{"id":73216,"date":"2026-08-30T13:53:22","date_gmt":"2026-08-30T16:53:22","guid":{"rendered":"https:\/\/a3aengenharia.com\/?post_type=articles&#038;p=73216"},"modified":"2026-08-30T13:56:19","modified_gmt":"2026-08-30T16:56:19","slug":"articulo-140-ley-14133-recepcion-obras-servicios-ingenieria","status":"publish","type":"articles","link":"https:\/\/a3aengenharia.com\/es-es\/contenido\/articulos-tecnicos\/articulo-140-ley-14133-recepcion-obras-servicios-ingenieria\/","title":{"rendered":"Art\u00edculo 140 de la Ley 14.133: recepci\u00f3n de obras y servicios de ingenier\u00eda"},"content":{"rendered":"\n<p class=\"wp-block-paragraph\">El <strong>art. 140 de la Ley 14.133<\/strong> regula c\u00f3mo la Administraci\u00f3n debe recibir el objeto contratado y, para obras y servicios, establece una secuencia formal de verificaci\u00f3n: recepci\u00f3n provisional por el responsable del seguimiento y fiscalizaci\u00f3n, mediante acta detallada y verificaci\u00f3n de las exigencias de car\u00e1cter t\u00e9cnico; y recepci\u00f3n definitiva por servidor o comisi\u00f3n designada, tambi\u00e9n mediante acta detallada que demuestre el cumplimiento de las exigencias contractuales.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Esta estructura significa que conclusi\u00f3n f\u00edsica, entrega por la contratista, recepci\u00f3n provisional, aceptaci\u00f3n t\u00e9cnica y recepci\u00f3n definitiva no son sin\u00f3nimos. Una obra puede estar materialmente concluida y aun as\u00ed presentar documentaci\u00f3n incompleta, pruebas pendientes, no conformidades, As-Built incompatible con lo ejecutado, garant\u00edas sin trazabilidad o requisitos contractuales no demostrados. En esta condici\u00f3n, la simple comunicaci\u00f3n de que \u201cel servicio termin\u00f3\u201d no sustituye la verificaci\u00f3n que sustenta la recepci\u00f3n.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">El art\u00edculo tambi\u00e9n prev\u00e9 que el objeto puede ser rechazado, total o parcialmente, cuando est\u00e9 en desacuerdo con el contrato; que los plazos y m\u00e9todos de recepci\u00f3n deben definirse en reglamento o en el propio contrato; y que ensayos, pruebas y dem\u00e1s comprobaciones exigidas por normas t\u00e9cnicas oficiales, salvo disposici\u00f3n en contrario, corren por cuenta del contratista. Para la ingenier\u00eda del contratante, por tanto, el art. 140 debe leerse como una regla de gobernanza de la entrega: el cierre debe planificarse con tiempo, criterios, evidencias, responsabilidades y una ventana real para correcci\u00f3n.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Qu\u00e9 determina el art. 140 de la Ley 14.133 para obras y servicios<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">La Ley separa dos decisiones. En la recepci\u00f3n provisional, el responsable del seguimiento y fiscalizaci\u00f3n verifica el cumplimiento de las exigencias de car\u00e1cter t\u00e9cnico. En la recepci\u00f3n definitiva, un servidor o comisi\u00f3n designada por la autoridad competente formaliza, mediante acta detallada, que las exigencias contractuales fueron atendidas.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Esta distinci\u00f3n es relevante porque evita tratar la recepci\u00f3n como un \u00fanico acto burocr\u00e1tico. El primer hito est\u00e1 directamente asociado a la verificaci\u00f3n t\u00e9cnica del objeto; el segundo ampl\u00eda el an\u00e1lisis hacia la conformidad contractual necesaria para cerrar la entrega. El art\u00edculo sobre el <a href=\"https:\/\/a3aengenharia.com.br\/conteudo\/artigos-tecnicos\/recebimento-provisorio-definitivo-engenharia-diferencas-riscos-documentacao\/\">Acta de Recepci\u00f3n Definitiva<\/a> profundiza la diferencia entre conclusi\u00f3n f\u00edsica, entrega t\u00e9cnica, recepci\u00f3n provisional, aceptaci\u00f3n y recepci\u00f3n definitiva.<\/p>\n\n\n\n<figure class=\"wp-block-table\"><table><tbody><tr><td>Etapa<\/td><td>Responsable previsto en el art. 140<\/td><td>Pregunta central<\/td><td>Evidencia esperada<\/td><\/tr><tr><td>Recepci\u00f3n provisional<\/td><td>Responsable del seguimiento y fiscalizaci\u00f3n<\/td><td>\u00bfSe cumplieron las exigencias de car\u00e1cter t\u00e9cnico?<\/td><td>Acta detallada, inspecciones, pruebas, documentos y registros<\/td><\/tr><tr><td>Tratamiento de pendientes<\/td><td>Contratista y fiscalizaci\u00f3n, conforme al contrato<\/td><td>\u00bfLas desviaciones identificadas fueron corregidas y reverificadas?<\/td><td>Punch list, RNCs, evidencias de correcci\u00f3n y nuevas pruebas<\/td><\/tr><tr><td>Recepci\u00f3n definitiva<\/td><td>Servidor o comisi\u00f3n designada<\/td><td>\u00bfSe cumplieron las exigencias contractuales aplicables?<\/td><td>Acta detallada sustentada por el conjunto de evidencias t\u00e9cnicas y contractuales<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p class=\"wp-block-paragraph\">La recepci\u00f3n definitiva no debe funcionar como sustituto de la fiscalizaci\u00f3n realizada durante la ejecuci\u00f3n. Consolida una decisi\u00f3n que necesita estar sustentada por evidencias producidas a lo largo del contrato.<\/p>\n\n\n\n<div class=\"wp-block-a3a-destaque\">\n<p class=\"wp-block-paragraph\"><strong>La recepci\u00f3n exige evidencia, no solamente conclusi\u00f3n f\u00edsica.<\/strong> Cuando el objeto posee m\u00faltiples disciplinas, sistemas cr\u00edticos o documentaci\u00f3n extensa, la inspecci\u00f3n final debe transformar requisitos contractuales en verificaciones objetivas y trazables.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><a href=\"https:\/\/a3aengenharia.com.br\/servicos\/implementacao\/recebimento-tecnico-obras-servicos-engenharia\/\">Recepci\u00f3n T\u00e9cnica de Obras y Servicios de Ingenier\u00eda<\/a><\/p>\n<\/div>\n\n\n\n<h2 class=\"wp-block-heading\">Recepci\u00f3n provisional: el acta detallada comienza con la verificaci\u00f3n t\u00e9cnica<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Para obras y servicios, la recepci\u00f3n provisional est\u00e1 asociada a la actuaci\u00f3n de quien acompa\u00f1\u00f3 y fiscaliz\u00f3 el contrato. Esto crea una relaci\u00f3n directa entre el control de la ejecuci\u00f3n y la decisi\u00f3n de reconocer que el objeto alcanz\u00f3 las condiciones t\u00e9cnicas previstas para ese hito.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">La expresi\u00f3n <strong>acta detallada<\/strong> es particularmente relevante. Un documento de una sola l\u00ednea informando que \u201clos servicios fueron recibidos\u201d no demuestra, por s\u00ed solo, qu\u00e9 requisitos fueron verificados, qu\u00e9 documentos fueron analizados, qu\u00e9 pruebas fueron ejecutadas o qu\u00e9 pendientes permanecen. La solidez de la recepci\u00f3n depende de la trazabilidad entre requisito, evidencia y conclusi\u00f3n t\u00e9cnica.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">En contratos de ingenier\u00eda, la verificaci\u00f3n normalmente debe considerar, seg\u00fan el objeto:<\/p>\n\n\n\n<ul class=\"wp-block-list\"><li>alcance y cantidades efectivamente ejecutadas;<\/li><li>adherencia al proyecto, especificaciones y documentos contractuales;<\/li><li>calidad de la ejecuci\u00f3n y registros de inspecci\u00f3n;<\/li><li>ensayos, pruebas y resultados de puesta en servicio;<\/li><li>no conformidades y sus respectivos cierres;<\/li><li>documentaci\u00f3n final y revisiones aprobadas;<\/li><li>As-Built compatible con la condici\u00f3n construida;<\/li><li>informes fotogr\u00e1ficos y evidencias de campo;<\/li><li>garant\u00edas, certificados, manuales y licencias;<\/li><li>capacitaci\u00f3n, operaci\u00f3n asistida o transferencia a operaci\u00f3n, cuando est\u00e9n previstas.<\/li><\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">Cuando la estructura del contratante no posee toda la especializaci\u00f3n necesaria, el <a href=\"https:\/\/a3aengenharia.com.br\/servicos\/implementacao\/apoio-tecnico-fiscalizacao-obras-contratos-engenharia\/\">apoyo t\u00e9cnico a la fiscalizaci\u00f3n de obras y contratos de ingenier\u00eda<\/a> puede organizar inspecciones, evidencias, pendientes y verificaciones sin retirar al agente p\u00fablico la competencia decisoria que le corresponde.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Recepci\u00f3n definitiva: el cumplimiento contractual debe demostrarse<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">La recepci\u00f3n definitiva corresponde a un servidor o comisi\u00f3n designada por la autoridad competente y exige un acta detallada que demuestre el cumplimiento de las exigencias contractuales. La palabra <strong>demuestre<\/strong> cambia la l\u00f3gica del proceso: no basta una percepci\u00f3n de que la obra \u201cest\u00e1 lista\u201d; es necesario disponer de una base documental y t\u00e9cnica capaz de sustentar la decisi\u00f3n.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">El Tribunal de Cuentas de la Uni\u00f3n destaca que la documentaci\u00f3n de la recepci\u00f3n definitiva, junto con la producida para la recepci\u00f3n provisional, compone la base documental del cierre y de la liquidaci\u00f3n del gasto. En obras, la recepci\u00f3n definitiva ocurre despu\u00e9s de la conclusi\u00f3n del emprendimiento; las mediciones parciales durante la ejecuci\u00f3n no se confunden con la recepci\u00f3n definitiva del objeto.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Por ello, la cadena documental debe ser coherente. Si la ejecuci\u00f3n presenta una determinada condici\u00f3n en campo, el As-Built debe representar esa condici\u00f3n. Si un requisito depende del desempe\u00f1o, debe existir la prueba o ensayo correspondiente. Si hubo una no conformidad, debe existir registro del tratamiento y evidencia de cierre. Si hubo una modificaci\u00f3n de alcance, la documentaci\u00f3n contractual debe explicar c\u00f3mo fue autorizada e incorporada.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">El <a href=\"https:\/\/a3aengenharia.com.br\/conteudo\/artigos-tecnicos\/termo-de-aceite-tecnico-engenharia-validacao-pendencias-encerramento\/\">Certificado de Aceptaci\u00f3n T\u00e9cnica en Ingenier\u00eda<\/a> es una pieza \u00fatil para consolidar esta validaci\u00f3n, siempre que no se trate como un simple recibo y est\u00e9 sustentado por los criterios y evidencias aplicables.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Qu\u00e9 significa un acta detallada en el contexto de la ingenier\u00eda<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">La Ley no transforma el acta detallada en un formulario \u00fanico. El contenido necesario depende del objeto, del contrato, del reglamento aplicable y de la criticidad t\u00e9cnica. Sin embargo, desde el punto de vista de una buena gobernanza de ingenier\u00eda, el documento debe permitir reconstruir la decisi\u00f3n de recepci\u00f3n.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Un acta t\u00e9cnicamente defendible tiende a registrar:<\/p>\n\n\n\n<ol class=\"wp-block-list\"><li>identificaci\u00f3n del contrato, objeto, etapa y partes involucradas;<\/li><li>referencia a la solicitud formal de entrega o recepci\u00f3n presentada por la contratista;<\/li><li>relaci\u00f3n de los documentos y revisiones analizados;<\/li><li>criterios t\u00e9cnicos y contractuales utilizados en la verificaci\u00f3n;<\/li><li>inspecciones, ensayos, pruebas y verificaciones ejecutadas;<\/li><li>situaci\u00f3n de las pendientes y no conformidades;<\/li><li>reservas eventualmente admitidas y su justificaci\u00f3n;<\/li><li>obligaciones remanentes de garant\u00eda, correcci\u00f3n o documentaci\u00f3n;<\/li><li>conclusi\u00f3n objetiva sobre recepci\u00f3n, rechazo o necesidad de correcci\u00f3n;<\/li><li>identificaci\u00f3n de los responsables del an\u00e1lisis y de la formalizaci\u00f3n.<\/li><\/ol>\n\n\n\n<p class=\"wp-block-paragraph\">El acta no necesita reproducir \u00edntegramente todos los informes. Debe referenciar de forma trazable las evidencias que sustentan la conclusi\u00f3n. Esta arquitectura es compatible con la <a href=\"https:\/\/a3aengenharia.com.br\/solucoes\/gestao-e-governanca-de-engenharia\/gestao-requisitos-evidencias-criterios-aceite\/\">Gesti\u00f3n de Requisitos, Evidencias y Criterios de Aceptaci\u00f3n<\/a>, que organiza la relaci\u00f3n entre lo que deb\u00eda cumplirse y aquello que demuestra el cumplimiento.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">El objeto puede rechazarse total o parcialmente<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">El \u00a71 del art. 140 establece que el objeto puede ser rechazado, total o parcialmente, cuando est\u00e9 en desacuerdo con el contrato. Esta previsi\u00f3n impide que la recepci\u00f3n sea tratada como consecuencia autom\u00e1tica del transcurso del plazo o de la simple declaraci\u00f3n de la ejecutora.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">El rechazo debe estar sustentado por criterios verificables. En ingenier\u00eda, esto significa demostrar la divergencia entre el requisito y la condici\u00f3n encontrada. La diferencia puede involucrar cantidad, calidad, desempe\u00f1o, documentaci\u00f3n, seguridad, funcionalidad, integraci\u00f3n, plazo u otra obligaci\u00f3n contractual.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Las no conformidades deben registrarse de manera objetiva. El <a href=\"https:\/\/a3aengenharia.com.br\/conteudo\/artigos-tecnicos\/relatorio-nao-conformidade-rnc-ncr-engenharia\/\">Informe de No Conformidad \u2014 RNC\/NCR<\/a> permite documentar la desviaci\u00f3n, su disposici\u00f3n, responsabilidad, acci\u00f3n correctiva, nueva prueba y cierre. La soluci\u00f3n de <a href=\"https:\/\/a3aengenharia.com.br\/solucoes\/gestao-e-governanca-de-engenharia\/gestao-pendencias-rfis-nao-conformidades\/\">Gesti\u00f3n de Pendientes, RFIs y No Conformidades<\/a> ampl\u00eda este control al conjunto del proyecto.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">No toda pendiente posee la misma criticidad. Un error de nomenclatura f\u00e1cilmente corregible no debe tratarse como una falla equivalente a la ausencia de una prueba funcional de un sistema cr\u00edtico. El proceso debe clasificar impacto, riesgo, condici\u00f3n de uso y efecto sobre la recepci\u00f3n.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">El plazo contractual no es un plazo exclusivo para instalar<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">El \u00a73 determina que los plazos y m\u00e9todos para las recepciones provisional y definitiva sean definidos en reglamento o en el contrato. Este punto tiene una consecuencia gerencial importante: el cronograma de la ejecutora debe reservar tiempo para entregar, ser verificada, corregir pendientes y demostrar la correcci\u00f3n.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Un contrato de 90 d\u00edas no significa que la empresa disponga de 90 d\u00edas para ejecutar f\u00edsicamente y pueda presentar la solicitud de aceptaci\u00f3n el \u00faltimo d\u00eda. La entrega adecuada debe caber dentro de una secuencia planificada:<\/p>\n\n\n\n<ol class=\"wp-block-list\"><li>conclusi\u00f3n de la ejecuci\u00f3n f\u00edsica;<\/li><li>consolidaci\u00f3n de la documentaci\u00f3n final;<\/li><li>solicitud formal de recepci\u00f3n;<\/li><li>inspecci\u00f3n y an\u00e1lisis documental por el contratante;<\/li><li>puesta en servicio, ensayos y pruebas aplicables;<\/li><li>emisi\u00f3n de pendientes;<\/li><li>correcciones por la contratista;<\/li><li>reverificaci\u00f3n y nuevas pruebas;<\/li><li>dictamen t\u00e9cnico;<\/li><li>recepci\u00f3n en los hitos previstos.<\/li><\/ol>\n\n\n\n<p class=\"wp-block-paragraph\">Cuando el pliego y los T\u00e9rminos de Referencia no definen esta l\u00f3gica, el problema se desplaza al final del contrato. La <a href=\"https:\/\/a3aengenharia.com.br\/servicos\/planejamento\/revisao-tecnica-termo-referencia-obras-servicos-engenharia\/\">Revisi\u00f3n T\u00e9cnica de T\u00e9rminos de Referencia para Obras y Servicios de Ingenier\u00eda<\/a> y la <a href=\"https:\/\/a3aengenharia.com.br\/servicos\/planejamento\/revisao-tecnica-edital-anexos-licitacoes-engenharia\/\">Revisi\u00f3n T\u00e9cnica de Pliego y Anexos<\/a> ayudan a verificar si requisitos, documentos, responsabilidades y criterios de recepci\u00f3n fueron definidos antes de la licitaci\u00f3n.<\/p>\n\n\n\n<div class=\"wp-block-a3a-destaque\">\n<p class=\"wp-block-paragraph\"><strong>La recepci\u00f3n comienza en la planificaci\u00f3n de la contrataci\u00f3n.<\/strong> Criterios de aceptaci\u00f3n, documentos finales, pruebas, responsables y ventanas de correcci\u00f3n deben estar definidos antes de la ejecuci\u00f3n; de lo contrario, la Administraci\u00f3n intenta resolver en el cierre aquello que deber\u00eda haberse contratado desde el inicio.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><a href=\"https:\/\/a3aengenharia.com.br\/servicos\/planejamento\/revisao-tecnica-termo-referencia-obras-servicos-engenharia\/\">Revisi\u00f3n T\u00e9cnica de T\u00e9rminos de Referencia para Obras y Servicios de Ingenier\u00eda<\/a><\/p>\n<\/div>\n\n\n\n<figure class=\"a3a-mermaid\"><svg id=\"a3a-diagram-1\" width=\"100%\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" class=\"flowchart\" style=\"max-width:min(1740.53125px, 100%);height:auto;display:block;margin:0 auto\" viewBox=\"0 0 1740.53125 209.61328125\" role=\"graphics-document document\" aria-roledescription=\"flowchart-v2\" aria-labelledby=\"chart-title-a3a-diagram-1\"><title id=\"chart-title-a3a-diagram-1\">Flujo t\u00e9cnico entre la conclusi\u00f3n f\u00edsica y la recepci\u00f3n definitiva<\/title><style>#a3a-diagram-1{font-family:Roboto,sans-serif;font-size:15px;fill:var(--a3a-diag-text, #0a0a0a);}@keyframes edge-animation-frame{from{stroke-dashoffset:0;}}@keyframes dash{to{stroke-dashoffset:0;}}#a3a-diagram-1 .edge-animation-slow{stroke-dasharray:9,5!important;stroke-dashoffset:900;animation:dash 50s linear infinite;stroke-linecap:round;}#a3a-diagram-1 .edge-animation-fast{stroke-dasharray:9,5!important;stroke-dashoffset:900;animation:dash 20s linear infinite;stroke-linecap:round;}#a3a-diagram-1 .error-icon{fill:var(--a3a-diag-canvas, #ffffff);}#a3a-diagram-1 .error-text{fill:#000000;stroke:#000000;}#a3a-diagram-1 .edge-thickness-normal{stroke-width:1px;}#a3a-diagram-1 .edge-thickness-thick{stroke-width:3.5px;}#a3a-diagram-1 .edge-pattern-solid{stroke-dasharray:0;}#a3a-diagram-1 .edge-thickness-invisible{stroke-width:0;fill:none;}#a3a-diagram-1 .edge-pattern-dashed{stroke-dasharray:3;}#a3a-diagram-1 .edge-pattern-dotted{stroke-dasharray:2;}#a3a-diagram-1 .marker{fill:var(--a3a-diag-stroke, #2e42a2);stroke:var(--a3a-diag-stroke, #2e42a2);}#a3a-diagram-1 .marker.cross{stroke:var(--a3a-diag-stroke, #2e42a2);}#a3a-diagram-1 svg{font-family:Roboto,sans-serif;font-size:15px;}#a3a-diagram-1 p{margin:0;}#a3a-diagram-1 .label{font-family:Roboto,sans-serif;color:var(--a3a-diag-text, #0a0a0a);}#a3a-diagram-1 .cluster-label text{fill:var(--a3a-diag-title, #0124af);}#a3a-diagram-1 .cluster-label span{color:var(--a3a-diag-title, #0124af);}#a3a-diagram-1 .cluster-label span p{background-color:transparent;}#a3a-diagram-1 .label text,#a3a-diagram-1 span{fill:var(--a3a-diag-text, #0a0a0a);color:var(--a3a-diag-text, #0a0a0a);}#a3a-diagram-1 .node rect,#a3a-diagram-1 .node circle,#a3a-diagram-1 .node ellipse,#a3a-diagram-1 .node polygon,#a3a-diagram-1 .node path{fill:var(--a3a-diag-fill, #eef2fd);stroke:var(--a3a-diag-stroke, #2e42a2);stroke-width:1px;}#a3a-diagram-1 .rough-node .label text,#a3a-diagram-1 .node .label text,#a3a-diagram-1 .image-shape .label,#a3a-diagram-1 .icon-shape .label{text-anchor:middle;}#a3a-diagram-1 .node .katex path{fill:#000;stroke:#000;stroke-width:1px;}#a3a-diagram-1 .rough-node .label,#a3a-diagram-1 .node .label,#a3a-diagram-1 .image-shape .label,#a3a-diagram-1 .icon-shape .label{text-align:center;}#a3a-diagram-1 .node.clickable{cursor:pointer;}#a3a-diagram-1 .root .anchor path{fill:var(--a3a-diag-stroke, #2e42a2)!important;stroke-width:0;stroke:var(--a3a-diag-stroke, #2e42a2);}#a3a-diagram-1 .arrowheadPath{fill:var(--a3a-diag-stroke, #0b0b0b);}#a3a-diagram-1 .edgePath .path{stroke:var(--a3a-diag-stroke, #2e42a2);stroke-width:2.0px;}#a3a-diagram-1 .flowchart-link{stroke:var(--a3a-diag-stroke, #2e42a2);fill:none;}#a3a-diagram-1 .edgeLabel{background-color:var(--a3a-diag-canvas, #ffffff);text-align:center;}#a3a-diagram-1 .edgeLabel p{background-color:var(--a3a-diag-canvas, #ffffff);}#a3a-diagram-1 .edgeLabel rect{opacity:0.5;background-color:var(--a3a-diag-canvas, #ffffff);fill:var(--a3a-diag-canvas, #ffffff);}#a3a-diagram-1 .labelBkg{background-color:rgba(255, 255, 255, 0.5);}#a3a-diagram-1 .cluster rect{fill:var(--a3a-diag-surface, #f8f8f8);stroke:var(--a3a-diag-border, #e2e8f0);stroke-width:1px;}#a3a-diagram-1 .cluster text{fill:var(--a3a-diag-title, #0124af);}#a3a-diagram-1 .cluster span{color:var(--a3a-diag-title, #0124af);}#a3a-diagram-1 div.mermaidTooltip{position:absolute;text-align:center;max-width:200px;padding:2px;font-family:Roboto,sans-serif;font-size:12px;background:var(--a3a-diag-canvas, #ffffff);border:1px solid hsl(0, 0%, 90%);border-radius:2px;pointer-events:none;z-index:100;}#a3a-diagram-1 .flowchartTitleText{text-anchor:middle;font-size:18px;fill:var(--a3a-diag-text, #0a0a0a);}#a3a-diagram-1 rect.text{fill:none;stroke-width:0;}#a3a-diagram-1 .icon-shape,#a3a-diagram-1 .image-shape{background-color:var(--a3a-diag-canvas, #ffffff);text-align:center;}#a3a-diagram-1 .icon-shape p,#a3a-diagram-1 .image-shape p{background-color:var(--a3a-diag-canvas, #ffffff);padding:2px;}#a3a-diagram-1 .icon-shape rect,#a3a-diagram-1 .image-shape rect{opacity:0.5;background-color:var(--a3a-diag-canvas, #ffffff);fill:var(--a3a-diag-canvas, #ffffff);}#a3a-diagram-1 .label-icon{display:inline-block;height:1em;overflow:visible;vertical-align:-0.125em;}#a3a-diagram-1 .node .label-icon path{fill:currentColor;stroke:revert;stroke-width:revert;}#a3a-diagram-1 :root{--mermaid-font-family:Roboto,sans-serif;}<\/style><g><marker id=\"a3a-diagram-1_flowchart-v2-pointEnd\" class=\"marker flowchart-v2\" viewBox=\"0 0 10 10\" refX=\"5\" refY=\"5\" markerUnits=\"userSpaceOnUse\" markerWidth=\"8\" markerHeight=\"8\" orient=\"auto\"><path d=\"M 0 0 L 10 5 L 0 10 z\" class=\"arrowMarkerPath\" style=\"stroke-width: 1; stroke-dasharray: 1, 0;\"><\/path><\/marker><marker id=\"a3a-diagram-1_flowchart-v2-pointStart\" class=\"marker flowchart-v2\" viewBox=\"0 0 10 10\" refX=\"4.5\" refY=\"5\" markerUnits=\"userSpaceOnUse\" markerWidth=\"8\" markerHeight=\"8\" orient=\"auto\"><path d=\"M 0 5 L 10 10 L 10 0 z\" class=\"arrowMarkerPath\" style=\"stroke-width: 1; stroke-dasharray: 1, 0;\"><\/path><\/marker><marker id=\"a3a-diagram-1_flowchart-v2-circleEnd\" class=\"marker flowchart-v2\" viewBox=\"0 0 10 10\" refX=\"11\" refY=\"5\" markerUnits=\"userSpaceOnUse\" markerWidth=\"11\" markerHeight=\"11\" orient=\"auto\"><circle cx=\"5\" cy=\"5\" r=\"5\" class=\"arrowMarkerPath\" style=\"stroke-width: 1; stroke-dasharray: 1, 0;\"><\/circle><\/marker><marker id=\"a3a-diagram-1_flowchart-v2-circleStart\" class=\"marker flowchart-v2\" viewBox=\"0 0 10 10\" refX=\"-1\" refY=\"5\" markerUnits=\"userSpaceOnUse\" markerWidth=\"11\" markerHeight=\"11\" orient=\"auto\"><circle cx=\"5\" cy=\"5\" r=\"5\" class=\"arrowMarkerPath\" style=\"stroke-width: 1; stroke-dasharray: 1, 0;\"><\/circle><\/marker><marker id=\"a3a-diagram-1_flowchart-v2-crossEnd\" class=\"marker cross flowchart-v2\" viewBox=\"0 0 11 11\" refX=\"12\" refY=\"5.2\" markerUnits=\"userSpaceOnUse\" markerWidth=\"11\" markerHeight=\"11\" orient=\"auto\"><path d=\"M 1,1 l 9,9 M 10,1 l -9,9\" class=\"arrowMarkerPath\" style=\"stroke-width: 2; stroke-dasharray: 1, 0;\"><\/path><\/marker><marker id=\"a3a-diagram-1_flowchart-v2-crossStart\" class=\"marker cross flowchart-v2\" viewBox=\"0 0 11 11\" refX=\"-1\" refY=\"5.2\" markerUnits=\"userSpaceOnUse\" markerWidth=\"11\" markerHeight=\"11\" orient=\"auto\"><path d=\"M 1,1 l 9,9 M 10,1 l -9,9\" class=\"arrowMarkerPath\" style=\"stroke-width: 2; stroke-dasharray: 1, 0;\"><\/path><\/marker><g class=\"root\"><g class=\"clusters\"><\/g><g class=\"edgePaths\"><path d=\"M183.281,85.5L187.448,85.5C191.615,85.5,199.948,85.5,207.615,85.5C215.281,85.5,222.281,85.5,225.781,85.5L229.281,85.5\" id=\"L_A_B_0\" class=\"edge-thickness-normal edge-pattern-solid edge-thickness-normal edge-pattern-solid flowchart-link\" style=\";\" data-edge=\"true\" data-et=\"edge\" data-id=\"L_A_B_0\" data-points=\"W3sieCI6MTgzLjI4MTI1LCJ5Ijo4NS41fSx7IngiOjIwOC4yODEyNSwieSI6ODUuNX0seyJ4IjoyMzMuMjgxMjUsInkiOjg1LjV9XQ==\" marker-end=\"url(#a3a-diagram-1_flowchart-v2-pointEnd)\"><\/path><path d=\"M433.5,85.5L437.667,85.5C441.833,85.5,450.167,85.5,457.833,85.5C465.5,85.5,472.5,85.5,476,85.5L479.5,85.5\" id=\"L_B_C_0\" class=\"edge-thickness-normal edge-pattern-solid edge-thickness-normal edge-pattern-solid flowchart-link\" style=\";\" data-edge=\"true\" data-et=\"edge\" data-id=\"L_B_C_0\" data-points=\"W3sieCI6NDMzLjUsInkiOjg1LjV9LHsieCI6NDU4LjUsInkiOjg1LjV9LHsieCI6NDgzLjUsInkiOjg1LjV9XQ==\" marker-end=\"url(#a3a-diagram-1_flowchart-v2-pointEnd)\"><\/path><path d=\"M743.5,85.5L747.667,85.5C751.833,85.5,760.167,85.5,767.833,85.5C775.5,85.5,782.5,85.5,786,85.5L789.5,85.5\" id=\"L_C_D_0\" class=\"edge-thickness-normal edge-pattern-solid edge-thickness-normal edge-pattern-solid flowchart-link\" style=\";\" data-edge=\"true\" data-et=\"edge\" data-id=\"L_C_D_0\" data-points=\"W3sieCI6NzQzLjUsInkiOjg1LjV9LHsieCI6NzY4LjUsInkiOjg1LjV9LHsieCI6NzkzLjUsInkiOjg1LjV9XQ==\" marker-end=\"url(#a3a-diagram-1_flowchart-v2-pointEnd)\"><\/path><path d=\"M961.565,111.75L971.695,115.77C981.825,119.79,1002.084,127.831,1015.714,131.851C1029.344,135.871,1036.344,135.871,1039.844,135.871L1043.344,135.871\" id=\"L_D_E_0\" class=\"edge-thickness-normal edge-pattern-solid edge-thickness-normal edge-pattern-solid flowchart-link\" style=\";\" data-edge=\"true\" data-et=\"edge\" data-id=\"L_D_E_0\" data-points=\"W3sieCI6OTYxLjU2NDk1MzcxMjY3OTMsInkiOjExMS43NX0seyJ4IjoxMDIyLjM0Mzc1LCJ5IjoxMzUuODcxMDkzNzV9LHsieCI6MTA0Ny4zNDM3NSwieSI6MTM1Ljg3MTA5Mzc1fV0=\" marker-end=\"url(#a3a-diagram-1_flowchart-v2-pointEnd)\"><\/path><path d=\"M1156.589,113.632L1166.046,108.796C1175.504,103.961,1194.42,94.291,1215.458,85.644C1236.495,76.998,1259.655,69.374,1271.235,65.562L1282.814,61.751\" id=\"L_E_F_0\" class=\"edge-thickness-normal edge-pattern-solid edge-thickness-normal edge-pattern-solid flowchart-link\" style=\";\" data-edge=\"true\" data-et=\"edge\" data-id=\"L_E_F_0\" data-points=\"W3sieCI6MTE1Ni41ODg2MDYxMjYyMzc3LCJ5IjoxMTMuNjMxNTc0ODc2MjM3NjJ9LHsieCI6MTIxMy4zMzU5Mzc1LCJ5Ijo4NC42MjEwOTM3NX0seyJ4IjoxMjg2LjYxMzkzMTAyOTQ2ODksInkiOjYwLjV9XQ==\" marker-end=\"url(#a3a-diagram-1_flowchart-v2-pointEnd)\"><\/path><path d=\"M1247.844,22.149L1242.092,21.561C1236.341,20.974,1224.839,19.8,1202.379,19.212C1179.919,18.625,1146.503,18.625,1114.671,18.625C1082.839,18.625,1052.591,18.625,1025.207,25.085C997.823,31.545,973.302,44.465,961.041,50.925L948.78,57.385\" id=\"L_F_D_0\" class=\"edge-thickness-normal edge-pattern-solid edge-thickness-normal edge-pattern-solid flowchart-link\" style=\";\" data-edge=\"true\" data-et=\"edge\" data-id=\"L_F_D_0\" data-points=\"W3sieCI6MTI0Ny44NDM3NSwieSI6MjIuMTQ4NTQyNDAwNTcxODA2fSx7IngiOjEyMTMuMzM1OTM3NSwieSI6MTguNjI1fSx7IngiOjExMTMuMDg1OTM3NSwieSI6MTguNjI1fSx7IngiOjEwMjIuMzQzNzUsInkiOjE4LjYyNX0seyJ4Ijo5NDUuMjQxNjc2NDAxODY5MiwieSI6NTkuMjV9XQ==\" marker-end=\"url(#a3a-diagram-1_flowchart-v2-pointEnd)\"><\/path><path d=\"M1167.33,147.369L1174.998,148.995C1182.665,150.62,1198.001,153.87,1215.713,155.496C1233.424,157.121,1253.513,157.121,1263.557,157.121L1273.602,157.121\" id=\"L_E_G_0\" class=\"edge-thickness-normal edge-pattern-solid edge-thickness-normal edge-pattern-solid flowchart-link\" style=\";\" data-edge=\"true\" data-et=\"edge\" data-id=\"L_E_G_0\" data-points=\"W3sieCI6MTE2Ny4zMzAwMDU3ODcwMzcsInkiOjE0Ny4zNjkyMTI5NjI5NjI5Nn0seyJ4IjoxMjEzLjMzNTkzNzUsInkiOjE1Ny4xMjEwOTM3NX0seyJ4IjoxMjc3LjYwMTU2MjUsInkiOjE1Ny4xMjEwOTM3NX1d\" marker-end=\"url(#a3a-diagram-1_flowchart-v2-pointEnd)\"><\/path><path d=\"M1455.117,157.121L1464.243,157.121C1473.37,157.121,1491.622,157.121,1504.249,157.121C1516.875,157.121,1523.875,157.121,1527.375,157.121L1530.875,157.121\" id=\"L_G_H_0\" class=\"edge-thickness-normal edge-pattern-solid edge-thickness-normal edge-pattern-solid flowchart-link\" style=\";\" data-edge=\"true\" data-et=\"edge\" data-id=\"L_G_H_0\" data-points=\"W3sieCI6MTQ1NS4xMTcxODc1LCJ5IjoxNTcuMTIxMDkzNzV9LHsieCI6MTUwOS44NzUsInkiOjE1Ny4xMjEwOTM3NX0seyJ4IjoxNTM0Ljg3NSwieSI6MTU3LjEyMTA5Mzc1fV0=\" marker-end=\"url(#a3a-diagram-1_flowchart-v2-pointEnd)\"><\/path><\/g><g class=\"edgeLabels\"><g class=\"edgeLabel\"><g class=\"label\" data-id=\"L_A_B_0\" transform=\"translate(0, 0)\"><foreignObject width=\"0\" height=\"0\"><div xmlns=\"http:\/\/www.w3.org\/1999\/xhtml\" class=\"labelBkg\" style=\"display: table-cell; white-space: nowrap; line-height: 1.5; max-width: 200px; text-align: center;\"><span class=\"edgeLabel\"><\/span><\/div><\/foreignObject><\/g><\/g><g class=\"edgeLabel\"><g class=\"label\" data-id=\"L_B_C_0\" transform=\"translate(0, 0)\"><foreignObject width=\"0\" height=\"0\"><div xmlns=\"http:\/\/www.w3.org\/1999\/xhtml\" class=\"labelBkg\" style=\"display: table-cell; white-space: nowrap; line-height: 1.5; max-width: 200px; text-align: center;\"><span class=\"edgeLabel\"><\/span><\/div><\/foreignObject><\/g><\/g><g class=\"edgeLabel\"><g class=\"label\" data-id=\"L_C_D_0\" transform=\"translate(0, 0)\"><foreignObject width=\"0\" height=\"0\"><div xmlns=\"http:\/\/www.w3.org\/1999\/xhtml\" class=\"labelBkg\" style=\"display: table-cell; white-space: nowrap; line-height: 1.5; max-width: 200px; text-align: center;\"><span class=\"edgeLabel\"><\/span><\/div><\/foreignObject><\/g><\/g><g class=\"edgeLabel\"><g class=\"label\" data-id=\"L_D_E_0\" transform=\"translate(0, 0)\"><foreignObject width=\"0\" height=\"0\"><div xmlns=\"http:\/\/www.w3.org\/1999\/xhtml\" class=\"labelBkg\" style=\"display: table-cell; white-space: nowrap; line-height: 1.5; max-width: 200px; text-align: center;\"><span class=\"edgeLabel\"><\/span><\/div><\/foreignObject><\/g><\/g><g class=\"edgeLabel\" transform=\"translate(1219.70625, 82.52416)\"><g class=\"label\" data-id=\"L_E_F_0\" transform=\"translate(-9.5078125, -11.25)\"><foreignObject width=\"19.015625\" height=\"22.5\"><div xmlns=\"http:\/\/www.w3.org\/1999\/xhtml\" class=\"labelBkg\" style=\"display: table-cell; white-space: nowrap; line-height: 1.5; max-width: 200px; text-align: center;\"><span class=\"edgeLabel\"><p>No<\/p><\/span><\/div><\/foreignObject><\/g><\/g><g class=\"edgeLabel\"><g class=\"label\" data-id=\"L_F_D_0\" transform=\"translate(0, 0)\"><foreignObject width=\"0\" height=\"0\"><div xmlns=\"http:\/\/www.w3.org\/1999\/xhtml\" class=\"labelBkg\" style=\"display: table-cell; white-space: nowrap; line-height: 1.5; max-width: 200px; text-align: center;\"><span class=\"edgeLabel\"><\/span><\/div><\/foreignObject><\/g><\/g><g class=\"edgeLabel\" transform=\"translate(1213.3359375, 157.12109375)\"><g class=\"label\" data-id=\"L_E_G_0\" transform=\"translate(-6.203125, -11.25)\"><foreignObject width=\"12.40625\" height=\"22.5\"><div xmlns=\"http:\/\/www.w3.org\/1999\/xhtml\" class=\"labelBkg\" style=\"display: table-cell; white-space: nowrap; line-height: 1.5; max-width: 200px; text-align: center;\"><span class=\"edgeLabel\"><p>S\u00ed<\/p><\/span><\/div><\/foreignObject><\/g><\/g><g class=\"edgeLabel\"><g class=\"label\" data-id=\"L_G_H_0\" transform=\"translate(0, 0)\"><foreignObject width=\"0\" height=\"0\"><div xmlns=\"http:\/\/www.w3.org\/1999\/xhtml\" class=\"labelBkg\" style=\"display: table-cell; white-space: nowrap; line-height: 1.5; max-width: 200px; text-align: center;\"><span class=\"edgeLabel\"><\/span><\/div><\/foreignObject><\/g><\/g><\/g><g class=\"nodes\"><g class=\"node default\" id=\"flowchart-A-0\" transform=\"translate(95.640625, 85.5)\"><rect class=\"basic label-container\" style=\"\" x=\"-87.640625\" y=\"-26.25\" width=\"175.28125\" height=\"52.5\"><\/rect><g class=\"label\" style=\"\" transform=\"translate(-57.640625, -11.25)\"><rect><\/rect><foreignObject width=\"115.28125\" height=\"22.5\"><div xmlns=\"http:\/\/www.w3.org\/1999\/xhtml\" style=\"display: table-cell; white-space: nowrap; line-height: 1.5; max-width: 200px; text-align: center;\"><span class=\"nodeLabel\"><p>Conclusi\u00f3n f\u00edsica<\/p><\/span><\/div><\/foreignObject><\/g><\/g><g class=\"node default\" id=\"flowchart-B-1\" transform=\"translate(333.390625, 85.5)\"><rect class=\"basic label-container\" style=\"\" x=\"-100.109375\" y=\"-26.25\" width=\"200.21875\" height=\"52.5\"><\/rect><g class=\"label\" style=\"\" transform=\"translate(-70.109375, -11.25)\"><rect><\/rect><foreignObject width=\"140.21875\" height=\"22.5\"><div xmlns=\"http:\/\/www.w3.org\/1999\/xhtml\" style=\"display: table-cell; white-space: nowrap; line-height: 1.5; max-width: 200px; text-align: center;\"><span class=\"nodeLabel\"><p>Documentaci\u00f3n final<\/p><\/span><\/div><\/foreignObject><\/g><\/g><g class=\"node default\" id=\"flowchart-C-3\" transform=\"translate(613.5, 85.5)\"><rect class=\"basic label-container\" style=\"\" x=\"-130\" y=\"-37.5\" width=\"260\" height=\"75\"><\/rect><g class=\"label\" style=\"\" transform=\"translate(-100, -22.5)\"><rect><\/rect><foreignObject width=\"200\" height=\"45\"><div xmlns=\"http:\/\/www.w3.org\/1999\/xhtml\" style=\"display: table; white-space: break-spaces; line-height: 1.5; max-width: 200px; text-align: center; width: 200px;\"><span class=\"nodeLabel\"><p>Solicitud formal de recepci\u00f3n<\/p><\/span><\/div><\/foreignObject><\/g><\/g><g class=\"node default\" id=\"flowchart-D-5\" transform=\"translate(895.421875, 85.5)\"><rect class=\"basic label-container\" style=\"\" x=\"-101.921875\" y=\"-26.25\" width=\"203.84375\" height=\"52.5\"><\/rect><g class=\"label\" style=\"\" transform=\"translate(-71.921875, -11.25)\"><rect><\/rect><foreignObject width=\"143.84375\" height=\"22.5\"><div xmlns=\"http:\/\/www.w3.org\/1999\/xhtml\" style=\"display: table-cell; white-space: nowrap; line-height: 1.5; max-width: 200px; text-align: center;\"><span class=\"nodeLabel\"><p>Inspecci\u00f3n y pruebas<\/p><\/span><\/div><\/foreignObject><\/g><\/g><g class=\"node default\" id=\"flowchart-E-7\" transform=\"translate(1113.0859375, 135.87109375)\"><polygon points=\"65.7421875,0 131.484375,-65.7421875 65.7421875,-131.484375 0,-65.7421875\" class=\"label-container\" transform=\"translate(-65.2421875, 65.7421875)\"><\/polygon><g class=\"label\" style=\"\" transform=\"translate(-39.4921875, -11.25)\"><rect><\/rect><foreignObject width=\"78.984375\" height=\"22.5\"><div xmlns=\"http:\/\/www.w3.org\/1999\/xhtml\" style=\"display: table-cell; white-space: nowrap; line-height: 1.5; max-width: 200px; text-align: center;\"><span class=\"nodeLabel\"><p>\u00bfConforme?<\/p><\/span><\/div><\/foreignObject><\/g><\/g><g class=\"node default\" id=\"flowchart-F-9\" transform=\"translate(1366.359375, 34.25)\"><rect class=\"basic label-container\" style=\"\" x=\"-118.515625\" y=\"-26.25\" width=\"237.03125\" height=\"52.5\"><\/rect><g class=\"label\" style=\"\" transform=\"translate(-88.515625, -11.25)\"><rect><\/rect><foreignObject width=\"177.03125\" height=\"22.5\"><div xmlns=\"http:\/\/www.w3.org\/1999\/xhtml\" style=\"display: table-cell; white-space: nowrap; line-height: 1.5; max-width: 200px; text-align: center;\"><span class=\"nodeLabel\"><p>Pendientes y correcciones<\/p><\/span><\/div><\/foreignObject><\/g><\/g><g class=\"node default\" id=\"flowchart-G-13\" transform=\"translate(1366.359375, 157.12109375)\"><rect class=\"basic label-container\" style=\"\" x=\"-88.7578125\" y=\"-26.25\" width=\"177.515625\" height=\"52.5\"><\/rect><g class=\"label\" style=\"\" transform=\"translate(-58.7578125, -11.25)\"><rect><\/rect><foreignObject width=\"117.515625\" height=\"22.5\"><div xmlns=\"http:\/\/www.w3.org\/1999\/xhtml\" style=\"display: table-cell; white-space: nowrap; line-height: 1.5; max-width: 200px; text-align: center;\"><span class=\"nodeLabel\"><p>Dictamen t\u00e9cnico<\/p><\/span><\/div><\/foreignObject><\/g><\/g><g class=\"node default\" id=\"flowchart-H-15\" transform=\"translate(1633.703125, 157.12109375)\"><rect class=\"basic label-container\" style=\"\" x=\"-98.828125\" y=\"-26.25\" width=\"197.65625\" height=\"52.5\"><\/rect><g class=\"label\" style=\"\" transform=\"translate(-68.828125, -11.25)\"><rect><\/rect><foreignObject width=\"137.65625\" height=\"22.5\"><div xmlns=\"http:\/\/www.w3.org\/1999\/xhtml\" style=\"display: table-cell; white-space: nowrap; line-height: 1.5; max-width: 200px; text-align: center;\"><span class=\"nodeLabel\"><p>Recepci\u00f3n definitiva<\/p><\/span><\/div><\/foreignObject><\/g><\/g><\/g><\/g><\/g><\/svg><figcaption>Flujo t\u00e9cnico entre la conclusi\u00f3n f\u00edsica y la recepci\u00f3n definitiva<\/figcaption><\/figure>\n\n\n\n<h2 class=\"wp-block-heading\">Ensayos, pruebas y comprobaciones de buena ejecuci\u00f3n forman parte de la recepci\u00f3n<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">El \u00a74 establece que, salvo disposici\u00f3n en contrario en el pliego o en un acto normativo, los ensayos, pruebas y dem\u00e1s comprobaciones necesarios para evaluar la buena ejecuci\u00f3n, cuando sean exigidos por normas t\u00e9cnicas oficiales, corren por cuenta del contratista.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Este dispositivo refuerza que demostrar la conformidad no es una actividad accesoria. Cuando un requisito solo puede validarse mediante una prueba, la prueba forma parte de la comprobaci\u00f3n de la entrega. El objeto no se vuelve t\u00e9cnicamente aceptable simplemente porque fue instalado.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">En sistemas de ingenier\u00eda, la verificaci\u00f3n puede involucrar ensayos el\u00e9ctricos, pruebas funcionales, comunicaci\u00f3n entre subsistemas, redundancia, desempe\u00f1o, seguridad, operaci\u00f3n ante fallos, parametrizaci\u00f3n, integraci\u00f3n y otros criterios definidos en el proyecto y en el contrato. La <a href=\"https:\/\/a3aengenharia.com.br\/conteudo\/artigos-tecnicos\/comissionamento-de-obras-edificacoes-sistemas-prediais\/\">Puesta en Servicio de Obras y Edificaciones<\/a> organiza estas pruebas en una secuencia documentada que puede sustentar la recepci\u00f3n.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">La Administraci\u00f3n tambi\u00e9n debe distinguir una prueba realizada de una prueba demostrada. Que un t\u00e9cnico afirme que \u201cfue probado\u201d no sustituye un informe que identifique procedimiento, instrumentos, condici\u00f3n de prueba, resultado, criterio de aprobaci\u00f3n y responsable.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">La documentaci\u00f3n final no es un accesorio administrativo<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">La calidad documental forma parte de la calidad de la entrega. El contratante necesita operar, mantener, auditar y eventualmente modificar aquello que recibi\u00f3. Sin documentaci\u00f3n confiable, la organizaci\u00f3n hereda un activo cuya condici\u00f3n real no puede reconstruirse con seguridad.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">En objetos de mayor complejidad, la documentaci\u00f3n final puede incluir As-Built, listas de equipos y n\u00fameros de serie, certificados, garant\u00edas, informes de pruebas, memorias, planos, diagramas, copias de seguridad, parametrizaciones, registros fotogr\u00e1ficos, manuales, capacitaciones, RNCs cerradas y otros documentos definidos en el contrato.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">El <a href=\"https:\/\/a3aengenharia.com.br\/conteudo\/artigos-tecnicos\/data-book-engenharia-documentos-rastreabilidade-aceite\/\">Data Book en Ingenier\u00eda<\/a> consolida este conjunto. Cuando el paquete es extenso o presenta inconsistencias, una <a href=\"https:\/\/a3aengenharia.com.br\/servicos\/implementacao\/auditoria-tecnica-data-book-documentacao-final-engenharia\/\">Auditor\u00eda T\u00e9cnica de Data Book y Documentaci\u00f3n Final<\/a> puede verificar completitud, revisi\u00f3n, trazabilidad y adherencia a lo contratado antes de la recepci\u00f3n.<\/p>\n\n\n\n<div class=\"wp-block-a3a-destaque\">\n<p class=\"wp-block-paragraph\"><strong>Documento entregado no significa documento validado.<\/strong> En el cierre, las incoherencias entre campo, As-Built, pruebas, garant\u00edas y registros pueden comprometer la trazabilidad de la recepci\u00f3n incluso cuando el paquete documental parece voluminoso.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><a href=\"https:\/\/a3aengenharia.com.br\/servicos\/implementacao\/auditoria-tecnica-data-book-documentacao-final-engenharia\/\">Auditor\u00eda T\u00e9cnica de Data Book y Documentaci\u00f3n Final de Ingenier\u00eda<\/a><\/p>\n<\/div>\n\n\n\n<h2 class=\"wp-block-heading\">La recepci\u00f3n provisional y definitiva no eliminan responsabilidades<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">El \u00a72 del art. 140 determina que la recepci\u00f3n provisional o definitiva no excluye la responsabilidad civil por la solidez y seguridad de la obra o servicio ni la responsabilidad \u00e9tico-profesional por la correcta ejecuci\u00f3n, dentro de los l\u00edmites de la ley o del contrato.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">La propia Ley tambi\u00e9n establece reglas espec\u00edficas para proyectos de obra y para obras. En el caso de un proyecto, la recepci\u00f3n definitiva no elimina la responsabilidad del proyectista o consultor por da\u00f1os causados por fallos de proyecto. En el caso de obras, la Ley preserva la responsabilidad del contratista respecto de solidez, seguridad, funcionalidad y correcci\u00f3n de vicios en los t\u00e9rminos del \u00a76.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Esto significa que la recepci\u00f3n no equivale a una renuncia a los derechos del contratante. Sin embargo, una documentaci\u00f3n de recepci\u00f3n mal producida puede dificultar la reconstrucci\u00f3n del historial, la identificaci\u00f3n de la condici\u00f3n existente en el hito de entrega y la gesti\u00f3n posterior de garant\u00edas.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">C\u00f3mo estructurar la recepci\u00f3n desde la planificaci\u00f3n de la contrataci\u00f3n<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">La mejor recepci\u00f3n es aquella que no necesita improvisar criterios al final. Los requisitos de entrega deben surgir en la planificaci\u00f3n y recorrer todo el ciclo de la contrataci\u00f3n.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">En la fase de ETP, la Administraci\u00f3n identifica la necesidad, los resultados esperados y las condicionantes del objeto. En los T\u00e9rminos de Referencia o Proyecto B\u00e1sico, transforma estas necesidades en alcance, requisitos, entregables, criterios de desempe\u00f1o y documentaci\u00f3n. En el pliego, preserva la coherencia de los criterios de selecci\u00f3n y ejecuci\u00f3n. Durante el contrato, la fiscalizaci\u00f3n y la gesti\u00f3n acompa\u00f1an evidencias, mediciones, cambios y pendientes. En el cierre, los registros ya existen y solo necesitan consolidarse.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">La secuencia puede estructurarse as\u00ed:<\/p>\n\n\n\n<figure class=\"wp-block-table\"><table><tbody><tr><td>Fase<\/td><td>Definici\u00f3n necesaria para la futura recepci\u00f3n<\/td><\/tr><tr><td>Planificaci\u00f3n<\/td><td>necesidad, riesgos, desempe\u00f1o esperado y estrategia de contrataci\u00f3n<\/td><\/tr><tr><td>Proyecto\/TR<\/td><td>alcance, documentos, pruebas, criterios de aceptaci\u00f3n y responsabilidades<\/td><\/tr><tr><td>Pliego<\/td><td>requisitos verificables y coherentes con la competencia<\/td><\/tr><tr><td>Habilitaci\u00f3n<\/td><td>comprobaci\u00f3n de la capacidad t\u00e9cnica exigida<\/td><\/tr><tr><td>Ejecuci\u00f3n<\/td><td>inspecciones, mediciones, RNCs, modificaciones y evidencias<\/td><\/tr><tr><td>Puesta en servicio<\/td><td>pruebas de desempe\u00f1o e integraci\u00f3n<\/td><\/tr><tr><td>Entrega<\/td><td>documentaci\u00f3n final, solicitud formal y condici\u00f3n para inspecci\u00f3n<\/td><\/tr><tr><td>Recepci\u00f3n<\/td><td>actas detalladas sustentadas por evidencias<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p class=\"wp-block-paragraph\">Esta visi\u00f3n conecta el art. 140 con el resto de la Ley 14.133 y con la ingenier\u00eda del proceso de contrataci\u00f3n. El art\u00edculo <a href=\"https:\/\/a3aengenharia.com.br\/conteudo\/artigos-tecnicos\/fiscal-contrato-apoio-tecnico-engenharia-consultiva-lei-14133\/\">\u00bfPuede el fiscal del contrato contar con apoyo t\u00e9cnico?<\/a> muestra c\u00f3mo el apoyo especializado puede complementar la fiscalizaci\u00f3n cuando la complejidad del objeto supera la capacidad disponible internamente.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Caso aplicado: sistema de seguridad electr\u00f3nica sustancialmente instalado<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Considere una implantaci\u00f3n de seguridad electr\u00f3nica con CCTV IP y control de acceso. La empresa ejecutora concluye la mayor parte de la instalaci\u00f3n f\u00edsica e informa que el sistema est\u00e1 listo. Las c\u00e1maras muestran im\u00e1genes, las controladoras est\u00e1n energizadas y el software est\u00e1 funcionando. Visualmente, la implantaci\u00f3n parece pr\u00f3xima al 100%.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Sin embargo, al iniciar la verificaci\u00f3n, la ingenier\u00eda del contratante identifica que el As-Built no corresponde integralmente al campo, existen equipos sin n\u00famero de serie registrado, los informes de pruebas no demuestran criterios de aprobaci\u00f3n, parte de las parametrizaciones no est\u00e1 documentada, existen pendientes de identificaci\u00f3n y el paquete de garant\u00edas no es trazable. La solicitud formal de recepci\u00f3n tambi\u00e9n fue presentada cuando quedaban pocos d\u00edas de la vigencia operacional planificada.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">En este escenario, la pregunta relevante no es \u201c\u00bflas c\u00e1maras est\u00e1n funcionando?\u201d. La pregunta es si las exigencias t\u00e9cnicas y contractuales est\u00e1n comprobablemente atendidas para el hito de recepci\u00f3n aplicable.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">La situaci\u00f3n ilustra por qu\u00e9 un <a href=\"https:\/\/a3aengenharia.com.br\/conteudo\/artigos-tecnicos\/sistema-instalado-nao-e-sistema-entregue-entrega-tecnica-aceite\/\">sistema instalado no es un sistema entregado<\/a>. Un porcentaje f\u00edsico elevado, una conclusi\u00f3n sustancial o un funcionamiento aparente no sustituyen documentaci\u00f3n, pruebas, trazabilidad y cierre de pendientes.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Qu\u00e9 verificar antes de firmar el acta de recepci\u00f3n<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Antes de la formalizaci\u00f3n, el responsable t\u00e9cnico, gestor o comisi\u00f3n debe trabajar sobre una matriz de verificaci\u00f3n compatible con el contrato. Un checklist gen\u00e9rico no sustituye los requisitos reales del objeto, pero algunos grupos de control son recurrentes.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Alcance y ejecuci\u00f3n<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Verificar si cantidades, sistemas, interfaces, materiales y servicios corresponden al alcance contratado y a las modificaciones formalmente aprobadas.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Calidad y no conformidades<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Confirmar la situaci\u00f3n de las inspecciones, RNCs, punch lists y pendientes. Los \u00edtems cr\u00edticos no pueden quedar ocultos por un alto porcentaje f\u00edsico.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Pruebas y desempe\u00f1o<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Comprobar si los ensayos y pruebas previstos fueron ejecutados en las condiciones correctas y si los resultados demuestran los criterios establecidos.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Documentaci\u00f3n final<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Verificar si los documentos poseen la revisi\u00f3n correcta, firma o responsabilidad cuando se exijan, coherencia entre s\u00ed y correspondencia con la condici\u00f3n ejecutada.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Garant\u00edas y operaci\u00f3n<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Confirmar inicio, plazo y alcance de las garant\u00edas, documentaci\u00f3n del fabricante, licencias, accesos, capacitaci\u00f3n, copias de seguridad y dem\u00e1s elementos necesarios para la operaci\u00f3n.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Formalizaci\u00f3n<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Registrar la decisi\u00f3n mediante acta detallada, indicando documentos analizados, pendientes, reservas y responsabilidades remanentes.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Cuando la contratista simplemente informa que termin\u00f3 la obra, el contenido <a href=\"https:\/\/a3aengenharia.com.br\/conteudo\/artigos-tecnicos\/empresa-contratada-finalizou-obra-o-que-verificar-recebimento-aceite\/\">Acta de Entrega de Obra: qu\u00e9 verificar antes de la recepci\u00f3n y aceptaci\u00f3n<\/a> presenta una secuencia pr\u00e1ctica para organizar esta evaluaci\u00f3n.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">D\u00f3nde intervienen la Ingenier\u00eda Consultiva y Owner\u2019s Engineering<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">El art. 140 define responsabilidades administrativas de recepci\u00f3n; no sustituye la necesidad de competencia t\u00e9cnica para evaluar objetos complejos. La decisi\u00f3n contin\u00faa perteneciendo a los agentes designados, pero su formaci\u00f3n puede exigir inspecciones, dict\u00e1menes, ensayos, an\u00e1lisis documental y conocimiento multidisciplinar.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">La <a href=\"https:\/\/a3aengenharia.com.br\/conteudo\/artigos-tecnicos\/owner-engineering-engenharia-proprietario\/\">Owner\u2019s Engineering<\/a> act\u00faa del lado del propietario para preservar requisitos, interfaces, calidad, evidencias y criterios de aceptaci\u00f3n a lo largo de la implantaci\u00f3n. Cuando se contrata desde la planificaci\u00f3n, reduce la probabilidad de que el organismo descubra problemas solamente en el cierre.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Una cadena t\u00e9cnicamente robusta puede incluir:<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Proyecto y requisitos \u2192 revisi\u00f3n t\u00e9cnica de la contrataci\u00f3n \u2192 apoyo a la licitaci\u00f3n \u2192 habilitaci\u00f3n t\u00e9cnica \u2192 an\u00e1lisis del Proyecto Ejecutivo \u2192 fiscalizaci\u00f3n\/Owner\u2019s Engineering \u2192 QA\/QC \u2192 puesta en servicio \u2192 documentaci\u00f3n final \u2192 dictamen t\u00e9cnico \u2192 recepci\u00f3n.<\/strong><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Esta actuaci\u00f3n no sustituye la autoridad administrativa. Proporciona capacidad t\u00e9cnica independiente para que la decisi\u00f3n se tome con evidencias.<\/p>\n\n\n\n<div class=\"wp-block-a3a-destaque\">\n<p class=\"wp-block-paragraph\"><strong>La independencia t\u00e9cnica es especialmente valiosa en el cierre.<\/strong> La ejecutora demuestra aquello que realiz\u00f3; la ingenier\u00eda del propietario verifica, contrasta requisitos, organiza evidencias y sustenta la decisi\u00f3n del contratante sobre pendientes, correcciones y aceptaci\u00f3n.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><a href=\"https:\/\/a3aengenharia.com.br\/conteudo\/artigos-tecnicos\/owner-engineering-engenharia-proprietario\/\">Owner\u2019s Engineering y gobernanza t\u00e9cnica del propietario<\/a><\/p>\n<\/div>\n\n\n\n<h2 class=\"wp-block-heading\">C\u00f3mo contratar apoyo t\u00e9cnico para el proceso de recepci\u00f3n<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">El alcance del apoyo debe definirse seg\u00fan la fase del contrato y el problema existente. En una contrataci\u00f3n todav\u00eda en planificaci\u00f3n, la prioridad es estructurar criterios, documentos y m\u00e9todos de recepci\u00f3n. Durante la ejecuci\u00f3n, la necesidad se desplaza hacia fiscalizaci\u00f3n, evidencias y gesti\u00f3n de pendientes. Cerca del cierre, el enfoque pasa a inspecci\u00f3n final, puesta en servicio, auditor\u00eda documental y dictamen t\u00e9cnico.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Un alcance consistente puede prever:<\/p>\n\n\n\n<ul class=\"wp-block-list\"><li>revisi\u00f3n de los requisitos contractuales de recepci\u00f3n;<\/li><li>matriz de criterios y evidencias;<\/li><li>inspecciones de campo;<\/li><li>an\u00e1lisis de As-Built y documentaci\u00f3n final;<\/li><li>acompa\u00f1amiento de ensayos y pruebas;<\/li><li>elaboraci\u00f3n o revisi\u00f3n de punch list;<\/li><li>verificaci\u00f3n de correcciones;<\/li><li>auditor\u00eda de Data Book;<\/li><li>apoyo al acta detallada y al dictamen t\u00e9cnico;<\/li><li>soporte a la transici\u00f3n hacia operaci\u00f3n y garant\u00edas.<\/li><\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">La <a href=\"https:\/\/a3aengenharia.com.br\/servicos\/implementacao\/recebimento-tecnico-obras-servicos-engenharia\/\">Recepci\u00f3n T\u00e9cnica de Obras y Servicios de Ingenier\u00eda<\/a> materializa esta necesidad cuando el contratante requiere una evaluaci\u00f3n organizada del objeto antes del cierre.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Consideraciones finales<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">El art. 140 de la Ley 14.133 transforma la recepci\u00f3n en un proceso verificable. Para obras y servicios existen responsabilidades distintas en la recepci\u00f3n provisional y definitiva, ambas sustentadas por actas detalladas. La Ley admite el rechazo del objeto en desacuerdo, exige que plazos y m\u00e9todos sean definidos y preserva la necesidad de ensayos, pruebas y responsabilidades posteriores a la recepci\u00f3n.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Para la ingenier\u00eda del contratante, la consecuencia pr\u00e1ctica es directa: <strong>recibir no es registrar que la ejecutora termin\u00f3; es formar y documentar evidencia suficiente de que el objeto cumple el hito t\u00e9cnico y contractual aplicable<\/strong>. Cuanto antes se definan criterios, documentos, pruebas y responsabilidades, menor ser\u00e1 la probabilidad de que el cierre se transforme en una disputa sobre aquello que deber\u00eda haber sido demostrado durante la ejecuci\u00f3n.<\/p>\n\n\n\n<details class=\"wp-block-details is-layout-flow wp-block-details-is-layout-flow\"><summary>Referencias t\u00e9cnicas<\/summary>\n<p class=\"wp-block-paragraph\">[1] BRASIL. Ley n.\u00ba 14.133, de 1 de abril de 2021. Ley de Licitaciones y Contratos Administrativos. Disponible en: <a href=\"https:\/\/www.planalto.gov.br\/ccivil_03\/_ato2019-2022\/2021\/lei\/l14133.htm\">https:\/\/www.planalto.gov.br\/ccivil_03\/_ato2019-2022\/2021\/lei\/l14133.htm<\/a><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">[2] TRIBUNAL DE CUENTAS DE LA UNI\u00d3N (TCU). Licitaciones y Contratos: gesti\u00f3n del contrato y recepci\u00f3n definitiva. Disponible en: <a href=\"https:\/\/licitacoesecontratos.tcu.gov.br\/6-1-6-gestao-do-contrato-e-recebimento-definitivo-2\/\">https:\/\/licitacoesecontratos.tcu.gov.br\/6-1-6-gestao-do-contrato-e-recebimento-definitivo-2\/<\/a><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">[3] INTERNATIONAL ORGANIZATION FOR STANDARDIZATION (ISO). ISO 21502:2020 \u2014 Project, programme and portfolio management \u2014 Guidance on project management. Disponible en: <a href=\"https:\/\/www.iso.org\/standard\/74947.html\">https:\/\/www.iso.org\/standard\/74947.html<\/a><\/p>\n<\/details>\n\n\n\n<details class=\"wp-block-details is-layout-flow wp-block-details-is-layout-flow\"><summary>Preguntas frecuentes<\/summary>\n<div class=\"schema-faq wp-block-yoast-faq-block\"><div class=\"schema-faq-section\" id=\"faq-question-o-que-diz-o-art-140-da-lei-14-133-sobre-obras-e--14bd05eb\"><strong class=\"schema-faq-question\">\u00bfQu\u00e9 dice el art. 140 de la Ley 14.133 sobre obras y servicios?<\/strong> <p class=\"schema-faq-answer\">El art. 140 prev\u00e9 recepci\u00f3n provisional por el responsable del seguimiento y fiscalizaci\u00f3n, mediante acta detallada despu\u00e9s de verificar las exigencias t\u00e9cnicas, y recepci\u00f3n definitiva por servidor o comisi\u00f3n designada, tambi\u00e9n mediante acta detallada que demuestre el cumplimiento de las exigencias contractuales.<\/p><\/div><div class=\"schema-faq-section\" id=\"faq-question-recebimento-provis-rio-significa-que-a-obra-foi--e9a588a1\"><strong class=\"schema-faq-question\">\u00bfLa recepci\u00f3n provisional significa que la obra fue aceptada definitivamente?<\/strong> <p class=\"schema-faq-answer\">No. La recepci\u00f3n provisional es un hito distinto de la recepci\u00f3n definitiva. Est\u00e1 vinculada a la verificaci\u00f3n de las exigencias de car\u00e1cter t\u00e9cnico y puede ser seguida por tratamiento de pendientes, correcciones, verificaciones adicionales y formalizaci\u00f3n definitiva conforme al contrato y reglamento.<\/p><\/div><div class=\"schema-faq-section\" id=\"faq-question-a-administra-o-pode-rejeitar-uma-obra-ou-servi-o-d65e743d\"><strong class=\"schema-faq-question\">\u00bfLa Administraci\u00f3n puede rechazar una obra o servicio entregado?<\/strong> <p class=\"schema-faq-answer\">S\u00ed. El \u00a71 del art. 140 permite rechazar el objeto, total o parcialmente, cuando est\u00e9 en desacuerdo con el contrato. La decisi\u00f3n debe estar sustentada por criterios y evidencias que demuestren la no conformidad.<\/p><\/div><div class=\"schema-faq-section\" id=\"faq-question-quem-define-o-prazo-entre-recebimento-provis-rio-cf310843\"><strong class=\"schema-faq-question\">\u00bfQui\u00e9n define el plazo entre recepci\u00f3n provisional y definitiva?<\/strong> <p class=\"schema-faq-answer\">El \u00a73 del art. 140 establece que los plazos y m\u00e9todos para las recepciones provisional y definitiva deben definirse en reglamento o en el contrato. Por ello, estos hitos deben planificarse desde la contrataci\u00f3n.<\/p><\/div><div class=\"schema-faq-section\" id=\"faq-question-quem-paga-os-testes-necess-rios-ao-recebimento-f8f1126e\"><strong class=\"schema-faq-question\">\u00bfQui\u00e9n paga las pruebas necesarias para la recepci\u00f3n?<\/strong> <p class=\"schema-faq-answer\">Salvo disposici\u00f3n en contrario en el pliego o en un acto normativo, el \u00a74 del art. 140 establece que ensayos, pruebas y dem\u00e1s comprobaciones exigidos por normas t\u00e9cnicas oficiales para evaluar la buena ejecuci\u00f3n corren por cuenta del contratista.<\/p><\/div><div class=\"schema-faq-section\" id=\"faq-question-o-recebimento-definitivo-elimina-a-responsabilid-ed37ae6b\"><strong class=\"schema-faq-question\">\u00bfLa recepci\u00f3n definitiva elimina la responsabilidad de la contratista?<\/strong> <p class=\"schema-faq-answer\">No. La Ley preserva responsabilidades civiles, \u00e9tico-profesionales, de solidez, seguridad, funcionalidad y correcci\u00f3n de vicios en los t\u00e9rminos aplicables, incluso despu\u00e9s de la recepci\u00f3n.<\/p><\/div><div class=\"schema-faq-section\" id=\"faq-question-quando-vale-contratar-apoio-t-cnico-para-o-receb-7673649d\"><strong class=\"schema-faq-question\">\u00bfCu\u00e1ndo conviene contratar apoyo t\u00e9cnico para la recepci\u00f3n?<\/strong> <p class=\"schema-faq-answer\">Cuando el objeto exige especializaci\u00f3n que el equipo interno no posee integralmente, cuando existe documentaci\u00f3n extensa o inconsistente, sistemas cr\u00edticos, m\u00faltiples interfaces, pendientes relevantes, necesidad de puesta en servicio o dudas sobre la conformidad entre contrato, proyecto, ejecuci\u00f3n y evidencias.<\/p><\/div><\/div>\n<\/details>\n\n\n\n<details class=\"wp-block-details is-layout-flow wp-block-details-is-layout-flow\"><summary>Materiales t\u00e9cnicos complementarios<\/summary>\n<h4 class=\"wp-block-heading\">Soluciones relacionadas<\/h4>\n\n<ul class=\"wp-block-list\"><li><a href=\"https:\/\/a3aengenharia.com.br\/solucoes\/gestao-e-governanca-de-engenharia\/gestao-requisitos-evidencias-criterios-aceite\/\">Gesti\u00f3n de Requisitos, Evidencias y Criterios de Aceptaci\u00f3n<\/a><\/li><li><a href=\"https:\/\/a3aengenharia.com.br\/solucoes\/gestao-e-governanca-de-engenharia\/gestao-contratos-escopo-entregaveis\/\">Gesti\u00f3n de Contratos, Alcance y Entregables<\/a><\/li><li><a href=\"https:\/\/a3aengenharia.com.br\/solucoes\/gestao-e-governanca-de-engenharia\/gestao-pendencias-rfis-nao-conformidades\/\">Gesti\u00f3n de Pendientes, RFIs y No Conformidades<\/a><\/li><\/ul>\n\n<h4 class=\"wp-block-heading\">Servicios relacionados<\/h4>\n\n<ul class=\"wp-block-list\"><li><a href=\"https:\/\/a3aengenharia.com.br\/servicos\/implementacao\/recebimento-tecnico-obras-servicos-engenharia\/\">Recepci\u00f3n T\u00e9cnica de Obras y Servicios de Ingenier\u00eda<\/a><\/li><li><a href=\"https:\/\/a3aengenharia.com.br\/servicos\/implementacao\/apoio-tecnico-fiscalizacao-obras-contratos-engenharia\/\">Apoyo T\u00e9cnico a la Fiscalizaci\u00f3n de Obras y Contratos de Ingenier\u00eda<\/a><\/li><li><a href=\"https:\/\/a3aengenharia.com.br\/servicos\/implementacao\/auditoria-tecnica-data-book-documentacao-final-engenharia\/\">Auditor\u00eda T\u00e9cnica de Data Book y Documentaci\u00f3n Final de Ingenier\u00eda<\/a><\/li><li><a href=\"https:\/\/a3aengenharia.com.br\/servicos\/planejamento\/revisao-tecnica-termo-referencia-obras-servicos-engenharia\/\">Revisi\u00f3n T\u00e9cnica de T\u00e9rminos de Referencia para Obras y Servicios de Ingenier\u00eda<\/a><\/li><li><a href=\"https:\/\/a3aengenharia.com.br\/servicos\/planejamento\/revisao-tecnica-edital-anexos-licitacoes-engenharia\/\">Revisi\u00f3n T\u00e9cnica de Pliego y Anexos para Licitaciones de Ingenier\u00eda<\/a><\/li><\/ul>\n\n<h4 class=\"wp-block-heading\">Contenidos principales sobre el tema<\/h4>\n\n<ul class=\"wp-block-list\"><li><a href=\"https:\/\/a3aengenharia.com.br\/conteudo\/artigos-tecnicos\/recebimento-provisorio-definitivo-engenharia-diferencas-riscos-documentacao\/\">Acta de Recepci\u00f3n Definitiva: por qu\u00e9 una instalaci\u00f3n concluida no significa una entrega aceptada<\/a><\/li><li><a href=\"https:\/\/a3aengenharia.com.br\/conteudo\/artigos-tecnicos\/empresa-contratada-finalizou-obra-o-que-verificar-recebimento-aceite\/\">Acta de Entrega de Obra: qu\u00e9 verificar antes de la recepci\u00f3n y aceptaci\u00f3n<\/a><\/li><li><a href=\"https:\/\/a3aengenharia.com.br\/conteudo\/artigos-tecnicos\/termo-de-aceite-tecnico-engenharia-validacao-pendencias-encerramento\/\">Certificado de Aceptaci\u00f3n T\u00e9cnica en Ingenier\u00eda<\/a><\/li><li><a href=\"https:\/\/a3aengenharia.com.br\/conteudo\/artigos-tecnicos\/sistema-instalado-nao-e-sistema-entregue-entrega-tecnica-aceite\/\">Sistema instalado no es sistema entregado<\/a><\/li><li><a href=\"https:\/\/a3aengenharia.com.br\/conteudo\/artigos-tecnicos\/fiscal-contrato-apoio-tecnico-engenharia-consultiva-lei-14133\/\">\u00bfPuede el fiscal del contrato tener apoyo t\u00e9cnico?<\/a><\/li><\/ul>\n\n<h4 class=\"wp-block-heading\">Contenidos t\u00e9cnicos relacionados<\/h4>\n\n<ul class=\"wp-block-list\"><li><a href=\"https:\/\/a3aengenharia.com.br\/conteudo\/artigos-tecnicos\/owner-engineering-engenharia-proprietario\/\">Owner\u2019s Engineering: Gobernanza T\u00e9cnica para Obras y Sistemas Cr\u00edticos<\/a><\/li><li><a href=\"https:\/\/a3aengenharia.com.br\/conteudo\/artigos-tecnicos\/data-book-engenharia-documentos-rastreabilidade-aceite\/\">Data Book en Ingenier\u00eda<\/a><\/li><li><a href=\"https:\/\/a3aengenharia.com.br\/conteudo\/artigos-tecnicos\/relatorio-nao-conformidade-rnc-ncr-engenharia\/\">Informe de No Conformidad (RNC\/NCR)<\/a><\/li><li><a href=\"https:\/\/a3aengenharia.com.br\/conteudo\/artigos-tecnicos\/handover-tecnico-engenharia-entrega-operacao\/\">Handover T\u00e9cnico en Ingenier\u00eda<\/a><\/li><li><a href=\"https:\/\/a3aengenharia.com.br\/conteudo\/guias-tecnicos\/guia-completo-sobre-licitacoes-e-contratos-de-engenharia\/\">Gu\u00eda Completa sobre Licitaciones y Contratos de Obras y Servicios de Ingenier\u00eda<\/a><\/li><li><a href=\"https:\/\/a3aengenharia.com.br\/conteudo\/whitepapers\/framework-handover-tecnico-obras-sistemas-operacao\/\">Framework de Handover T\u00e9cnico de Obras y Sistemas<\/a><\/li><\/ul>\n<\/details>\n","protected":false},"excerpt":{"rendered":"<p>Conozca el art. 140 de la Ley 14.133 aplicado a la recepci\u00f3n de obras y servicios: acta detallada, recepci\u00f3n provisional y definitiva, rechazo, pruebas, documentaci\u00f3n y responsabilidades.<\/p>\n","protected":false},"author":1,"featured_media":0,"parent":0,"template":"","meta":{"_a3a_global_related_solutions":[],"_a3a_global_related_services":[70993,70989,72892],"_a3a_global_related_materials":[73210,73206,73120,73116,73134,73130,72890,72870],"_a3a_post_lang":"es-es","_a3a_translation_group_id":"3ed8120a-154e-484a-9992-41cfafe3ed17","_a3a_i18n_canonical_slug":"articulo-140-ley-14133-recepcion-obras-servicios-ingenieria"},"categories":[],"segments":[],"mercados":[],"etapas":[],"class_list":["post-73216","articles","type-articles","status-publish","hentry"],"_links":{"self":[{"href":"https:\/\/a3aengenharia.com\/es-es\/wp-json\/wp\/v2\/articles\/73216","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/a3aengenharia.com\/es-es\/wp-json\/wp\/v2\/articles"}],"about":[{"href":"https:\/\/a3aengenharia.com\/es-es\/wp-json\/wp\/v2\/types\/articles"}],"author":[{"embeddable":true,"href":"https:\/\/a3aengenharia.com\/es-es\/wp-json\/wp\/v2\/users\/1"}],"version-history":[{"count":1,"href":"https:\/\/a3aengenharia.com\/es-es\/wp-json\/wp\/v2\/articles\/73216\/revisions"}],"predecessor-version":[{"id":73218,"href":"https:\/\/a3aengenharia.com\/es-es\/wp-json\/wp\/v2\/articles\/73216\/revisions\/73218"}],"wp:attachment":[{"href":"https:\/\/a3aengenharia.com\/es-es\/wp-json\/wp\/v2\/media?parent=73216"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/a3aengenharia.com\/es-es\/wp-json\/wp\/v2\/categories?post=73216"},{"taxonomy":"segments","embeddable":true,"href":"https:\/\/a3aengenharia.com\/es-es\/wp-json\/wp\/v2\/segments?post=73216"},{"taxonomy":"mercados","embeddable":true,"href":"https:\/\/a3aengenharia.com\/es-es\/wp-json\/wp\/v2\/mercados?post=73216"},{"taxonomy":"etapas","embeddable":true,"href":"https:\/\/a3aengenharia.com\/es-es\/wp-json\/wp\/v2\/etapas?post=73216"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}