza contin\u00faa. El contrato se convierte en baseline para ingenier\u00eda, Procurement, construcci\u00f3n, cambios, pruebas y aceptaci\u00f3n. Cuando la preparaci\u00f3n fue consistente, el contratista EPC posee libertad suficiente para integrar la soluci\u00f3n y el Owner dispone de criterios suficientes para verificar el resultado sin asumir la ejecuci\u00f3n.<\/p>\n\n\n\n<details class=\"wp-block-details is-layout-flow wp-block-details-is-layout-flow\"><summary>Referencias t\u00e9cnicas<\/summary>\n<p class=\"wp-block-paragraph\">[1] INTERNATIONAL FEDERATION OF CONSULTING ENGINEERS \u2014 FIDIC. Conditions of Contract for EPC\/Turnkey Projects \u2014 Silver Book. 2.\u00aa ed. Geneva: FIDIC, 2017. Disponible en: <a href=\"https:\/\/fidic.org\/books\/epcturnkey-contract-2nd-ed-2017-silver-book\">https:\/\/fidic.org\/books\/epcturnkey-contract-2nd-ed-2017-silver-book<\/a><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">[2] WORLD BANK. Procurement Framework and Standard Procurement Documents. Washington, DC: World Bank. Disponible en: <a href=\"https:\/\/www.worldbank.org\/en\/projects-operations\/products-and-services\/brief\/procurement-new-framework\">https:\/\/www.worldbank.org\/en\/projects-operations\/products-and-services\/brief\/procurement-new-framework<\/a><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">[3] PROJECT MANAGEMENT INSTITUTE \u2014 PMI. Standards and PMBOK Guide. Newtown Square: PMI. Disponible en: <a href=\"https:\/\/www.pmi.org\/pmbok-guide-standards\">https:\/\/www.pmi.org\/pmbok-guide-standards<\/a><\/p>\n<\/details>\n\n\n\n<details class=\"wp-block-details is-layout-flow wp-block-details-is-layout-flow\"><summary>Preguntas frecuentes<\/summary>\n<div class=\"schema-faq wp-block-yoast-faq-block\"><div class=\"schema-faq-section\" id=\"faq-question-como-come-ar-uma-contrata-o-epc-cb793454\"><strong class=\"schema-faq-question\">\u00bfC\u00f3mo comenzar una contrataci\u00f3n EPC?<\/strong> <p class=\"schema-faq-answer\">Primero confirme que EPC es el modelo adecuado; despu\u00e9s eval\u00fae readiness y defina requisitos, ingenier\u00eda de referencia, alcance, interfaces, riesgos, desempe\u00f1o y aceptaci\u00f3n antes de estructurar la RFP.<\/p><\/div><div class=\"schema-faq-section\" id=\"faq-question-necess-rio-ter-feed-para-contratar-epc-443f5c11\"><strong class=\"schema-faq-question\">\u00bfEs necesario tener FEED para contratar EPC?<\/strong> <p class=\"schema-faq-answer\">No en todos los casos, pero se necesita una ingenier\u00eda de referencia compatible con la complejidad del proyecto. FEED es especialmente \u00fatil en proyectos industriales y multidisciplinarios.<\/p><\/div><div class=\"schema-faq-section\" id=\"faq-question-o-que-tbe-em-uma-contrata-o-epc-50b39e1d\"><strong class=\"schema-faq-question\">\u00bfQu\u00e9 es TBE en una contrataci\u00f3n EPC?<\/strong> <p class=\"schema-faq-answer\">Technical Bid Evaluation es la evaluaci\u00f3n t\u00e9cnica estructurada de las propuestas frente a requisitos y criterios, registrando conformidades, desviaciones y excepciones antes de la comparaci\u00f3n comercial.<\/p><\/div><div class=\"schema-faq-section\" id=\"faq-question-por-que-n-o-comparar-apenas-o-menor-pre-o-f4d7a44f\"><strong class=\"schema-faq-question\">\u00bfPor qu\u00e9 no comparar \u00fanicamente el menor precio?<\/strong> <p class=\"schema-faq-answer\">Porque las propuestas pueden tener alcances, exclusiones, obligaciones de desempe\u00f1o, pruebas y riesgos diferentes. El precio solo es comparable despu\u00e9s de la igualaci\u00f3n t\u00e9cnica y comercial.<\/p><\/div><div class=\"schema-faq-section\" id=\"faq-question-como-escolher-empresas-para-participar-da-rfp-d647b5f5\"><strong class=\"schema-faq-question\">\u00bfC\u00f3mo elegir empresas para participar en la RFP?<\/strong> <p class=\"schema-faq-answer\">Mediante una precalificaci\u00f3n proporcional al objeto, evaluando experiencia, capacidad de ingenier\u00eda, Procurement, construcci\u00f3n, gesti\u00f3n, calidad, puesta en marcha, situaci\u00f3n financiera y equipo.<\/p><\/div><div class=\"schema-faq-section\" id=\"faq-question-o-que-deve-ser-consolidado-antes-do-award-22cb4858\"><strong class=\"schema-faq-question\">\u00bfQu\u00e9 debe consolidarse antes del award?<\/strong> <p class=\"schema-faq-answer\">Requisitos, alcance, interfaces, riesgos, precio, plazo, calificaciones, garant\u00edas, pruebas, documentaci\u00f3n y todas las aclaraciones y adendas que modificaron la propuesta.<\/p><\/div><div class=\"schema-faq-section\" id=\"faq-question-quando-contratar-owner-s-engineering-para-apoiar-66c3b051\"><strong class=\"schema-faq-question\">\u00bfCu\u00e1ndo contratar Owner\u2019s Engineering para apoyar el proceso?<\/strong> <p class=\"schema-faq-answer\">Cuando el Owner necesita apoyo independiente para requisitos, ingenier\u00eda de referencia, RFP, TBE, negociaci\u00f3n, gobernanza de la ejecuci\u00f3n, pruebas y recepci\u00f3n t\u00e9cnica.<\/p><\/div><\/div>\n<\/details>\n\n\n\n<details class=\"wp-block-details is-layout-flow wp-block-details-is-layout-flow\"><summary>Materiales t\u00e9cnicos complementarios<\/summary>\n<h4 class=\"wp-block-heading\">Soluciones relacionadas<\/h4>\n\n<ul class=\"wp-block-list\"><li><a href=\"https:\/\/a3aengenharia.com.br\/solucoes\/gestao-e-governanca-de-engenharia\/governanca-de-projetos-programas-e-portfolios\/\">Gobernanza de Proyectos, Programas y Portafolios<\/a><\/li><li><a href=\"https:\/\/a3aengenharia.com.br\/solucoes\/gestao-e-governanca-de-engenharia\/gestao-contratos-escopo-entregaveis\/\">Gesti\u00f3n de Contratos, Alcance y Entregables<\/a><\/li><li><a href=\"https:\/\/a3aengenharia.com.br\/solucoes\/gestao-e-governanca-de-engenharia\/gestao-requisitos-evidencias-criterios-aceite\/\">Gesti\u00f3n de Requisitos, Evidencias y Criterios de Aceptaci\u00f3n<\/a><\/li><li><a href=\"https:\/\/a3aengenharia.com.br\/solucoes\/gestao-e-governanca-de-engenharia\/gestao-processos-workflows-aprovacoes-tecnicas\/\">Gesti\u00f3n de Procesos, Workflows y Aprobaciones T\u00e9cnicas<\/a><\/li><\/ul>\n\n<h4 class=\"wp-block-heading\">Servicios relacionados<\/h4>\n\n<ul class=\"wp-block-list\"><li><a href=\"https:\/\/a3aengenharia.com.br\/servicos\/contratacao-integrada\/epc-turnkey\/\">EPC \u2014 implantaci\u00f3n turnkey<\/a><\/li><li><a href=\"https:\/\/a3aengenharia.com.br\/servicos\/contratacao-integrada\/engenharia-do-proprietario\/\">Owner\u2019s Engineering<\/a><\/li><li><a href=\"https:\/\/a3aengenharia.com.br\/servicos\/contratacao-integrada\/feed-front-end-engineering-design\/\">FEED \u2014 Front-End Engineering Design<\/a><\/li><li><a href=\"https:\/\/a3aengenharia.com.br\/servicos\/implementacao\/procurement\/\">Procurement T\u00e9cnico<\/a><\/li><li><a href=\"https:\/\/a3aengenharia.com.br\/servicos\/implementacao\/gestao-de-projetos\/\">Gesti\u00f3n de Proyectos y Project Controls<\/a><\/li><li><a href=\"https:\/\/a3aengenharia.com.br\/servicos\/implementacao\/recebimento-tecnico-obras-servicos-engenharia\/\">Recepci\u00f3n T\u00e9cnica<\/a><\/li><\/ul>\n\n<h4 class=\"wp-block-heading\">Contenidos principales sobre el tema<\/h4>\n\n<ul class=\"wp-block-list\"><li><a href=\"https:\/\/a3aengenharia.com.br\/conteudo\/artigos-tecnicos\/epc-em-engenharia-o-que-e-como-funciona\/\">EPC en Ingenier\u00eda: qu\u00e9 es y c\u00f3mo funciona<\/a><\/li><li><a href=\"https:\/\/a3aengenharia.com.br\/conteudo\/artigos-tecnicos\/projeto-epc-como-funciona-engenharia-entrega-empreendimento\/\">Proyecto EPC: de la Ingenier\u00eda a la entrega<\/a><\/li><li><a href=\"https:\/\/a3aengenharia.com.br\/conteudo\/artigos-tecnicos\/epc-turnkey-engenharia-o-que-resolve-quando-adotar\/\">EPC Turnkey en Ingenier\u00eda<\/a><\/li><li><a href=\"https:\/\/a3aengenharia.com.br\/conteudo\/artigos-tecnicos\/contrato-epc-engenharia-escopo-responsabilidades-riscos\/\">Contrato EPC en Ingenier\u00eda<\/a><\/li><li><a href=\"https:\/\/a3aengenharia.com.br\/conteudo\/artigos-tecnicos\/contrato-epc-x-epcm-diferencas\/\">EPC vs. EPCM: diferencias y cu\u00e1ndo usar cada modelo<\/a><\/li><\/ul>\n\n<h4 class=\"wp-block-heading\">Contenidos t\u00e9cnicos relacionados<\/h4>\n\n<ul class=\"wp-block-list\"><li><a href=\"https:\/\/a3aengenharia.com.br\/conteudo\/artigos-tecnicos\/project-readiness-engenharia-avaliacao-prontidao-projeto\/\">Project Readiness en Ingenier\u00eda<\/a><\/li><li><a href=\"https:\/\/a3aengenharia.com.br\/conteudo\/artigos-tecnicos\/pdri-project-definition-rating-index-engenharia\/\">PDRI en Ingenier\u00eda<\/a><\/li><li><a href=\"https:\/\/a3aengenharia.com.br\/conteudo\/artigos-tecnicos\/rfp-engenharia-escopo-requisitos-criterios-selecao\/\">RFP en Ingenier\u00eda<\/a><\/li><li><a href=\"https:\/\/a3aengenharia.com.br\/conteudo\/artigos-tecnicos\/tbe-technical-bid-evaluation-engenharia\/\">TBE en Ingenier\u00eda<\/a><\/li><li><a href=\"https:\/\/a3aengenharia.com.br\/conteudo\/artigos-tecnicos\/estrategia-contratacao-engenharia-procurement-pacotes-riscos\/\">Estrategia de Contrataci\u00f3n en Ingenier\u00eda<\/a><\/li><li><a href=\"https:\/\/a3aengenharia.com.br\/conteudo\/artigos-tecnicos\/gestao-requisitos-engenharia-definicao-rastreabilidade-mudancas-aceite\/\">Gesti\u00f3n de Requisitos en Ingenier\u00eda<\/a><\/li><li><a href=\"https:\/\/a3aengenharia.com.br\/conteudo\/artigos-tecnicos\/project-controls-controle-projetos-engenharia\/\">Project Controls<\/a><\/li><li><a href=\"https:\/\/a3aengenharia.com.br\/conteudo\/guias-tecnicos\/guia-completo-sobre-comissionamento\/\">Puesta en Marcha: gu\u00eda completa<\/a><\/li><\/ul>\n<\/details>\n","protected":false},"excerpt":{"rendered":"<p>Vea c\u00f3mo estructurar una contrataci\u00f3n EPC en Ingenier\u00eda: requisitos, ingenier\u00eda de referencia, RFP, calificaci\u00f3n, TBE, riesgos, negociaci\u00f3n y criterios de aceptaci\u00f3n.<\/p>\n","protected":false},"author":1,"featured_media":0,"parent":0,"template":"","meta":{"_a3a_global_related_solutions":[],"_a3a_global_related_services":[],"_a3a_global_related_materials":[],"_a3a_post_lang":"es-es","_a3a_translation_group_id":"a928dfa3-5f41-43e0-9d7c-b50bd414339f","_a3a_i18n_canonical_slug":"contratacion-epc-ingenieria-requisitos-alcance-criterios"},"categories":[],"segments":[],"mercados":[],"etapas":[],"class_list":["post-73571","articles","type-articles","status-publish","hentry"],"_links":{"self":[{"href":"https:\/\/a3aengenharia.com\/es-es\/wp-json\/wp\/v2\/articles\/73571","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/a3aengenharia.com\/es-es\/wp-json\/wp\/v2\/articles"}],"about":[{"href":"https:\/\/a3aengenharia.com\/es-es\/wp-json\/wp\/v2\/types\/articles"}],"author":[{"embeddable":true,"href":"https:\/\/a3aengenharia.com\/es-es\/wp-json\/wp\/v2\/users\/1"}],"version-history":[{"count":3,"href":"https:\/\/a3aengenharia.com\/es-es\/wp-json\/wp\/v2\/articles\/73571\/revisions"}],"predecessor-version":[{"id":73577,"href":"https:\/\/a3aengenharia.com\/es-es\/wp-json\/wp\/v2\/articles\/73571\/revisions\/73577"}],"wp:attachment":[{"href":"https:\/\/a3aengenharia.com\/es-es\/wp-json\/wp\/v2\/media?parent=73571"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/a3aengenharia.com\/es-es\/wp-json\/wp\/v2\/categories?post=73571"},{"taxonomy":"segments","embeddable":true,"href":"https:\/\/a3aengenharia.com\/es-es\/wp-json\/wp\/v2\/segments?post=73571"},{"taxonomy":"mercados","embeddable":true,"href":"https:\/\/a3aengenharia.com\/es-es\/wp-json\/wp\/v2\/mercados?post=73571"},{"taxonomy":"etapas","embeddable":true,"href":"https:\/\/a3aengenharia.com\/es-es\/wp-json\/wp\/v2\/etapas?post=73571"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}