{"id":73273,"date":"2026-08-30T16:18:13","date_gmt":"2026-08-30T19:18:13","guid":{"rendered":"https:\/\/a3aengenharia.com\/?post_type=articles&#038;p=73273"},"modified":"2026-08-30T16:18:13","modified_gmt":"2026-08-30T19:18:13","slug":"plan-comunicacion-proyectos-publicos-canales-responsabilidades","status":"publish","type":"articles","link":"https:\/\/a3aengenharia.com\/es-es\/contenido\/articulos-tecnicos\/plan-comunicacion-proyectos-publicos-canales-responsabilidades\/","title":{"rendered":"Plan de Comunicaci\u00f3n en Proyectos: c\u00f3mo estructurar p\u00fablicos, canales y responsabilidades"},"content":{"rendered":"\n<p class=\"wp-block-paragraph\">El plan de comunicaci\u00f3n en proyectos es el instrumento que define qu\u00e9 informaci\u00f3n debe circular, para qui\u00e9n, con qu\u00e9 finalidad, en qu\u00e9 momento, por qu\u00e9 canal, con qu\u00e9 responsable, qu\u00e9 retorno se espera y c\u00f3mo se registrar\u00e1 la evidencia. Transforma las necesidades de informaci\u00f3n e involucramiento en un sistema de comunicaci\u00f3n planificado, trazable y ajustado al contexto del proyecto.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Un buen plan no es una tabla gen\u00e9rica de reuniones semanales e informes mensuales. Debe responder a las necesidades reales de los stakeholders y de las decisiones del proyecto. Esto significa diferenciar comunicaci\u00f3n ejecutiva, t\u00e9cnica, contractual, operacional y externa; definir disparadores adem\u00e1s de frecuencias fijas; proteger informaci\u00f3n sensible; exigir feedback cuando sea necesario; y conectar la comunicaci\u00f3n con requisitos, riesgos, cambios, interfaces, cronograma y aceptaci\u00f3n.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">En proyectos de ingenier\u00eda, las fallas de comunicaci\u00f3n rara vez son solamente problemas de redacci\u00f3n o env\u00edo. Pueden producir requisitos mal interpretados, aprobaciones tard\u00edas, interfaces no coordinadas, decisiones reabiertas, compromisos informales sin validez, movilizaci\u00f3n sin autorizaci\u00f3n o entregables rechazados. Por eso, el plan de comunicaci\u00f3n debe tratarse como parte de la gobernanza del proyecto.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Qu\u00e9 es un plan de comunicaci\u00f3n en proyectos<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">El <strong>plan de comunicaci\u00f3n<\/strong> organiza el flujo de informaci\u00f3n e interacci\u00f3n necesario para que personas y organizaciones comprendan lo que necesitan saber, participen cuando sea necesario y tomen decisiones dentro del plazo y la autoridad definidos.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Debe derivarse de la <a href=\"https:\/\/a3aengenharia.com.br\/conteudo\/artigos-tecnicos\/gestao-de-stakeholders\/\">gesti\u00f3n de stakeholders<\/a>. Primero el equipo identifica qui\u00e9n afecta o es afectado por el proyecto, comprende intereses, influencia, impacto y necesidades; despu\u00e9s define c\u00f3mo cada stakeholder o grupo necesita ser involucrado e informado.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">La diferencia es importante:<\/p>\n\n\n\n<figure class=\"wp-block-table\"><table><tbody><tr><td>Elemento<\/td><td>Pregunta central<\/td><\/tr><tr><td>Gesti\u00f3n de stakeholders<\/td><td>\u00bfQui\u00e9n necesita participar, por qu\u00e9 y en qu\u00e9 nivel?<\/td><\/tr><tr><td>Mapeo de stakeholders<\/td><td>\u00bfC\u00f3mo se relacionan estas partes y qu\u00e9 conexiones importan?<\/td><\/tr><tr><td>Plan de comunicaci\u00f3n<\/td><td>\u00bfQu\u00e9 informaci\u00f3n o interacci\u00f3n debe ocurrir, cu\u00e1ndo, por qu\u00e9 canal y con qu\u00e9 retorno?<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p class=\"wp-block-paragraph\">El plan de comunicaci\u00f3n no sustituye reuniones, actas, informes o sistemas. Define cu\u00e1ndo y c\u00f3mo se utilizar\u00e1n esos mecanismos.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Por qu\u00e9 el plan de comunicaci\u00f3n es cr\u00edtico en proyectos de ingenier\u00eda<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">La ingenier\u00eda depende de decisiones distribuidas. Los proyectistas necesitan requisitos; los proveedores necesitan aprobaciones; las contratistas dependen de liberaciones; operaci\u00f3n necesita conocer impactos; los patrocinadores necesitan decidir excepciones; los organismos externos pueden condicionar hitos; la supervisi\u00f3n necesita recibir evidencias; los usuarios necesitan prepararse para la transici\u00f3n.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Sin un sistema de comunicaci\u00f3n coherente, el proyecto tiende a generar s\u00edntomas conocidos:<\/p>\n\n\n\n<ul class=\"wp-block-list\"><li>preguntas repetidas porque la informaci\u00f3n no est\u00e1 accesible;<\/li><li>decisiones retrasadas porque no se involucr\u00f3 al destinatario correcto;<\/li><li>correos extensos sin una decisi\u00f3n expl\u00edcita;<\/li><li>exceso de personas copiadas sin responsabilidad definida;<\/li><li>reuniones sin agenda, autoridad o registro;<\/li><li>aprobaci\u00f3n verbal sin trazabilidad;<\/li><li>cambio ejecutado sin control de cambios;<\/li><li>informe enviado sin confirmaci\u00f3n de comprensi\u00f3n;<\/li><li>informaci\u00f3n t\u00e9cnica desactualizada circulando en paralelo;<\/li><li>comunicaci\u00f3n contractual fuera del canal previsto;<\/li><li>operaci\u00f3n informada solamente cerca de la aceptaci\u00f3n.<\/li><\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">La comunicaci\u00f3n eficaz no es la mayor cantidad de mensajes. Es la circulaci\u00f3n suficiente de la informaci\u00f3n correcta, entre las partes correctas, en el momento en que puede modificar una decisi\u00f3n o acci\u00f3n.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">C\u00f3mo nace el plan de comunicaci\u00f3n del mapeo de stakeholders<\/h2>\n\n\n\n<div class=\"wp-block-a3a-destaque\">\n<p class=\"wp-block-paragraph\">Un plan de comunicaci\u00f3n solo es \u00fatil cuando est\u00e1 conectado con las necesidades reales de los stakeholders. La frecuencia es una consecuencia; primero vienen el objetivo, la decisi\u00f3n y el retorno esperado.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><a href=\"https:\/\/a3aengenharia.com.br\/conteudo\/artigos-tecnicos\/mapeamento-stakeholders-como-identificar-analisar-mapa\/\">Vea c\u00f3mo mapear stakeholders<\/a><\/p>\n<\/div>\n\n\n\n<p class=\"wp-block-paragraph\">El <a href=\"https:\/\/a3aengenharia.com.br\/conteudo\/artigos-tecnicos\/mapeamento-stakeholders-como-identificar-analisar-mapa\/\">mapeo de stakeholders<\/a> proporciona la base del plan. Revela grupos, relaciones, influencia, impacto y momentos cr\u00edticos.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Un stakeholder con alta autoridad puede necesitar comunicaci\u00f3n breve y orientada a la decisi\u00f3n. Un especialista t\u00e9cnico puede requerir datos detallados y tiempo para an\u00e1lisis. Operaci\u00f3n puede exigir workshops antes de congelamientos del proyecto. Una concesionaria puede exigir protocolos formales y plazos espec\u00edficos. Un proveedor puede necesitar submittals controlados en lugar de intercambio informal de archivos.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Por eso, cada l\u00ednea del plan necesita una l\u00f3gica de negocio y proyecto, no solamente una periodicidad.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Qu\u00e9 informaci\u00f3n debe constar en el plan de comunicaci\u00f3n<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Un plan \u00fatil puede estructurarse con los siguientes campos:<\/p>\n\n\n\n<figure class=\"wp-block-table\"><table><tbody><tr><td>Campo<\/td><td>Pregunta respondida<\/td><\/tr><tr><td>Stakeholder o p\u00fablico<\/td><td>\u00bfQui\u00e9n necesita recibir o proporcionar la informaci\u00f3n?<\/td><\/tr><tr><td>Objetivo<\/td><td>\u00bfInformar, consultar, decidir, coordinar, aprobar, alertar o rendir cuentas?<\/td><\/tr><tr><td>Contenido<\/td><td>\u00bfQu\u00e9 informaci\u00f3n es necesaria?<\/td><\/tr><tr><td>Nivel de detalle<\/td><td>\u00bfEjecutivo, gerencial, t\u00e9cnico u operacional?<\/td><\/tr><tr><td>Emisor<\/td><td>\u00bfQui\u00e9n prepara y transmite?<\/td><\/tr><tr><td>Responsable de la respuesta<\/td><td>\u00bfQui\u00e9n necesita actuar o decidir?<\/td><\/tr><tr><td>Canal<\/td><td>\u00bfReuni\u00f3n, sistema, documento, correo, dashboard, workshop o protocolo?<\/td><\/tr><tr><td>Frecuencia o disparador<\/td><td>\u00bfCu\u00e1ndo ocurre?<\/td><\/tr><tr><td>Plazo de respuesta<\/td><td>\u00bfCu\u00e1nto tiempo existe para el retorno?<\/td><\/tr><tr><td>Clasificaci\u00f3n<\/td><td>\u00bfP\u00fablica, interna, restringida, confidencial o contractual?<\/td><\/tr><tr><td>Registro<\/td><td>\u00bfD\u00f3nde queda la evidencia?<\/td><\/tr><tr><td>Medida de eficacia<\/td><td>\u00bfC\u00f3mo saber si funcion\u00f3?<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p class=\"wp-block-paragraph\">Estos campos deben ajustarse al proyecto. Incluir columnas que nadie utiliza crea burocracia; omitir responsabilidad y retorno transforma la comunicaci\u00f3n en env\u00edo unilateral.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">C\u00f3mo definir el objetivo de cada comunicaci\u00f3n<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Antes de elegir canal o formato, defina el resultado esperado. Una comunicaci\u00f3n puede tener diferentes objetivos:<\/p>\n\n\n\n<ul class=\"wp-block-list\"><li><strong>informar:<\/strong> transmitir una situaci\u00f3n sin solicitar acci\u00f3n inmediata;<\/li><li><strong>consultar:<\/strong> obtener opini\u00f3n, requisito, validaci\u00f3n o dato;<\/li><li><strong>coordinar:<\/strong> alinear actividades y dependencias;<\/li><li><strong>decidir:<\/strong> presentar alternativas y obtener una decisi\u00f3n dentro de la autoridad;<\/li><li><strong>aprobar:<\/strong> formalizar conformidad con un documento, etapa o cambio;<\/li><li><strong>alertar:<\/strong> comunicar riesgo, desviaci\u00f3n, incidente o condici\u00f3n cr\u00edtica;<\/li><li><strong>rendir cuentas:<\/strong> presentar desempe\u00f1o, uso de recursos y tendencia;<\/li><li><strong>movilizar:<\/strong> preparar personas para acci\u00f3n, transici\u00f3n o cambio;<\/li><li><strong>registrar:<\/strong> preservar evidencia de orientaci\u00f3n, compromiso o decisi\u00f3n.<\/li><\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">Cuando el objetivo no est\u00e1 claro, la comunicaci\u00f3n tiende a producir una respuesta igualmente incierta.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">C\u00f3mo segmentar los p\u00fablicos del proyecto<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">No todos los stakeholders necesitan recibir la misma informaci\u00f3n. La segmentaci\u00f3n reduce ruido y mejora la comprensi\u00f3n.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Patrocinador y comit\u00e9<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Necesitan visi\u00f3n ejecutiva: valor, hitos, tendencias, riesgos relevantes, decisiones pendientes, excepciones y recomendaciones. El exceso de detalle t\u00e9cnico puede ocultar la decisi\u00f3n necesaria.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Equipo de ingenier\u00eda<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Necesita requisitos, interfaces, premisas, revisiones, comentarios, decisiones y documentos controlados. La trazabilidad y la versi\u00f3n son esenciales.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Operaci\u00f3n y mantenimiento<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Necesitan comprender impacto, requisitos de operaci\u00f3n, mantenibilidad, ventanas, capacitaci\u00f3n, pruebas, documentaci\u00f3n y transici\u00f3n.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Proveedores y contratistas<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Necesitan canales formales compatibles con el contrato, submittals, aclaraciones, decisiones, criterios de aceptaci\u00f3n, pendientes y cambios autorizados.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Autoridades y concesionarias<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Normalmente exigen protocolos, documentos espec\u00edficos, plazos y representantes autorizados. El plan debe respetar el procedimiento aplicable.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Usuarios y partes externas<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Pueden exigir lenguaje accesible, anticipaci\u00f3n, transparencia sobre impactos y mecanismos de consulta o retorno.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">C\u00f3mo elegir el canal de comunicaci\u00f3n<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">El canal debe elegirse seg\u00fan finalidad, criticidad, complejidad y necesidad de evidencia.<\/p>\n\n\n\n<figure class=\"wp-block-table\"><table><tbody><tr><td>Situaci\u00f3n<\/td><td>Canal adecuado<\/td><\/tr><tr><td>Decisi\u00f3n compleja<\/td><td>Reuni\u00f3n o workshop con material previo y registro posterior<\/td><\/tr><tr><td>Informaci\u00f3n ejecutiva<\/td><td>Informe sint\u00e9tico, dashboard y reuni\u00f3n de gobernanza<\/td><\/tr><tr><td>Revisi\u00f3n t\u00e9cnica<\/td><td>CDE, sistema documental, markup controlado o reuni\u00f3n de revisi\u00f3n<\/td><\/tr><tr><td>Alerta cr\u00edtica<\/td><td>Canal inmediato con confirmaci\u00f3n de recepci\u00f3n y escalamiento<\/td><\/tr><tr><td>Obligaci\u00f3n contractual<\/td><td>Canal formal definido en el contrato<\/td><\/tr><tr><td>Coordinaci\u00f3n rutinaria<\/td><td>Reuni\u00f3n breve y sistema de seguimiento<\/td><\/tr><tr><td>Aprobaci\u00f3n<\/td><td>Workflow o documento con trazabilidad de decisi\u00f3n<\/td><\/tr><tr><td>Divulgaci\u00f3n amplia<\/td><td>Portal, comunicado, presentaci\u00f3n o canal institucional<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p class=\"wp-block-paragraph\">El correo electr\u00f3nico es una herramienta, no una estrategia. Puede ser adecuado para registrar o distribuir, pero tiende a fallar cuando se utiliza como sustituto de una decisi\u00f3n estructurada, workflow o gesti\u00f3n documental.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Comunicaci\u00f3n s\u00edncrona y as\u00edncrona<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Los proyectos necesitan combinar ambos formatos.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Comunicaci\u00f3n s\u00edncrona<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Reuniones, workshops y llamadas son \u00fatiles cuando existe ambig\u00fcedad, negociaci\u00f3n, m\u00faltiples perspectivas o necesidad de decisi\u00f3n interactiva. El costo es mayor, por eso deben reservarse para situaciones que justifican interacci\u00f3n en tiempo real.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Comunicaci\u00f3n as\u00edncrona<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Informes, sistemas, dashboards, documentos, comentarios y correos permiten reflexi\u00f3n, trazabilidad y trabajo en horarios diferentes. Son mejores para informaci\u00f3n estructurada, pero exigen claridad sobre plazo y retorno.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Una buena pr\u00e1ctica es utilizar comunicaci\u00f3n s\u00edncrona para construir entendimiento y as\u00edncrona para preservar evidencia y acompa\u00f1ar la ejecuci\u00f3n.<\/p>\n\n\n\n<figure class=\"a3a-mermaid\"><svg id=\"a3a-diagram-1\" width=\"100%\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" class=\"flowchart\" style=\"max-width:min(503.58984375px, 100%);height:auto;display:block;margin:0 auto\" viewBox=\"0 0 503.58984375 1323.203125\" role=\"graphics-document document\" aria-roledescription=\"flowchart-v2\" aria-labelledby=\"chart-title-a3a-diagram-1\"><title id=\"chart-title-a3a-diagram-1\">Flujo de comunicaci\u00f3n orientado a decisiones en proyectos de ingenier\u00eda<\/title><style>#a3a-diagram-1{font-family:Roboto,sans-serif;font-size:15px;fill:var(--a3a-diag-text, #0a0a0a);}@keyframes edge-animation-frame{from{stroke-dashoffset:0;}}@keyframes dash{to{stroke-dashoffset:0;}}#a3a-diagram-1 .edge-animation-slow{stroke-dasharray:9,5!important;stroke-dashoffset:900;animation:dash 50s linear infinite;stroke-linecap:round;}#a3a-diagram-1 .edge-animation-fast{stroke-dasharray:9,5!important;stroke-dashoffset:900;animation:dash 20s linear infinite;stroke-linecap:round;}#a3a-diagram-1 .error-icon{fill:var(--a3a-diag-canvas, #ffffff);}#a3a-diagram-1 .error-text{fill:#000000;stroke:#000000;}#a3a-diagram-1 .edge-thickness-normal{stroke-width:1px;}#a3a-diagram-1 .edge-thickness-thick{stroke-width:3.5px;}#a3a-diagram-1 .edge-pattern-solid{stroke-dasharray:0;}#a3a-diagram-1 .edge-thickness-invisible{stroke-width:0;fill:none;}#a3a-diagram-1 .edge-pattern-dashed{stroke-dasharray:3;}#a3a-diagram-1 .edge-pattern-dotted{stroke-dasharray:2;}#a3a-diagram-1 .marker{fill:var(--a3a-diag-stroke, #2e42a2);stroke:var(--a3a-diag-stroke, #2e42a2);}#a3a-diagram-1 .marker.cross{stroke:var(--a3a-diag-stroke, #2e42a2);}#a3a-diagram-1 svg{font-family:Roboto,sans-serif;font-size:15px;}#a3a-diagram-1 p{margin:0;}#a3a-diagram-1 .label{font-family:Roboto,sans-serif;color:var(--a3a-diag-text, #0a0a0a);}#a3a-diagram-1 .cluster-label text{fill:var(--a3a-diag-title, #0124af);}#a3a-diagram-1 .cluster-label span{color:var(--a3a-diag-title, #0124af);}#a3a-diagram-1 .cluster-label span p{background-color:transparent;}#a3a-diagram-1 .label text,#a3a-diagram-1 span{fill:var(--a3a-diag-text, #0a0a0a);color:var(--a3a-diag-text, #0a0a0a);}#a3a-diagram-1 .node rect,#a3a-diagram-1 .node circle,#a3a-diagram-1 .node ellipse,#a3a-diagram-1 .node polygon,#a3a-diagram-1 .node path{fill:var(--a3a-diag-fill, #eef2fd);stroke:var(--a3a-diag-stroke, #2e42a2);stroke-width:1px;}#a3a-diagram-1 .rough-node .label text,#a3a-diagram-1 .node .label text,#a3a-diagram-1 .image-shape .label,#a3a-diagram-1 .icon-shape .label{text-anchor:middle;}#a3a-diagram-1 .node .katex path{fill:#000;stroke:#000;stroke-width:1px;}#a3a-diagram-1 .rough-node .label,#a3a-diagram-1 .node .label,#a3a-diagram-1 .image-shape .label,#a3a-diagram-1 .icon-shape .label{text-align:center;}#a3a-diagram-1 .node.clickable{cursor:pointer;}#a3a-diagram-1 .root .anchor path{fill:var(--a3a-diag-stroke, #2e42a2)!important;stroke-width:0;stroke:var(--a3a-diag-stroke, #2e42a2);}#a3a-diagram-1 .arrowheadPath{fill:var(--a3a-diag-stroke, #0b0b0b);}#a3a-diagram-1 .edgePath .path{stroke:var(--a3a-diag-stroke, #2e42a2);stroke-width:2.0px;}#a3a-diagram-1 .flowchart-link{stroke:var(--a3a-diag-stroke, #2e42a2);fill:none;}#a3a-diagram-1 .edgeLabel{background-color:var(--a3a-diag-canvas, #ffffff);text-align:center;}#a3a-diagram-1 .edgeLabel p{background-color:var(--a3a-diag-canvas, #ffffff);}#a3a-diagram-1 .edgeLabel rect{opacity:0.5;background-color:var(--a3a-diag-canvas, #ffffff);fill:var(--a3a-diag-canvas, #ffffff);}#a3a-diagram-1 .labelBkg{background-color:rgba(255, 255, 255, 0.5);}#a3a-diagram-1 .cluster rect{fill:var(--a3a-diag-surface, #f8f8f8);stroke:var(--a3a-diag-border, #e2e8f0);stroke-width:1px;}#a3a-diagram-1 .cluster text{fill:var(--a3a-diag-title, #0124af);}#a3a-diagram-1 .cluster span{color:var(--a3a-diag-title, #0124af);}#a3a-diagram-1 div.mermaidTooltip{position:absolute;text-align:center;max-width:200px;padding:2px;font-family:Roboto,sans-serif;font-size:12px;background:var(--a3a-diag-canvas, #ffffff);border:1px solid hsl(0, 0%, 90%);border-radius:2px;pointer-events:none;z-index:100;}#a3a-diagram-1 .flowchartTitleText{text-anchor:middle;font-size:18px;fill:var(--a3a-diag-text, #0a0a0a);}#a3a-diagram-1 rect.text{fill:none;stroke-width:0;}#a3a-diagram-1 .icon-shape,#a3a-diagram-1 .image-shape{background-color:var(--a3a-diag-canvas, #ffffff);text-align:center;}#a3a-diagram-1 .icon-shape p,#a3a-diagram-1 .image-shape p{background-color:var(--a3a-diag-canvas, #ffffff);padding:2px;}#a3a-diagram-1 .icon-shape rect,#a3a-diagram-1 .image-shape rect{opacity:0.5;background-color:var(--a3a-diag-canvas, #ffffff);fill:var(--a3a-diag-canvas, #ffffff);}#a3a-diagram-1 .label-icon{display:inline-block;height:1em;overflow:visible;vertical-align:-0.125em;}#a3a-diagram-1 .node .label-icon path{fill:currentColor;stroke:revert;stroke-width:revert;}#a3a-diagram-1 :root{--mermaid-font-family:Roboto,sans-serif;}<\/style><g><marker id=\"a3a-diagram-1_flowchart-v2-pointEnd\" class=\"marker flowchart-v2\" viewBox=\"0 0 10 10\" refX=\"5\" refY=\"5\" markerUnits=\"userSpaceOnUse\" markerWidth=\"8\" markerHeight=\"8\" orient=\"auto\"><path d=\"M 0 0 L 10 5 L 0 10 z\" class=\"arrowMarkerPath\" style=\"stroke-width: 1; stroke-dasharray: 1, 0;\"><\/path><\/marker><marker id=\"a3a-diagram-1_flowchart-v2-pointStart\" class=\"marker flowchart-v2\" viewBox=\"0 0 10 10\" refX=\"4.5\" refY=\"5\" markerUnits=\"userSpaceOnUse\" markerWidth=\"8\" markerHeight=\"8\" orient=\"auto\"><path d=\"M 0 5 L 10 10 L 10 0 z\" class=\"arrowMarkerPath\" style=\"stroke-width: 1; stroke-dasharray: 1, 0;\"><\/path><\/marker><marker id=\"a3a-diagram-1_flowchart-v2-circleEnd\" class=\"marker flowchart-v2\" viewBox=\"0 0 10 10\" refX=\"11\" refY=\"5\" markerUnits=\"userSpaceOnUse\" markerWidth=\"11\" markerHeight=\"11\" orient=\"auto\"><circle cx=\"5\" cy=\"5\" r=\"5\" class=\"arrowMarkerPath\" style=\"stroke-width: 1; stroke-dasharray: 1, 0;\"><\/circle><\/marker><marker id=\"a3a-diagram-1_flowchart-v2-circleStart\" class=\"marker flowchart-v2\" viewBox=\"0 0 10 10\" refX=\"-1\" refY=\"5\" markerUnits=\"userSpaceOnUse\" markerWidth=\"11\" markerHeight=\"11\" orient=\"auto\"><circle cx=\"5\" cy=\"5\" r=\"5\" class=\"arrowMarkerPath\" style=\"stroke-width: 1; stroke-dasharray: 1, 0;\"><\/circle><\/marker><marker id=\"a3a-diagram-1_flowchart-v2-crossEnd\" class=\"marker cross flowchart-v2\" viewBox=\"0 0 11 11\" refX=\"12\" refY=\"5.2\" markerUnits=\"userSpaceOnUse\" markerWidth=\"11\" markerHeight=\"11\" orient=\"auto\"><path d=\"M 1,1 l 9,9 M 10,1 l -9,9\" class=\"arrowMarkerPath\" style=\"stroke-width: 2; stroke-dasharray: 1, 0;\"><\/path><\/marker><marker id=\"a3a-diagram-1_flowchart-v2-crossStart\" class=\"marker cross flowchart-v2\" viewBox=\"0 0 11 11\" refX=\"-1\" refY=\"5.2\" markerUnits=\"userSpaceOnUse\" markerWidth=\"11\" markerHeight=\"11\" orient=\"auto\"><path d=\"M 1,1 l 9,9 M 10,1 l -9,9\" class=\"arrowMarkerPath\" style=\"stroke-width: 2; stroke-dasharray: 1, 0;\"><\/path><\/marker><g class=\"root\"><g class=\"clusters\"><\/g><g class=\"edgePaths\"><path d=\"M268.43,83L268.43,87.167C268.43,91.333,268.43,99.667,268.43,107.333C268.43,115,268.43,122,268.43,125.5L268.43,129\" id=\"L_A_B_0\" class=\"edge-thickness-normal edge-pattern-solid edge-thickness-normal edge-pattern-solid flowchart-link\" style=\";\" data-edge=\"true\" data-et=\"edge\" data-id=\"L_A_B_0\" data-points=\"W3sieCI6MjY4LjQyOTY4NzUsInkiOjgzfSx7IngiOjI2OC40Mjk2ODc1LCJ5IjoxMDh9LHsieCI6MjY4LjQyOTY4NzUsInkiOjEzM31d\" marker-end=\"url(#a3a-diagram-1_flowchart-v2-pointEnd)\"><\/path><path d=\"M268.43,185.5L268.43,189.667C268.43,193.833,268.43,202.167,268.43,209.833C268.43,217.5,268.43,224.5,268.43,228L268.43,231.5\" id=\"L_B_C_0\" class=\"edge-thickness-normal edge-pattern-solid edge-thickness-normal edge-pattern-solid flowchart-link\" style=\";\" data-edge=\"true\" data-et=\"edge\" data-id=\"L_B_C_0\" data-points=\"W3sieCI6MjY4LjQyOTY4NzUsInkiOjE4NS41fSx7IngiOjI2OC40Mjk2ODc1LCJ5IjoyMTAuNX0seyJ4IjoyNjguNDI5Njg3NSwieSI6MjM1LjV9XQ==\" marker-end=\"url(#a3a-diagram-1_flowchart-v2-pointEnd)\"><\/path><path d=\"M268.43,288L268.43,292.167C268.43,296.333,268.43,304.667,268.43,312.333C268.43,320,268.43,327,268.43,330.5L268.43,334\" id=\"L_C_D_0\" class=\"edge-thickness-normal edge-pattern-solid edge-thickness-normal edge-pattern-solid flowchart-link\" style=\";\" data-edge=\"true\" data-et=\"edge\" data-id=\"L_C_D_0\" data-points=\"W3sieCI6MjY4LjQyOTY4NzUsInkiOjI4OH0seyJ4IjoyNjguNDI5Njg3NSwieSI6MzEzfSx7IngiOjI2OC40Mjk2ODc1LCJ5IjozMzh9XQ==\" marker-end=\"url(#a3a-diagram-1_flowchart-v2-pointEnd)\"><\/path><path d=\"M268.43,413L268.43,417.167C268.43,421.333,268.43,429.667,268.43,437.333C268.43,445,268.43,452,268.43,455.5L268.43,459\" id=\"L_D_E_0\" class=\"edge-thickness-normal edge-pattern-solid edge-thickness-normal edge-pattern-solid flowchart-link\" style=\";\" data-edge=\"true\" data-et=\"edge\" data-id=\"L_D_E_0\" data-points=\"W3sieCI6MjY4LjQyOTY4NzUsInkiOjQxM30seyJ4IjoyNjguNDI5Njg3NSwieSI6NDM4fSx7IngiOjI2OC40Mjk2ODc1LCJ5Ijo0NjN9XQ==\" marker-end=\"url(#a3a-diagram-1_flowchart-v2-pointEnd)\"><\/path><path d=\"M217.625,598.226L200.161,612.735C182.698,627.244,147.771,656.263,130.307,681.189C112.844,706.115,112.844,726.948,112.844,747.781C112.844,768.615,112.844,789.448,112.844,826.004C112.844,862.56,112.844,914.839,112.844,967.117C112.844,1019.396,112.844,1071.674,113.973,1103.203C115.103,1134.731,117.363,1145.51,118.492,1150.899L119.622,1156.288\" id=\"L_E_F_0\" class=\"edge-thickness-normal edge-pattern-solid edge-thickness-normal edge-pattern-solid flowchart-link\" style=\";\" data-edge=\"true\" data-et=\"edge\" data-id=\"L_E_F_0\" data-points=\"W3sieCI6MjE3LjYyNDU0ODUzMzAyMTYsInkiOjU5OC4yMjYxMTEwMzMwMjE1fSx7IngiOjExMi44NDM3NSwieSI6Njg1LjI4MTI1fSx7IngiOjExMi44NDM3NSwieSI6NzQ3Ljc4MTI1fSx7IngiOjExMi44NDM3NSwieSI6ODEwLjI4MTI1fSx7IngiOjExMi44NDM3NSwieSI6OTY3LjExNzE4NzV9LHsieCI6MTEyLjg0Mzc1LCJ5IjoxMTIzLjk1MzEyNX0seyJ4IjoxMjAuNDQyNjU2MjUsInkiOjExNjAuMjAzMTI1fV0=\" marker-end=\"url(#a3a-diagram-1_flowchart-v2-pointEnd)\"><\/path><path d=\"M303.376,614.085L310.517,625.951C317.658,637.817,331.94,661.549,339.082,678.79C346.223,696.031,346.223,706.781,346.223,712.156L346.223,717.531\" id=\"L_E_G_0\" class=\"edge-thickness-normal edge-pattern-solid edge-thickness-normal edge-pattern-solid flowchart-link\" style=\";\" data-edge=\"true\" data-et=\"edge\" data-id=\"L_E_G_0\" data-points=\"W3sieCI6MzAzLjM3NjEzMTc3ODU4NTgzLCJ5Ijo2MTQuMDg0ODA1NzIxNDE0MX0seyJ4IjozNDYuMjIyNjU2MjUsInkiOjY4NS4yODEyNX0seyJ4IjozNDYuMjIyNjU2MjUsInkiOjcyMS41MzEyNX1d\" marker-end=\"url(#a3a-diagram-1_flowchart-v2-pointEnd)\"><\/path><path d=\"M313.55,774.031L306.03,780.073C298.51,786.115,283.47,798.198,275.95,809.615C268.43,821.031,268.43,831.781,268.43,837.156L268.43,842.531\" id=\"L_G_H_0\" class=\"edge-thickness-normal edge-pattern-solid edge-thickness-normal edge-pattern-solid flowchart-link\" style=\";\" data-edge=\"true\" data-et=\"edge\" data-id=\"L_G_H_0\" data-points=\"W3sieCI6MzEzLjU0OTYwOTM3NSwieSI6Nzc0LjAzMTI1fSx7IngiOjI2OC40Mjk2ODc1LCJ5Ijo4MTAuMjgxMjV9LHsieCI6MjY4LjQyOTY4NzUsInkiOjg0Ni41MzEyNX1d\" marker-end=\"url(#a3a-diagram-1_flowchart-v2-pointEnd)\"><\/path><path d=\"M233.216,1052.489L228.303,1064.4C223.39,1076.31,213.564,1100.132,201.651,1117.667C189.738,1135.201,175.737,1146.45,168.737,1152.074L161.737,1157.698\" id=\"L_H_F_0\" class=\"edge-thickness-normal edge-pattern-solid edge-thickness-normal edge-pattern-solid flowchart-link\" style=\";\" data-edge=\"true\" data-et=\"edge\" data-id=\"L_H_F_0\" data-points=\"W3sieCI6MjMzLjIxNTY0MjQxMjg0NzYsInkiOjEwNTIuNDg5MDc5OTEyODQ3NX0seyJ4IjoyMDMuNzM4MjgxMjUsInkiOjExMjMuOTUzMTI1fSx7IngiOjE1OC42MTgzNTkzNzUsInkiOjExNjAuMjAzMTI1fV0=\" marker-end=\"url(#a3a-diagram-1_flowchart-v2-pointEnd)\"><\/path><path d=\"M303.002,1053.131L307.747,1064.934C312.491,1076.738,321.98,1100.346,333.725,1117.774C345.469,1135.201,359.47,1146.45,366.47,1152.074L373.47,1157.698\" id=\"L_H_I_0\" class=\"edge-thickness-normal edge-pattern-solid edge-thickness-normal edge-pattern-solid flowchart-link\" style=\";\" data-edge=\"true\" data-et=\"edge\" data-id=\"L_H_I_0\" data-points=\"W3sieCI6MzAzLjAwMjE2OTM2NzgwNDg3LCJ5IjoxMDUzLjEzMDY0MzEzMjE5NTJ9LHsieCI6MzMxLjQ2ODc1LCJ5IjoxMTIzLjk1MzEyNX0seyJ4IjozNzYuNTg4NjcxODc1LCJ5IjoxMTYwLjIwMzEyNX1d\" marker-end=\"url(#a3a-diagram-1_flowchart-v2-pointEnd)\"><\/path><path d=\"M415.458,1160.203L416.885,1154.161C418.311,1148.12,421.163,1136.036,422.589,1103.855C424.016,1071.674,424.016,1019.396,424.016,967.117C424.016,914.839,424.016,862.56,417.015,830.796C410.015,799.033,396.015,787.785,389.014,782.161L382.014,776.537\" id=\"L_I_G_0\" class=\"edge-thickness-normal edge-pattern-solid edge-thickness-normal edge-pattern-solid flowchart-link\" style=\";\" data-edge=\"true\" data-et=\"edge\" data-id=\"L_I_G_0\" data-points=\"W3sieCI6NDE1LjQ1ODM1OTM3NSwieSI6MTE2MC4yMDMxMjV9LHsieCI6NDI0LjAxNTYyNSwieSI6MTEyMy45NTMxMjV9LHsieCI6NDI0LjAxNTYyNSwieSI6OTY3LjExNzE4NzV9LHsieCI6NDI0LjAxNTYyNSwieSI6ODEwLjI4MTI1fSx7IngiOjM3OC44OTU3MDMxMjUsInkiOjc3NC4wMzEyNX1d\" marker-end=\"url(#a3a-diagram-1_flowchart-v2-pointEnd)\"><\/path><path d=\"M125.945,1212.703L125.945,1216.87C125.945,1221.036,125.945,1229.37,125.945,1237.036C125.945,1244.703,125.945,1251.703,125.945,1255.203L125.945,1258.703\" id=\"L_F_J_0\" class=\"edge-thickness-normal edge-pattern-solid edge-thickness-normal edge-pattern-solid flowchart-link\" style=\";\" data-edge=\"true\" data-et=\"edge\" data-id=\"L_F_J_0\" data-points=\"W3sieCI6MTI1Ljk0NTMxMjUsInkiOjEyMTIuNzAzMTI1fSx7IngiOjEyNS45NDUzMTI1LCJ5IjoxMjM3LjcwMzEyNX0seyJ4IjoxMjUuOTQ1MzEyNSwieSI6MTI2Mi43MDMxMjV9XQ==\" marker-end=\"url(#a3a-diagram-1_flowchart-v2-pointEnd)\"><\/path><\/g><g class=\"edgeLabels\"><g class=\"edgeLabel\"><g class=\"label\" data-id=\"L_A_B_0\" transform=\"translate(0, 0)\"><foreignObject width=\"0\" height=\"0\"><div xmlns=\"http:\/\/www.w3.org\/1999\/xhtml\" class=\"labelBkg\" style=\"display: table-cell; white-space: nowrap; line-height: 1.5; max-width: 200px; text-align: center;\"><span class=\"edgeLabel\"><\/span><\/div><\/foreignObject><\/g><\/g><g class=\"edgeLabel\"><g class=\"label\" data-id=\"L_B_C_0\" transform=\"translate(0, 0)\"><foreignObject width=\"0\" height=\"0\"><div xmlns=\"http:\/\/www.w3.org\/1999\/xhtml\" class=\"labelBkg\" style=\"display: table-cell; white-space: nowrap; line-height: 1.5; max-width: 200px; text-align: center;\"><span class=\"edgeLabel\"><\/span><\/div><\/foreignObject><\/g><\/g><g class=\"edgeLabel\"><g class=\"label\" data-id=\"L_C_D_0\" transform=\"translate(0, 0)\"><foreignObject width=\"0\" height=\"0\"><div xmlns=\"http:\/\/www.w3.org\/1999\/xhtml\" class=\"labelBkg\" style=\"display: table-cell; white-space: nowrap; line-height: 1.5; max-width: 200px; text-align: center;\"><span class=\"edgeLabel\"><\/span><\/div><\/foreignObject><\/g><\/g><g class=\"edgeLabel\"><g class=\"label\" data-id=\"L_D_E_0\" transform=\"translate(0, 0)\"><foreignObject width=\"0\" height=\"0\"><div xmlns=\"http:\/\/www.w3.org\/1999\/xhtml\" class=\"labelBkg\" style=\"display: table-cell; white-space: nowrap; line-height: 1.5; max-width: 200px; text-align: center;\"><span class=\"edgeLabel\"><\/span><\/div><\/foreignObject><\/g><\/g><g class=\"edgeLabel\" transform=\"translate(112.84375, 810.28125)\"><g class=\"label\" data-id=\"L_E_F_0\" transform=\"translate(-9.5078125, -11.25)\"><foreignObject width=\"19.015625\" height=\"22.5\"><div xmlns=\"http:\/\/www.w3.org\/1999\/xhtml\" class=\"labelBkg\" style=\"display: table-cell; white-space: nowrap; line-height: 1.5; max-width: 200px; text-align: center;\"><span class=\"edgeLabel\"><p>No<\/p><\/span><\/div><\/foreignObject><\/g><\/g><g class=\"edgeLabel\" transform=\"translate(346.22265625, 685.28125)\"><g class=\"label\" data-id=\"L_E_G_0\" transform=\"translate(-6.203125, -11.25)\"><foreignObject width=\"12.40625\" height=\"22.5\"><div xmlns=\"http:\/\/www.w3.org\/1999\/xhtml\" class=\"labelBkg\" style=\"display: table-cell; white-space: nowrap; line-height: 1.5; max-width: 200px; text-align: center;\"><span class=\"edgeLabel\"><p>S\u00ed<\/p><\/span><\/div><\/foreignObject><\/g><\/g><g class=\"edgeLabel\"><g class=\"label\" data-id=\"L_G_H_0\" transform=\"translate(0, 0)\"><foreignObject width=\"0\" height=\"0\"><div xmlns=\"http:\/\/www.w3.org\/1999\/xhtml\" class=\"labelBkg\" style=\"display: table-cell; white-space: nowrap; line-height: 1.5; max-width: 200px; text-align: center;\"><span class=\"edgeLabel\"><\/span><\/div><\/foreignObject><\/g><\/g><g class=\"edgeLabel\" transform=\"translate(207.44211, 1114.97366)\"><g class=\"label\" data-id=\"L_H_F_0\" transform=\"translate(-6.203125, -11.25)\"><foreignObject width=\"12.40625\" height=\"22.5\"><div xmlns=\"http:\/\/www.w3.org\/1999\/xhtml\" class=\"labelBkg\" style=\"display: table-cell; white-space: nowrap; line-height: 1.5; max-width: 200px; text-align: center;\"><span class=\"edgeLabel\"><p>S\u00ed<\/p><\/span><\/div><\/foreignObject><\/g><\/g><g class=\"edgeLabel\" transform=\"translate(328.0281, 1115.39307)\"><g class=\"label\" data-id=\"L_H_I_0\" transform=\"translate(-9.5078125, -11.25)\"><foreignObject width=\"19.015625\" height=\"22.5\"><div xmlns=\"http:\/\/www.w3.org\/1999\/xhtml\" class=\"labelBkg\" style=\"display: table-cell; white-space: nowrap; line-height: 1.5; max-width: 200px; text-align: center;\"><span class=\"edgeLabel\"><p>No<\/p><\/span><\/div><\/foreignObject><\/g><\/g><g class=\"edgeLabel\"><g class=\"label\" data-id=\"L_I_G_0\" transform=\"translate(0, 0)\"><foreignObject width=\"0\" height=\"0\"><div xmlns=\"http:\/\/www.w3.org\/1999\/xhtml\" class=\"labelBkg\" style=\"display: table-cell; white-space: nowrap; line-height: 1.5; max-width: 200px; text-align: center;\"><span class=\"edgeLabel\"><\/span><\/div><\/foreignObject><\/g><\/g><g class=\"edgeLabel\"><g class=\"label\" data-id=\"L_F_J_0\" transform=\"translate(0, 0)\"><foreignObject width=\"0\" height=\"0\"><div xmlns=\"http:\/\/www.w3.org\/1999\/xhtml\" class=\"labelBkg\" style=\"display: table-cell; white-space: nowrap; line-height: 1.5; max-width: 200px; text-align: center;\"><span class=\"edgeLabel\"><\/span><\/div><\/foreignObject><\/g><\/g><\/g><g class=\"nodes\"><g class=\"node default\" id=\"flowchart-A-0\" transform=\"translate(268.4296875, 45.5)\"><rect class=\"basic label-container\" style=\"\" x=\"-130\" y=\"-37.5\" width=\"260\" height=\"75\"><\/rect><g class=\"label\" style=\"\" transform=\"translate(-100, -22.5)\"><rect><\/rect><foreignObject width=\"200\" height=\"45\"><div xmlns=\"http:\/\/www.w3.org\/1999\/xhtml\" style=\"display: table; white-space: break-spaces; line-height: 1.5; max-width: 200px; text-align: center; width: 200px;\"><span class=\"nodeLabel\"><p>Necesidad de informaci\u00f3n o decisi\u00f3n<\/p><\/span><\/div><\/foreignObject><\/g><\/g><g class=\"node default\" id=\"flowchart-B-1\" transform=\"translate(268.4296875, 159.25)\"><rect class=\"basic label-container\" style=\"\" x=\"-115.578125\" y=\"-26.25\" width=\"231.15625\" height=\"52.5\"><\/rect><g class=\"label\" style=\"\" transform=\"translate(-85.578125, -11.25)\"><rect><\/rect><foreignObject width=\"171.15625\" height=\"22.5\"><div xmlns=\"http:\/\/www.w3.org\/1999\/xhtml\" style=\"display: table-cell; white-space: nowrap; line-height: 1.5; max-width: 200px; text-align: center;\"><span class=\"nodeLabel\"><p>Definir p\u00fablico y objetivo<\/p><\/span><\/div><\/foreignObject><\/g><\/g><g class=\"node default\" id=\"flowchart-C-3\" transform=\"translate(268.4296875, 261.75)\"><rect class=\"basic label-container\" style=\"\" x=\"-111.2265625\" y=\"-26.25\" width=\"222.453125\" height=\"52.5\"><\/rect><g class=\"label\" style=\"\" transform=\"translate(-81.2265625, -11.25)\"><rect><\/rect><foreignObject width=\"162.453125\" height=\"22.5\"><div xmlns=\"http:\/\/www.w3.org\/1999\/xhtml\" style=\"display: table-cell; white-space: nowrap; line-height: 1.5; max-width: 200px; text-align: center;\"><span class=\"nodeLabel\"><p>Elegir contenido y canal<\/p><\/span><\/div><\/foreignObject><\/g><\/g><g class=\"node default\" id=\"flowchart-D-5\" transform=\"translate(268.4296875, 375.5)\"><rect class=\"basic label-container\" style=\"\" x=\"-130\" y=\"-37.5\" width=\"260\" height=\"75\"><\/rect><g class=\"label\" style=\"\" transform=\"translate(-100, -22.5)\"><rect><\/rect><foreignObject width=\"200\" height=\"45\"><div xmlns=\"http:\/\/www.w3.org\/1999\/xhtml\" style=\"display: table; white-space: break-spaces; line-height: 1.5; max-width: 200px; text-align: center; width: 200px;\"><span class=\"nodeLabel\"><p>Transmitir o realizar interacci\u00f3n<\/p><\/span><\/div><\/foreignObject><\/g><\/g><g class=\"node default\" id=\"flowchart-E-7\" transform=\"translate(268.4296875, 556.015625)\"><polygon points=\"93.015625,0 186.03125,-93.015625 93.015625,-186.03125 0,-93.015625\" class=\"label-container\" transform=\"translate(-92.515625, 93.015625)\"><\/polygon><g class=\"label\" style=\"\" transform=\"translate(-66.765625, -11.25)\"><rect><\/rect><foreignObject width=\"133.53125\" height=\"22.5\"><div xmlns=\"http:\/\/www.w3.org\/1999\/xhtml\" style=\"display: table-cell; white-space: nowrap; line-height: 1.5; max-width: 200px; text-align: center;\"><span class=\"nodeLabel\"><p>\u00bfSe espera retorno?<\/p><\/span><\/div><\/foreignObject><\/g><\/g><g class=\"node default\" id=\"flowchart-F-9\" transform=\"translate(125.9453125, 1186.453125)\"><rect class=\"basic label-container\" style=\"\" x=\"-94.9453125\" y=\"-26.25\" width=\"189.890625\" height=\"52.5\"><\/rect><g class=\"label\" style=\"\" transform=\"translate(-64.9453125, -11.25)\"><rect><\/rect><foreignObject width=\"129.890625\" height=\"22.5\"><div xmlns=\"http:\/\/www.w3.org\/1999\/xhtml\" style=\"display: table-cell; white-space: nowrap; line-height: 1.5; max-width: 200px; text-align: center;\"><span class=\"nodeLabel\"><p>Registrar evidencia<\/p><\/span><\/div><\/foreignObject><\/g><\/g><g class=\"node default\" id=\"flowchart-G-11\" transform=\"translate(346.22265625, 747.78125)\"><rect class=\"basic label-container\" style=\"\" x=\"-89.078125\" y=\"-26.25\" width=\"178.15625\" height=\"52.5\"><\/rect><g class=\"label\" style=\"\" transform=\"translate(-59.078125, -11.25)\"><rect><\/rect><foreignObject width=\"118.15625\" height=\"22.5\"><div xmlns=\"http:\/\/www.w3.org\/1999\/xhtml\" style=\"display: table-cell; white-space: nowrap; line-height: 1.5; max-width: 200px; text-align: center;\"><span class=\"nodeLabel\"><p>Recibir respuesta<\/p><\/span><\/div><\/foreignObject><\/g><\/g><g class=\"node default\" id=\"flowchart-H-13\" transform=\"translate(268.4296875, 967.1171875)\"><polygon points=\"120.5859375,0 241.171875,-120.5859375 120.5859375,-241.171875 0,-120.5859375\" class=\"label-container\" transform=\"translate(-120.0859375, 120.5859375)\"><\/polygon><g class=\"label\" style=\"\" transform=\"translate(-94.3359375, -11.25)\"><rect><\/rect><foreignObject width=\"188.671875\" height=\"22.5\"><div xmlns=\"http:\/\/www.w3.org\/1999\/xhtml\" style=\"display: table-cell; white-space: nowrap; line-height: 1.5; max-width: 200px; text-align: center;\"><span class=\"nodeLabel\"><p>\u00bfLa respuesta es suficiente?<\/p><\/span><\/div><\/foreignObject><\/g><\/g><g class=\"node default\" id=\"flowchart-I-17\" transform=\"translate(409.26171875, 1186.453125)\"><rect class=\"basic label-container\" style=\"\" x=\"-86.328125\" y=\"-26.25\" width=\"172.65625\" height=\"52.5\"><\/rect><g class=\"label\" style=\"\" transform=\"translate(-56.328125, -11.25)\"><rect><\/rect><foreignObject width=\"112.65625\" height=\"22.5\"><div xmlns=\"http:\/\/www.w3.org\/1999\/xhtml\" style=\"display: table-cell; white-space: nowrap; line-height: 1.5; max-width: 200px; text-align: center;\"><span class=\"nodeLabel\"><p>Aclarar o escalar<\/p><\/span><\/div><\/foreignObject><\/g><\/g><g class=\"node default\" id=\"flowchart-J-21\" transform=\"translate(125.9453125, 1288.953125)\"><rect class=\"basic label-container\" style=\"\" x=\"-117.9453125\" y=\"-26.25\" width=\"235.890625\" height=\"52.5\"><\/rect><g class=\"label\" style=\"\" transform=\"translate(-87.9453125, -11.25)\"><rect><\/rect><foreignObject width=\"175.890625\" height=\"22.5\"><div xmlns=\"http:\/\/www.w3.org\/1999\/xhtml\" style=\"display: table-cell; white-space: nowrap; line-height: 1.5; max-width: 200px; text-align: center;\"><span class=\"nodeLabel\"><p>Actualizar proyecto y plan<\/p><\/span><\/div><\/foreignObject><\/g><\/g><\/g><\/g><\/g><\/svg><figcaption>Flujo de comunicaci\u00f3n orientado a decisiones en proyectos de ingenier\u00eda<\/figcaption><\/figure>\n\n\n\n<h2 class=\"wp-block-heading\">C\u00f3mo definir frecuencia y disparadores<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">La frecuencia fija es \u00fatil para cadencias de gobernanza, pero no cubre eventos cr\u00edticos.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Ejemplos de cadencia:<\/p>\n\n\n\n<ul class=\"wp-block-list\"><li>reuni\u00f3n semanal de coordinaci\u00f3n;<\/li><li>informe ejecutivo mensual;<\/li><li>revisi\u00f3n quincenal de riesgos;<\/li><li>reuni\u00f3n diaria durante una intervenci\u00f3n cr\u00edtica.<\/li><\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">Ejemplos de disparadores:<\/p>\n\n\n\n<ul class=\"wp-block-list\"><li>cambio de alcance;<\/li><li>ocurrencia de riesgo;<\/li><li>retraso por encima del l\u00edmite;<\/li><li>rechazo de documento;<\/li><li>necesidad de decisi\u00f3n ejecutiva;<\/li><li>preparaci\u00f3n de FAT\/SAT;<\/li><li>entrada de proveedor;<\/li><li>cambio de requisito;<\/li><li>desviaci\u00f3n de costo;<\/li><li>proximidad de hito de energizaci\u00f3n;<\/li><li>inicio de operaci\u00f3n asistida.<\/li><\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">La comunicaci\u00f3n por evento evita esperar el pr\u00f3ximo informe para tratar un asunto que ya exige acci\u00f3n.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">C\u00f3mo definir plazos de respuesta<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Muchas fallas de comunicaci\u00f3n son, en realidad, fallas de tiempo de respuesta. Enviar informaci\u00f3n sin plazo vuelve el retorno opcional o imprevisible.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">El plazo debe considerar:<\/p>\n\n\n\n<ul class=\"wp-block-list\"><li>criticidad de la decisi\u00f3n;<\/li><li>tiempo disponible en el cronograma;<\/li><li>complejidad del an\u00e1lisis;<\/li><li>obligaciones contractuales;<\/li><li>dependencias de otras \u00e1reas;<\/li><li>disponibilidad del stakeholder;<\/li><li>necesidad de rean\u00e1lisis despu\u00e9s de comentarios.<\/li><\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">Para decisiones cr\u00edticas, el cronograma debe incluir la actividad y duraci\u00f3n de aprobaci\u00f3n, no solamente una observaci\u00f3n en el plan de comunicaci\u00f3n.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">C\u00f3mo definir la responsabilidad por la comunicaci\u00f3n<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Cada comunicaci\u00f3n necesita un responsable. El responsable no es necesariamente quien aparece en el campo \u201cDe\u201d. Debe garantizar que contenido, momento, canal y retorno sean adecuados.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">La <a href=\"https:\/\/a3aengenharia.com.br\/conteudo\/artigos-tecnicos\/matriz-raci-projetos-engenharia\/\">Matriz RACI<\/a> puede complementar el plan para diferenciar qui\u00e9n prepara, aprueba, es consultado y recibe informaci\u00f3n.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Ejemplo:<\/p>\n\n\n\n<figure class=\"wp-block-table\"><table><tbody><tr><td>Comunicaci\u00f3n<\/td><td>Prepara<\/td><td>Aprueba<\/td><td>Recibe<\/td><td>Retorno esperado<\/td><\/tr><tr><td>Informe ejecutivo<\/td><td>Project Controls<\/td><td>Gerente del proyecto<\/td><td>Patrocinador<\/td><td>decisi\u00f3n sobre excepciones<\/td><\/tr><tr><td>Revisi\u00f3n de proyecto<\/td><td>Proyectista<\/td><td>L\u00edder de disciplina<\/td><td>Owner\u2019s Engineering<\/td><td>comentarios y aceptaci\u00f3n t\u00e9cnica<\/td><\/tr><tr><td>Aviso de intervenci\u00f3n<\/td><td>Planificaci\u00f3n<\/td><td>Operaci\u00f3n<\/td><td>usuarios afectados<\/td><td>conocimiento y contingencia<\/td><\/tr><tr><td>Solicitud contractual<\/td><td>Gestor contractual<\/td><td>Gerente autorizado<\/td><td>contratista<\/td><td>respuesta formal<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<h2 class=\"wp-block-heading\">C\u00f3mo planificar comunicaci\u00f3n ejecutiva<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">La comunicaci\u00f3n ejecutiva debe permitir una decisi\u00f3n r\u00e1pida sin perder integridad.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Un buen reporte ejecutivo normalmente destaca:<\/p>\n\n\n\n<ul class=\"wp-block-list\"><li>situaci\u00f3n general;<\/li><li>tendencia;<\/li><li>principales desviaciones;<\/li><li>riesgos emergentes;<\/li><li>decisiones pendientes;<\/li><li>impactos de plazo y costo;<\/li><li>alternativas;<\/li><li>recomendaci\u00f3n;<\/li><li>acci\u00f3n requerida y fecha l\u00edmite.<\/li><\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">El error es transformar una presentaci\u00f3n ejecutiva en resumen de todas las actividades. El liderazgo necesita entender d\u00f3nde actuar.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">C\u00f3mo planificar comunicaci\u00f3n t\u00e9cnica<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">La comunicaci\u00f3n t\u00e9cnica necesita preservar contexto y trazabilidad. Una decisi\u00f3n aislada en un correo puede ser imposible de interpretar meses despu\u00e9s.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Elementos importantes incluyen:<\/p>\n\n\n\n<ul class=\"wp-block-list\"><li>identificaci\u00f3n del documento o requisito;<\/li><li>revisi\u00f3n aplicable;<\/li><li>premisas;<\/li><li>base t\u00e9cnica;<\/li><li>interfaces afectadas;<\/li><li>comentarios;<\/li><li>decisi\u00f3n;<\/li><li>responsable;<\/li><li>fecha de vigencia;<\/li><li>impacto en otros documentos.<\/li><\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">Cuando existe fuerte dependencia entre disciplinas, el plan debe conectarse con la <a href=\"https:\/\/a3aengenharia.com.br\/conteudo\/artigos-tecnicos\/gestao-interfaces-projetos-engenharia-matriz-icd-responsabilidades-mudancas\/\">gesti\u00f3n de interfaces en proyectos<\/a>.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">C\u00f3mo planificar comunicaci\u00f3n contractual<\/h2>\n\n\n\n<div class=\"wp-block-a3a-destaque\">\n<p class=\"wp-block-paragraph\">La comunicaci\u00f3n t\u00e9cnica y la comunicaci\u00f3n contractual pueden coexistir, pero no deben confundirse. La colaboraci\u00f3n no elimina forma, plazo, autoridad y evidencia exigidos por el contrato.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><a href=\"https:\/\/a3aengenharia.com.br\/solucoes\/gestao-e-governanca-de-engenharia\/gestao-contratos-escopo-entregaveis\/\">Conozca la gesti\u00f3n de contratos, alcance y entregables<\/a><\/p>\n<\/div>\n\n\n\n<p class=\"wp-block-paragraph\">La comunicaci\u00f3n contractual debe respetar forma, destinatario, plazo y autoridad previstos en el contrato. Las reuniones colaborativas no sustituyen las notificaciones formales cuando son exigidas.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">El plan debe distinguir:<\/p>\n\n\n\n<ul class=\"wp-block-list\"><li>comunicaci\u00f3n t\u00e9cnica de rutina;<\/li><li>submittals y aprobaciones;<\/li><li>solicitudes de aclaraci\u00f3n;<\/li><li>notificaciones;<\/li><li>cambios autorizados;<\/li><li>registros de retraso;<\/li><li>reclamos;<\/li><li>aceptaci\u00f3n y cierre.<\/li><\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">Esta separaci\u00f3n protege la trazabilidad y reduce conflictos entre colaboraci\u00f3n t\u00e9cnica y obligaciones formales.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">C\u00f3mo integrar comunicaci\u00f3n con gesti\u00f3n documental<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Los documentos necesitan una fuente oficial. Si el proyecto distribuye archivos por correo, carpeta local y aplicaci\u00f3n de mensajer\u00eda sin control, la comunicaci\u00f3n puede multiplicar versiones conflictivas.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Un ambiente controlado debe definir:<\/p>\n\n\n\n<ul class=\"wp-block-list\"><li>repositorio oficial;<\/li><li>convenci\u00f3n de nombres;<\/li><li>estado y revisi\u00f3n;<\/li><li>permisos;<\/li><li>flujo de comentarios;<\/li><li>aprobaci\u00f3n;<\/li><li>distribuci\u00f3n;<\/li><li>retenci\u00f3n e historial.<\/li><\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">La comunicaci\u00f3n informa que algo ocurri\u00f3; el sistema documental preserva qu\u00e9 contenido era v\u00e1lido.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">C\u00f3mo integrar comunicaci\u00f3n con requisitos<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Los requisitos surgen de stakeholders y decisiones. El plan debe garantizar que consultas y aprobaciones ocurran antes de congelamientos del proyecto.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Al trabajar con <a href=\"https:\/\/a3aengenharia.com.br\/conteudo\/artigos-tecnicos\/gestao-requisitos-engenharia-definicao-rastreabilidade-mudancas-aceite\/\">gesti\u00f3n de requisitos en ingenier\u00eda<\/a>, las comunicaciones necesitan asegurar que:<\/p>\n\n\n\n<ul class=\"wp-block-list\"><li>el origen del requisito sea conocido;<\/li><li>la duda tenga un responsable;<\/li><li>el cambio sea formalizado;<\/li><li>el impacto sea evaluado;<\/li><li>la aceptaci\u00f3n sea registrada;<\/li><li>las versiones anteriores no sigan circulando.<\/li><\/ul>\n\n\n\n<h2 class=\"wp-block-heading\">C\u00f3mo integrar comunicaci\u00f3n con riesgos e issues<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Un riesgo que no llega al decisor dentro de la ventana adecuada es un riesgo mal gestionado. El <a href=\"https:\/\/a3aengenharia.com.br\/conteudo\/artigos-tecnicos\/registro-riscos-risk-register-projetos-engenharia\/\">registro de riesgos<\/a> debe tener criterios de escalamiento y comunicaci\u00f3n.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Del mismo modo, los issues necesitan:<\/p>\n\n\n\n<ul class=\"wp-block-list\"><li>responsable;<\/li><li>prioridad;<\/li><li>decisi\u00f3n requerida;<\/li><li>plazo;<\/li><li>escalamiento;<\/li><li>evidencia de cierre.<\/li><\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">El plan de comunicaci\u00f3n proporciona los canales y ritos para que riesgo e issue no queden atrapados en silos.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">C\u00f3mo tratar informaci\u00f3n sensible<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">No toda informaci\u00f3n debe circular para todos los stakeholders. El plan necesita establecer clasificaci\u00f3n y necesidad de conocimiento.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Ejemplos incluyen:<\/p>\n\n\n\n<ul class=\"wp-block-list\"><li>informaci\u00f3n comercial;<\/li><li>evaluaci\u00f3n de proveedores;<\/li><li>vulnerabilidades de seguridad;<\/li><li>datos personales;<\/li><li>riesgos a\u00fan en investigaci\u00f3n;<\/li><li>propuestas y negociaciones;<\/li><li>documentaci\u00f3n controlada por contrato.<\/li><\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">Transparencia no significa exposici\u00f3n indiscriminada. Significa proporcionar informaci\u00f3n adecuada a las partes leg\u00edtimas, con trazabilidad y protecci\u00f3n compatible.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">C\u00f3mo medir la eficacia de la comunicaci\u00f3n<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">La cantidad de reuniones y correos es una medida de actividad, no de eficacia.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Indicadores m\u00e1s \u00fatiles incluyen:<\/p>\n\n\n\n<ul class=\"wp-block-list\"><li>decisiones tomadas en plazo;<\/li><li>porcentaje de solicitudes respondidas dentro del SLA;<\/li><li>comentarios cerrados en el ciclo previsto;<\/li><li>retrabajo por informaci\u00f3n incorrecta;<\/li><li>cambios tard\u00edos por requisito no comunicado;<\/li><li>pendientes de aprobaci\u00f3n;<\/li><li>acciones vencidas;<\/li><li>reincidencia de dudas;<\/li><li>tiempo promedio de escalamiento;<\/li><li>comprensi\u00f3n confirmada en encuestas o entrevistas;<\/li><li>reducci\u00f3n de conflictos por alineaci\u00f3n anticipada.<\/li><\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">El indicador debe reflejar el resultado esperado de aquella comunicaci\u00f3n.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">C\u00f3mo revisar el plan de comunicaci\u00f3n<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">El plan es un artefacto vivo. Debe revisarse cuando:<\/p>\n\n\n\n<ul class=\"wp-block-list\"><li>entra un nuevo stakeholder;<\/li><li>cambia la estructura de gobernanza;<\/li><li>surge un proveedor cr\u00edtico;<\/li><li>el proyecto cambia de fase;<\/li><li>cambian el alcance o la estrategia de ejecuci\u00f3n;<\/li><li>aumentan conflictos o retrasos de decisi\u00f3n;<\/li><li>el canal actual se muestra ineficaz;<\/li><li>cambian requisitos regulatorios;<\/li><li>se aproxima comisionamiento o aceptaci\u00f3n;<\/li><li>ocurre reorganizaci\u00f3n del cliente o del equipo.<\/li><\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">La revisi\u00f3n puede ser simple: agregar p\u00fablico, alterar frecuencia, cambiar canal, redefinir responsable o crear un nuevo disparador.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Ejemplo de plan de comunicaci\u00f3n en una modernizaci\u00f3n industrial<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Considere una modernizaci\u00f3n en una instalaci\u00f3n operacional.<\/p>\n\n\n\n<figure class=\"wp-block-table\"><table><tbody><tr><td>P\u00fablico<\/td><td>Objetivo<\/td><td>Comunicaci\u00f3n<\/td><td>Momento<\/td><td>Responsable<\/td><td>Retorno<\/td><\/tr><tr><td>Patrocinador<\/td><td>Decidir excepciones<\/td><td>Informe ejecutivo + reuni\u00f3n<\/td><td>Mensual y por disparador<\/td><td>Gerente del proyecto<\/td><td>decisi\u00f3n registrada<\/td><\/tr><tr><td>Operaci\u00f3n<\/td><td>Validar impacto<\/td><td>Workshop t\u00e9cnico<\/td><td>antes del congelamiento<\/td><td>L\u00edder de ingenier\u00eda<\/td><td>requisitos cerrados<\/td><\/tr><tr><td>Mantenimiento<\/td><td>Validar mantenibilidad<\/td><td>Revisi\u00f3n de proyecto<\/td><td>hitos de dise\u00f1o<\/td><td>Coordinador<\/td><td>comentarios cerrados<\/td><\/tr><tr><td>Proveedor<\/td><td>Coordinar datos<\/td><td>Submittal controlado<\/td><td>seg\u00fan fecha de necesidad<\/td><td>Procurement\/Ingenier\u00eda<\/td><td>documento aprobado<\/td><\/tr><tr><td>Concesionaria<\/td><td>Obtener autorizaci\u00f3n<\/td><td>Protocolo formal<\/td><td>antes del hito<\/td><td>Responsable de interfaz<\/td><td>autorizaci\u00f3n<\/td><\/tr><tr><td>Contratista<\/td><td>Coordinar ejecuci\u00f3n<\/td><td>Reuni\u00f3n + sistema<\/td><td>semanal<\/td><td>Supervisi\u00f3n<\/td><td>acciones y plazos<\/td><\/tr><tr><td>Usuarios afectados<\/td><td>Preparar indisponibilidad<\/td><td>Aviso dirigido<\/td><td>antes de la intervenci\u00f3n<\/td><td>Operaci\u00f3n<\/td><td>conocimiento<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p class=\"wp-block-paragraph\">El plan transforma diferentes necesidades en un sistema coherente. No existe un \u00fanico mensaje o canal capaz de atender a todos estos p\u00fablicos.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Errores comunes al elaborar el plan<\/h2>\n\n\n\n<h3 class=\"wp-block-heading\">Copiar un modelo de otro proyecto<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Un template ayuda en la estructura, pero stakeholders, canales, contratos y decisiones son espec\u00edficos.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Definir solo frecuencia<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">\u201cSemanal\u201d no explica objetivo, contenido, responsable o retorno.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Usar reuniones para todo<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Las reuniones consumen tiempo y no siempre generan un mejor resultado. \u00daselas cuando la interacci\u00f3n sea necesaria.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Usar correo para todo<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">El correo no sustituye workflow, control documental, decisi\u00f3n formal o gesti\u00f3n de issues.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Comunicar sin pedir respuesta<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Si existe una acci\u00f3n esperada, debe estar expl\u00edcita con responsable y plazo.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">No distinguir comunicaci\u00f3n t\u00e9cnica de contractual<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Esto puede generar compromisos informales y disputas sobre validez.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">No medir eficacia<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Sin indicador o feedback, el equipo sabe que envi\u00f3, pero no sabe si la comunicaci\u00f3n funcion\u00f3.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Checklist para un plan de comunicaci\u00f3n robusto<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Antes de aprobar el plan, verifique si:<\/p>\n\n\n\n<ul class=\"wp-block-list\"><li>los stakeholders prioritarios fueron identificados;<\/li><li>cada comunicaci\u00f3n posee un objetivo claro;<\/li><li>existe segmentaci\u00f3n de p\u00fablicos;<\/li><li>el nivel de detalle es adecuado;<\/li><li>canal y frecuencia tienen sentido;<\/li><li>los disparadores cr\u00edticos est\u00e1n definidos;<\/li><li>las responsabilidades son claras;<\/li><li>hay plazo cuando se necesita retorno;<\/li><li>las comunicaciones contractuales respetan el contrato;<\/li><li>la informaci\u00f3n sensible posee clasificaci\u00f3n;<\/li><li>existe un lugar oficial de registro;<\/li><li>el plan est\u00e1 conectado con el cronograma;<\/li><li>la comunicaci\u00f3n de riesgos y cambios est\u00e1 prevista;<\/li><li>operaci\u00f3n y mantenimiento participan antes de la aceptaci\u00f3n;<\/li><li>la eficacia ser\u00e1 monitoreada;<\/li><li>existen disparadores para revisar el propio plan.<\/li><\/ul>\n\n\n\n<h2 class=\"wp-block-heading\">Plan de comunicaci\u00f3n e Ingenier\u00eda Consultiva<\/h2>\n\n\n\n<div class=\"wp-block-a3a-destaque\">\n<p class=\"wp-block-paragraph\">La Ingenier\u00eda Consultiva agrega valor cuando transforma comunicaci\u00f3n dispersa en gobernanza operacional: ritos, dashboards, workflows, escalamiento y decisiones trazables.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><a href=\"https:\/\/a3aengenharia.com.br\/servicos\/implementacao\/gerenciamento-de-projetos\/\">Conozca la Gesti\u00f3n de Proyectos de Ingenier\u00eda<\/a><\/p>\n<\/div>\n\n\n\n<p class=\"wp-block-paragraph\">En proyectos complejos, la dificultad no est\u00e1 en completar una planilla, sino en dise\u00f1ar un sistema de comunicaci\u00f3n coherente con gobernanza, interfaces, contratos y decisiones.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">En la <a href=\"https:\/\/a3aengenharia.com.br\/servicos\/implementacao\/gerenciamento-de-projetos\/\">Gesti\u00f3n de Proyectos de Ingenier\u00eda<\/a>, la Ingenier\u00eda Consultiva puede estructurar ritos, informes, dashboards, workflows, matriz de comunicaci\u00f3n, reglas de escalamiento y mecanismos de decisi\u00f3n. El objetivo es reducir ruido y garantizar que la informaci\u00f3n relevante llegue a la parte adecuada antes de transformarse en retraso o retrabajo.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">En la <a href=\"https:\/\/a3aengenharia.com.br\/servicos\/contratacao-integrada\/engenharia-do-proprietario\/\">Ingenier\u00eda del Propietario<\/a>, esta disciplina ayuda a integrar propietario, proyectistas, proveedores, contratistas, supervisi\u00f3n y operaci\u00f3n, preservando al mismo tiempo los l\u00edmites de autoridad y los canales contractuales.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Consideraciones finales<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">El plan de comunicaci\u00f3n en proyectos no es un calendario de reuniones. Es un mecanismo de gobernanza para definir informaci\u00f3n, prop\u00f3sito, p\u00fablico, canal, responsabilidad, momento, retorno y registro.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Su eficacia depende de tres condiciones: conocer a los stakeholders y sus necesidades; conectar la comunicaci\u00f3n con las decisiones y entregables reales del proyecto; y revisar el plan conforme cambia el contexto.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Cuando estas condiciones se cumplen, la comunicaci\u00f3n deja de ser una actividad administrativa y pasa a reducir incertidumbre, acelerar decisiones, preservar trazabilidad y mejorar la coordinaci\u00f3n entre ingenier\u00eda, contratos, proveedores, operaci\u00f3n y gobernanza.<\/p>\n\n\n\n<details class=\"wp-block-details is-layout-flow wp-block-details-is-layout-flow\"><summary>Referencias t\u00e9cnicas<\/summary>\n<p class=\"wp-block-paragraph\">[1] INTERNATIONAL ORGANIZATION FOR STANDARDIZATION. ISO 21502:2020 \u2014 Project, programme and portfolio management \u2014 Guidance on project management. Geneva: ISO, 2020. Disponible en: <a href=\"https:\/\/www.iso.org\/standard\/74947.html\">https:\/\/www.iso.org\/standard\/74947.html<\/a><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">[2] PROJECT MANAGEMENT INSTITUTE. A Guide to the Project Management Body of Knowledge (PMBOK\u00ae Guide). 8. ed. Newtown Square: PMI, 2025. Disponible en: <a href=\"https:\/\/www.pmi.org\/standards\/pmbok\">https:\/\/www.pmi.org\/standards\/pmbok<\/a><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">[3] PROJECT MANAGEMENT INSTITUTE. Managing communications effectively and efficiently. Newtown Square: PMI. Disponible en: <a href=\"https:\/\/www.pmi.org\/learning\/library\/managing-communications-effectively-efficiently-5916\">https:\/\/www.pmi.org\/learning\/library\/managing-communications-effectively-efficiently-5916<\/a><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">[4] PROJECT MANAGEMENT INSTITUTE. Communication works for those who work at it. Newtown Square: PMI. Disponible en: <a href=\"https:\/\/www.pmi.org\/learning\/library\/techniques-communicate-project-stakeholders-na-7238\">https:\/\/www.pmi.org\/learning\/library\/techniques-communicate-project-stakeholders-na-7238<\/a><\/p>\n<\/details>\n\n\n\n<details class=\"wp-block-details is-layout-flow wp-block-details-is-layout-flow\"><summary>Preguntas frecuentes<\/summary>\n<div class=\"schema-faq wp-block-yoast-faq-block\"><div class=\"schema-faq-section\" id=\"faq-question-o-que-um-plano-de-comunica-o-em-projetos-d53c1b42\"><strong class=\"schema-faq-question\">\u00bfQu\u00e9 es un plan de comunicaci\u00f3n en proyectos?<\/strong> <p class=\"schema-faq-answer\">Es el instrumento que define p\u00fablicos, objetivos, informaci\u00f3n, canales, frecuencia o disparadores, responsables, plazos, retorno esperado, clasificaci\u00f3n y registro de las comunicaciones necesarias para el proyecto.<\/p><\/div><div class=\"schema-faq-section\" id=\"faq-question-o-que-deve-conter-um-plano-de-comunica-o-d87c1ba9\"><strong class=\"schema-faq-question\">\u00bfQu\u00e9 debe contener un plan de comunicaci\u00f3n?<\/strong> <p class=\"schema-faq-answer\">Debe contener al menos stakeholder o p\u00fablico, objetivo, contenido, nivel de detalle, emisor, destinatario, canal, frecuencia o disparador, plazo de respuesta, clasificaci\u00f3n, registro y medida de eficacia.<\/p><\/div><div class=\"schema-faq-section\" id=\"faq-question-plano-de-comunica-o-a-mesma-coisa-que-plano-de-s-63e49da0\"><strong class=\"schema-faq-question\">\u00bfEl plan de comunicaci\u00f3n es lo mismo que el plan de stakeholders?<\/strong> <p class=\"schema-faq-answer\">No. La gesti\u00f3n de stakeholders define qui\u00e9n necesita involucrarse y en qu\u00e9 nivel. El plan de comunicaci\u00f3n detalla c\u00f3mo ocurrir\u00e1n la informaci\u00f3n y la interacci\u00f3n para apoyar ese involucramiento y las decisiones del proyecto.<\/p><\/div><div class=\"schema-faq-section\" id=\"faq-question-como-escolher-o-canal-de-comunica-o-de-um-projet-76068e8e\"><strong class=\"schema-faq-question\">\u00bfC\u00f3mo elegir el canal de comunicaci\u00f3n de un proyecto?<\/strong> <p class=\"schema-faq-answer\">El canal debe reflejar objetivo, complejidad, criticidad, necesidad de interacci\u00f3n y exigencia de evidencia. Las decisiones complejas pueden exigir reuni\u00f3n; las aprobaciones y documentos necesitan workflow; las alertas cr\u00edticas exigen canal inmediato.<\/p><\/div><div class=\"schema-faq-section\" id=\"faq-question-qual-a-diferen-a-entre-comunica-o-s-ncrona-e-ass-7ae16dd6\"><strong class=\"schema-faq-question\">\u00bfCu\u00e1l es la diferencia entre comunicaci\u00f3n s\u00edncrona y as\u00edncrona?<\/strong> <p class=\"schema-faq-answer\">La s\u00edncrona ocurre en tiempo real y es \u00fatil para discusi\u00f3n y negociaci\u00f3n. La as\u00edncrona permite an\u00e1lisis y trazabilidad y es adecuada para documentos, informes, dashboards y comentarios controlados.<\/p><\/div><div class=\"schema-faq-section\" id=\"faq-question-como-medir-a-efic-cia-do-plano-de-comunica-o-a1b4913d\"><strong class=\"schema-faq-question\">\u00bfC\u00f3mo medir la eficacia del plan de comunicaci\u00f3n?<\/strong> <p class=\"schema-faq-answer\">Use resultados como decisiones en plazo, respuestas dentro del SLA, reducci\u00f3n de retrabajo, cierre de comentarios, disminuci\u00f3n de dudas recurrentes y alineaci\u00f3n entre la comunicaci\u00f3n realizada y la acci\u00f3n esperada.<\/p><\/div><div class=\"schema-faq-section\" id=\"faq-question-com-que-frequ-ncia-o-plano-de-comunica-o-deve-se-7282be4b\"><strong class=\"schema-faq-question\">\u00bfCon qu\u00e9 frecuencia debe actualizarse el plan de comunicaci\u00f3n?<\/strong> <p class=\"schema-faq-answer\">Siempre que haya un cambio relevante de stakeholders, fase, gobernanza, contratos, proveedores, alcance, riesgos o canales. Los proyectos din\u00e1micos pueden exigir revisi\u00f3n en cada ciclo gerencial.<\/p><\/div><div class=\"schema-faq-section\" id=\"faq-question-e-mail-pode-ser-o-principal-canal-de-comunica-o--eea5cc53\"><strong class=\"schema-faq-question\">\u00bfEl correo puede ser el principal canal de comunicaci\u00f3n del proyecto?<\/strong> <p class=\"schema-faq-answer\">Puede ser \u00fatil para distribuci\u00f3n y registro, pero no debe sustituir sistemas de gesti\u00f3n documental, workflows, decisiones formales, gesti\u00f3n de issues o canales contractuales cuando esos mecanismos son necesarios.<\/p><\/div><\/div>\n<\/details>\n\n\n\n<details class=\"wp-block-details is-layout-flow wp-block-details-is-layout-flow\"><summary>Materiales t\u00e9cnicos complementarios<\/summary>\n<h4 class=\"wp-block-heading\">Soluciones relacionadas<\/h4>\n\n<ul class=\"wp-block-list\"><li><a href=\"https:\/\/a3aengenharia.com.br\/solucoes\/gestao-e-governanca-de-engenharia\/gestao-processos-workflows-aprovacoes-tecnicas\/\">Gesti\u00f3n de Procesos, Workflows y Aprobaciones T\u00e9cnicas<\/a><\/li><li><a href=\"https:\/\/a3aengenharia.com.br\/solucoes\/gestao-e-governanca-de-engenharia\/gestao-contratos-escopo-entregaveis\/\">Gesti\u00f3n de Contratos, Alcance y Entregables<\/a><\/li><\/ul>\n\n<h4 class=\"wp-block-heading\">Servicios relacionados<\/h4>\n\n<ul class=\"wp-block-list\"><li><a href=\"https:\/\/a3aengenharia.com.br\/servicos\/implementacao\/gerenciamento-de-projetos\/\">Gesti\u00f3n de Proyectos de Ingenier\u00eda<\/a><\/li><li><a href=\"https:\/\/a3aengenharia.com.br\/servicos\/contratacao-integrada\/engenharia-do-proprietario\/\">Ingenier\u00eda del Propietario (Owner\u2019s Engineering)<\/a><\/li><\/ul>\n\n<h4 class=\"wp-block-heading\">Contenidos principales sobre el tema<\/h4>\n\n<ul class=\"wp-block-list\"><li><a href=\"https:\/\/a3aengenharia.com.br\/conteudo\/artigos-tecnicos\/gestao-de-stakeholders\/\">Gesti\u00f3n de stakeholders en proyectos<\/a><\/li><li><a href=\"https:\/\/a3aengenharia.com.br\/conteudo\/artigos-tecnicos\/mapeamento-stakeholders-como-identificar-analisar-mapa\/\">Mapeo de Stakeholders<\/a><\/li><li><a href=\"https:\/\/a3aengenharia.com.br\/conteudo\/artigos-tecnicos\/matriz-raci-projetos-engenharia\/\">Matriz RACI en Proyectos de Ingenier\u00eda<\/a><\/li><\/ul>\n\n<h4 class=\"wp-block-heading\">Contenidos t\u00e9cnicos relacionados<\/h4>\n\n<ul class=\"wp-block-list\"><li><a href=\"https:\/\/a3aengenharia.com.br\/conteudo\/artigos-tecnicos\/gestao-interfaces-projetos-engenharia-matriz-icd-responsabilidades-mudancas\/\">Gesti\u00f3n de Interfaces en Proyectos de Ingenier\u00eda<\/a><\/li><li><a href=\"https:\/\/a3aengenharia.com.br\/conteudo\/artigos-tecnicos\/registro-riscos-risk-register-projetos-engenharia\/\">Registro de Riesgos en Proyectos de Ingenier\u00eda<\/a><\/li><li><a href=\"https:\/\/a3aengenharia.com.br\/conteudo\/artigos-tecnicos\/gestao-requisitos-engenharia-definicao-rastreabilidade-mudancas-aceite\/\">Gesti\u00f3n de Requisitos en Ingenier\u00eda<\/a><\/li><\/ul>\n<\/details>\n","protected":false},"excerpt":{"rendered":"<p>Aprenda a elaborar un plan de comunicaci\u00f3n en proyectos: p\u00fablicos, objetivos, canales, frecuencia, responsabilidades, plazos, feedback y gobernanza.<\/p>\n","protected":false},"author":1,"featured_media":0,"parent":0,"template":"","meta":{"_a3a_global_related_solutions":[],"_a3a_global_related_services":[],"_a3a_global_related_materials":[],"_a3a_post_lang":"es-es","_a3a_translation_group_id":"2bfc9408-12f6-45ad-ad56-b9a683aaab65","_a3a_i18n_canonical_slug":"plan-comunicacion-proyectos-publicos-canales-responsabilidades"},"categories":[],"segments":[],"mercados":[],"etapas":[],"class_list":["post-73273","articles","type-articles","status-publish","hentry"],"_links":{"self":[{"href":"https:\/\/a3aengenharia.com\/es-es\/wp-json\/wp\/v2\/articles\/73273","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/a3aengenharia.com\/es-es\/wp-json\/wp\/v2\/articles"}],"about":[{"href":"https:\/\/a3aengenharia.com\/es-es\/wp-json\/wp\/v2\/types\/articles"}],"author":[{"embeddable":true,"href":"https:\/\/a3aengenharia.com\/es-es\/wp-json\/wp\/v2\/users\/1"}],"version-history":[{"count":2,"href":"https:\/\/a3aengenharia.com\/es-es\/wp-json\/wp\/v2\/articles\/73273\/revisions"}],"predecessor-version":[{"id":73286,"href":"https:\/\/a3aengenharia.com\/es-es\/wp-json\/wp\/v2\/articles\/73273\/revisions\/73286"}],"wp:attachment":[{"href":"https:\/\/a3aengenharia.com\/es-es\/wp-json\/wp\/v2\/media?parent=73273"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/a3aengenharia.com\/es-es\/wp-json\/wp\/v2\/categories?post=73273"},{"taxonomy":"segments","embeddable":true,"href":"https:\/\/a3aengenharia.com\/es-es\/wp-json\/wp\/v2\/segments?post=73273"},{"taxonomy":"mercados","embeddable":true,"href":"https:\/\/a3aengenharia.com\/es-es\/wp-json\/wp\/v2\/mercados?post=73273"},{"taxonomy":"etapas","embeddable":true,"href":"https:\/\/a3aengenharia.com\/es-es\/wp-json\/wp\/v2\/etapas?post=73273"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}