{"id":73138,"date":"2026-08-29T16:50:50","date_gmt":"2026-08-29T19:50:50","guid":{"rendered":"https:\/\/a3aengenharia.com\/?post_type=articles&#038;p=73138"},"modified":"2026-08-29T16:50:50","modified_gmt":"2026-08-29T19:50:50","slug":"certificados-capacidad-tecnica-licitaciones-ingenieria-experiencia-compatible","status":"publish","type":"articles","link":"https:\/\/a3aengenharia.com\/es-es\/contenido\/articulos-tecnicos\/certificados-capacidad-tecnica-licitaciones-ingenieria-experiencia-compatible\/","title":{"rendered":"Certificados de Capacidad T\u00e9cnica en Licitaciones de Ingenier\u00eda: c\u00f3mo analizar experiencia compatible"},"content":{"rendered":"\n<p class=\"wp-block-paragraph\">Los <strong>certificados de capacidad t\u00e9cnica<\/strong> son instrumentos utilizados en la habilitaci\u00f3n para demostrar que el licitador posee experiencia compatible con el objeto que la Administraci\u00f3n pretende contratar. En licitaciones de ingenier\u00eda, el an\u00e1lisis no debe reducirse a buscar palabras id\u00e9nticas entre el certificado y el pliego. El punto central es verificar si la experiencia acreditada demuestra capacidad t\u00e9cnico-profesional y\/o t\u00e9cnico-operativa adecuada a las <strong>caracter\u00edsticas, complejidad tecnol\u00f3gica, escala y condiciones relevantes<\/strong> de la futura contrataci\u00f3n, dentro de los l\u00edmites definidos por la Ley brasile\u00f1a n\u00ba 14.133\/2021 y por el propio instrumento de convocatoria.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Para el organismo p\u00fablico, el desaf\u00edo es doble. Exigencias insuficientes pueden permitir la habilitaci\u00f3n de una empresa que no demostr\u00f3 capacidad para ejecutar el objeto. Exigencias excesivas, por otra parte, pueden restringir indebidamente la competencia, elevar precios, generar impugnaciones o excluir licitadores t\u00e9cnicamente aptos. Por ello, los criterios deben nacer de un an\u00e1lisis t\u00e9cnico de las partes realmente relevantes de la contrataci\u00f3n y ser evaluados de forma objetiva, documentada y proporcional.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Un certificado tampoco debe tratarse como prueba absoluta de que la empresa ejecutar\u00e1 correctamente el nuevo contrato. Acredita una experiencia anterior dentro de lo efectivamente documentado. La Administraci\u00f3n todav\u00eda debe comparar alcance, cantidades, complejidad, responsabilidades, profesionales, condiciones de ejecuci\u00f3n y eventuales diligencias antes de concluir sobre la habilitaci\u00f3n.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Qu\u00e9 demuestra realmente un certificado de capacidad t\u00e9cnica<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">El certificado acredita una experiencia anterior declarada y documentada. Debe permitir que la Administraci\u00f3n identifique <strong>qui\u00e9n ejecut\u00f3, para qui\u00e9n, cu\u00e1l fue el objeto, qu\u00e9 parte se realiz\u00f3, en qu\u00e9 cantidad, con qu\u00e9 caracter\u00edsticas y, cuando corresponda, bajo responsabilidad de qu\u00e9 profesionales<\/strong>.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">El documento no debe interpretarse de forma aislada cuando su contenido no sea suficiente para esclarecer la experiencia. Contrato, \u00d3rdenes de Servicio, planillas, facturas, certificados, registros profesionales, documentos de acervo y otros elementos pueden ser necesarios para confirmar una condici\u00f3n ya existente o aclarar lo que efectivamente se ejecut\u00f3, observando las reglas del pliego y de la legislaci\u00f3n.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">En la pr\u00e1ctica, la pregunta correcta no es:<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>\u201c\u00bfEl certificado menciona exactamente el mismo nombre del objeto?\u201d<\/strong><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">La pregunta es:<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>\u201c\u00bfLa experiencia acreditada demuestra aptitud para ejecutar las partes t\u00e9cnicamente relevantes de este objeto?\u201d<\/strong><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Este cambio evita tanto la aceptaci\u00f3n autom\u00e1tica de documentos gen\u00e9ricos como el rechazo indebido de experiencias t\u00e9cnicamente equivalentes.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">La cualificaci\u00f3n t\u00e9cnico-profesional y t\u00e9cnico-operativa no son lo mismo<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">El art\u00edculo 67 de la Ley brasile\u00f1a n\u00ba 14.133\/2021 trata la documentaci\u00f3n relativa a la cualificaci\u00f3n t\u00e9cnico-profesional y t\u00e9cnico-operativa. Aunque est\u00e1n relacionadas, responden a preguntas diferentes.<\/p>\n\n\n\n<figure class=\"wp-block-table\"><table><tbody><tr><td>Dimensi\u00f3n<\/td><td>Pregunta central<\/td><td>Evidencia t\u00edpica<\/td><\/tr><tr><td>T\u00e9cnico-profesional<\/td><td>\u00bfExiste un profesional con experiencia y responsabilidad t\u00e9cnica compatibles?<\/td><td>profesional indicado, registro en el consejo competente cuando corresponda y experiencia t\u00e9cnica acreditada<\/td><\/tr><tr><td>T\u00e9cnico-operativa<\/td><td>\u00bfLa organizaci\u00f3n demuestra capacidad para ejecutar servicios de complejidad tecnol\u00f3gica y operativa equivalente o superior?<\/td><td>certificados, atestados y dem\u00e1s documentos admitidos por la legislaci\u00f3n y el pliego<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p class=\"wp-block-paragraph\">La <strong>cualificaci\u00f3n t\u00e9cnico-profesional<\/strong> est\u00e1 relacionada con la experiencia de los profesionales que asumir\u00e1n la responsabilidad t\u00e9cnica del trabajo. La ley prev\u00e9 la presentaci\u00f3n de un profesional, debidamente registrado en el consejo profesional competente cuando corresponda, que posea acreditaci\u00f3n de responsabilidad t\u00e9cnica por ejecuci\u00f3n de obra o servicio de caracter\u00edsticas semejantes.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">La <strong>cualificaci\u00f3n t\u00e9cnico-operativa<\/strong> est\u00e1 relacionada con la capacidad de la empresa u organizaci\u00f3n para movilizar procesos, estructura, recursos y experiencia con el fin de ejecutar un objeto de complejidad compatible. El art\u00edculo 67 tambi\u00e9n prev\u00e9 certificados o atestados que demuestren capacidad operativa en servicios similares de complejidad tecnol\u00f3gica y operativa equivalente o superior.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Esta separaci\u00f3n es esencial. Una empresa puede disponer de un profesional con excelente acervo t\u00e9cnico y, aun as\u00ed, necesitar demostrar capacidad operativa cuando el pliego la exija leg\u00edtimamente. Del mismo modo, un amplio historial empresarial no sustituye la necesidad de un profesional habilitado cuando la actividad exige responsabilidad t\u00e9cnica espec\u00edfica.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">La <a href=\"https:\/\/a3aengenharia.com.br\/conteudo\/guias-tecnicos\/guia-completo-sobre-licitacoes-e-contratos-de-engenharia\/\">Gu\u00eda Completa sobre Licitaciones y Contratos de Obras y Servicios de Ingenier\u00eda<\/a> sit\u00faa la habilitaci\u00f3n dentro del proceso completo de contrataci\u00f3n, desde la planificaci\u00f3n hasta la fiscalizaci\u00f3n y recepci\u00f3n.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Certificado, ART\/RRT y CAT: documentos relacionados, pero con funciones distintas<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">En ingenier\u00eda y arquitectura, es habitual que el an\u00e1lisis involucre documentos emitidos o registrados en consejos profesionales. Sin embargo, el organismo no debe tratar todas las siglas como si fueran equivalentes.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">La ART, RRT o documento correspondiente registra la responsabilidad t\u00e9cnica conforme a la profesi\u00f3n y al consejo aplicable. La CAT, en el sistema brasile\u00f1o Confea\/Crea, est\u00e1 vinculada al acervo t\u00e9cnico profesional y certifica actividades registradas para el profesional seg\u00fan las reglas del consejo. Por su parte, el certificado emitido por el contratante describe la experiencia y el objeto ejecutado.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">La forma documental exigible depende del tipo de cualificaci\u00f3n, del objeto, del consejo competente y de lo permitido por la legislaci\u00f3n. Por ello, el pliego debe evitar f\u00f3rmulas gen\u00e9ricas como \u201ccertificados registrados en CREA\u201d sin verificar si la exigencia corresponde efectivamente a la naturaleza de la comprobaci\u00f3n pretendida.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">El punto t\u00e9cnico consiste en separar tres dimensiones:<\/p>\n\n\n\n<ol class=\"wp-block-list\"><li><strong>qui\u00e9n asumi\u00f3 la responsabilidad t\u00e9cnica<\/strong>;<\/li><li><strong>qu\u00e9 fue efectivamente ejecutado<\/strong>;<\/li><li><strong>qu\u00e9 experiencia pertenece al profesional y cu\u00e1l pertenece a la organizaci\u00f3n<\/strong>.<\/li><\/ol>\n\n\n\n<p class=\"wp-block-paragraph\">Mezclar estas dimensiones puede llevar tanto a una habilitaci\u00f3n indebida como a una restricci\u00f3n innecesaria de la competencia.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">El pliego debe exigir experiencia similar, no necesariamente id\u00e9ntica<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">La jurisprudencia del TCU refuerza que los requisitos de calificaci\u00f3n t\u00e9cnica deben admitir experiencia previa en obras o servicios de caracter\u00edsticas <strong>similares o de complejidad superior<\/strong>, y no necesariamente id\u00e9nticas al objeto futuro.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Este principio es especialmente importante en ingenier\u00eda porque una misma competencia puede aparecer en proyectos con nomenclaturas diferentes.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Ejemplo: un pliego para implantaci\u00f3n de videovigilancia puede exigir experiencia relevante en arquitectura IP, VMS, almacenamiento, integraci\u00f3n y puesta en servicio. Un certificado anterior puede utilizar expresiones diferentes, como \u201csistema integrado de seguridad\u201d, \u201cCFTV IP\u201d, \u201cplataforma de gesti\u00f3n de video\u201d o \u201ccentral de monitoreo\u201d. El an\u00e1lisis t\u00e9cnico debe identificar el contenido efectivamente ejecutado, y no solo la correspondencia literal de palabras.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Lo contrario tambi\u00e9n es cierto. Un documento cuyo t\u00edtulo parece similar puede no acreditar la parcela relevante. Un certificado denominado \u201cimplantaci\u00f3n de sistema de seguridad\u201d puede haber involucrado \u00fanicamente suministro de equipos, sin integraci\u00f3n, dise\u00f1o, instalaci\u00f3n, pruebas o documentaci\u00f3n.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Por ello, el an\u00e1lisis debe descender al <strong>alcance real<\/strong>.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Parcelas de mayor relevancia o valor significativo<\/h2>\n\n\n\n<div class=\"wp-block-a3a-destaque\">\n<p class=\"wp-block-paragraph\">Los criterios de capacidad t\u00e9cnica deben nacer de las parcelas relevantes y del riesgo real del objeto. Exigir demasiados documentos no hace m\u00e1s segura la contrataci\u00f3n si no demuestran la competencia que realmente importa.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><a href=\"https:\/\/a3aengenharia.com.br\/servicos\/servicos-transversais\/apoio-tecnico-licitacao-analise-propostas-engenharia\/\">Estructurar apoyo t\u00e9cnico para licitaciones de ingenier\u00eda<\/a><\/p>\n<\/div>\n\n\n\n<p class=\"wp-block-paragraph\">La Ley brasile\u00f1a n\u00ba 14.133\/2021 restringe la exigencia de certificados a las parcelas de mayor relevancia o valor significativo del objeto. El art. 67 establece que, para esta finalidad, se consideran parcelas de valor significativo aquellas con valor individual igual o superior al 4% del valor total estimado de la contrataci\u00f3n.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">La l\u00f3gica es evitar que el organismo convierta cada \u00edtem de la planilla en requisito de experiencia previa. Esto podr\u00eda exigir que el licitante ya hubiera ejecutado una copia casi perfecta del nuevo contrato, reduciendo la competencia sin un beneficio t\u00e9cnico proporcional.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">La selecci\u00f3n de las parcelas debe estar motivada. En ingenier\u00eda, pueden ser relevantes no solo los \u00edtems de mayor precio, sino tambi\u00e9n actividades cuya falla represente un riesgo t\u00e9cnico desproporcionado para el proyecto, siempre que el encuadre legal y la motivaci\u00f3n est\u00e9n adecuadamente estructurados.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Una matriz simple puede ayudar:<\/p>\n\n\n\n<figure class=\"wp-block-table\"><table><tbody><tr><td>Parcela<\/td><td>Valor relativo<\/td><td>Criticidad t\u00e9cnica<\/td><td>Complejidad<\/td><td>\u00bfExigir acreditaci\u00f3n?<\/td><td>Justificaci\u00f3n<\/td><\/tr><tr><td>Sistema principal<\/td><td>alta<\/td><td>alta<\/td><td>alta<\/td><td>s\u00ed<\/td><td>capacidad central del objeto<\/td><\/tr><tr><td>Infraestructura auxiliar<\/td><td>media<\/td><td>media<\/td><td>baja<\/td><td>evaluar<\/td><td>depende de la relevancia real<\/td><\/tr><tr><td>\u00cdtem accesorio<\/td><td>baja<\/td><td>baja<\/td><td>baja<\/td><td>normalmente no<\/td><td>la exigencia puede ser desproporcionada<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p class=\"wp-block-paragraph\">La decisi\u00f3n debe estar vinculada al planeamiento y al Proyecto B\u00e1sico o T\u00e9rminos de Referencia. Si la Administraci\u00f3n no puede explicar por qu\u00e9 esa parcela exige experiencia previa, probablemente deba revisarse el criterio de habilitaci\u00f3n.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Cantidades m\u00ednimas: hasta d\u00f3nde puede exigir la Administraci\u00f3n<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Observado el art. 67, \u00a7\u00a7 1\u00ba y 2\u00ba, la Administraci\u00f3n puede exigir certificados con cantidades m\u00ednimas de hasta <strong>el 50% de las parcelas<\/strong> calificadas conforme a los criterios legales. La ley tambi\u00e9n proh\u00edbe limitaciones de tiempo y de lugares espec\u00edficos relativas a los certificados en estas condiciones.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Esto no significa que el 50% deba utilizarse autom\u00e1ticamente. Es un l\u00edmite, no una meta. La cantidad debe guardar relaci\u00f3n con el riesgo y con aquello que realmente demuestra capacidad.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Una exigencia del 50% puede ser defendible en determinada actividad cr\u00edtica e innecesaria en otra. Desde el punto de vista de ingenier\u00eda, el equipo debe preguntarse:<\/p>\n\n\n\n<ul class=\"wp-block-list\"><li>\u00bfqu\u00e9 escala m\u00ednima demuestra que el licitante ya enfrent\u00f3 una complejidad similar?<\/li><li>\u00bfla dificultad aumenta linealmente con la cantidad?<\/li><li>\u00bfexiste beneficio t\u00e9cnico en exigir una cantidad elevada?<\/li><li>\u00bfel objeto admite la suma de experiencias?<\/li><li>\u00bfel criterio excluye empresas capacitadas sin mejorar la seguridad de la contrataci\u00f3n?<\/li><li>\u00bfexiste una parcela especializada que pueda subcontratarse seg\u00fan lo permitido por la ley?<\/li><\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">La motivaci\u00f3n t\u00e9cnica debe estar documentada antes del certamen.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">C\u00f3mo comparar un certificado de capacidad t\u00e9cnica con el objeto de la licitaci\u00f3n<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">El an\u00e1lisis debe ser estructurado, no intuitivo. Una matriz de adherencia reduce la subjetividad y facilita una eventual diligencia.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Una metodolog\u00eda pr\u00e1ctica consiste en comparar siete dimensiones.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">1. Naturaleza del servicio<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Identificar si la experiencia comprende dise\u00f1o, obra, instalaci\u00f3n, integraci\u00f3n, supervisi\u00f3n, fiscalizaci\u00f3n, mantenimiento, consultor\u00eda, puesta en servicio, suministro o una combinaci\u00f3n de estas actividades.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Una empresa que \u00fanicamente suministr\u00f3 equipos no necesariamente acredita experiencia en integraci\u00f3n y puesta en servicio. Del mismo modo, quien elabor\u00f3 el dise\u00f1o no necesariamente acredita ejecuci\u00f3n de obra cuando el pliego exige capacidad operacional en esa actividad.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">2. Alcance efectivamente ejecutado<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Leer el detalle del certificado y los documentos de soporte. Verificar actividades, entregables y responsabilidades.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">3. Complejidad tecnol\u00f3gica<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Comparar tecnolog\u00edas, interfaces, integraciones, nivel de automatizaci\u00f3n, criticidad, redundancia, operaci\u00f3n y requisitos de desempe\u00f1o.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">4. Complejidad operacional<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Evaluar ambiente ocupado, continuidad de operaci\u00f3n, multiplicidad de sitios, restricciones de acceso, turnos, log\u00edstica, interfaces con terceros y exigencia de coordinaci\u00f3n.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">5. Cantidades relevantes<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Comparar \u00fanicamente las cantidades relacionadas con las parcelas que realmente deban demostrarse.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">6. Responsabilidad del licitante o profesional<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Verificar si el documento demuestra que la empresa o profesional respondi\u00f3 efectivamente por la parcela alegada, especialmente en consorcios, subcontrataciones o contratos multidisciplinarios.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">7. Resultado y conclusi\u00f3n<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Identificar si el documento confirma ejecuci\u00f3n\/conclusi\u00f3n y si existen elementos suficientes para sustentar la decisi\u00f3n de habilitaci\u00f3n.<\/p>\n\n\n\n<figure class=\"a3a-mermaid\"><svg id=\"a3a-diagram-1\" width=\"100%\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" class=\"flowchart\" style=\"max-width:min(363.25390625px, 100%);height:auto;display:block;margin:0 auto\" viewBox=\"0 0 363.25390625 1183.6875\" role=\"graphics-document document\" aria-roledescription=\"flowchart-v2\" aria-labelledby=\"chart-title-a3a-diagram-1\"><title id=\"chart-title-a3a-diagram-1\">Flujo de an\u00e1lisis de un certificado de capacidad t\u00e9cnica<\/title><style>#a3a-diagram-1{font-family:Roboto,sans-serif;font-size:15px;fill:var(--a3a-diag-text, #0a0a0a);}@keyframes edge-animation-frame{from{stroke-dashoffset:0;}}@keyframes dash{to{stroke-dashoffset:0;}}#a3a-diagram-1 .edge-animation-slow{stroke-dasharray:9,5!important;stroke-dashoffset:900;animation:dash 50s linear infinite;stroke-linecap:round;}#a3a-diagram-1 .edge-animation-fast{stroke-dasharray:9,5!important;stroke-dashoffset:900;animation:dash 20s linear infinite;stroke-linecap:round;}#a3a-diagram-1 .error-icon{fill:var(--a3a-diag-canvas, #ffffff);}#a3a-diagram-1 .error-text{fill:#000000;stroke:#000000;}#a3a-diagram-1 .edge-thickness-normal{stroke-width:1px;}#a3a-diagram-1 .edge-thickness-thick{stroke-width:3.5px;}#a3a-diagram-1 .edge-pattern-solid{stroke-dasharray:0;}#a3a-diagram-1 .edge-thickness-invisible{stroke-width:0;fill:none;}#a3a-diagram-1 .edge-pattern-dashed{stroke-dasharray:3;}#a3a-diagram-1 .edge-pattern-dotted{stroke-dasharray:2;}#a3a-diagram-1 .marker{fill:var(--a3a-diag-stroke, #2e42a2);stroke:var(--a3a-diag-stroke, #2e42a2);}#a3a-diagram-1 .marker.cross{stroke:var(--a3a-diag-stroke, #2e42a2);}#a3a-diagram-1 svg{font-family:Roboto,sans-serif;font-size:15px;}#a3a-diagram-1 p{margin:0;}#a3a-diagram-1 .label{font-family:Roboto,sans-serif;color:var(--a3a-diag-text, #0a0a0a);}#a3a-diagram-1 .cluster-label text{fill:var(--a3a-diag-title, #0124af);}#a3a-diagram-1 .cluster-label span{color:var(--a3a-diag-title, #0124af);}#a3a-diagram-1 .cluster-label span p{background-color:transparent;}#a3a-diagram-1 .label text,#a3a-diagram-1 span{fill:var(--a3a-diag-text, #0a0a0a);color:var(--a3a-diag-text, #0a0a0a);}#a3a-diagram-1 .node rect,#a3a-diagram-1 .node circle,#a3a-diagram-1 .node ellipse,#a3a-diagram-1 .node polygon,#a3a-diagram-1 .node path{fill:var(--a3a-diag-fill, #eef2fd);stroke:var(--a3a-diag-stroke, #2e42a2);stroke-width:1px;}#a3a-diagram-1 .rough-node .label text,#a3a-diagram-1 .node .label text,#a3a-diagram-1 .image-shape .label,#a3a-diagram-1 .icon-shape .label{text-anchor:middle;}#a3a-diagram-1 .node .katex path{fill:#000;stroke:#000;stroke-width:1px;}#a3a-diagram-1 .rough-node .label,#a3a-diagram-1 .node .label,#a3a-diagram-1 .image-shape .label,#a3a-diagram-1 .icon-shape .label{text-align:center;}#a3a-diagram-1 .node.clickable{cursor:pointer;}#a3a-diagram-1 .root .anchor path{fill:var(--a3a-diag-stroke, #2e42a2)!important;stroke-width:0;stroke:var(--a3a-diag-stroke, #2e42a2);}#a3a-diagram-1 .arrowheadPath{fill:var(--a3a-diag-stroke, #0b0b0b);}#a3a-diagram-1 .edgePath .path{stroke:var(--a3a-diag-stroke, #2e42a2);stroke-width:2.0px;}#a3a-diagram-1 .flowchart-link{stroke:var(--a3a-diag-stroke, #2e42a2);fill:none;}#a3a-diagram-1 .edgeLabel{background-color:var(--a3a-diag-canvas, #ffffff);text-align:center;}#a3a-diagram-1 .edgeLabel p{background-color:var(--a3a-diag-canvas, #ffffff);}#a3a-diagram-1 .edgeLabel rect{opacity:0.5;background-color:var(--a3a-diag-canvas, #ffffff);fill:var(--a3a-diag-canvas, #ffffff);}#a3a-diagram-1 .labelBkg{background-color:rgba(255, 255, 255, 0.5);}#a3a-diagram-1 .cluster rect{fill:var(--a3a-diag-surface, #f8f8f8);stroke:var(--a3a-diag-border, #e2e8f0);stroke-width:1px;}#a3a-diagram-1 .cluster text{fill:var(--a3a-diag-title, #0124af);}#a3a-diagram-1 .cluster span{color:var(--a3a-diag-title, #0124af);}#a3a-diagram-1 div.mermaidTooltip{position:absolute;text-align:center;max-width:200px;padding:2px;font-family:Roboto,sans-serif;font-size:12px;background:var(--a3a-diag-canvas, #ffffff);border:1px solid hsl(0, 0%, 90%);border-radius:2px;pointer-events:none;z-index:100;}#a3a-diagram-1 .flowchartTitleText{text-anchor:middle;font-size:18px;fill:var(--a3a-diag-text, #0a0a0a);}#a3a-diagram-1 rect.text{fill:none;stroke-width:0;}#a3a-diagram-1 .icon-shape,#a3a-diagram-1 .image-shape{background-color:var(--a3a-diag-canvas, #ffffff);text-align:center;}#a3a-diagram-1 .icon-shape p,#a3a-diagram-1 .image-shape p{background-color:var(--a3a-diag-canvas, #ffffff);padding:2px;}#a3a-diagram-1 .icon-shape rect,#a3a-diagram-1 .image-shape rect{opacity:0.5;background-color:var(--a3a-diag-canvas, #ffffff);fill:var(--a3a-diag-canvas, #ffffff);}#a3a-diagram-1 .label-icon{display:inline-block;height:1em;overflow:visible;vertical-align:-0.125em;}#a3a-diagram-1 .node .label-icon path{fill:currentColor;stroke:revert;stroke-width:revert;}#a3a-diagram-1 :root{--mermaid-font-family:Roboto,sans-serif;}<\/style><g><marker id=\"a3a-diagram-1_flowchart-v2-pointEnd\" class=\"marker flowchart-v2\" viewBox=\"0 0 10 10\" refX=\"5\" refY=\"5\" markerUnits=\"userSpaceOnUse\" markerWidth=\"8\" markerHeight=\"8\" orient=\"auto\"><path d=\"M 0 0 L 10 5 L 0 10 z\" class=\"arrowMarkerPath\" style=\"stroke-width: 1; stroke-dasharray: 1, 0;\"><\/path><\/marker><marker id=\"a3a-diagram-1_flowchart-v2-pointStart\" class=\"marker flowchart-v2\" viewBox=\"0 0 10 10\" refX=\"4.5\" refY=\"5\" markerUnits=\"userSpaceOnUse\" markerWidth=\"8\" markerHeight=\"8\" orient=\"auto\"><path d=\"M 0 5 L 10 10 L 10 0 z\" class=\"arrowMarkerPath\" style=\"stroke-width: 1; stroke-dasharray: 1, 0;\"><\/path><\/marker><marker id=\"a3a-diagram-1_flowchart-v2-circleEnd\" class=\"marker flowchart-v2\" viewBox=\"0 0 10 10\" refX=\"11\" refY=\"5\" markerUnits=\"userSpaceOnUse\" markerWidth=\"11\" markerHeight=\"11\" orient=\"auto\"><circle cx=\"5\" cy=\"5\" r=\"5\" class=\"arrowMarkerPath\" style=\"stroke-width: 1; stroke-dasharray: 1, 0;\"><\/circle><\/marker><marker id=\"a3a-diagram-1_flowchart-v2-circleStart\" class=\"marker flowchart-v2\" viewBox=\"0 0 10 10\" refX=\"-1\" refY=\"5\" markerUnits=\"userSpaceOnUse\" markerWidth=\"11\" markerHeight=\"11\" orient=\"auto\"><circle cx=\"5\" cy=\"5\" r=\"5\" class=\"arrowMarkerPath\" style=\"stroke-width: 1; stroke-dasharray: 1, 0;\"><\/circle><\/marker><marker id=\"a3a-diagram-1_flowchart-v2-crossEnd\" class=\"marker cross flowchart-v2\" viewBox=\"0 0 11 11\" refX=\"12\" refY=\"5.2\" markerUnits=\"userSpaceOnUse\" markerWidth=\"11\" markerHeight=\"11\" orient=\"auto\"><path d=\"M 1,1 l 9,9 M 10,1 l -9,9\" class=\"arrowMarkerPath\" style=\"stroke-width: 2; stroke-dasharray: 1, 0;\"><\/path><\/marker><marker id=\"a3a-diagram-1_flowchart-v2-crossStart\" class=\"marker cross flowchart-v2\" viewBox=\"0 0 11 11\" refX=\"-1\" refY=\"5.2\" markerUnits=\"userSpaceOnUse\" markerWidth=\"11\" markerHeight=\"11\" orient=\"auto\"><path d=\"M 1,1 l 9,9 M 10,1 l -9,9\" class=\"arrowMarkerPath\" style=\"stroke-width: 2; stroke-dasharray: 1, 0;\"><\/path><\/marker><g class=\"root\"><g class=\"clusters\"><\/g><g class=\"edgePaths\"><path d=\"M138,60.5L138,64.667C138,68.833,138,77.167,138,84.833C138,92.5,138,99.5,138,103L138,106.5\" id=\"L_A_B_0\" class=\"edge-thickness-normal edge-pattern-solid edge-thickness-normal edge-pattern-solid flowchart-link\" style=\";\" data-edge=\"true\" data-et=\"edge\" data-id=\"L_A_B_0\" data-points=\"W3sieCI6MTM4LCJ5Ijo2MC41fSx7IngiOjEzOCwieSI6ODUuNX0seyJ4IjoxMzgsInkiOjExMC41fV0=\" marker-end=\"url(#a3a-diagram-1_flowchart-v2-pointEnd)\"><\/path><path d=\"M138,163L138,167.167C138,171.333,138,179.667,138,187.333C138,195,138,202,138,205.5L138,209\" id=\"L_B_C_0\" class=\"edge-thickness-normal edge-pattern-solid edge-thickness-normal edge-pattern-solid flowchart-link\" style=\";\" data-edge=\"true\" data-et=\"edge\" data-id=\"L_B_C_0\" data-points=\"W3sieCI6MTM4LCJ5IjoxNjN9LHsieCI6MTM4LCJ5IjoxODh9LHsieCI6MTM4LCJ5IjoyMTN9XQ==\" marker-end=\"url(#a3a-diagram-1_flowchart-v2-pointEnd)\"><\/path><path d=\"M138,265.5L138,269.667C138,273.833,138,282.167,138,289.833C138,297.5,138,304.5,138,308L138,311.5\" id=\"L_C_D_0\" class=\"edge-thickness-normal edge-pattern-solid edge-thickness-normal edge-pattern-solid flowchart-link\" style=\";\" data-edge=\"true\" data-et=\"edge\" data-id=\"L_C_D_0\" data-points=\"W3sieCI6MTM4LCJ5IjoyNjUuNX0seyJ4IjoxMzgsInkiOjI5MC41fSx7IngiOjEzOCwieSI6MzE1LjV9XQ==\" marker-end=\"url(#a3a-diagram-1_flowchart-v2-pointEnd)\"><\/path><path d=\"M138,390.5L138,394.667C138,398.833,138,407.167,138,414.833C138,422.5,138,429.5,138,433L138,436.5\" id=\"L_D_E_0\" class=\"edge-thickness-normal edge-pattern-solid edge-thickness-normal edge-pattern-solid flowchart-link\" style=\";\" data-edge=\"true\" data-et=\"edge\" data-id=\"L_D_E_0\" data-points=\"W3sieCI6MTM4LCJ5IjozOTAuNX0seyJ4IjoxMzgsInkiOjQxNS41fSx7IngiOjEzOCwieSI6NDQwLjV9XQ==\" marker-end=\"url(#a3a-diagram-1_flowchart-v2-pointEnd)\"><\/path><path d=\"M138,515.5L138,519.667C138,523.833,138,532.167,138,539.833C138,547.5,138,554.5,138,558L138,561.5\" id=\"L_E_F_0\" class=\"edge-thickness-normal edge-pattern-solid edge-thickness-normal edge-pattern-solid flowchart-link\" style=\";\" data-edge=\"true\" data-et=\"edge\" data-id=\"L_E_F_0\" data-points=\"W3sieCI6MTM4LCJ5Ijo1MTUuNX0seyJ4IjoxMzgsInkiOjU0MC41fSx7IngiOjEzOCwieSI6NTY1LjV9XQ==\" marker-end=\"url(#a3a-diagram-1_flowchart-v2-pointEnd)\"><\/path><path d=\"M180.558,758.13L188.007,771.265C195.456,784.399,210.355,810.668,217.805,829.178C225.254,847.688,225.254,858.438,225.254,863.813L225.254,869.188\" id=\"L_F_G_0\" class=\"edge-thickness-normal edge-pattern-solid edge-thickness-normal edge-pattern-solid flowchart-link\" style=\";\" data-edge=\"true\" data-et=\"edge\" data-id=\"L_F_G_0\" data-points=\"W3sieCI6MTgwLjU1NzUwMjIwNzUxNDQ2LCJ5Ijo3NTguMTI5OTk3NzkyNDg1NX0seyJ4IjoyMjUuMjUzOTA2MjUsInkiOjgzNi45Mzc1fSx7IngiOjIyNS4yNTM5MDYyNSwieSI6ODczLjE4NzV9XQ==\" marker-end=\"url(#a3a-diagram-1_flowchart-v2-pointEnd)\"><\/path><path d=\"M95.442,758.13L87.993,771.265C80.544,784.399,65.645,810.668,58.195,836.095C50.746,861.521,50.746,886.104,50.746,908.813C50.746,931.521,50.746,952.354,57.265,966.6C63.784,980.846,76.822,988.504,83.341,992.333L89.86,996.162\" id=\"L_F_H_0\" class=\"edge-thickness-normal edge-pattern-solid edge-thickness-normal edge-pattern-solid flowchart-link\" style=\";\" data-edge=\"true\" data-et=\"edge\" data-id=\"L_F_H_0\" data-points=\"W3sieCI6OTUuNDQyNDk3NzkyNDg1NTQsInkiOjc1OC4xMjk5OTc3OTI0ODU1fSx7IngiOjUwLjc0NjA5Mzc1LCJ5Ijo4MzYuOTM3NX0seyJ4Ijo1MC43NDYwOTM3NSwieSI6OTEwLjY4NzV9LHsieCI6NTAuNzQ2MDkzNzUsInkiOjk3My4xODc1fSx7IngiOjkzLjMwODk3NDg0NzU2MDk4LCJ5Ijo5OTguMTg3NX1d\" marker-end=\"url(#a3a-diagram-1_flowchart-v2-pointEnd)\"><\/path><path d=\"M225.254,948.188L225.254,952.354C225.254,956.521,225.254,964.854,218.735,972.85C212.216,980.846,199.178,988.504,192.659,992.333L186.14,996.162\" id=\"L_G_H_0\" class=\"edge-thickness-normal edge-pattern-solid edge-thickness-normal edge-pattern-solid flowchart-link\" style=\";\" data-edge=\"true\" data-et=\"edge\" data-id=\"L_G_H_0\" data-points=\"W3sieCI6MjI1LjI1MzkwNjI1LCJ5Ijo5NDguMTg3NX0seyJ4IjoyMjUuMjUzOTA2MjUsInkiOjk3My4xODc1fSx7IngiOjE4Mi42OTEwMjUxNTI0MzksInkiOjk5OC4xODc1fV0=\" marker-end=\"url(#a3a-diagram-1_flowchart-v2-pointEnd)\"><\/path><path d=\"M138,1050.688L138,1054.854C138,1059.021,138,1067.354,138,1075.021C138,1082.688,138,1089.688,138,1093.188L138,1096.688\" id=\"L_H_I_0\" class=\"edge-thickness-normal edge-pattern-solid edge-thickness-normal edge-pattern-solid flowchart-link\" style=\";\" data-edge=\"true\" data-et=\"edge\" data-id=\"L_H_I_0\" data-points=\"W3sieCI6MTM4LCJ5IjoxMDUwLjY4NzV9LHsieCI6MTM4LCJ5IjoxMDc1LjY4NzV9LHsieCI6MTM4LCJ5IjoxMTAwLjY4NzV9XQ==\" marker-end=\"url(#a3a-diagram-1_flowchart-v2-pointEnd)\"><\/path><\/g><g class=\"edgeLabels\"><g class=\"edgeLabel\"><g class=\"label\" data-id=\"L_A_B_0\" transform=\"translate(0, 0)\"><foreignObject width=\"0\" height=\"0\"><div xmlns=\"http:\/\/www.w3.org\/1999\/xhtml\" class=\"labelBkg\" style=\"display: table-cell; white-space: nowrap; line-height: 1.5; max-width: 200px; text-align: center;\"><span class=\"edgeLabel\"><\/span><\/div><\/foreignObject><\/g><\/g><g class=\"edgeLabel\"><g class=\"label\" data-id=\"L_B_C_0\" transform=\"translate(0, 0)\"><foreignObject width=\"0\" height=\"0\"><div xmlns=\"http:\/\/www.w3.org\/1999\/xhtml\" class=\"labelBkg\" style=\"display: table-cell; white-space: nowrap; line-height: 1.5; max-width: 200px; text-align: center;\"><span class=\"edgeLabel\"><\/span><\/div><\/foreignObject><\/g><\/g><g class=\"edgeLabel\"><g class=\"label\" data-id=\"L_C_D_0\" transform=\"translate(0, 0)\"><foreignObject width=\"0\" height=\"0\"><div xmlns=\"http:\/\/www.w3.org\/1999\/xhtml\" class=\"labelBkg\" style=\"display: table-cell; white-space: nowrap; line-height: 1.5; max-width: 200px; text-align: center;\"><span class=\"edgeLabel\"><\/span><\/div><\/foreignObject><\/g><\/g><g class=\"edgeLabel\"><g class=\"label\" data-id=\"L_D_E_0\" transform=\"translate(0, 0)\"><foreignObject width=\"0\" height=\"0\"><div xmlns=\"http:\/\/www.w3.org\/1999\/xhtml\" class=\"labelBkg\" style=\"display: table-cell; white-space: nowrap; line-height: 1.5; max-width: 200px; text-align: center;\"><span class=\"edgeLabel\"><\/span><\/div><\/foreignObject><\/g><\/g><g class=\"edgeLabel\"><g class=\"label\" data-id=\"L_E_F_0\" transform=\"translate(0, 0)\"><foreignObject width=\"0\" height=\"0\"><div xmlns=\"http:\/\/www.w3.org\/1999\/xhtml\" class=\"labelBkg\" style=\"display: table-cell; white-space: nowrap; line-height: 1.5; max-width: 200px; text-align: center;\"><span class=\"edgeLabel\"><\/span><\/div><\/foreignObject><\/g><\/g><g class=\"edgeLabel\" transform=\"translate(225.25390625, 836.9375)\"><g class=\"label\" data-id=\"L_F_G_0\" transform=\"translate(-6.203125, -11.25)\"><foreignObject width=\"12.40625\" height=\"22.5\"><div xmlns=\"http:\/\/www.w3.org\/1999\/xhtml\" class=\"labelBkg\" style=\"display: table-cell; white-space: nowrap; line-height: 1.5; max-width: 200px; text-align: center;\"><span class=\"edgeLabel\"><p>S\u00ed<\/p><\/span><\/div><\/foreignObject><\/g><\/g><g class=\"edgeLabel\" transform=\"translate(50.74609375, 910.6875)\"><g class=\"label\" data-id=\"L_F_H_0\" transform=\"translate(-9.5078125, -11.25)\"><foreignObject width=\"19.015625\" height=\"22.5\"><div xmlns=\"http:\/\/www.w3.org\/1999\/xhtml\" class=\"labelBkg\" style=\"display: table-cell; white-space: nowrap; line-height: 1.5; max-width: 200px; text-align: center;\"><span class=\"edgeLabel\"><p>No<\/p><\/span><\/div><\/foreignObject><\/g><\/g><g class=\"edgeLabel\"><g class=\"label\" data-id=\"L_G_H_0\" transform=\"translate(0, 0)\"><foreignObject width=\"0\" height=\"0\"><div xmlns=\"http:\/\/www.w3.org\/1999\/xhtml\" class=\"labelBkg\" style=\"display: table-cell; white-space: nowrap; line-height: 1.5; max-width: 200px; text-align: center;\"><span class=\"edgeLabel\"><\/span><\/div><\/foreignObject><\/g><\/g><g class=\"edgeLabel\"><g class=\"label\" data-id=\"L_H_I_0\" transform=\"translate(0, 0)\"><foreignObject width=\"0\" height=\"0\"><div xmlns=\"http:\/\/www.w3.org\/1999\/xhtml\" class=\"labelBkg\" style=\"display: table-cell; white-space: nowrap; line-height: 1.5; max-width: 200px; text-align: center;\"><span class=\"edgeLabel\"><\/span><\/div><\/foreignObject><\/g><\/g><\/g><g class=\"nodes\"><g class=\"node default\" id=\"flowchart-A-0\" transform=\"translate(138, 34.25)\"><rect class=\"basic label-container\" style=\"\" x=\"-96.5078125\" y=\"-26.25\" width=\"193.015625\" height=\"52.5\"><\/rect><g class=\"label\" style=\"\" transform=\"translate(-66.5078125, -11.25)\"><rect><\/rect><foreignObject width=\"133.015625\" height=\"22.5\"><div xmlns=\"http:\/\/www.w3.org\/1999\/xhtml\" style=\"display: table-cell; white-space: nowrap; line-height: 1.5; max-width: 200px; text-align: center;\"><span class=\"nodeLabel\"><p>Certificado recibido<\/p><\/span><\/div><\/foreignObject><\/g><\/g><g class=\"node default\" id=\"flowchart-B-1\" transform=\"translate(138, 136.75)\"><rect class=\"basic label-container\" style=\"\" x=\"-119.859375\" y=\"-26.25\" width=\"239.71875\" height=\"52.5\"><\/rect><g class=\"label\" style=\"\" transform=\"translate(-89.859375, -11.25)\"><rect><\/rect><foreignObject width=\"179.71875\" height=\"22.5\"><div xmlns=\"http:\/\/www.w3.org\/1999\/xhtml\" style=\"display: table-cell; white-space: nowrap; line-height: 1.5; max-width: 200px; text-align: center;\"><span class=\"nodeLabel\"><p>Identificar objeto y emisor<\/p><\/span><\/div><\/foreignObject><\/g><\/g><g class=\"node default\" id=\"flowchart-C-3\" transform=\"translate(138, 239.25)\"><rect class=\"basic label-container\" style=\"\" x=\"-118.7578125\" y=\"-26.25\" width=\"237.515625\" height=\"52.5\"><\/rect><g class=\"label\" style=\"\" transform=\"translate(-88.7578125, -11.25)\"><rect><\/rect><foreignObject width=\"177.515625\" height=\"22.5\"><div xmlns=\"http:\/\/www.w3.org\/1999\/xhtml\" style=\"display: table-cell; white-space: nowrap; line-height: 1.5; max-width: 200px; text-align: center;\"><span class=\"nodeLabel\"><p>Mapear alcance ejecutado<\/p><\/span><\/div><\/foreignObject><\/g><\/g><g class=\"node default\" id=\"flowchart-D-5\" transform=\"translate(138, 353)\"><rect class=\"basic label-container\" style=\"\" x=\"-130\" y=\"-37.5\" width=\"260\" height=\"75\"><\/rect><g class=\"label\" style=\"\" transform=\"translate(-100, -22.5)\"><rect><\/rect><foreignObject width=\"200\" height=\"45\"><div xmlns=\"http:\/\/www.w3.org\/1999\/xhtml\" style=\"display: table; white-space: break-spaces; line-height: 1.5; max-width: 200px; text-align: center; width: 200px;\"><span class=\"nodeLabel\"><p>Comparar parcelas relevantes<\/p><\/span><\/div><\/foreignObject><\/g><\/g><g class=\"node default\" id=\"flowchart-E-7\" transform=\"translate(138, 478)\"><rect class=\"basic label-container\" style=\"\" x=\"-130\" y=\"-37.5\" width=\"260\" height=\"75\"><\/rect><g class=\"label\" style=\"\" transform=\"translate(-100, -22.5)\"><rect><\/rect><foreignObject width=\"200\" height=\"45\"><div xmlns=\"http:\/\/www.w3.org\/1999\/xhtml\" style=\"display: table; white-space: break-spaces; line-height: 1.5; max-width: 200px; text-align: center; width: 200px;\"><span class=\"nodeLabel\"><p>Comparar complejidad y cantidades<\/p><\/span><\/div><\/foreignObject><\/g><\/g><g class=\"node default\" id=\"flowchart-F-9\" transform=\"translate(138, 683.09375)\"><polygon points=\"117.59375,0 235.1875,-117.59375 117.59375,-235.1875 0,-117.59375\" class=\"label-container\" transform=\"translate(-117.09375, 117.59375)\"><\/polygon><g class=\"label\" style=\"\" transform=\"translate(-91.34375, -11.25)\"><rect><\/rect><foreignObject width=\"182.6875\" height=\"22.5\"><div xmlns=\"http:\/\/www.w3.org\/1999\/xhtml\" style=\"display: table-cell; white-space: nowrap; line-height: 1.5; max-width: 200px; text-align: center;\"><span class=\"nodeLabel\"><p>\u00bfExiste una duda material?<\/p><\/span><\/div><\/foreignObject><\/g><\/g><g class=\"node default\" id=\"flowchart-G-11\" transform=\"translate(225.25390625, 910.6875)\"><rect class=\"basic label-container\" style=\"\" x=\"-130\" y=\"-37.5\" width=\"260\" height=\"75\"><\/rect><g class=\"label\" style=\"\" transform=\"translate(-100, -22.5)\"><rect><\/rect><foreignObject width=\"200\" height=\"45\"><div xmlns=\"http:\/\/www.w3.org\/1999\/xhtml\" style=\"display: table; white-space: break-spaces; line-height: 1.5; max-width: 200px; text-align: center; width: 200px;\"><span class=\"nodeLabel\"><p>Diligencia y documentos de soporte<\/p><\/span><\/div><\/foreignObject><\/g><\/g><g class=\"node default\" id=\"flowchart-H-13\" transform=\"translate(138, 1024.4375)\"><rect class=\"basic label-container\" style=\"\" x=\"-93.7265625\" y=\"-26.25\" width=\"187.453125\" height=\"52.5\"><\/rect><g class=\"label\" style=\"\" transform=\"translate(-63.7265625, -11.25)\"><rect><\/rect><foreignObject width=\"127.453125\" height=\"22.5\"><div xmlns=\"http:\/\/www.w3.org\/1999\/xhtml\" style=\"display: table-cell; white-space: nowrap; line-height: 1.5; max-width: 200px; text-align: center;\"><span class=\"nodeLabel\"><p>Conclusi\u00f3n t\u00e9cnica<\/p><\/span><\/div><\/foreignObject><\/g><\/g><g class=\"node default\" id=\"flowchart-I-17\" transform=\"translate(138, 1138.1875)\"><rect class=\"basic label-container\" style=\"\" x=\"-130\" y=\"-37.5\" width=\"260\" height=\"75\"><\/rect><g class=\"label\" style=\"\" transform=\"translate(-100, -22.5)\"><rect><\/rect><foreignObject width=\"200\" height=\"45\"><div xmlns=\"http:\/\/www.w3.org\/1999\/xhtml\" style=\"display: table; white-space: break-spaces; line-height: 1.5; max-width: 200px; text-align: center; width: 200px;\"><span class=\"nodeLabel\"><p>Habilitar o inhabilitar con motivaci\u00f3n<\/p><\/span><\/div><\/foreignObject><\/g><\/g><\/g><\/g><\/g><\/svg><figcaption>Flujo de an\u00e1lisis de un certificado de capacidad t\u00e9cnica<\/figcaption><\/figure>\n\n\n\n<h2 class=\"wp-block-heading\">Matriz de adherencia: una forma objetiva de analizar capacidad t\u00e9cnica<\/h2>\n\n\n\n<div class=\"wp-block-a3a-destaque\">\n<p class=\"wp-block-paragraph\">Cuando la equivalencia entre experiencias no es evidente, una matriz de adherencia t\u00e9cnica transforma el an\u00e1lisis en criterios verificables y registra por qu\u00e9 cada documento cumple, no cumple o exige diligencia.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><a href=\"https:\/\/a3aengenharia.com.br\/servicos\/servicos-transversais\/consultoria-tecnica\/\">Conocer la Consultor\u00eda T\u00e9cnica de Ingenier\u00eda<\/a><\/p>\n<\/div>\n\n\n\n<p class=\"wp-block-paragraph\">El equipo puede estructurar una matriz para cada licitante.<\/p>\n\n\n\n<figure class=\"wp-block-table\"><table><tbody><tr><td>Criterio del pliego<\/td><td>Evidencia presentada<\/td><td>Adherencia<\/td><td>Observaci\u00f3n t\u00e9cnica<\/td><\/tr><tr><td>experiencia en dise\u00f1o<\/td><td>certificado X<\/td><td>cumple<\/td><td>el alcance incluye dise\u00f1o de detalle<\/td><\/tr><tr><td>integraci\u00f3n de sistemas<\/td><td>certificado X<\/td><td>cumple parcialmente<\/td><td>integraci\u00f3n descrita de forma gen\u00e9rica<\/td><\/tr><tr><td>cantidad m\u00ednima<\/td><td>certificado Y<\/td><td>cumple<\/td><td>cantidad superior al m\u00ednimo<\/td><\/tr><tr><td>profesional responsable<\/td><td>CAT\/certificado Z<\/td><td>cumple<\/td><td>experiencia similar<\/td><\/tr><tr><td>operaci\u00f3n en ambiente cr\u00edtico<\/td><td>documento insuficiente<\/td><td>duda<\/td><td>diligencia recomendada<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p class=\"wp-block-paragraph\">La columna \u201cadherencia\u201d no necesita limitarse a \u201cs\u00ed\/no\u201d. Durante el an\u00e1lisis preliminar puede haber <strong>cumple, no cumple, cumple parcialmente o requiere diligencia<\/strong>. Sin embargo, la decisi\u00f3n final debe ser compatible con el pliego y estar debidamente motivada.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">La l\u00f3gica es similar a una <a href=\"https:\/\/a3aengenharia.com.br\/conteudo\/artigos-tecnicos\/tbe-technical-bid-evaluation-engenharia\/\">Technical Bid Evaluation \u2014 TBE<\/a>, pero con una frontera clara: la habilitaci\u00f3n t\u00e9cnica verifica las condiciones del licitante; la TBE compara la adherencia t\u00e9cnica de las propuestas y soluciones con lo especificado.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">La habilitaci\u00f3n t\u00e9cnica no debe confundirse con la evaluaci\u00f3n de la propuesta<\/h2>\n\n\n\n<div class=\"wp-block-a3a-destaque\">\n<p class=\"wp-block-paragraph\">La habilitaci\u00f3n y la evaluaci\u00f3n t\u00e9cnica son capas diferentes del certamen. Separarlas evita utilizar certificados de experiencia para evaluar un producto o, en sentido inverso, aceptar a un proveedor que no haya demostrado la capacidad exigida.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><a href=\"https:\/\/a3aengenharia.com.br\/conteudo\/artigos-tecnicos\/tbe-technical-bid-evaluation-engenharia\/\">Ver c\u00f3mo estructurar el an\u00e1lisis t\u00e9cnico de propuestas<\/a><\/p>\n<\/div>\n\n\n\n<p class=\"wp-block-paragraph\">Esta separaci\u00f3n es cr\u00edtica.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">La habilitaci\u00f3n responde:<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>\u201c\u00bfEste licitante demostr\u00f3 capacidad t\u00e9cnica para ejecutar el objeto?\u201d<\/strong><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">La evaluaci\u00f3n t\u00e9cnica de la propuesta responde:<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>\u201c\u00bfLa soluci\u00f3n, metodolog\u00eda, equipo humano, equipamiento o propuesta presentada cumple los requisitos del pliego y, cuando corresponde, c\u00f3mo se compara con las dem\u00e1s?\u201d<\/strong><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Mezclar ambas etapas puede generar exigencias documentales inadecuadas. Certificados de productos, muestras, desempe\u00f1o de equipos y metodolog\u00edas de ejecuci\u00f3n pueden pertenecer a la evaluaci\u00f3n de la propuesta o a la ejecuci\u00f3n contractual, y no necesariamente a la habilitaci\u00f3n de la empresa.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">El <a href=\"https:\/\/a3aengenharia.com.br\/servicos\/servicos-transversais\/apoio-tecnico-licitacao-analise-propostas-engenharia\/\">Apoyo T\u00e9cnico a la Licitaci\u00f3n y An\u00e1lisis de Propuestas de Ingenier\u00eda<\/a> puede estructurar esta separaci\u00f3n en matrices distintas, reduciendo la subjetividad y registrando la fundamentaci\u00f3n t\u00e9cnica de cada decisi\u00f3n.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Certificados gen\u00e9ricos: cuando la descripci\u00f3n no permite concluir<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Hay certificados que informan \u00fanicamente que los \u201cservicios fueron ejecutados satisfactoriamente\u201d y presentan un t\u00edtulo amplio. Este nivel de descripci\u00f3n puede ser insuficiente para acreditar una parcela espec\u00edfica.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">La Administraci\u00f3n puede necesitar aclarar:<\/p>\n\n\n\n<ul class=\"wp-block-list\"><li>qu\u00e9 servicios fueron ejecutados;<\/li><li>qu\u00e9 cantidades;<\/li><li>qu\u00e9 per\u00edodo;<\/li><li>qu\u00e9 lugares;<\/li><li>qu\u00e9 tecnolog\u00edas;<\/li><li>qui\u00e9n fue responsable t\u00e9cnicamente;<\/li><li>si hubo subcontrataci\u00f3n;<\/li><li>qu\u00e9 parcela correspondi\u00f3 al licitante;<\/li><li>qu\u00e9 entregables fueron producidos.<\/li><\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">La ausencia de estas informaciones no debe suplirse mediante una suposici\u00f3n favorable o desfavorable. Lo correcto es verificar si existe posibilidad de diligencia o complementaci\u00f3n de informaci\u00f3n sobre una condici\u00f3n preexistente, dentro de los l\u00edmites permitidos por la legislaci\u00f3n.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Diligencia: aclarar la experiencia sin crear experiencia nueva<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">La diligencia sirve para aclarar, confirmar o complementar informaciones relativas a una condici\u00f3n existente. No puede utilizarse para permitir que el licitante adquiera, despu\u00e9s de la apertura del certamen, una experiencia que no pose\u00eda.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">En la pr\u00e1ctica, pueden surgir situaciones como:<\/p>\n\n\n\n<ul class=\"wp-block-list\"><li>el certificado cita el contrato, pero no informa cantidades;<\/li><li>el documento describe un objeto amplio, pero no identifica la parcela ejecutada;<\/li><li>un consorcio aparece como contratado, pero la participaci\u00f3n individual no est\u00e1 clara;<\/li><li>hay divergencia de fechas;<\/li><li>el consejo profesional presenta informaci\u00f3n diferente del documento;<\/li><li>el emisor necesita confirmar la autenticidad;<\/li><li>el alcance presentado parece incompatible con el objeto del contrato original.<\/li><\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">La diligencia debe ser objetiva, registrada y vinculada a la duda material que impide la decisi\u00f3n.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">El TCU posee jurisprudencia que valora el saneamiento de fallas documentales cuando no existe alteraci\u00f3n de la sustancia de la condici\u00f3n preexistente, siempre mediante decisi\u00f3n motivada y respeto a la igualdad de trato.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">C\u00f3mo tratar la experiencia en consorcio<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">La Ley brasile\u00f1a n\u00ba 14.133\/2021 establece reglas espec\u00edficas para certificados de desempe\u00f1o anterior emitidos a favor de un consorcio. El an\u00e1lisis debe identificar si el consorcio era homog\u00e9neo o heterog\u00e9neo y qu\u00e9 actividad o participaci\u00f3n correspondi\u00f3 a cada consorciado.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">En servicios t\u00e9cnicos especializados de naturaleza predominantemente intelectual, la ley establece un tratamiento propio para el reconocimiento de las experiencias conforme al art. 67, \u00a7 10.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">La precauci\u00f3n pr\u00e1ctica es evitar atribuir autom\u00e1ticamente a una empresa toda la experiencia del consorcio sin verificar la naturaleza de la participaci\u00f3n acreditada.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Cuando el certificado o instrumento de constituci\u00f3n no identifica la actuaci\u00f3n individual, puede ser necesaria la documentaci\u00f3n complementaria prevista en la legislaci\u00f3n.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Potencial subcontratista y parcelas altamente especializadas<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Otro punto relevante es el art. 67, \u00a7 9\u00ba, que permite al pliego prever, para aspectos t\u00e9cnicos espec\u00edficos, la demostraci\u00f3n de calificaci\u00f3n mediante certificados relativos a un potencial subcontratista, limitada al 25% del objeto a licitar.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Esta posibilidad es importante en obras multidisciplinarias que incluyen parcelas altamente especializadas. Obligar a la empresa principal a poseer directamente todo el historial de especialidades que normalmente son ejecutadas por subcontratistas puede restringir la competencia sin un beneficio proporcional.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Decisiones recientes del TCU han reforzado la necesidad de considerar esta posibilidad cuando sea aplicable y de fundamentar las restricciones.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Errores comunes al definir criterios de capacidad t\u00e9cnica<\/h2>\n\n\n\n<h3 class=\"wp-block-heading\">Exigir un objeto id\u00e9ntico<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Restringe indebidamente experiencias equivalentes y puede transformar la habilitaci\u00f3n en una reproducci\u00f3n del contrato futuro.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Exigir acreditaci\u00f3n de todos los \u00edtems de la planilla<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Ignora la regla de concentraci\u00f3n en las parcelas relevantes y puede excluir empresas t\u00e9cnicamente aptas.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Usar el 50% autom\u00e1ticamente<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">El l\u00edmite legal no sustituye la justificaci\u00f3n t\u00e9cnica.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Exigir un n\u00famero m\u00ednimo de certificados sin necesidad<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">La cantidad de documentos no es sin\u00f3nimo de capacidad. En muchos casos, un \u00fanico certificado robusto puede acreditar la experiencia necesaria.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Prohibir la suma sin fundamentaci\u00f3n<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Dependiendo de la naturaleza de la parcela, experiencias acumuladas pueden demostrar capacidad. Las restricciones a la suma necesitan justificaci\u00f3n t\u00e9cnica cuando la especificidad del objeto realmente exija experiencia concentrada.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Exigir lugar o per\u00edodo espec\u00edfico<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">La legislaci\u00f3n proh\u00edbe limitaciones de tiempo y lugares espec\u00edficos relativas a los certificados conforme al art. 67, \u00a7 2\u00ba.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Confundir habilitaci\u00f3n con especificaci\u00f3n del producto<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">La capacidad del licitante y la conformidad del equipo o soluci\u00f3n son dimensiones diferentes.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">C\u00f3mo analizar la autenticidad y consistencia del certificado<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">El an\u00e1lisis t\u00e9cnico tambi\u00e9n debe observar se\u00f1ales de inconsistencia. Esto no significa presumir fraude, sino verificar si la evidencia es coherente.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Algunos puntos de control:<\/p>\n\n\n\n<ul class=\"wp-block-list\"><li>identificaci\u00f3n del emisor;<\/li><li>contacto institucional verificable;<\/li><li>objeto y contrato relacionados;<\/li><li>fechas compatibles;<\/li><li>valores y cantidades plausibles;<\/li><li>firma y competencia del firmante;<\/li><li>relaci\u00f3n con registros profesionales;<\/li><li>coherencia con el alcance de actividades de la empresa;<\/li><li>compatibilidad entre certificado, contrato y dem\u00e1s documentos;<\/li><li>ausencia de alteraciones aparentes o informaciones contradictorias.<\/li><\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">Cuando exista una duda relevante, el organismo debe realizar diligencia. La presentaci\u00f3n de informaci\u00f3n falsa tiene consecuencias graves y no puede tratarse como una simple irregularidad formal.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">La capacidad t\u00e9cnica debe ser proporcional al riesgo de la contrataci\u00f3n<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Una buena habilitaci\u00f3n no es la que exige m\u00e1s documentos. Es la que exige <strong>las evidencias correctas<\/strong> para proteger el inter\u00e9s p\u00fablico sin restringir innecesariamente la competencia.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Una obra convencional de baja complejidad no requiere el mismo dise\u00f1o de calificaci\u00f3n que un sistema cr\u00edtico, un data center, una subestaci\u00f3n, una automatizaci\u00f3n compleja o una plataforma integrada de seguridad.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">El an\u00e1lisis de riesgo debe considerar:<\/p>\n\n\n\n<ul class=\"wp-block-list\"><li>consecuencia de la falla;<\/li><li>complejidad t\u00e9cnica;<\/li><li>criticidad operacional;<\/li><li>cantidad de interfaces;<\/li><li>necesidad de integraci\u00f3n;<\/li><li>especializaci\u00f3n de la mano de obra;<\/li><li>dificultad de correcci\u00f3n despu\u00e9s de la implantaci\u00f3n;<\/li><li>riesgo de indisponibilidad;<\/li><li>relevancia econ\u00f3mica;<\/li><li>exposici\u00f3n de la Administraci\u00f3n a retrabajos y aditivos.<\/li><\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">La <a href=\"https:\/\/a3aengenharia.com.br\/conteudo\/artigos-tecnicos\/qualificacao-fornecedores-engenharia-criterios-shortlist\/\">Calificaci\u00f3n y Homologaci\u00f3n de Proveedores en Ingenier\u00eda<\/a> ofrece una visi\u00f3n complementaria sobre evaluaci\u00f3n de proveedores fuera de la l\u00f3gica estricta de la habilitaci\u00f3n p\u00fablica.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">El papel de la Ingenier\u00eda Consultiva en el an\u00e1lisis de habilitaci\u00f3n<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">En objetos complejos, la comisi\u00f3n, el agente de contrataci\u00f3n o el equipo responsable puede necesitar apoyo especializado para interpretar alcances, tecnolog\u00edas, cantidades y equivalencia de experiencia.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">La asistencia t\u00e9cnica puede estructurar:<\/p>\n\n\n\n<ul class=\"wp-block-list\"><li>matriz de requisitos de habilitaci\u00f3n;<\/li><li>definici\u00f3n t\u00e9cnica de las parcelas relevantes;<\/li><li>justificaciones de cantidades m\u00ednimas;<\/li><li>criterios objetivos de equivalencia;<\/li><li>checklist documental;<\/li><li>an\u00e1lisis de cada certificado;<\/li><li>matriz de adherencia;<\/li><li>identificaci\u00f3n de dudas y necesidad de diligencia;<\/li><li>comparaci\u00f3n con el consejo profesional cuando corresponda;<\/li><li>dictamen o nota t\u00e9cnica de apoyo a la decisi\u00f3n;<\/li><li>registro de las razones de cumplimiento o incumplimiento.<\/li><\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">La decisi\u00f3n administrativa permanece con los agentes competentes del organismo. El apoyo de ingenier\u00eda proporciona base t\u00e9cnica para que esa decisi\u00f3n sea m\u00e1s consistente, trazable y defendible.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">C\u00f3mo estructurar el an\u00e1lisis de la empresa provisionalmente adjudicataria<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Cuando la fase del certamen llega a la verificaci\u00f3n de habilitaci\u00f3n, una secuencia organizada reduce retrabajos.<\/p>\n\n\n\n<ol class=\"wp-block-list\"><li>Confirmar los criterios del pliego sin crear exigencias nuevas.<\/li><li>Identificar qu\u00e9 documentos fueron presentados para cada criterio.<\/li><li>Separar calificaci\u00f3n t\u00e9cnico-profesional de t\u00e9cnico-operacional.<\/li><li>Mapear parcelas relevantes y cantidades m\u00ednimas.<\/li><li>Comparar alcance, complejidad y cantidad.<\/li><li>Verificar responsabilidad y participaci\u00f3n efectiva.<\/li><li>Comprobar los registros profesionales aplicables.<\/li><li>Identificar inconsistencias o lagunas.<\/li><li>Realizar diligencia cuando sea legalmente procedente.<\/li><li>Producir una conclusi\u00f3n t\u00e9cnica motivada.<\/li><\/ol>\n\n\n\n<p class=\"wp-block-paragraph\">Este an\u00e1lisis debe dialogar con la evaluaci\u00f3n de la propuesta, pero sin fusionar ambas funciones. Despu\u00e9s de la habilitaci\u00f3n, la <a href=\"https:\/\/a3aengenharia.com.br\/conteudo\/artigos-tecnicos\/tbe-technical-bid-evaluation-engenharia\/\">TBE en Ingenier\u00eda<\/a> puede ser \u00fatil cuando existe propuesta t\u00e9cnica, documentos de ingenier\u00eda, metodolog\u00edas, equipos o soluciones que deben confrontarse con los requisitos.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Qu\u00e9 debe contener un informe t\u00e9cnico de an\u00e1lisis de certificados<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Para objetos relevantes, conviene registrar el razonamiento en un documento propio.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Una estructura posible incluye:<\/p>\n\n\n\n<ul class=\"wp-block-list\"><li>identificaci\u00f3n del certamen y del licitante;<\/li><li>criterios t\u00e9cnicos del pliego;<\/li><li>documentos analizados;<\/li><li>matriz de parcelas relevantes;<\/li><li>an\u00e1lisis t\u00e9cnico-profesional;<\/li><li>an\u00e1lisis t\u00e9cnico-operacional;<\/li><li>cantidades acreditadas;<\/li><li>equivalencia de alcance y complejidad;<\/li><li>diligencias realizadas;<\/li><li>respuestas recibidas;<\/li><li>inconsistencias encontradas;<\/li><li>conclusi\u00f3n por criterio;<\/li><li>recomendaci\u00f3n t\u00e9cnica final.<\/li><\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">El informe no sustituye la decisi\u00f3n administrativa, pero crea trazabilidad para auditor\u00eda, recurso, control interno y eventual revisi\u00f3n.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Consideraciones finales<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Los certificados de capacidad t\u00e9cnica no son una formalidad burocr\u00e1tica ni una colecci\u00f3n de palabras clave. Son evidencias que deben confrontarse con el riesgo y con las parcelas relevantes de la futura contrataci\u00f3n.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Un an\u00e1lisis t\u00e9cnicamente maduro evita dos extremos: aceptar documentos que no acreditan la experiencia necesaria o crear exigencias tan espec\u00edficas que solo una experiencia pr\u00e1cticamente id\u00e9ntica podr\u00eda cumplirlas. El equilibrio est\u00e1 en criterios proporcionales, equivalencia t\u00e9cnica bien definida, cantidades justificadas, diligencias objetivas y decisi\u00f3n documentada.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Para organismos p\u00fablicos que contratan obras, sistemas y servicios especializados, esta etapa es una de las principales barreras de protecci\u00f3n contra una contrataci\u00f3n inadecuada. Cuando la complejidad supera la capacidad disponible internamente, el apoyo t\u00e9cnico de Ingenier\u00eda Consultiva puede transformar una revisi\u00f3n documental gen\u00e9rica en una evaluaci\u00f3n de alcance, complejidad, responsabilidad y evidencia realmente alineada con el objeto.<\/p>\n\n\n\n<div class=\"wp-block-a3a-destaque\">\n<p class=\"wp-block-paragraph\">En objetos de alta complejidad, el an\u00e1lisis de certificados puede exigir revisi\u00f3n de alcance, cantidades, tecnolog\u00eda, responsabilidades y registros profesionales. El apoyo t\u00e9cnico no sustituye la decisi\u00f3n administrativa; aumenta la calidad de la evidencia utilizada para decidir.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><a href=\"https:\/\/a3aengenharia.com.br\/servicos\/servicos-transversais\/apoio-tecnico-licitacao-analise-propostas-engenharia\/\">Apoyo t\u00e9cnico a la licitaci\u00f3n y an\u00e1lisis de propuestas de ingenier\u00eda<\/a><\/p>\n<\/div>\n\n\n\n<details class=\"wp-block-details is-layout-flow wp-block-details-is-layout-flow\"><summary>Referencias t\u00e9cnicas<\/summary>\n<p class=\"wp-block-paragraph\">[1] BRASIL. Ley n\u00ba 14.133, de 1 de abril de 2021. Ley de Licitaciones y Contratos Administrativos, especialmente el art. 67. Disponible en: <a href=\"https:\/\/www.planalto.gov.br\/ccivil_03\/_ato2019-2022\/2021\/lei\/l14133.htm\">https:\/\/www.planalto.gov.br\/ccivil_03\/_ato2019-2022\/2021\/lei\/l14133.htm<\/a><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">[2] TRIBUNAL DE CUENTAS DE LA UNI\u00d3N. Licitaciones y Contratos: Habilitaci\u00f3n T\u00e9cnica. Disponible en: <a href=\"https:\/\/licitacoesecontratos.tcu.gov.br\/5-5-2-habilitacao-tecnica\/\">https:\/\/licitacoesecontratos.tcu.gov.br\/5-5-2-habilitacao-tecnica\/<\/a><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">[3] TRIBUNAL DE CUENTAS DE LA UNI\u00d3N. Licitaciones y Contratos: Habilitaci\u00f3n. Disponible en: <a href=\"https:\/\/licitacoesecontratos.tcu.gov.br\/5-5-habilitacao-2\/\">https:\/\/licitacoesecontratos.tcu.gov.br\/5-5-habilitacao-2\/<\/a><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">[4] CONSEJO FEDERAL DE INGENIER\u00cdA Y AGRONOM\u00cdA. Sistema Confea\/Crea \u2014 acervo y responsabilidad t\u00e9cnica. Disponible en: <a href=\"https:\/\/www.confea.org.br\/\">https:\/\/www.confea.org.br\/<\/a><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">[5] BRASIL. Portal Nacional de Contrataciones P\u00fablicas. PNCP. Disponible en: <a href=\"https:\/\/www.gov.br\/pncp\/pt-br\">https:\/\/www.gov.br\/pncp\/pt-br<\/a><\/p>\n<\/details>\n\n\n\n<details class=\"wp-block-details is-layout-flow wp-block-details-is-layout-flow\"><summary>Preguntas frecuentes<\/summary>\n<div class=\"schema-faq wp-block-yoast-faq-block\"><div class=\"schema-faq-section\" id=\"faq-question-o-que-atestado-de-capacidade-t-cnica-em-licita-o-6521c9dd\"><strong class=\"schema-faq-question\">\u00bfQu\u00e9 es un certificado de capacidad t\u00e9cnica en una licitaci\u00f3n?<\/strong> <p class=\"schema-faq-answer\">Es un documento utilizado para acreditar experiencia previa compatible con el objeto de la contrataci\u00f3n. En ingenier\u00eda, puede analizarse bajo las dimensiones t\u00e9cnico-profesional y t\u00e9cnico-operacional, seg\u00fan la naturaleza del requisito y el art. 67 de la Ley brasile\u00f1a n\u00ba 14.133\/2021.<\/p><\/div><div class=\"schema-faq-section\" id=\"faq-question-o-atestado-precisa-ser-de-objeto-id-ntico-ao-da--263e2638\"><strong class=\"schema-faq-question\">\u00bfEl certificado debe ser de un objeto id\u00e9ntico al de la licitaci\u00f3n?<\/strong> <p class=\"schema-faq-answer\">No necesariamente. El an\u00e1lisis debe considerar servicios similares o de complejidad equivalente o superior, observando los criterios del pliego y la proporcionalidad de la exigencia.<\/p><\/div><div class=\"schema-faq-section\" id=\"faq-question-qual-a-diferen-a-entre-capacidade-t-cnico-profis-819f3a04\"><strong class=\"schema-faq-question\">\u00bfCu\u00e1l es la diferencia entre capacidad t\u00e9cnico-profesional y t\u00e9cnico-operacional?<\/strong> <p class=\"schema-faq-answer\">La t\u00e9cnico-profesional est\u00e1 vinculada a la experiencia de los profesionales responsables; la t\u00e9cnico-operacional demuestra la capacidad de la organizaci\u00f3n para ejecutar servicios similares con complejidad tecnol\u00f3gica y operacional equivalente.<\/p><\/div><div class=\"schema-faq-section\" id=\"faq-question-a-administra-o-pode-exigir-quantidade-m-nima-em--6296abf2\"><strong class=\"schema-faq-question\">\u00bfLa Administraci\u00f3n puede exigir una cantidad m\u00ednima en un certificado?<\/strong> <p class=\"schema-faq-answer\">S\u00ed, observados los l\u00edmites y condiciones del art. 67 de la Ley brasile\u00f1a n\u00ba 14.133\/2021. El \u00a7 2\u00ba admite cantidades m\u00ednimas de hasta el 50% de las parcelas encuadradas seg\u00fan los criterios legales, pero la exigencia debe estar t\u00e9cnicamente justificada.<\/p><\/div><div class=\"schema-faq-section\" id=\"faq-question-todo-item-da-planilha-pode-exigir-atestado-727bdc20\"><strong class=\"schema-faq-question\">\u00bfTodo \u00edtem de la planilla puede exigir certificado?<\/strong> <p class=\"schema-faq-answer\">No. La ley restringe la exigencia a las parcelas de mayor relevancia o valor significativo, conforme a los criterios del art. 67.<\/p><\/div><div class=\"schema-faq-section\" id=\"faq-question-pode-haver-dilig-ncia-sobre-atestado-de-capacida-5be6f569\"><strong class=\"schema-faq-question\">\u00bfPuede haber diligencia sobre un certificado de capacidad t\u00e9cnica?<\/strong> <p class=\"schema-faq-answer\">Puede realizarse diligencia para aclarar o acreditar una condici\u00f3n preexistente, respetando la legislaci\u00f3n, el pliego, la igualdad de trato y la prohibici\u00f3n de crear una condici\u00f3n de habilitaci\u00f3n inexistente en la fecha pertinente.<\/p><\/div><div class=\"schema-faq-section\" id=\"faq-question-cat-e-atestado-de-capacidade-t-cnica-s-o-a-mesma-424bee7a\"><strong class=\"schema-faq-question\">\u00bfCAT y certificado de capacidad t\u00e9cnica son lo mismo?<\/strong> <p class=\"schema-faq-answer\">No. La CAT, en el sistema Confea\/Crea, est\u00e1 vinculada al acervo t\u00e9cnico profesional. El certificado describe la experiencia ejecutada y es emitido por el contratante. La documentaci\u00f3n aplicable depende de la modalidad de calificaci\u00f3n y del consejo profesional competente.<\/p><\/div><div class=\"schema-faq-section\" id=\"faq-question-a-empresa-pode-somar-v-rios-atestados-e72bfc02\"><strong class=\"schema-faq-question\">\u00bfLa empresa puede sumar varios certificados?<\/strong> <p class=\"schema-faq-answer\">La posibilidad depende de la naturaleza del requisito y de las reglas del pliego. Las restricciones a la suma deben justificarse cuando la especificidad del objeto realmente exija experiencia concentrada.<\/p><\/div><div class=\"schema-faq-section\" id=\"faq-question-como-analisar-atestado-apresentado-por-cons-rcio-37675ea1\"><strong class=\"schema-faq-question\">\u00bfC\u00f3mo analizar un certificado presentado por un consorcio?<\/strong> <p class=\"schema-faq-answer\">Es necesario identificar la naturaleza del consorcio y la participaci\u00f3n efectiva de cada consorciado, aplicando las reglas del art. 67, \u00a7\u00a7 10 y 11, de la Ley brasile\u00f1a n\u00ba 14.133\/2021.<\/p><\/div><div class=\"schema-faq-section\" id=\"faq-question-quando-contratar-apoio-t-cnico-para-an-lise-de-h-684473ff\"><strong class=\"schema-faq-question\">\u00bfCu\u00e1ndo contratar apoyo t\u00e9cnico para el an\u00e1lisis de habilitaci\u00f3n?<\/strong> <p class=\"schema-faq-answer\">Cuando la equivalencia de alcance, complejidad, cantidades, tecnolog\u00edas o responsabilidades exige juicio de ingenier\u00eda m\u00e1s all\u00e1 de una simple revisi\u00f3n documental.<\/p><\/div><\/div>\n<\/details>\n\n\n\n<details class=\"wp-block-details is-layout-flow wp-block-details-is-layout-flow\"><summary>Materiales t\u00e9cnicos complementarios<\/summary>\n<h4 class=\"wp-block-heading\">Soluciones relacionadas<\/h4>\n\n<ul class=\"wp-block-list\"><li><a href=\"https:\/\/a3aengenharia.com.br\/solucoes\/gestao-e-governanca-de-engenharia\/gestao-contratos-escopo-entregaveis\/\">Gesti\u00f3n de Contratos, Alcance y Entregables<\/a><\/li><li><a href=\"https:\/\/a3aengenharia.com.br\/solucoes\/gestao-e-governanca-de-engenharia\/gestao-requisitos-evidencias-criterios-aceite\/\">Gesti\u00f3n de Requisitos, Evidencias y Criterios de Aceptaci\u00f3n<\/a><\/li><li><a href=\"https:\/\/a3aengenharia.com.br\/solucoes\/gestao-e-governanca-de-engenharia\/gestao-processos-workflows-aprovacoes-tecnicas\/\">Gesti\u00f3n de Procesos, Workflows y Aprobaciones T\u00e9cnicas<\/a><\/li><li><a href=\"https:\/\/a3aengenharia.com.br\/solucoes\/gestao-e-governanca-de-engenharia\/governanca-de-projetos-programas-e-portfolios\/\">Gobernanza de Proyectos, Programas y Portafolios<\/a><\/li><\/ul>\n\n<h4 class=\"wp-block-heading\">Servicios relacionados<\/h4>\n\n<ul class=\"wp-block-list\"><li><a href=\"https:\/\/a3aengenharia.com.br\/servicos\/servicos-transversais\/apoio-tecnico-licitacao-analise-propostas-engenharia\/\">Apoyo T\u00e9cnico a la Licitaci\u00f3n y An\u00e1lisis de Propuestas de Ingenier\u00eda<\/a><\/li><li><a href=\"https:\/\/a3aengenharia.com.br\/servicos\/servicos-transversais\/consultoria-tecnica\/\">Consultor\u00eda T\u00e9cnica de Ingenier\u00eda<\/a><\/li><li><a href=\"https:\/\/a3aengenharia.com.br\/servicos\/planejamento\/termo-referencia-obras-servicos-engenharia\/\">T\u00e9rminos de Referencia para Obras y Servicios de Ingenier\u00eda<\/a><\/li><li><a href=\"https:\/\/a3aengenharia.com.br\/servicos\/planejamento\/projeto-basico\/\">Proyecto B\u00e1sico de Ingenier\u00eda<\/a><\/li><li><a href=\"https:\/\/a3aengenharia.com.br\/servicos\/contratacao-integrada\/engenharia-do-proprietario\/\">Owner\u2019s Engineering<\/a><\/li><\/ul>\n\n<h4 class=\"wp-block-heading\">Contenidos principales sobre el tema<\/h4>\n\n<ul class=\"wp-block-list\"><li><a href=\"https:\/\/a3aengenharia.com.br\/conteudo\/guias-tecnicos\/guia-completo-sobre-licitacoes-e-contratos-de-engenharia\/\">Gu\u00eda Completa sobre Licitaciones y Contratos de Obras y Servicios de Ingenier\u00eda<\/a><\/li><li><a href=\"https:\/\/a3aengenharia.com.br\/conteudo\/artigos-tecnicos\/tbe-technical-bid-evaluation-engenharia\/\">TBE en Ingenier\u00eda: c\u00f3mo realizar la Technical Bid Evaluation<\/a><\/li><li><a href=\"https:\/\/a3aengenharia.com.br\/conteudo\/artigos-tecnicos\/qualificacao-fornecedores-engenharia-criterios-shortlist\/\">Calificaci\u00f3n y Homologaci\u00f3n de Proveedores en Ingenier\u00eda<\/a><\/li><li><a href=\"https:\/\/a3aengenharia.com.br\/conteudo\/artigos-tecnicos\/rfp-engenharia-escopo-requisitos-criterios-selecao\/\">RFP en Ingenier\u00eda: c\u00f3mo estructurar alcance, requisitos y criterios de selecci\u00f3n<\/a><\/li><li><a href=\"https:\/\/a3aengenharia.com.br\/conteudo\/artigos-tecnicos\/termo-de-referencia-engenharia-escopo-criterios-tecnicos-medicao-aceite\/\">T\u00e9rminos de Referencia en Ingenier\u00eda: alcance, criterios t\u00e9cnicos, medici\u00f3n y aceptaci\u00f3n<\/a><\/li><\/ul>\n\n<h4 class=\"wp-block-heading\">Contenidos t\u00e9cnicos relacionados<\/h4>\n\n<ul class=\"wp-block-list\"><li><a href=\"https:\/\/a3aengenharia.com.br\/conteudo\/artigos-tecnicos\/riscos-contratuais-fornecedores-projetos-engenharia\/\">Riesgos Contractuales y de Proveedores en Proyectos de Ingenier\u00eda<\/a><\/li><li><a href=\"https:\/\/a3aengenharia.com.br\/conteudo\/artigos-tecnicos\/gestao-qualidade-procurement-fornecedores-engenharia\/\">Gesti\u00f3n de la Calidad en Procurement<\/a><\/li><li><a href=\"https:\/\/a3aengenharia.com.br\/conteudo\/artigos-tecnicos\/project-assurance-engenharia-revisao-independente-governanca\/\">Project Assurance en Ingenier\u00eda<\/a><\/li><li><a href=\"https:\/\/a3aengenharia.com.br\/conteudo\/guias-tecnicos\/guia-completo-sobre-engenharia-consultiva\/\">Ingenier\u00eda Consultiva \u2014 Gu\u00eda Completa<\/a><\/li><li><a href=\"https:\/\/a3aengenharia.com.br\/conteudo\/whitepapers\/owners-engineering-framework-contratacao-governanca\/\">Owner\u2019s Engineering: framework ejecutivo para contrataci\u00f3n, gobernanza y aceptaci\u00f3n<\/a><\/li><\/ul>\n<\/details>\n","protected":false},"excerpt":{"rendered":"<p>Conozca c\u00f3mo analizar certificados de capacidad t\u00e9cnica en licitaciones de ingenier\u00eda, distinguiendo capacidad t\u00e9cnico-profesional y t\u00e9cnico-operativa, partes relevantes, cantidades, equivalencia y diligencias.<\/p>\n","protected":false},"author":1,"featured_media":0,"parent":0,"template":"","meta":{"_a3a_global_related_solutions":[],"_a3a_global_related_services":[],"_a3a_global_related_materials":[],"_a3a_post_lang":"es-es","_a3a_translation_group_id":"61dc01d1-d7ae-4749-85c7-53933e052fd6","_a3a_i18n_canonical_slug":"certificados-capacidad-tecnica-licitaciones-ingenieria-experiencia-compatible"},"categories":[],"segments":[],"mercados":[],"etapas":[],"class_list":["post-73138","articles","type-articles","status-publish","hentry"],"_links":{"self":[{"href":"https:\/\/a3aengenharia.com\/es-es\/wp-json\/wp\/v2\/articles\/73138","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/a3aengenharia.com\/es-es\/wp-json\/wp\/v2\/articles"}],"about":[{"href":"https:\/\/a3aengenharia.com\/es-es\/wp-json\/wp\/v2\/types\/articles"}],"author":[{"embeddable":true,"href":"https:\/\/a3aengenharia.com\/es-es\/wp-json\/wp\/v2\/users\/1"}],"version-history":[{"count":1,"href":"https:\/\/a3aengenharia.com\/es-es\/wp-json\/wp\/v2\/articles\/73138\/revisions"}],"predecessor-version":[{"id":73140,"href":"https:\/\/a3aengenharia.com\/es-es\/wp-json\/wp\/v2\/articles\/73138\/revisions\/73140"}],"wp:attachment":[{"href":"https:\/\/a3aengenharia.com\/es-es\/wp-json\/wp\/v2\/media?parent=73138"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/a3aengenharia.com\/es-es\/wp-json\/wp\/v2\/categories?post=73138"},{"taxonomy":"segments","embeddable":true,"href":"https:\/\/a3aengenharia.com\/es-es\/wp-json\/wp\/v2\/segments?post=73138"},{"taxonomy":"mercados","embeddable":true,"href":"https:\/\/a3aengenharia.com\/es-es\/wp-json\/wp\/v2\/mercados?post=73138"},{"taxonomy":"etapas","embeddable":true,"href":"https:\/\/a3aengenharia.com\/es-es\/wp-json\/wp\/v2\/etapas?post=73138"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}