{"id":72805,"date":"2026-08-28T13:37:53","date_gmt":"2026-08-28T16:37:53","guid":{"rendered":"https:\/\/a3aengenharia.com\/?post_type=articles&#038;p=72805"},"modified":"2026-08-28T13:37:53","modified_gmt":"2026-08-28T16:37:53","slug":"qa-qc-independiente-ingenieria-owner-tercera-parte","status":"publish","type":"articles","link":"https:\/\/a3aengenharia.com\/es-es\/contenido\/articulos-tecnicos\/qa-qc-independiente-ingenieria-owner-tercera-parte\/","title":{"rendered":"QA\/QC Independiente en Ingenier\u00eda: cu\u00e1ndo el Owner necesita una tercera parte"},"content":{"rendered":"\n<p class=\"wp-block-paragraph\">El QA\/QC independiente es la actuaci\u00f3n de una parte t\u00e9cnica que no ejecuta el objeto y que verifica, con autonom\u00eda definida, si los procesos, materiales, equipos, documentos, inspecciones, pruebas y evidencias cumplen los requisitos del proyecto. En lugar de depender exclusivamente del autocontrol de la contratista, el Owner crea una capa adicional de confianza entre lo especificado, lo ejecutado y aquello que ser\u00e1 aceptado.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Esta independencia no significa duplicar el trabajo de la contratista, sustituir la supervisi\u00f3n formal ni asumir la responsabilidad t\u00e9cnica de quien ejecuta. Su papel es establecer una segunda l\u00ednea de verificaci\u00f3n: evaluar si el sistema de calidad est\u00e1 funcionando, si los puntos cr\u00edticos est\u00e1n siendo controlados, si las evidencias son suficientes y si la condici\u00f3n presentada como \u201cconforme\u201d puede realmente sustentar una decisi\u00f3n de aceptaci\u00f3n.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">La necesidad aumenta cuando existe un alto impacto de fallo, interfaces entre varios proveedores, componentes que quedar\u00e1n ocultos, fabricaci\u00f3n fuera del sitio, pruebas irreversibles, requisitos regulatorios, historial de no conformidades o baja madurez del sistema de calidad de la contratista. En estos escenarios, la independencia deja de ser una capa burocr\u00e1tica y pasa a ser un mecanismo de protecci\u00f3n t\u00e9cnica del propietario.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Qu\u00e9 significa QA\/QC independiente<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">El t\u00e9rmino combina dos funciones complementarias. Quality Assurance act\u00faa principalmente sobre la confianza en el proceso: procedimientos, responsabilidades, planificaci\u00f3n, auditor\u00edas, cualificaci\u00f3n, controles y capacidad de producir resultados conformes. Quality Control act\u00faa sobre la verificaci\u00f3n del producto o servicio: inspecciones, mediciones, ensayos, resultados, registros, rechazos y liberaciones.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">En una estructura independiente, estas funciones son ejecutadas o supervisadas por un equipo que no tiene inter\u00e9s directo en acelerar la producci\u00f3n a costa del criterio t\u00e9cnico. Esto reduce un conflicto cl\u00e1sico de la ejecuci\u00f3n: la misma organizaci\u00f3n que debe cumplir plazo y coste tambi\u00e9n es responsable de declarar si su propio trabajo es aceptable.<\/p>\n\n\n\n<figure class=\"wp-block-table\"><table><tbody><tr><td>Dimensi\u00f3n<\/td><td>Control de la contratista<\/td><td>QA\/QC independiente del Owner<\/td><\/tr><tr><td>objetivo principal<\/td><td>producir y demostrar conformidad<\/td><td>verificar si la conformidad declarada es confiable<\/td><\/tr><tr><td>v\u00ednculo<\/td><td>parte ejecutora<\/td><td>propietario, financiador o parte interesada independiente<\/td><\/tr><tr><td>enfoque<\/td><td>proceso y producto bajo su responsabilidad<\/td><td>riesgo del proyecto y suficiencia de las evidencias<\/td><\/tr><tr><td>autoridad<\/td><td>seg\u00fan contrato y sistema interno<\/td><td>seg\u00fan el mandato del Owner y la matriz de autoridad<\/td><\/tr><tr><td>muestreo<\/td><td>definido por el plan de la contratista<\/td><td>basado tambi\u00e9n en criticidad y riesgo residual<\/td><\/tr><tr><td>no conformidad<\/td><td>registrar y tratar su propio desv\u00edo<\/td><td>verificar clasificaci\u00f3n, disposici\u00f3n, correcci\u00f3n, reensayo y cierre<\/td><\/tr><tr><td>aceptaci\u00f3n<\/td><td>prepara evidencias para su presentaci\u00f3n<\/td><td>apoya la decisi\u00f3n del Owner sin sustituir a quien posee la autoridad contractual<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p class=\"wp-block-paragraph\">El punto m\u00e1s importante es separar independencia t\u00e9cnica de autoridad contractual. Un equipo independiente puede emitir un dictamen, recomendar el rechazo, solicitar evidencia adicional o bloquear t\u00e9cnicamente un avance cuando as\u00ed lo determine el contrato. Aun as\u00ed, la decisi\u00f3n formal de aceptaci\u00f3n, medici\u00f3n o recepci\u00f3n corresponde al rol definido en la gobernanza del proyecto.<\/p>\n\n\n\n<figure class=\"a3a-mermaid\"><svg overflow=\"visible\" id=\"a3a-diagram-1\" width=\"100%\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" class=\"flowchart\" style=\"max-width:min(1798.65625px, 100%);height:auto;display:block;margin:0 auto\" viewBox=\"0 0 1798.65625 68.5\" role=\"graphics-document document\" aria-roledescription=\"flowchart-v2\" aria-labelledby=\"chart-title-a3a-diagram-1\"><title id=\"chart-title-a3a-diagram-1\">Camadas de confian\u00e7a entre execu\u00e7\u00e3o, QA\/QC da contratada e verifica\u00e7\u00e3o independente do Owner<\/title><style>#a3a-diagram-1{font-family:Roboto,sans-serif;font-size:15px;fill:var(--a3a-diag-text, #0a0a0a);}@keyframes edge-animation-frame{from{stroke-dashoffset:0;}}@keyframes dash{to{stroke-dashoffset:0;}}#a3a-diagram-1 .edge-animation-slow{stroke-dasharray:9,5!important;stroke-dashoffset:900;animation:dash 50s linear infinite;stroke-linecap:round;}#a3a-diagram-1 .edge-animation-fast{stroke-dasharray:9,5!important;stroke-dashoffset:900;animation:dash 20s linear infinite;stroke-linecap:round;}#a3a-diagram-1 .error-icon{fill:var(--a3a-diag-canvas, #ffffff);}#a3a-diagram-1 .error-text{fill:#000000;stroke:#000000;}#a3a-diagram-1 .edge-thickness-normal{stroke-width:1px;}#a3a-diagram-1 .edge-thickness-thick{stroke-width:3.5px;}#a3a-diagram-1 .edge-pattern-solid{stroke-dasharray:0;}#a3a-diagram-1 .edge-thickness-invisible{stroke-width:0;fill:none;}#a3a-diagram-1 .edge-pattern-dashed{stroke-dasharray:3;}#a3a-diagram-1 .edge-pattern-dotted{stroke-dasharray:2;}#a3a-diagram-1 .marker{fill:var(--a3a-diag-stroke, #2e42a2);stroke:var(--a3a-diag-stroke, #2e42a2);}#a3a-diagram-1 .marker.cross{stroke:var(--a3a-diag-stroke, #2e42a2);}#a3a-diagram-1 svg{font-family:Roboto,sans-serif;font-size:15px;}#a3a-diagram-1 p{margin:0;}#a3a-diagram-1 .label{font-family:Roboto,sans-serif;color:var(--a3a-diag-text, #0a0a0a);}#a3a-diagram-1 .cluster-label text{fill:var(--a3a-diag-title, #0124af);}#a3a-diagram-1 .cluster-label span{color:var(--a3a-diag-title, #0124af);}#a3a-diagram-1 .cluster-label span p{background-color:transparent;}#a3a-diagram-1 .label text,#a3a-diagram-1 span{fill:var(--a3a-diag-text, #0a0a0a);color:var(--a3a-diag-text, #0a0a0a);}#a3a-diagram-1 .node rect,#a3a-diagram-1 .node circle,#a3a-diagram-1 .node ellipse,#a3a-diagram-1 .node polygon,#a3a-diagram-1 .node path{fill:var(--a3a-diag-fill, #eef2fd);stroke:var(--a3a-diag-stroke, #2e42a2);stroke-width:1px;}#a3a-diagram-1 .rough-node .label text,#a3a-diagram-1 .node .label text,#a3a-diagram-1 .image-shape .label,#a3a-diagram-1 .icon-shape .label{text-anchor:middle;}#a3a-diagram-1 .node .katex path{fill:#000;stroke:#000;stroke-width:1px;}#a3a-diagram-1 .rough-node .label,#a3a-diagram-1 .node .label,#a3a-diagram-1 .image-shape .label,#a3a-diagram-1 .icon-shape .label{text-align:center;}#a3a-diagram-1 .node.clickable{cursor:pointer;}#a3a-diagram-1 .root .anchor path{fill:var(--a3a-diag-stroke, #2e42a2)!important;stroke-width:0;stroke:var(--a3a-diag-stroke, #2e42a2);}#a3a-diagram-1 .arrowheadPath{fill:var(--a3a-diag-stroke, #0b0b0b);}#a3a-diagram-1 .edgePath .path{stroke:var(--a3a-diag-stroke, #2e42a2);stroke-width:2.0px;}#a3a-diagram-1 .flowchart-link{stroke:var(--a3a-diag-stroke, #2e42a2);fill:none;}#a3a-diagram-1 .edgeLabel{background-color:var(--a3a-diag-canvas, #ffffff);text-align:center;}#a3a-diagram-1 .edgeLabel p{background-color:var(--a3a-diag-canvas, #ffffff);}#a3a-diagram-1 .edgeLabel rect{opacity:0.5;background-color:var(--a3a-diag-canvas, #ffffff);fill:var(--a3a-diag-canvas, #ffffff);}#a3a-diagram-1 .labelBkg{background-color:rgba(255, 255, 255, 0.5);}#a3a-diagram-1 .cluster rect{fill:var(--a3a-diag-surface, #f8f8f8);stroke:var(--a3a-diag-border, #e2e8f0);stroke-width:1px;}#a3a-diagram-1 .cluster text{fill:var(--a3a-diag-title, #0124af);}#a3a-diagram-1 .cluster span{color:var(--a3a-diag-title, #0124af);}#a3a-diagram-1 div.mermaidTooltip{position:absolute;text-align:center;max-width:200px;padding:2px;font-family:Roboto,sans-serif;font-size:12px;background:var(--a3a-diag-canvas, #ffffff);border:1px solid hsl(0, 0%, 90%);border-radius:2px;pointer-events:none;z-index:100;}#a3a-diagram-1 .flowchartTitleText{text-anchor:middle;font-size:18px;fill:var(--a3a-diag-text, #0a0a0a);}#a3a-diagram-1 rect.text{fill:none;stroke-width:0;}#a3a-diagram-1 .icon-shape,#a3a-diagram-1 .image-shape{background-color:var(--a3a-diag-canvas, #ffffff);text-align:center;}#a3a-diagram-1 .icon-shape p,#a3a-diagram-1 .image-shape p{background-color:var(--a3a-diag-canvas, #ffffff);padding:2px;}#a3a-diagram-1 .icon-shape rect,#a3a-diagram-1 .image-shape rect{opacity:0.5;background-color:var(--a3a-diag-canvas, #ffffff);fill:var(--a3a-diag-canvas, #ffffff);}#a3a-diagram-1 .label-icon{display:inline-block;height:1em;overflow:visible;vertical-align:-0.125em;}#a3a-diagram-1 .node .label-icon path{fill:currentColor;stroke:revert;stroke-width:revert;}#a3a-diagram-1 :root{--mermaid-font-family:Roboto,sans-serif;}<\/style><g><marker id=\"a3a-diagram-1_flowchart-v2-pointEnd\" class=\"marker flowchart-v2\" viewBox=\"0 0 10 10\" refX=\"5\" refY=\"5\" markerUnits=\"userSpaceOnUse\" markerWidth=\"8\" markerHeight=\"8\" orient=\"auto\"><path d=\"M 0 0 L 10 5 L 0 10 z\" class=\"arrowMarkerPath\" style=\"stroke-width: 1; stroke-dasharray: 1, 0;\"><\/path><\/marker><marker id=\"a3a-diagram-1_flowchart-v2-pointStart\" class=\"marker flowchart-v2\" viewBox=\"0 0 10 10\" refX=\"4.5\" refY=\"5\" markerUnits=\"userSpaceOnUse\" markerWidth=\"8\" markerHeight=\"8\" orient=\"auto\"><path d=\"M 0 5 L 10 10 L 10 0 z\" class=\"arrowMarkerPath\" style=\"stroke-width: 1; stroke-dasharray: 1, 0;\"><\/path><\/marker><marker id=\"a3a-diagram-1_flowchart-v2-circleEnd\" class=\"marker flowchart-v2\" viewBox=\"0 0 10 10\" refX=\"11\" refY=\"5\" markerUnits=\"userSpaceOnUse\" markerWidth=\"11\" markerHeight=\"11\" orient=\"auto\"><circle cx=\"5\" cy=\"5\" r=\"5\" class=\"arrowMarkerPath\" style=\"stroke-width: 1; stroke-dasharray: 1, 0;\"><\/circle><\/marker><marker id=\"a3a-diagram-1_flowchart-v2-circleStart\" class=\"marker flowchart-v2\" viewBox=\"0 0 10 10\" refX=\"-1\" refY=\"5\" markerUnits=\"userSpaceOnUse\" markerWidth=\"11\" markerHeight=\"11\" orient=\"auto\"><circle cx=\"5\" cy=\"5\" r=\"5\" class=\"arrowMarkerPath\" style=\"stroke-width: 1; stroke-dasharray: 1, 0;\"><\/circle><\/marker><marker id=\"a3a-diagram-1_flowchart-v2-crossEnd\" class=\"marker cross flowchart-v2\" viewBox=\"0 0 11 11\" refX=\"12\" refY=\"5.2\" markerUnits=\"userSpaceOnUse\" markerWidth=\"11\" markerHeight=\"11\" orient=\"auto\"><path d=\"M 1,1 l 9,9 M 10,1 l -9,9\" class=\"arrowMarkerPath\" style=\"stroke-width: 2; stroke-dasharray: 1, 0;\"><\/path><\/marker><marker id=\"a3a-diagram-1_flowchart-v2-crossStart\" class=\"marker cross flowchart-v2\" viewBox=\"0 0 11 11\" refX=\"-1\" refY=\"5.2\" markerUnits=\"userSpaceOnUse\" markerWidth=\"11\" markerHeight=\"11\" orient=\"auto\"><path d=\"M 1,1 l 9,9 M 10,1 l -9,9\" class=\"arrowMarkerPath\" style=\"stroke-width: 2; stroke-dasharray: 1, 0;\"><\/path><\/marker><g class=\"root\"><g class=\"clusters\"><\/g><g class=\"edgePaths\"><path d=\"M208.719,34.25L212.885,34.25C217.052,34.25,225.385,34.25,233.052,34.25C240.719,34.25,247.719,34.25,251.219,34.25L254.719,34.25\" id=\"L_A_B_0\" class=\"edge-thickness-normal edge-pattern-solid edge-thickness-normal edge-pattern-solid flowchart-link\" style=\";\" data-edge=\"true\" data-et=\"edge\" data-id=\"L_A_B_0\" data-points=\"W3sieCI6MjA4LjcxODc1LCJ5IjozNC4yNX0seyJ4IjoyMzMuNzE4NzUsInkiOjM0LjI1fSx7IngiOjI1OC43MTg3NSwieSI6MzQuMjV9XQ==\" marker-end=\"url(#a3a-diagram-1_flowchart-v2-pointEnd)\"><\/path><path d=\"M480.703,34.25L484.87,34.25C489.036,34.25,497.37,34.25,505.036,34.25C512.703,34.25,519.703,34.25,523.203,34.25L526.703,34.25\" id=\"L_B_C_0\" class=\"edge-thickness-normal edge-pattern-solid edge-thickness-normal edge-pattern-solid flowchart-link\" style=\";\" data-edge=\"true\" data-et=\"edge\" data-id=\"L_B_C_0\" data-points=\"W3sieCI6NDgwLjcwMzEyNSwieSI6MzQuMjV9LHsieCI6NTA1LjcwMzEyNSwieSI6MzQuMjV9LHsieCI6NTMwLjcwMzEyNSwieSI6MzQuMjV9XQ==\" marker-end=\"url(#a3a-diagram-1_flowchart-v2-pointEnd)\"><\/path><path d=\"M734.734,34.25L738.901,34.25C743.068,34.25,751.401,34.25,759.068,34.25C766.734,34.25,773.734,34.25,777.234,34.25L780.734,34.25\" id=\"L_C_D_0\" class=\"edge-thickness-normal edge-pattern-solid edge-thickness-normal edge-pattern-solid flowchart-link\" style=\";\" data-edge=\"true\" data-et=\"edge\" data-id=\"L_C_D_0\" data-points=\"W3sieCI6NzM0LjczNDM3NSwieSI6MzQuMjV9LHsieCI6NzU5LjczNDM3NSwieSI6MzQuMjV9LHsieCI6Nzg0LjczNDM3NSwieSI6MzQuMjV9XQ==\" marker-end=\"url(#a3a-diagram-1_flowchart-v2-pointEnd)\"><\/path><path d=\"M1036.734,34.25L1040.901,34.25C1045.068,34.25,1053.401,34.25,1061.068,34.25C1068.734,34.25,1075.734,34.25,1079.234,34.25L1082.734,34.25\" id=\"L_D_E_0\" class=\"edge-thickness-normal edge-pattern-solid edge-thickness-normal edge-pattern-solid flowchart-link\" style=\";\" data-edge=\"true\" data-et=\"edge\" data-id=\"L_D_E_0\" data-points=\"W3sieCI6MTAzNi43MzQzNzUsInkiOjM0LjI1fSx7IngiOjEwNjEuNzM0Mzc1LCJ5IjozNC4yNX0seyJ4IjoxMDg2LjczNDM3NSwieSI6MzQuMjV9XQ==\" marker-end=\"url(#a3a-diagram-1_flowchart-v2-pointEnd)\"><\/path><path d=\"M1291.141,34.25L1295.307,34.25C1299.474,34.25,1307.807,34.25,1315.474,34.25C1323.141,34.25,1330.141,34.25,1333.641,34.25L1337.141,34.25\" id=\"L_E_F_0\" class=\"edge-thickness-normal edge-pattern-solid edge-thickness-normal edge-pattern-solid flowchart-link\" style=\";\" data-edge=\"true\" data-et=\"edge\" data-id=\"L_E_F_0\" data-points=\"W3sieCI6MTI5MS4xNDA2MjUsInkiOjM0LjI1fSx7IngiOjEzMTYuMTQwNjI1LCJ5IjozNC4yNX0seyJ4IjoxMzQxLjE0MDYyNSwieSI6MzQuMjV9XQ==\" marker-end=\"url(#a3a-diagram-1_flowchart-v2-pointEnd)\"><\/path><path d=\"M1557.406,34.25L1561.573,34.25C1565.74,34.25,1574.073,34.25,1581.74,34.25C1589.406,34.25,1596.406,34.25,1599.906,34.25L1603.406,34.25\" id=\"L_F_G_0\" class=\"edge-thickness-normal edge-pattern-solid edge-thickness-normal edge-pattern-solid flowchart-link\" style=\";\" data-edge=\"true\" data-et=\"edge\" data-id=\"L_F_G_0\" data-points=\"W3sieCI6MTU1Ny40MDYyNSwieSI6MzQuMjV9LHsieCI6MTU4Mi40MDYyNSwieSI6MzQuMjV9LHsieCI6MTYwNy40MDYyNSwieSI6MzQuMjV9XQ==\" marker-end=\"url(#a3a-diagram-1_flowchart-v2-pointEnd)\"><\/path><\/g><g class=\"edgeLabels\"><g class=\"edgeLabel\"><g class=\"label\" data-id=\"L_A_B_0\" transform=\"translate(0, 0)\"><foreignObject width=\"0\" height=\"0\"><div xmlns=\"http:\/\/www.w3.org\/1999\/xhtml\" class=\"labelBkg\" style=\"display: table-cell; white-space: nowrap; line-height: 1.5; max-width: 200px; text-align: center;\"><span class=\"edgeLabel\"><\/span><\/div><\/foreignObject><\/g><\/g><g class=\"edgeLabel\"><g class=\"label\" data-id=\"L_B_C_0\" transform=\"translate(0, 0)\"><foreignObject width=\"0\" height=\"0\"><div xmlns=\"http:\/\/www.w3.org\/1999\/xhtml\" class=\"labelBkg\" style=\"display: table-cell; white-space: nowrap; line-height: 1.5; max-width: 200px; text-align: center;\"><span class=\"edgeLabel\"><\/span><\/div><\/foreignObject><\/g><\/g><g class=\"edgeLabel\"><g class=\"label\" data-id=\"L_C_D_0\" transform=\"translate(0, 0)\"><foreignObject width=\"0\" height=\"0\"><div xmlns=\"http:\/\/www.w3.org\/1999\/xhtml\" class=\"labelBkg\" style=\"display: table-cell; white-space: nowrap; line-height: 1.5; max-width: 200px; text-align: center;\"><span class=\"edgeLabel\"><\/span><\/div><\/foreignObject><\/g><\/g><g class=\"edgeLabel\"><g class=\"label\" data-id=\"L_D_E_0\" transform=\"translate(0, 0)\"><foreignObject width=\"0\" height=\"0\"><div xmlns=\"http:\/\/www.w3.org\/1999\/xhtml\" class=\"labelBkg\" style=\"display: table-cell; white-space: nowrap; line-height: 1.5; max-width: 200px; text-align: center;\"><span class=\"edgeLabel\"><\/span><\/div><\/foreignObject><\/g><\/g><g class=\"edgeLabel\"><g class=\"label\" data-id=\"L_E_F_0\" transform=\"translate(0, 0)\"><foreignObject width=\"0\" height=\"0\"><div xmlns=\"http:\/\/www.w3.org\/1999\/xhtml\" class=\"labelBkg\" style=\"display: table-cell; white-space: nowrap; line-height: 1.5; max-width: 200px; text-align: center;\"><span class=\"edgeLabel\"><\/span><\/div><\/foreignObject><\/g><\/g><g class=\"edgeLabel\"><g class=\"label\" data-id=\"L_F_G_0\" transform=\"translate(0, 0)\"><foreignObject width=\"0\" height=\"0\"><div xmlns=\"http:\/\/www.w3.org\/1999\/xhtml\" class=\"labelBkg\" style=\"display: table-cell; white-space: nowrap; line-height: 1.5; max-width: 200px; text-align: center;\"><span class=\"edgeLabel\"><\/span><\/div><\/foreignObject><\/g><\/g><\/g><g class=\"nodes\"><g class=\"node default\" id=\"flowchart-A-0\" transform=\"translate(108.359375, 34.25)\"><rect class=\"basic label-container\" style=\"\" x=\"-100.359375\" y=\"-26.25\" width=\"200.71875\" height=\"52.5\"><\/rect><g class=\"label\" style=\"\" transform=\"translate(-70.359375, -11.25)\"><rect><\/rect><foreignObject width=\"140.71875\" height=\"22.5\"><div xmlns=\"http:\/\/www.w3.org\/1999\/xhtml\" style=\"display: table-cell; white-space: nowrap; line-height: 1.5; max-width: 200px; text-align: center;\"><span class=\"nodeLabel\"><p>Requisitos do Owner<\/p><\/span><\/div><\/foreignObject><\/g><\/g><g class=\"node default\" id=\"flowchart-B-1\" transform=\"translate(369.7109375, 34.25)\"><rect class=\"basic label-container\" style=\"\" x=\"-110.9921875\" y=\"-26.25\" width=\"221.984375\" height=\"52.5\"><\/rect><g class=\"label\" style=\"\" transform=\"translate(-80.9921875, -11.25)\"><rect><\/rect><foreignObject width=\"161.984375\" height=\"22.5\"><div xmlns=\"http:\/\/www.w3.org\/1999\/xhtml\" style=\"display: table-cell; white-space: nowrap; line-height: 1.5; max-width: 200px; text-align: center;\"><span class=\"nodeLabel\"><p>Execu\u00e7\u00e3o da contratada<\/p><\/span><\/div><\/foreignObject><\/g><\/g><g class=\"node default\" id=\"flowchart-C-3\" transform=\"translate(632.71875, 34.25)\"><rect class=\"basic label-container\" style=\"\" x=\"-102.015625\" y=\"-26.25\" width=\"204.03125\" height=\"52.5\"><\/rect><g class=\"label\" style=\"\" transform=\"translate(-72.015625, -11.25)\"><rect><\/rect><foreignObject width=\"144.03125\" height=\"22.5\"><div xmlns=\"http:\/\/www.w3.org\/1999\/xhtml\" style=\"display: table-cell; white-space: nowrap; line-height: 1.5; max-width: 200px; text-align: center;\"><span class=\"nodeLabel\"><p>QA\/QC da contratada<\/p><\/span><\/div><\/foreignObject><\/g><\/g><g class=\"node default\" id=\"flowchart-D-5\" transform=\"translate(910.734375, 34.25)\"><rect class=\"basic label-container\" style=\"\" x=\"-126\" y=\"-26.25\" width=\"252\" height=\"52.5\"><\/rect><g class=\"label\" style=\"\" transform=\"translate(-96, -11.25)\"><rect><\/rect><foreignObject width=\"192\" height=\"22.5\"><div xmlns=\"http:\/\/www.w3.org\/1999\/xhtml\" style=\"display: table-cell; white-space: nowrap; line-height: 1.5; max-width: 200px; text-align: center;\"><span class=\"nodeLabel\"><p>Evid\u00eancias de conformidade<\/p><\/span><\/div><\/foreignObject><\/g><\/g><g class=\"node default\" id=\"flowchart-E-7\" transform=\"translate(1188.9375, 34.25)\"><rect class=\"basic label-container\" style=\"\" x=\"-102.203125\" y=\"-26.25\" width=\"204.40625\" height=\"52.5\"><\/rect><g class=\"label\" style=\"\" transform=\"translate(-72.203125, -11.25)\"><rect><\/rect><foreignObject width=\"144.40625\" height=\"22.5\"><div xmlns=\"http:\/\/www.w3.org\/1999\/xhtml\" style=\"display: table-cell; white-space: nowrap; line-height: 1.5; max-width: 200px; text-align: center;\"><span class=\"nodeLabel\"><p>QA\/QC independente<\/p><\/span><\/div><\/foreignObject><\/g><\/g><g class=\"node default\" id=\"flowchart-F-9\" transform=\"translate(1449.2734375, 34.25)\"><rect class=\"basic label-container\" style=\"\" x=\"-108.1328125\" y=\"-26.25\" width=\"216.265625\" height=\"52.5\"><\/rect><g class=\"label\" style=\"\" transform=\"translate(-78.1328125, -11.25)\"><rect><\/rect><foreignObject width=\"156.265625\" height=\"22.5\"><div xmlns=\"http:\/\/www.w3.org\/1999\/xhtml\" style=\"display: table-cell; white-space: nowrap; line-height: 1.5; max-width: 200px; text-align: center;\"><span class=\"nodeLabel\"><p>Recomenda\u00e7\u00e3o t\u00e9cnica<\/p><\/span><\/div><\/foreignObject><\/g><\/g><g class=\"node default\" id=\"flowchart-G-11\" transform=\"translate(1699.03125, 34.25)\"><rect class=\"basic label-container\" style=\"\" x=\"-91.625\" y=\"-26.25\" width=\"183.25\" height=\"52.5\"><\/rect><g class=\"label\" style=\"\" transform=\"translate(-61.625, -11.25)\"><rect><\/rect><foreignObject width=\"123.25\" height=\"22.5\"><div xmlns=\"http:\/\/www.w3.org\/1999\/xhtml\" style=\"display: table-cell; white-space: nowrap; line-height: 1.5; max-width: 200px; text-align: center;\"><span class=\"nodeLabel\"><p>Aceite pelo Owner<\/p><\/span><\/div><\/foreignObject><\/g><\/g><\/g><\/g><\/g><\/svg><figcaption>Camadas de confianza entre ejecuci\u00f3n, QA\/QC de la contratista y verificaci\u00f3n independiente del Owner<\/figcaption><\/figure>\n\n\n\n<h2 class=\"wp-block-heading\">Por qu\u00e9 el autocontrol de la contratista puede no ser suficiente<\/h2>\n\n\n\n<div class=\"wp-block-a3a-destaque\">\n<p class=\"wp-block-paragraph\">Cuando la misma organizaci\u00f3n que ejecuta tambi\u00e9n es la \u00fanica responsable de declarar su propia conformidad, el Owner asume un riesgo de informaci\u00f3n. En sistemas cr\u00edticos, una segunda l\u00ednea de verificaci\u00f3n reduce la posibilidad de que la aceptaci\u00f3n ocurra con evidencias incompletas o criterios flexibilizados.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><a href=\"https:\/\/a3aengenharia.com.br\/servicos\/contratacao-integrada\/engenharia-do-proprietario\/\">Conozca la Ingenier\u00eda del Propietario de A3A Engenharia<\/a><\/p>\n<\/div>\n\n\n\n<p class=\"wp-block-paragraph\">El autocontrol es indispensable. Ninguna tercera parte puede compensar a una contratista sin procesos, supervisi\u00f3n, inspecci\u00f3n, documentaci\u00f3n y cultura de calidad. El problema surge cuando el Owner trata el autocontrol como \u00fanica fuente de confianza en alcances de mayor criticidad.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">La contratista tiene incentivos leg\u00edtimos de productividad, plazo y coste. Estos incentivos pueden entrar en tensi\u00f3n con decisiones como detener un frente, rechazar un lote, desmontar una instalaci\u00f3n, repetir un ensayo o admitir que una etapa debe rehacerse. Un sistema de calidad maduro gestiona esa tensi\u00f3n. Un sistema d\u00e9bil tiende a postergar el descubrimiento del problema.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Tambi\u00e9n existe un l\u00edmite de perspectiva. La contratista normalmente controla aquello que est\u00e1 dentro de su alcance. El Owner necesita visualizar interfaces entre contratos, compatibilidad entre disciplinas, impacto operativo, requisitos del activo, documentaci\u00f3n final y riesgos de integraci\u00f3n. Una actividad puede estar \u201cconforme\u201d aisladamente y aun as\u00ed producir una interfaz inadecuada para el proyecto.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Situaciones en las que una tercera parte agrega m\u00e1s valor<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">La decisi\u00f3n no deber\u00eda tomarse \u00fanicamente por el tama\u00f1o del contrato. Los proyectos peque\u00f1os pueden contener \u00edtems de alta criticidad, mientras que grandes obras pueden incluir partes estandarizadas de bajo riesgo. El mejor criterio es la combinaci\u00f3n entre consecuencia del fallo, dificultad de detecci\u00f3n y coste de correcci\u00f3n tard\u00eda.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Sistemas cr\u00edticos<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Data centers, subestaciones, generaci\u00f3n, protecci\u00f3n, automatizaci\u00f3n, seguridad electr\u00f3nica, telecomunicaciones, HVAC cr\u00edtico, utilidades industriales y sistemas de protecci\u00f3n pueden exigir verificaci\u00f3n independiente cuando un fallo provoca indisponibilidad, riesgo de seguridad, p\u00e9rdida operativa o alto coste de recuperaci\u00f3n.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Elementos ocultos o irreversibles<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Hormigonado, impermeabilizaci\u00f3n, infraestructura enterrada, cables embutidos, soldaduras posteriormente inaccesibles, conexiones internas, sellados y otros elementos deben verificarse antes del cierre f\u00edsico. Despu\u00e9s de esa etapa, una evidencia ausente puede exigir apertura, demolici\u00f3n o ensayo indirecto.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Fabricaci\u00f3n fuera del sitio<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Los equipos fabricados por terceros exigen control de documentaci\u00f3n, materiales, procesos, pruebas, <a href=\"https:\/\/a3aengenharia.com.br\/conteudo\/artigos-tecnicos\/fat-sat-testes-integrados-sistemas-criticos\/\">FAT<\/a> y liberaci\u00f3n para embarque. La <a href=\"https:\/\/a3aengenharia.com.br\/conteudo\/artigos-tecnicos\/inspecao-fabricacao-vendor-inspection-fornecedores-engenharia\/\">Vendor Inspection<\/a> permite que el Owner intervenga mientras los desv\u00edos todav\u00eda pueden corregirse en origen. Si el primer contacto t\u00e9cnico del Owner ocurre \u00fanicamente en la recepci\u00f3n, el coste de correcci\u00f3n aumenta significativamente.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Interfaces entre varios proveedores<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Un proveedor puede entregar correctamente su paquete y aun as\u00ed existir un fallo en el punto de interfaz con otro. El QA\/QC independiente puede trabajar con matrices de interfaces, criterios de frontera, responsabilidades y evidencias integradas.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Historial de RNC o baja madurez<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">La recurrencia de no conformidades, documentos incompletos, retrabajo, fallos de trazabilidad, pruebas sin protocolo, materiales sin certificaci\u00f3n o gran cantidad de pendientes son se\u00f1ales de que la confianza en el autocontrol necesita reforzarse.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">C\u00f3mo decidir si la independencia es necesaria<\/h2>\n\n\n\n<figure class=\"wp-block-table\"><table><tbody><tr><td>Criterio<\/td><td>Baja necesidad<\/td><td>Necesidad creciente<\/td><\/tr><tr><td>consecuencia del fallo<\/td><td>efecto local y reversible<\/td><td>seguridad, operaci\u00f3n, gran CAPEX o indisponibilidad<\/td><\/tr><tr><td>detectabilidad<\/td><td>fallo f\u00e1cilmente visible<\/td><td>fallo oculto o solo detectable en pruebas finales<\/td><\/tr><tr><td>reversibilidad<\/td><td>correcci\u00f3n simple<\/td><td>desmontaje, demolici\u00f3n o sustituci\u00f3n compleja<\/td><\/tr><tr><td>madurez del proveedor<\/td><td>historial consistente<\/td><td>proveedor nuevo, desempe\u00f1o irregular o RNC recurrentes<\/td><\/tr><tr><td>complejidad de interfaz<\/td><td>paquete aislado<\/td><td>m\u00faltiples disciplinas y contratos<\/td><\/tr><tr><td>criticidad documental<\/td><td>documentaci\u00f3n simple<\/td><td>Data Book, certificaci\u00f3n, trazabilidad, configuraci\u00f3n<\/td><\/tr><tr><td>distancia del Owner<\/td><td>seguimiento directo<\/td><td>fabricaci\u00f3n remota o varios frentes simult\u00e1neos<\/td><\/tr><tr><td>impacto de una aceptaci\u00f3n incorrecta<\/td><td>bajo<\/td><td>transferencia de riesgo a operaci\u00f3n<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p class=\"wp-block-paragraph\">La matriz no necesita dar como resultado \u201cinspeccionar todo\u201d. El concepto m\u00e1s eficiente es QA\/QC basado en riesgo. Cuanto mayor sea el riesgo, mayor ser\u00e1 la profundidad de revisi\u00f3n, frecuencia de presencia, cobertura de muestreo y autoridad en los puntos de intervenci\u00f3n.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Independencia no significa inspecci\u00f3n del 100%<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Una interpretaci\u00f3n equivocada es imaginar que una tercera parte independiente debe repetir todas las inspecciones de la contratista. Esto encarece el proyecto y puede incluso diluir responsabilidades.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">El dise\u00f1o m\u00e1s robusto utiliza revisi\u00f3n de procesos, puntos de intervenci\u00f3n en actividades cr\u00edticas, muestreo orientado por criticidad y escalonamiento cuando los resultados indican p\u00e9rdida de control. Si una muestra presenta fallos repetidos, la cobertura puede aumentar; si un proveedor mantiene un desempe\u00f1o consistente, la presencia puede reducirse sin abandonar la gobernanza.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Alcance t\u00edpico de un QA\/QC independiente<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">El alcance puede variar desde una auditor\u00eda puntual hasta un seguimiento integral del ciclo de contrataci\u00f3n. En una estructura completa, puede incluir revisi\u00f3n de requisitos, Plan de Calidad, PIT\/ITP, auditor\u00edas, inspecciones, pruebas, gesti\u00f3n de RNC, verificaci\u00f3n documental y apoyo a la recepci\u00f3n t\u00e9cnica.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Revisi\u00f3n de requisitos y documentos contractuales<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Antes de la movilizaci\u00f3n, el equipo eval\u00faa si las especificaciones definen criterios objetivos, normas aplicables, entregables, responsabilidad por las inspecciones, requisitos de trazabilidad, documentaci\u00f3n final y reglas de aceptaci\u00f3n.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Revisi\u00f3n del Plan de Calidad y PIT\/ITP<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">El Plan de Calidad debe reflejar el contrato espec\u00edfico. El PIT debe convertir actividades cr\u00edticas en puntos controlables y definir m\u00e9todo, frecuencia, criterio, registro y puntos H\/W\/R coherentes con el riesgo.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Auditor\u00edas y verificaciones de proceso<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Las auditor\u00edas eval\u00faan si el sistema definido est\u00e1 siendo realmente aplicado. La ISO 19011:2026 proporciona orientaci\u00f3n sobre principios de auditor\u00eda, gesti\u00f3n de programas, realizaci\u00f3n de auditor\u00edas y competencia de los auditores.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Inspecciones, pruebas y no conformidades<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">El equipo puede participar en inspecciones de fabricaci\u00f3n, recepci\u00f3n, ejecuci\u00f3n en campo, FAT, SAT, pruebas funcionales e integradas. En RNC, verifica requisito, disposici\u00f3n, correcci\u00f3n, reensayo y evidencia de cierre.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Verificaci\u00f3n documental y recepci\u00f3n<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">MDR\/VDR, certificados, informes, registros de inspecci\u00f3n, FAT\/SAT, RNC, as-built y dossieres finales deben converger con la condici\u00f3n f\u00edsica. En el cierre, la tercera parte consolida evidencias y salvedades para apoyar la decisi\u00f3n del Owner.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">C\u00f3mo definir la autoridad de la tercera parte<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Sin una matriz de autoridad, el equipo independiente se convierte en una consultor\u00eda sin capacidad de intervenci\u00f3n o crea bloqueos sin base contractual. El contrato y el Plan de Calidad deben aclarar qui\u00e9n comenta, clasifica RNC, coloca una actividad en Hold, libera un Hold Point, aprueba desv\u00edos, autoriza el embarque, acepta documentos y formaliza la recepci\u00f3n.<\/p>\n\n\n\n<figure class=\"a3a-mermaid\"><svg overflow=\"visible\" id=\"a3a-diagram-2\" width=\"100%\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" class=\"flowchart\" style=\"max-width:min(538.19140625px, 100%);height:auto;display:block;margin:0 auto\" viewBox=\"0 0 538.19140625 1238.9375\" role=\"graphics-document document\" aria-roledescription=\"flowchart-v2\" aria-labelledby=\"chart-title-a3a-diagram-2\"><title id=\"chart-title-a3a-diagram-2\">Fluxo de decis\u00e3o para escalonamento de QA\/QC independente<\/title><style>#a3a-diagram-2{font-family:Roboto,sans-serif;font-size:15px;fill:var(--a3a-diag-text, #0a0a0a);}@keyframes edge-animation-frame{from{stroke-dashoffset:0;}}@keyframes dash{to{stroke-dashoffset:0;}}#a3a-diagram-2 .edge-animation-slow{stroke-dasharray:9,5!important;stroke-dashoffset:900;animation:dash 50s linear infinite;stroke-linecap:round;}#a3a-diagram-2 .edge-animation-fast{stroke-dasharray:9,5!important;stroke-dashoffset:900;animation:dash 20s linear infinite;stroke-linecap:round;}#a3a-diagram-2 .error-icon{fill:var(--a3a-diag-canvas, #ffffff);}#a3a-diagram-2 .error-text{fill:#000000;stroke:#000000;}#a3a-diagram-2 .edge-thickness-normal{stroke-width:1px;}#a3a-diagram-2 .edge-thickness-thick{stroke-width:3.5px;}#a3a-diagram-2 .edge-pattern-solid{stroke-dasharray:0;}#a3a-diagram-2 .edge-thickness-invisible{stroke-width:0;fill:none;}#a3a-diagram-2 .edge-pattern-dashed{stroke-dasharray:3;}#a3a-diagram-2 .edge-pattern-dotted{stroke-dasharray:2;}#a3a-diagram-2 .marker{fill:var(--a3a-diag-stroke, #2e42a2);stroke:var(--a3a-diag-stroke, #2e42a2);}#a3a-diagram-2 .marker.cross{stroke:var(--a3a-diag-stroke, #2e42a2);}#a3a-diagram-2 svg{font-family:Roboto,sans-serif;font-size:15px;}#a3a-diagram-2 p{margin:0;}#a3a-diagram-2 .label{font-family:Roboto,sans-serif;color:var(--a3a-diag-text, #0a0a0a);}#a3a-diagram-2 .cluster-label text{fill:var(--a3a-diag-title, #0124af);}#a3a-diagram-2 .cluster-label span{color:var(--a3a-diag-title, #0124af);}#a3a-diagram-2 .cluster-label span p{background-color:transparent;}#a3a-diagram-2 .label text,#a3a-diagram-2 span{fill:var(--a3a-diag-text, #0a0a0a);color:var(--a3a-diag-text, #0a0a0a);}#a3a-diagram-2 .node rect,#a3a-diagram-2 .node circle,#a3a-diagram-2 .node ellipse,#a3a-diagram-2 .node polygon,#a3a-diagram-2 .node path{fill:var(--a3a-diag-fill, #eef2fd);stroke:var(--a3a-diag-stroke, #2e42a2);stroke-width:1px;}#a3a-diagram-2 .rough-node .label text,#a3a-diagram-2 .node .label text,#a3a-diagram-2 .image-shape .label,#a3a-diagram-2 .icon-shape .label{text-anchor:middle;}#a3a-diagram-2 .node .katex path{fill:#000;stroke:#000;stroke-width:1px;}#a3a-diagram-2 .rough-node .label,#a3a-diagram-2 .node .label,#a3a-diagram-2 .image-shape .label,#a3a-diagram-2 .icon-shape .label{text-align:center;}#a3a-diagram-2 .node.clickable{cursor:pointer;}#a3a-diagram-2 .root .anchor path{fill:var(--a3a-diag-stroke, #2e42a2)!important;stroke-width:0;stroke:var(--a3a-diag-stroke, #2e42a2);}#a3a-diagram-2 .arrowheadPath{fill:var(--a3a-diag-stroke, #0b0b0b);}#a3a-diagram-2 .edgePath .path{stroke:var(--a3a-diag-stroke, #2e42a2);stroke-width:2.0px;}#a3a-diagram-2 .flowchart-link{stroke:var(--a3a-diag-stroke, #2e42a2);fill:none;}#a3a-diagram-2 .edgeLabel{background-color:var(--a3a-diag-canvas, #ffffff);text-align:center;}#a3a-diagram-2 .edgeLabel p{background-color:var(--a3a-diag-canvas, #ffffff);}#a3a-diagram-2 .edgeLabel rect{opacity:0.5;background-color:var(--a3a-diag-canvas, #ffffff);fill:var(--a3a-diag-canvas, #ffffff);}#a3a-diagram-2 .labelBkg{background-color:rgba(255, 255, 255, 0.5);}#a3a-diagram-2 .cluster rect{fill:var(--a3a-diag-surface, #f8f8f8);stroke:var(--a3a-diag-border, #e2e8f0);stroke-width:1px;}#a3a-diagram-2 .cluster text{fill:var(--a3a-diag-title, #0124af);}#a3a-diagram-2 .cluster span{color:var(--a3a-diag-title, #0124af);}#a3a-diagram-2 div.mermaidTooltip{position:absolute;text-align:center;max-width:200px;padding:2px;font-family:Roboto,sans-serif;font-size:12px;background:var(--a3a-diag-canvas, #ffffff);border:1px solid hsl(0, 0%, 90%);border-radius:2px;pointer-events:none;z-index:100;}#a3a-diagram-2 .flowchartTitleText{text-anchor:middle;font-size:18px;fill:var(--a3a-diag-text, #0a0a0a);}#a3a-diagram-2 rect.text{fill:none;stroke-width:0;}#a3a-diagram-2 .icon-shape,#a3a-diagram-2 .image-shape{background-color:var(--a3a-diag-canvas, #ffffff);text-align:center;}#a3a-diagram-2 .icon-shape p,#a3a-diagram-2 .image-shape p{background-color:var(--a3a-diag-canvas, #ffffff);padding:2px;}#a3a-diagram-2 .icon-shape rect,#a3a-diagram-2 .image-shape rect{opacity:0.5;background-color:var(--a3a-diag-canvas, #ffffff);fill:var(--a3a-diag-canvas, #ffffff);}#a3a-diagram-2 .label-icon{display:inline-block;height:1em;overflow:visible;vertical-align:-0.125em;}#a3a-diagram-2 .node .label-icon path{fill:currentColor;stroke:revert;stroke-width:revert;}#a3a-diagram-2 :root{--mermaid-font-family:Roboto,sans-serif;}<\/style><g><marker id=\"a3a-diagram-2_flowchart-v2-pointEnd\" class=\"marker flowchart-v2\" viewBox=\"0 0 10 10\" refX=\"5\" refY=\"5\" markerUnits=\"userSpaceOnUse\" markerWidth=\"8\" markerHeight=\"8\" orient=\"auto\"><path d=\"M 0 0 L 10 5 L 0 10 z\" class=\"arrowMarkerPath\" style=\"stroke-width: 1; stroke-dasharray: 1, 0;\"><\/path><\/marker><marker id=\"a3a-diagram-2_flowchart-v2-pointStart\" class=\"marker flowchart-v2\" viewBox=\"0 0 10 10\" refX=\"4.5\" refY=\"5\" markerUnits=\"userSpaceOnUse\" markerWidth=\"8\" markerHeight=\"8\" orient=\"auto\"><path d=\"M 0 5 L 10 10 L 10 0 z\" class=\"arrowMarkerPath\" style=\"stroke-width: 1; stroke-dasharray: 1, 0;\"><\/path><\/marker><marker id=\"a3a-diagram-2_flowchart-v2-circleEnd\" class=\"marker flowchart-v2\" viewBox=\"0 0 10 10\" refX=\"11\" refY=\"5\" markerUnits=\"userSpaceOnUse\" markerWidth=\"11\" markerHeight=\"11\" orient=\"auto\"><circle cx=\"5\" cy=\"5\" r=\"5\" class=\"arrowMarkerPath\" style=\"stroke-width: 1; stroke-dasharray: 1, 0;\"><\/circle><\/marker><marker id=\"a3a-diagram-2_flowchart-v2-circleStart\" class=\"marker flowchart-v2\" viewBox=\"0 0 10 10\" refX=\"-1\" refY=\"5\" markerUnits=\"userSpaceOnUse\" markerWidth=\"11\" markerHeight=\"11\" orient=\"auto\"><circle cx=\"5\" cy=\"5\" r=\"5\" class=\"arrowMarkerPath\" style=\"stroke-width: 1; stroke-dasharray: 1, 0;\"><\/circle><\/marker><marker id=\"a3a-diagram-2_flowchart-v2-crossEnd\" class=\"marker cross flowchart-v2\" viewBox=\"0 0 11 11\" refX=\"12\" refY=\"5.2\" markerUnits=\"userSpaceOnUse\" markerWidth=\"11\" markerHeight=\"11\" orient=\"auto\"><path d=\"M 1,1 l 9,9 M 10,1 l -9,9\" class=\"arrowMarkerPath\" style=\"stroke-width: 2; stroke-dasharray: 1, 0;\"><\/path><\/marker><marker id=\"a3a-diagram-2_flowchart-v2-crossStart\" class=\"marker cross flowchart-v2\" viewBox=\"0 0 11 11\" refX=\"-1\" refY=\"5.2\" markerUnits=\"userSpaceOnUse\" markerWidth=\"11\" markerHeight=\"11\" orient=\"auto\"><path d=\"M 1,1 l 9,9 M 10,1 l -9,9\" class=\"arrowMarkerPath\" style=\"stroke-width: 2; stroke-dasharray: 1, 0;\"><\/path><\/marker><g class=\"root\"><g class=\"clusters\"><\/g><g class=\"edgePaths\"><path d=\"M225.586,60.5L225.586,64.667C225.586,68.833,225.586,77.167,225.586,84.833C225.586,92.5,225.586,99.5,225.586,103L225.586,106.5\" id=\"L_A_B_0\" class=\"edge-thickness-normal edge-pattern-solid edge-thickness-normal edge-pattern-solid flowchart-link\" style=\";\" data-edge=\"true\" data-et=\"edge\" data-id=\"L_A_B_0\" data-points=\"W3sieCI6MjI1LjU4NTkzNzUsInkiOjYwLjV9LHsieCI6MjI1LjU4NTkzNzUsInkiOjg1LjV9LHsieCI6MjI1LjU4NTkzNzUsInkiOjExMC41fV0=\" marker-end=\"url(#a3a-diagram-2_flowchart-v2-pointEnd)\"><\/path><path d=\"M190.985,200.79L176.312,212.599C161.639,224.407,132.292,248.024,117.619,270.249C102.945,292.474,102.945,313.307,102.945,332.266C102.945,351.224,102.945,368.307,102.945,394.395C102.945,420.482,102.945,455.573,102.945,492.539C102.945,529.505,102.945,568.346,102.945,598.184C102.945,628.021,102.945,648.854,102.945,669.688C102.945,690.521,102.945,711.354,102.945,732.188C102.945,753.021,102.945,773.854,102.945,792.813C102.945,811.771,102.945,828.854,102.945,845.938C102.945,863.021,102.945,880.104,102.945,897.188C102.945,914.271,102.945,931.354,102.945,948.438C102.945,965.521,102.945,982.604,102.945,999.688C102.945,1016.771,102.945,1033.854,102.945,1045.896C102.945,1057.938,102.945,1064.938,102.945,1068.438L102.945,1071.938\" id=\"L_B_C_0\" class=\"edge-thickness-normal edge-pattern-solid edge-thickness-normal edge-pattern-solid flowchart-link\" style=\";\" data-edge=\"true\" data-et=\"edge\" data-id=\"L_B_C_0\" data-points=\"W3sieCI6MTkwLjk4NTQ0NjMxOTg0NCwieSI6MjAwLjc5MDEzMzgxOTg0NH0seyJ4IjoxMDIuOTQ1MzEyNSwieSI6MjcxLjY0MDYyNX0seyJ4IjoxMDIuOTQ1MzEyNSwieSI6MzM0LjE0MDYyNX0seyJ4IjoxMDIuOTQ1MzEyNSwieSI6Mzg1LjM5MDYyNX0seyJ4IjoxMDIuOTQ1MzEyNSwieSI6NDkwLjY2NDA2MjV9LHsieCI6MTAyLjk0NTMxMjUsInkiOjYwNy4xODc1fSx7IngiOjEwMi45NDUzMTI1LCJ5Ijo2NjkuNjg3NX0seyJ4IjoxMDIuOTQ1MzEyNSwieSI6NzMyLjE4NzV9LHsieCI6MTAyLjk0NTMxMjUsInkiOjc5NC42ODc1fSx7IngiOjEwMi45NDUzMTI1LCJ5Ijo4NDUuOTM3NX0seyJ4IjoxMDIuOTQ1MzEyNSwieSI6ODk3LjE4NzV9LHsieCI6MTAyLjk0NTMxMjUsInkiOjk0OC40Mzc1fSx7IngiOjEwMi45NDUzMTI1LCJ5Ijo5OTkuNjg3NX0seyJ4IjoxMDIuOTQ1MzEyNSwieSI6MTA1MC45Mzc1fSx7IngiOjEwMi45NDUzMTI1LCJ5IjoxMDc1LjkzNzV9XQ==\" marker-end=\"url(#a3a-diagram-2_flowchart-v2-pointEnd)\"><\/path><path d=\"M102.945,1128.438L102.945,1132.604C102.945,1136.771,102.945,1145.104,112.301,1153.18C121.657,1161.257,140.368,1169.076,149.724,1172.986L159.079,1176.895\" id=\"L_C_D_0\" class=\"edge-thickness-normal edge-pattern-solid edge-thickness-normal edge-pattern-solid flowchart-link\" style=\";\" data-edge=\"true\" data-et=\"edge\" data-id=\"L_C_D_0\" data-points=\"W3sieCI6MTAyLjk0NTMxMjUsInkiOjExMjguNDM3NX0seyJ4IjoxMDIuOTQ1MzEyNSwieSI6MTE1My40Mzc1fSx7InkiOjExNzguNDM3NSwieCI6MTYyLjc3MDAwNzYyMTk1MTJ9XQ==\" marker-end=\"url(#a3a-diagram-2_flowchart-v2-pointEnd)\"><\/path><path d=\"M260.186,200.79L274.86,212.599C289.533,224.407,318.88,248.024,333.553,265.207C348.227,282.391,348.227,293.141,348.227,298.516L348.227,303.891\" id=\"L_B_E_0\" class=\"edge-thickness-normal edge-pattern-solid edge-thickness-normal edge-pattern-solid flowchart-link\" style=\";\" data-edge=\"true\" data-et=\"edge\" data-id=\"L_B_E_0\" data-points=\"W3sieCI6MjYwLjE4NjQyODY4MDE1NjA0LCJ5IjoyMDAuNzkwMTMzODE5ODQ0fSx7IngiOjM0OC4yMjY1NjI1LCJ5IjoyNzEuNjQwNjI1fSx7IngiOjM0OC4yMjY1NjI1LCJ5IjozMDcuODkwNjI1fV0=\" marker-end=\"url(#a3a-diagram-2_flowchart-v2-pointEnd)\"><\/path><path d=\"M348.227,360.391L348.227,364.557C348.227,368.724,348.227,377.057,348.227,384.724C348.227,392.391,348.227,399.391,348.227,402.891L348.227,406.391\" id=\"L_E_F_0\" class=\"edge-thickness-normal edge-pattern-solid edge-thickness-normal edge-pattern-solid flowchart-link\" style=\";\" data-edge=\"true\" data-et=\"edge\" data-id=\"L_E_F_0\" data-points=\"W3sieCI6MzQ4LjIyNjU2MjUsInkiOjM2MC4zOTA2MjV9LHsieCI6MzQ4LjIyNjU2MjUsInkiOjM4NS4zOTA2MjV9LHsieCI6MzQ4LjIyNjU2MjUsInkiOjQxMC4zOTA2MjV9XQ==\" marker-end=\"url(#a3a-diagram-2_flowchart-v2-pointEnd)\"><\/path><path d=\"M310.017,532.728L298.744,545.138C287.471,557.548,264.925,582.368,253.652,605.194C242.379,628.021,242.379,648.854,242.379,669.688C242.379,690.521,242.379,711.354,242.379,732.188C242.379,753.021,242.379,773.854,242.379,792.813C242.379,811.771,242.379,828.854,242.379,845.938C242.379,863.021,242.379,880.104,242.379,897.188C242.379,914.271,242.379,931.354,250.384,943.772C258.39,956.19,274.401,963.942,282.406,967.818L290.412,971.694\" id=\"L_F_G_0\" class=\"edge-thickness-normal edge-pattern-solid edge-thickness-normal edge-pattern-solid flowchart-link\" style=\";\" data-edge=\"true\" data-et=\"edge\" data-id=\"L_F_G_0\" data-points=\"W3sieCI6MzEwLjAxNjc2MTU5ODE4NzE0LCJ5Ijo1MzIuNzI3Njk5MDk4MTg3MX0seyJ4IjoyNDIuMzc4OTA2MjUsInkiOjYwNy4xODc1fSx7IngiOjI0Mi4zNzg5MDYyNSwieSI6NjY5LjY4NzV9LHsieCI6MjQyLjM3ODkwNjI1LCJ5Ijo3MzIuMTg3NX0seyJ4IjoyNDIuMzc4OTA2MjUsInkiOjc5NC42ODc1fSx7IngiOjI0Mi4zNzg5MDYyNSwieSI6ODQ1LjkzNzV9LHsieCI6MjQyLjM3ODkwNjI1LCJ5Ijo4OTcuMTg3NX0seyJ4IjoyNDIuMzc4OTA2MjUsInkiOjk0OC40Mzc1fSx7IngiOjI5NC4wMTE5MDkyOTg3ODA1LCJ5Ijo5NzMuNDM3NX1d\" marker-end=\"url(#a3a-diagram-2_flowchart-v2-pointEnd)\"><\/path><path d=\"M379.857,539.307L387.213,550.621C394.57,561.934,409.283,584.561,416.64,601.249C423.996,617.938,423.996,628.688,423.996,634.063L423.996,639.438\" id=\"L_F_H_0\" class=\"edge-thickness-normal edge-pattern-solid edge-thickness-normal edge-pattern-solid flowchart-link\" style=\";\" data-edge=\"true\" data-et=\"edge\" data-id=\"L_F_H_0\" data-points=\"W3sieCI6Mzc5Ljg1Njg0Mzk5NTY3MzEsInkiOjUzOS4zMDcyMTg1MDQzMjY5fSx7IngiOjQyMy45OTYwOTM3NSwieSI6NjA3LjE4NzV9LHsieCI6NDIzLjk5NjA5Mzc1LCJ5Ijo2NDMuNDM3NX1d\" marker-end=\"url(#a3a-diagram-2_flowchart-v2-pointEnd)\"><\/path><path d=\"M423.996,695.938L423.996,701.979C423.996,708.021,423.996,720.104,423.996,731.521C423.996,742.938,423.996,753.688,423.996,759.063L423.996,764.438\" id=\"L_H_I_0\" class=\"edge-thickness-normal edge-pattern-solid edge-thickness-normal edge-pattern-solid flowchart-link\" style=\";\" data-edge=\"true\" data-et=\"edge\" data-id=\"L_H_I_0\" data-points=\"W3sieCI6NDIzLjk5NjA5Mzc1LCJ5Ijo2OTUuOTM3NX0seyJ4Ijo0MjMuOTk2MDkzNzUsInkiOjczMi4xODc1fSx7IngiOjQyMy45OTYwOTM3NSwieSI6NzY4LjQzNzV9XQ==\" marker-end=\"url(#a3a-diagram-2_flowchart-v2-pointEnd)\"><\/path><path d=\"M423.996,820.938L423.996,825.104C423.996,829.271,423.996,837.604,423.996,845.271C423.996,852.938,423.996,859.938,423.996,863.438L423.996,866.938\" id=\"L_I_J_0\" class=\"edge-thickness-normal edge-pattern-solid edge-thickness-normal edge-pattern-solid flowchart-link\" style=\";\" data-edge=\"true\" data-et=\"edge\" data-id=\"L_I_J_0\" data-points=\"W3sieCI6NDIzLjk5NjA5Mzc1LCJ5Ijo4MjAuOTM3NX0seyJ4Ijo0MjMuOTk2MDkzNzUsInkiOjg0NS45Mzc1fSx7IngiOjQyMy45OTYwOTM3NSwieSI6ODcwLjkzNzV9XQ==\" marker-end=\"url(#a3a-diagram-2_flowchart-v2-pointEnd)\"><\/path><path d=\"M423.996,923.438L423.996,927.604C423.996,931.771,423.996,940.104,418.388,948.064C412.78,956.024,401.564,963.61,395.957,967.403L390.349,971.196\" id=\"L_J_G_0\" class=\"edge-thickness-normal edge-pattern-solid edge-thickness-normal edge-pattern-solid flowchart-link\" style=\";\" data-edge=\"true\" data-et=\"edge\" data-id=\"L_J_G_0\" data-points=\"W3sieCI6NDIzLjk5NjA5Mzc1LCJ5Ijo5MjMuNDM3NX0seyJ4Ijo0MjMuOTk2MDkzNzUsInkiOjk0OC40Mzc1fSx7IngiOjM4Ny4wMzUzNDY3OTg3ODA1LCJ5Ijo5NzMuNDM3NX1d\" marker-end=\"url(#a3a-diagram-2_flowchart-v2-pointEnd)\"><\/path><path d=\"M348.227,1025.938L348.227,1030.104C348.227,1034.271,348.227,1042.604,348.227,1050.271C348.227,1057.938,348.227,1064.938,348.227,1068.438L348.227,1071.938\" id=\"L_G_K_0\" class=\"edge-thickness-normal edge-pattern-solid edge-thickness-normal edge-pattern-solid flowchart-link\" style=\";\" data-edge=\"true\" data-et=\"edge\" data-id=\"L_G_K_0\" data-points=\"W3sieCI6MzQ4LjIyNjU2MjUsInkiOjEwMjUuOTM3NX0seyJ4IjozNDguMjI2NTYyNSwieSI6MTA1MC45Mzc1fSx7IngiOjM0OC4yMjY1LCJ5IjoxMDc1LjkzNzV9XQ==\" marker-end=\"url(#a3a-diagram-2_flowchart-v2-pointEnd)\"><\/path><path d=\"M348.227,1128.438L348.227,1132.604C348.227,1136.771,348.227,1145.104,338.871,1153.18C329.515,1161.257,310.804,1169.076,301.448,1172.986L292.093,1176.895\" id=\"L_K_D_0\" class=\"edge-thickness-normal edge-pattern-solid edge-thickness-normal edge-pattern-solid flowchart-link\" style=\";\" data-edge=\"true\" data-et=\"edge\" data-id=\"L_K_D_0\" data-points=\"W3sieCI6MzQ4LjIyNjU2MjUsInkiOjExMjguNDM3NX0seyJ4IjozNDguMjI2NTYyNSwieSI6MTE1My40Mzc1fSx7InkiOjExNzguNDM3NSwieCI6Mjg4LjQwMTg2NzM3ODA0ODh9XQ==\" marker-end=\"url(#a3a-diagram-2_flowchart-v2-pointEnd)\"><\/path><\/g><g class=\"edgeLabels\"><g class=\"edgeLabel\"><g class=\"label\" data-id=\"L_A_B_0\" transform=\"translate(0, 0)\"><foreignObject width=\"0\" height=\"0\"><div xmlns=\"http:\/\/www.w3.org\/1999\/xhtml\" class=\"labelBkg\" style=\"display: table-cell; white-space: nowrap; line-height: 1.5; max-width: 200px; text-align: center;\"><span class=\"edgeLabel\"><\/span><\/div><\/foreignObject><\/g><\/g><g class=\"edgeLabel\" transform=\"translate(102.9453125, 732.1875)\"><g class=\"label\" data-id=\"L_B_C_0\" transform=\"translate(-12.6328125, -11.25)\"><foreignObject width=\"25.265625\" height=\"22.5\"><div xmlns=\"http:\/\/www.w3.org\/1999\/xhtml\" class=\"labelBkg\" style=\"display: table-cell; white-space: nowrap; line-height: 1.5; max-width: 200px; text-align: center;\"><span class=\"edgeLabel\"><p>Sim<\/p><\/span><\/div><\/foreignObject><\/g><\/g><g class=\"edgeLabel\"><g class=\"label\" data-id=\"L_C_D_0\" transform=\"translate(0, 0)\"><foreignObject width=\"0\" height=\"0\"><div xmlns=\"http:\/\/www.w3.org\/1999\/xhtml\" class=\"labelBkg\" style=\"display: table-cell; white-space: nowrap; line-height: 1.5; max-width: 200px; text-align: center;\"><span class=\"edgeLabel\"><\/span><\/div><\/foreignObject><\/g><\/g><g class=\"edgeLabel\" transform=\"translate(348.2265625, 271.640625)\"><g class=\"label\" data-id=\"L_B_E_0\" transform=\"translate(-13.5859375, -11.25)\"><foreignObject width=\"27.171875\" height=\"22.5\"><div xmlns=\"http:\/\/www.w3.org\/1999\/xhtml\" class=\"labelBkg\" style=\"display: table-cell; white-space: nowrap; line-height: 1.5; max-width: 200px; text-align: center;\"><span class=\"edgeLabel\"><p>N\u00e3o<\/p><\/span><\/div><\/foreignObject><\/g><\/g><g class=\"edgeLabel\"><g class=\"label\" data-id=\"L_E_F_0\" transform=\"translate(0, 0)\"><foreignObject width=\"0\" height=\"0\"><div xmlns=\"http:\/\/www.w3.org\/1999\/xhtml\" class=\"labelBkg\" style=\"display: table-cell; white-space: nowrap; line-height: 1.5; max-width: 200px; text-align: center;\"><span class=\"edgeLabel\"><\/span><\/div><\/foreignObject><\/g><\/g><g class=\"edgeLabel\" transform=\"translate(242.37890625, 794.6875)\"><g class=\"label\" data-id=\"L_F_G_0\" transform=\"translate(-13.5859375, -11.25)\"><foreignObject width=\"27.171875\" height=\"22.5\"><div xmlns=\"http:\/\/www.w3.org\/1999\/xhtml\" class=\"labelBkg\" style=\"display: table-cell; white-space: nowrap; line-height: 1.5; max-width: 200px; text-align: center;\"><span class=\"edgeLabel\"><p>N\u00e3o<\/p><\/span><\/div><\/foreignObject><\/g><\/g><g class=\"edgeLabel\" transform=\"translate(423.99609375, 607.1875)\"><g class=\"label\" data-id=\"L_F_H_0\" transform=\"translate(-12.6328125, -11.25)\"><foreignObject width=\"25.265625\" height=\"22.5\"><div xmlns=\"http:\/\/www.w3.org\/1999\/xhtml\" class=\"labelBkg\" style=\"display: table-cell; white-space: nowrap; line-height: 1.5; max-width: 200px; text-align: center;\"><span class=\"edgeLabel\"><p>Sim<\/p><\/span><\/div><\/foreignObject><\/g><\/g><g class=\"edgeLabel\"><g class=\"label\" data-id=\"L_H_I_0\" transform=\"translate(0, 0)\"><foreignObject width=\"0\" height=\"0\"><div xmlns=\"http:\/\/www.w3.org\/1999\/xhtml\" class=\"labelBkg\" style=\"display: table-cell; white-space: nowrap; line-height: 1.5; max-width: 200px; text-align: center;\"><span class=\"edgeLabel\"><\/span><\/div><\/foreignObject><\/g><\/g><g class=\"edgeLabel\"><g class=\"label\" data-id=\"L_I_J_0\" transform=\"translate(0, 0)\"><foreignObject width=\"0\" height=\"0\"><div xmlns=\"http:\/\/www.w3.org\/1999\/xhtml\" class=\"labelBkg\" style=\"display: table-cell; white-space: nowrap; line-height: 1.5; max-width: 200px; text-align: center;\"><span class=\"edgeLabel\"><\/span><\/div><\/foreignObject><\/g><\/g><g class=\"edgeLabel\"><g class=\"label\" data-id=\"L_J_G_0\" transform=\"translate(0, 0)\"><foreignObject width=\"0\" height=\"0\"><div xmlns=\"http:\/\/www.w3.org\/1999\/xhtml\" class=\"labelBkg\" style=\"display: table-cell; white-space: nowrap; line-height: 1.5; max-width: 200px; text-align: center;\"><span class=\"edgeLabel\"><\/span><\/div><\/foreignObject><\/g><\/g><g class=\"edgeLabel\"><g class=\"label\" data-id=\"L_G_K_0\" transform=\"translate(0, 0)\"><foreignObject width=\"0\" height=\"0\"><div xmlns=\"http:\/\/www.w3.org\/1999\/xhtml\" class=\"labelBkg\" style=\"display: table-cell; white-space: nowrap; line-height: 1.5; max-width: 200px; text-align: center;\"><span class=\"edgeLabel\"><\/span><\/div><\/foreignObject><\/g><\/g><g class=\"edgeLabel\"><g class=\"label\" data-id=\"L_K_D_0\" transform=\"translate(0, 0)\"><foreignObject width=\"0\" height=\"0\"><div xmlns=\"http:\/\/www.w3.org\/1999\/xhtml\" class=\"labelBkg\" style=\"display: table-cell; white-space: nowrap; line-height: 1.5; max-width: 200px; text-align: center;\"><span class=\"edgeLabel\"><\/span><\/div><\/foreignObject><\/g><\/g><\/g><g class=\"nodes\"><g class=\"node default\" id=\"flowchart-A-0\" transform=\"translate(225.5859375, 34.25)\"><rect class=\"basic label-container\" style=\"\" x=\"-116.6171875\" y=\"-26.25\" width=\"233.234375\" height=\"52.5\"><\/rect><g class=\"label\" style=\"\" transform=\"translate(-86.6171875, -11.25)\"><rect><\/rect><foreignObject width=\"173.234375\" height=\"22.5\"><div xmlns=\"http:\/\/www.w3.org\/1999\/xhtml\" style=\"display: table-cell; white-space: nowrap; line-height: 1.5; max-width: 200px; text-align: center;\"><span class=\"nodeLabel\"><p>Verifica\u00e7\u00e3o independente<\/p><\/span><\/div><\/foreignObject><\/g><\/g><g class=\"node default\" id=\"flowchart-B-1\" transform=\"translate(225.5859375, 172.9453125)\"><polygon points=\"62.4453125,0 124.890625,-62.4453125 62.4453125,-124.890625 0,-62.4453125\" class=\"label-container\" transform=\"translate(-61.9453125, 62.4453125)\"><\/polygon><g class=\"label\" style=\"\" transform=\"translate(-36.1953125, -11.25)\"><rect><\/rect><foreignObject width=\"72.390625\" height=\"22.5\"><div xmlns=\"http:\/\/www.w3.org\/1999\/xhtml\" style=\"display: table-cell; white-space: nowrap; line-height: 1.5; max-width: 200px; text-align: center;\"><span class=\"nodeLabel\"><p>Conforme?<\/p><\/span><\/div><\/foreignObject><\/g><\/g><g class=\"node default\" id=\"flowchart-C-3\" transform=\"translate(102.9453125, 1102.1875)\"><rect class=\"basic label-container\" style=\"\" x=\"-94.9453125\" y=\"-26.25\" width=\"189.890625\" height=\"52.5\"><\/rect><g class=\"label\" style=\"\" transform=\"translate(-64.9453125, -11.25)\"><rect><\/rect><foreignObject width=\"129.890625\" height=\"22.5\"><div xmlns=\"http:\/\/www.w3.org\/1999\/xhtml\" style=\"display: table-cell; white-space: nowrap; line-height: 1.5; max-width: 200px; text-align: center;\"><span class=\"nodeLabel\"><p>Registrar evid\u00eancia<\/p><\/span><\/div><\/foreignObject><\/g><\/g><g class=\"node default\" id=\"flowchart-D-5\" transform=\"translate(225.5859375, 1204.6875)\"><rect class=\"basic label-container\" style=\"\" x=\"-127.984375\" y=\"-26.25\" width=\"255.96875\" height=\"52.5\"><\/rect><g class=\"label\" style=\"\" transform=\"translate(-97.984375, -11.25)\"><rect><\/rect><foreignObject width=\"195.96875\" height=\"22.5\"><div xmlns=\"http:\/\/www.w3.org\/1999\/xhtml\" style=\"display: table-cell; white-space: nowrap; line-height: 1.5; max-width: 200px; text-align: center;\"><span class=\"nodeLabel\"><p>Liberar conforme autoridade<\/p><\/span><\/div><\/foreignObject><\/g><\/g><g class=\"node default\" id=\"flowchart-E-7\" transform=\"translate(348.2265625, 334.140625)\"><rect class=\"basic label-container\" style=\"\" x=\"-88.2578125\" y=\"-26.25\" width=\"176.515625\" height=\"52.5\"><\/rect><g class=\"label\" style=\"\" transform=\"translate(-58.2578125, -11.25)\"><rect><\/rect><foreignObject width=\"116.515625\" height=\"22.5\"><div xmlns=\"http:\/\/www.w3.org\/1999\/xhtml\" style=\"display: table-cell; white-space: nowrap; line-height: 1.5; max-width: 200px; text-align: center;\"><span class=\"nodeLabel\"><p>Classificar desvio<\/p><\/span><\/div><\/foreignObject><\/g><\/g><g class=\"node default\" id=\"flowchart-F-9\" transform=\"translate(348.2265625, 490.6640625)\"><polygon points=\"80.2734375,0 160.546875,-80.2734375 80.2734375,-160.546875 0,-80.2734375\" class=\"label-container\" transform=\"translate(-79.7734375, 80.2734375)\"><\/polygon><g class=\"label\" style=\"\" transform=\"translate(-54.0234375, -11.25)\"><rect><\/rect><foreignObject width=\"108.046875\" height=\"22.5\"><div xmlns=\"http:\/\/www.w3.org\/1999\/xhtml\" style=\"display: table-cell; white-space: nowrap; line-height: 1.5; max-width: 200px; text-align: center;\"><span class=\"nodeLabel\"><p>Impacto cr\u00edtico?<\/p><\/span><\/div><\/foreignObject><\/g><\/g><g class=\"node default\" id=\"flowchart-G-11\" transform=\"translate(348.2265625, 999.6875)\"><rect class=\"basic label-container\" style=\"\" x=\"-91.7421875\" y=\"-26.25\" width=\"183.484375\" height=\"52.5\"><\/rect><g class=\"label\" style=\"\" transform=\"translate(-61.7421875, -11.25)\"><rect><\/rect><foreignObject width=\"123.484375\" height=\"22.5\"><div xmlns=\"http:\/\/www.w3.org\/1999\/xhtml\" style=\"display: table-cell; white-space: nowrap; line-height: 1.5; max-width: 200px; text-align: center;\"><span class=\"nodeLabel\"><p>Corre\u00e7\u00e3o e reteste<\/p><\/span><\/div><\/foreignObject><\/g><\/g><g class=\"node default\" id=\"flowchart-H-13\" transform=\"translate(423.99609375, 669.6875)\"><rect class=\"basic label-container\" style=\"\" x=\"-106.1953125\" y=\"-26.25\" width=\"212.390625\" height=\"52.5\"><\/rect><g class=\"label\" style=\"\" transform=\"translate(-76.1953125, -11.25)\"><rect><\/rect><foreignObject width=\"152.390625\" height=\"22.5\"><div xmlns=\"http:\/\/www.w3.org\/1999\/xhtml\" style=\"display: table-cell; white-space: nowrap; line-height: 1.5; max-width: 200px; text-align: center;\"><span class=\"nodeLabel\"><p>Hold e escalonamento<\/p><\/span><\/div><\/foreignObject><\/g><\/g><g class=\"node default\" id=\"flowchart-I-15\" transform=\"translate(423.99609375, 794.6875)\"><rect class=\"basic label-container\" style=\"\" x=\"-102.953125\" y=\"-26.25\" width=\"205.90625\" height=\"52.5\"><\/rect><g class=\"label\" style=\"\" transform=\"translate(-72.953125, -11.25)\"><rect><\/rect><foreignObject width=\"145.90625\" height=\"22.5\"><div xmlns=\"http:\/\/www.w3.org\/1999\/xhtml\" style=\"display: table-cell; white-space: nowrap; line-height: 1.5; max-width: 200px; text-align: center;\"><span class=\"nodeLabel\"><p>Engenharia do Owner<\/p><\/span><\/div><\/foreignObject><\/g><\/g><g class=\"node default\" id=\"flowchart-J-17\" transform=\"translate(423.99609375, 897.1875)\"><rect class=\"basic label-container\" style=\"\" x=\"-93.2265625\" y=\"-26.25\" width=\"186.453125\" height=\"52.5\"><\/rect><g class=\"label\" style=\"\" transform=\"translate(-63.2265625, -11.25)\"><rect><\/rect><foreignObject width=\"126.453125\" height=\"22.5\"><div xmlns=\"http:\/\/www.w3.org\/1999\/xhtml\" style=\"display: table-cell; white-space: nowrap; line-height: 1.5; max-width: 200px; text-align: center;\"><span class=\"nodeLabel\"><p>Disposi\u00e7\u00e3o t\u00e9cnica<\/p><\/span><\/div><\/foreignObject><\/g><\/g><g class=\"node default\" id=\"flowchart-K-21\" transform=\"translate(348.2265625, 1102.1875)\"><rect class=\"basic label-container\" style=\"\" x=\"-100.3359375\" y=\"-26.25\" width=\"200.671875\" height=\"52.5\"><\/rect><g class=\"label\" style=\"\" transform=\"translate(-70.3359375, -11.25)\"><rect><\/rect><foreignObject width=\"140.671875\" height=\"22.5\"><div xmlns=\"http:\/\/www.w3.org\/1999\/xhtml\" style=\"display: table-cell; white-space: nowrap; line-height: 1.5; max-width: 200px; text-align: center;\"><span class=\"nodeLabel\"><p>Verificar fechamento<\/p><\/span><\/div><\/foreignObject><\/g><\/g><\/g><\/g><\/g><\/svg><figcaption>Flujo de decisi\u00f3n para escalamiento de QA\/QC independiente<\/figcaption><\/figure>\n\n\n\n<h2 class=\"wp-block-heading\">Qu\u00e9 diferencia el QA\/QC independiente de la supervisi\u00f3n<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">La supervisi\u00f3n t\u00e9cnica acompa\u00f1a el cumplimiento contractual de la ejecuci\u00f3n y puede incluir medici\u00f3n, evidencias, avance, documentaci\u00f3n y aceptaci\u00f3n. El QA\/QC independiente se concentra en la confiabilidad del sistema de calidad y de las evidencias de conformidad. En algunos contratos, el mismo equipo ejecuta ambas funciones; en otros, est\u00e1n separadas.<\/p>\n\n\n\n<figure class=\"wp-block-table\"><table><tbody><tr><td>Funci\u00f3n<\/td><td>Pregunta dominante<\/td><\/tr><tr><td>supervisi\u00f3n t\u00e9cnica<\/td><td>\u00bfel servicio se est\u00e1 ejecutando conforme al contrato, proyecto y condiciones de medici\u00f3n?<\/td><\/tr><tr><td>QA<\/td><td>\u00bfel proceso planificado es capaz de producir un resultado conforme y se est\u00e1 siguiendo?<\/td><\/tr><tr><td>QC<\/td><td>\u00bfel \u00edtem verificado cumple el criterio objetivo?<\/td><\/tr><tr><td>auditor\u00eda<\/td><td>\u00bfel sistema o proceso posee evidencias suficientes y se ajusta a los criterios de auditor\u00eda?<\/td><\/tr><tr><td>Owner\u2019s Engineering<\/td><td>\u00bflas decisiones t\u00e9cnicas y las interfaces protegen los intereses del propietario?<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<h2 class=\"wp-block-heading\">Qu\u00e9 no debe hacer la tercera parte<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">No debe ejecutar el control que deber\u00eda realizar el proveedor, completar registros en nombre de la contratista, aprobar ingenier\u00eda fuera de su autoridad, alterar criterios sin gesti\u00f3n formal de cambios, asumir responsabilidad por la ejecuci\u00f3n f\u00edsica ni aceptar excepciones sin base t\u00e9cnica y documental.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">C\u00f3mo estructurar el contrato de QA\/QC independiente<\/h2>\n\n\n\n<div class=\"wp-block-a3a-destaque\">\n<p class=\"wp-block-paragraph\">El QA\/QC independiente no necesita significar presencia integral en campo. La cobertura puede definirse por criticidad, gatillos de riesgo, H\/W\/R Points, auditor\u00edas e hitos como FAT, SAT y recepci\u00f3n t\u00e9cnica.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><a href=\"https:\/\/a3aengenharia.com.br\/servicos\/implementacao\/apoio-tecnico-fiscalizacao-obras-contratos-engenharia\/\">Estructure un plan de supervisi\u00f3n basado en riesgo<\/a><\/p>\n<\/div>\n\n\n\n<p class=\"wp-block-paragraph\">Un alcance gen\u00e9rico como \u201cacompa\u00f1ar la calidad de la obra\u201d es insuficiente. Un Pliego de Prescripciones o T\u00e9rminos de Referencia deber\u00eda definir objeto y sistemas, documentos revisados, disciplinas, actividades sujetas a presencia, H\/W\/R Points, frecuencia, informes, RNC, interfaces con supervisi\u00f3n y puesta en marcha, autoridades, indicadores, Data Book y plazos de respuesta.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Cuando el riesgo est\u00e1 concentrado en pocos hitos, no es necesario contratar presencia continua. Un modelo bajo demanda puede combinar revisi\u00f3n documental remota, inspecciones programadas, participaci\u00f3n en FAT\/SAT y movilizaci\u00f3n por gatillos de riesgo.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Criterios de cualificaci\u00f3n del equipo independiente<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">La competencia debe ser compatible con los sistemas verificados. Eval\u00fae formaci\u00f3n y habilitaci\u00f3n profesional, experiencia en el tipo de sistema, conocimiento normativo, experiencia en inspecci\u00f3n y puesta en marcha, capacidad de interpretar proyectos, experiencia con RNC, independencia organizativa, m\u00e9todo de evidencias y capacidad para movilizar especialistas.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Indicadores \u00fatiles para el Owner<\/h2>\n\n\n\n<figure class=\"wp-block-table\"><table><tbody><tr><td>Indicador<\/td><td>Interpretaci\u00f3n<\/td><\/tr><tr><td>RNC por per\u00edodo y disciplina<\/td><td>concentraci\u00f3n de problemas<\/td><\/tr><tr><td>recurrencia de RNC<\/td><td>eficacia de las acciones correctivas<\/td><\/tr><tr><td>aprobaci\u00f3n en la primera inspecci\u00f3n<\/td><td>madurez de la ejecuci\u00f3n<\/td><\/tr><tr><td>punch list por sistema<\/td><td>preparaci\u00f3n para puesta en marcha<\/td><\/tr><tr><td>documentos cr\u00edticos pendientes<\/td><td>riesgo de aceptaci\u00f3n\/handover<\/td><\/tr><tr><td>H\/W Points realizados en plazo<\/td><td>disciplina del proceso<\/td><\/tr><tr><td>FAT aprobado en la primera ejecuci\u00f3n<\/td><td>calidad de fabricaci\u00f3n y preparaci\u00f3n<\/td><\/tr><tr><td>tiempo medio de cierre de RNC<\/td><td>capacidad de respuesta<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<h2 class=\"wp-block-heading\">Cu\u00e1ndo debe comenzar la independencia<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">El mejor momento es antes de contratar la ejecuci\u00f3n, cuando todav\u00eda es posible revisar especificaciones, criterios de aceptaci\u00f3n, documentos obligatorios, PIT\/ITP y responsabilidades. Cuanto m\u00e1s tarde entre el equipo, mayor ser\u00e1 la posibilidad de encontrar hechos consumados.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">QA\/QC independiente y gesti\u00f3n de riesgos<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">La justificaci\u00f3n econ\u00f3mica est\u00e1 en el coste evitado. Un fallo detectado en el proyecto tiende a ser menos costoso que el mismo fallo encontrado despu\u00e9s de la fabricaci\u00f3n o instalaci\u00f3n. El principio es ubicar la verificaci\u00f3n antes de los puntos en que el defecto se vuelve m\u00e1s caro o dif\u00edcil de detectar.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">La ISO 10005:2018 trata planes de calidad aplicables a procesos, productos, servicios, proyectos y contratos; la ISO 10006:2017 trata la gesti\u00f3n de la calidad en proyectos. Junto con la ISO 9001, ayudan a estructurar procesos, evidencias y mejora, sin sustituir las normas t\u00e9cnicas de cada disciplina.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Modelo de actuaci\u00f3n por fases<\/h2>\n\n\n\n<ol class=\"wp-block-list\"><li>Preparaci\u00f3n: requisitos, matriz documental, Plan de Calidad, PIT\/ITP y criterios de aceptaci\u00f3n.<\/li><li>Proveedores: cualificaci\u00f3n, Vendor Inspection, H\/W\/R Points, FAT, RNC y liberaci\u00f3n.<\/li><li>Obra: inspecciones cr\u00edticas, trazabilidad, interfaces y pendientes.<\/li><li>Puesta en marcha: preparaci\u00f3n, pruebas, cierre de desv\u00edos y punch list.<\/li><li>Handover: Quality Dossier, Data Books, as-built, manuales y recomendaci\u00f3n de recepci\u00f3n.<\/li><\/ol>\n\n\n\n<h2 class=\"wp-block-heading\">C\u00f3mo saber si el servicio est\u00e1 agregando valor<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">El valor no debe medirse por el n\u00famero de inspecciones, sino por requisitos m\u00e1s claros, desv\u00edos identificados antes, menor recurrencia, evidencias confiables, mejor preparaci\u00f3n para puesta en marcha y decisiones de aceptaci\u00f3n sustentadas.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Consideraciones finales<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">El QA\/QC independiente es una herramienta de gobernanza para proyectos en los que la consecuencia de aceptar una condici\u00f3n inadecuada supera el coste de una verificaci\u00f3n adicional. Su funci\u00f3n no es crear burocracia ni desconfiar por principio de la contratista; es construir una cadena de confianza t\u00e9cnica entre requisito, ejecuci\u00f3n, evidencia y aceptaci\u00f3n.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">El modelo m\u00e1s eficiente est\u00e1 basado en riesgo, con autoridad claramente definida, integraci\u00f3n con supervisi\u00f3n y Owner\u2019s Engineering, uso selectivo de H\/W\/R Points, auditor\u00edas, inspecciones y revisi\u00f3n documental. La contratista contin\u00faa siendo responsable de producir calidad. La tercera parte independiente verifica si esa calidad puede demostrarse de forma consistente y suficiente para proteger la decisi\u00f3n del propietario.<\/p>\n\n\n\n<div class=\"wp-block-a3a-destaque\">\n<p class=\"wp-block-paragraph\">Cuando el proyecto ya presenta RNC recurrentes, retrabajo, evidencias d\u00e9biles o dudas sobre la condici\u00f3n ejecutada, el enfoque deja de ser preventivo y pasa a exigir un diagn\u00f3stico independiente del estado real.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><a href=\"https:\/\/a3aengenharia.com.br\/servicos\/servicos-transversais\/auditoria-tecnica-engenharia\/\">Eval\u00fae la condici\u00f3n t\u00e9cnica con una Auditor\u00eda de Ingenier\u00eda<\/a><\/p>\n<\/div>\n\n\n\n<details class=\"wp-block-details is-layout-flow wp-block-details-is-layout-flow\"><summary>Referencias t\u00e9cnicas<\/summary>\n<p class=\"wp-block-paragraph\">[1] INTERNATIONAL ORGANIZATION FOR STANDARDIZATION. ISO 9001:2015 \u2014 Quality management systems \u2014 Requirements. Geneva: ISO, 2015. Disponible en: <a href=\"https:\/\/www.iso.org\/standard\/62085.html\">https:\/\/www.iso.org\/standard\/62085.html<\/a><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">[2] INTERNATIONAL ORGANIZATION FOR STANDARDIZATION. ISO 10005:2018 \u2014 Quality management \u2014 Guidelines for quality plans. Geneva: ISO, 2018. Disponible en: <a href=\"https:\/\/www.iso.org\/standard\/70398.html\">https:\/\/www.iso.org\/standard\/70398.html<\/a><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">[3] INTERNATIONAL ORGANIZATION FOR STANDARDIZATION. ISO 10006:2017 \u2014 Quality management \u2014 Guidelines for quality management in projects. Geneva: ISO, 2017. Disponible en: <a href=\"https:\/\/www.iso.org\/standard\/70376.html\">https:\/\/www.iso.org\/standard\/70376.html<\/a><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">[4] INTERNATIONAL ORGANIZATION FOR STANDARDIZATION. ISO 19011:2026 \u2014 Guidelines for auditing management systems. Geneva: ISO, 2026. Disponible en: <a href=\"https:\/\/www.iso.org\/standard\/19011\">https:\/\/www.iso.org\/standard\/19011<\/a><\/p>\n<\/details>\n\n\n\n<details class=\"wp-block-details is-layout-flow wp-block-details-is-layout-flow\"><summary>Preguntas frecuentes<\/summary>\n<div class=\"schema-faq wp-block-yoast-faq-block\"><div class=\"schema-faq-section\" id=\"faq-question-o-que-qa-qc-independente-b52c4388\"><strong class=\"schema-faq-question\">\u00bfQu\u00e9 es QA\/QC independiente?<\/strong> <p class=\"schema-faq-answer\">Es una capa de verificaci\u00f3n t\u00e9cnica ejecutada por una parte que no produce el objeto y que eval\u00faa si procesos, inspecciones, pruebas, documentos y evidencias son suficientes para demostrar la conformidad al Owner.<\/p><\/div><div class=\"schema-faq-section\" id=\"faq-question-qa-qc-independente-substitui-o-controle-da-contr-f93126ce\"><strong class=\"schema-faq-question\">\u00bfEl QA\/QC independiente sustituye el control de la contratista?<\/strong> <p class=\"schema-faq-answer\">No. La contratista contin\u00faa siendo responsable de ejecutar su propio QA\/QC. La tercera parte verifica la efectividad de ese sistema y la confiabilidad de las evidencias.<\/p><\/div><div class=\"schema-faq-section\" id=\"faq-question-quando-vale-a-pena-contratar-uma-terceira-parte-0dc379a9\"><strong class=\"schema-faq-question\">\u00bfCu\u00e1ndo merece la pena contratar una tercera parte?<\/strong> <p class=\"schema-faq-answer\">Cuando existe una alta consecuencia de fallo, baja detectabilidad, elementos irreversibles, fabricaci\u00f3n remota, m\u00faltiples interfaces, RNC recurrentes o insuficiencia de equipo t\u00e9cnico propio.<\/p><\/div><div class=\"schema-faq-section\" id=\"faq-question-qa-qc-independente-o-mesmo-que-fiscaliza-o-744c48e8\"><strong class=\"schema-faq-question\">\u00bfEl QA\/QC independiente es lo mismo que la supervisi\u00f3n?<\/strong> <p class=\"schema-faq-answer\">No necesariamente. La supervisi\u00f3n acompa\u00f1a el cumplimiento contractual y la ejecuci\u00f3n; el QA\/QC independiente se concentra en la confiabilidad del sistema de calidad y de las evidencias.<\/p><\/div><div class=\"schema-faq-section\" id=\"faq-question-a-terceira-parte-pode-bloquear-uma-atividade-5153d272\"><strong class=\"schema-faq-question\">\u00bfLa tercera parte puede bloquear una actividad?<\/strong> <p class=\"schema-faq-answer\">Solo cuando esa autoridad est\u00e9 definida en el contrato, PIT\/ITP, Plan de Calidad o matriz de autoridad.<\/p><\/div><div class=\"schema-faq-section\" id=\"faq-question-necess-rio-inspecionar-100-dos-itens-9cbae1fc\"><strong class=\"schema-faq-question\">\u00bfEs necesario inspeccionar el 100% de los \u00edtems?<\/strong> <p class=\"schema-faq-answer\">No. El modelo eficiente combina revisi\u00f3n de procesos, H\/W\/R Points, muestreo basado en riesgo y aumento de cobertura seg\u00fan el desempe\u00f1o.<\/p><\/div><\/div>\n<\/details>\n\n\n\n<details class=\"wp-block-details is-layout-flow wp-block-details-is-layout-flow\"><summary>Materiales t\u00e9cnicos complementarios<\/summary>\n<h4 class=\"wp-block-heading\">Soluciones relacionadas<\/h4>\n<ul class=\"wp-block-list\"><li><a href=\"https:\/\/a3aengenharia.com.br\/solucoes\/gestao-e-governanca-de-engenharia\/gestao-requisitos-evidencias-criterios-aceite\/\">Gesti\u00f3n de Requisitos, Evidencias y Criterios de Aceptaci\u00f3n<\/a><\/li><li><a href=\"https:\/\/a3aengenharia.com.br\/solucoes\/gestao-e-governanca-de-engenharia\/gestao-pendencias-rfis-nao-conformidades\/\">Gesti\u00f3n de Pendientes, RFIs y No Conformidades<\/a><\/li><li><a href=\"https:\/\/a3aengenharia.com.br\/solucoes\/gestao-e-governanca-de-engenharia\/gestao-processos-workflows-aprovacoes-tecnicas\/\">Gesti\u00f3n de Procesos, Workflows y Aprobaciones T\u00e9cnicas<\/a><\/li><li><a href=\"https:\/\/a3aengenharia.com.br\/solucoes\/gestao-e-governanca-de-engenharia\/governanca-de-projetos-programas-e-portfolios\/\">Gobernanza de Proyectos, Programas y Portafolios<\/a><\/li><\/ul>\n<h4 class=\"wp-block-heading\">Servicios relacionados<\/h4>\n<ul class=\"wp-block-list\"><li><a href=\"https:\/\/a3aengenharia.com.br\/servicos\/contratacao-integrada\/engenharia-do-proprietario\/\">Ingenier\u00eda del Propietario (Owner\u2019s Engineering)<\/a><\/li><li><a href=\"https:\/\/a3aengenharia.com.br\/servicos\/servicos-transversais\/auditoria-tecnica-engenharia\/\">Auditor\u00eda T\u00e9cnica de Ingenier\u00eda<\/a><\/li><li><a href=\"https:\/\/a3aengenharia.com.br\/servicos\/implementacao\/apoio-tecnico-fiscalizacao-obras-contratos-engenharia\/\">Apoyo T\u00e9cnico a la Supervisi\u00f3n<\/a><\/li><li><a href=\"https:\/\/a3aengenharia.com.br\/servicos\/servicos-transversais\/comissionamento-de-equipamentos\/\">Puesta en Marcha de Equipos<\/a><\/li><li><a href=\"https:\/\/a3aengenharia.com.br\/servicos\/implementacao\/recebimento-tecnico-obras-servicos-engenharia\/\">Recepci\u00f3n T\u00e9cnica de Obras y Servicios<\/a><\/li><\/ul>\n<h4 class=\"wp-block-heading\">Contenidos principales sobre el tema<\/h4>\n<ul class=\"wp-block-list\"><li><a href=\"https:\/\/a3aengenharia.com.br\/conteudo\/artigos-tecnicos\/qa-qc-obras-engenharia-inspecoes-rnc-aceite\/\">QA\/QC en Obras de Ingenier\u00eda<\/a><\/li><li><a href=\"https:\/\/a3aengenharia.com.br\/conteudo\/artigos-tecnicos\/auditoria-da-qualidade-engenharia-planejamento-achados\/\">Auditor\u00eda de la Calidad<\/a><\/li><li><a href=\"https:\/\/a3aengenharia.com.br\/conteudo\/artigos-tecnicos\/inspecao-fabricacao-vendor-inspection-fornecedores-engenharia\/\">Inspecci\u00f3n de Fabricaci\u00f3n y Vendor Inspection<\/a><\/li><li><a href=\"https:\/\/a3aengenharia.com.br\/conteudo\/artigos-tecnicos\/fat-sat-testes-integrados-sistemas-criticos\/\">FAT y SAT<\/a><\/li><li><a href=\"https:\/\/a3aengenharia.com.br\/conteudo\/artigos-tecnicos\/criterios-de-aceite-engenharia-requisitos-evidencias-validacao-tecnica\/\">Criterios de Aceptaci\u00f3n en Ingenier\u00eda<\/a><\/li><li><a href=\"https:\/\/a3aengenharia.com.br\/conteudo\/artigos-tecnicos\/evitar-nao-conformidades-comissionamento-engenharia\/\">C\u00f3mo evitar que las no conformidades lleguen a la puesta en marcha<\/a><\/li><li><a href=\"https:\/\/a3aengenharia.com.br\/conteudo\/artigos-tecnicos\/obra-falhas-qualidade-o-que-contratar-diagnostico-correcao\/\">Obra con fallos de calidad: qu\u00e9 contratar<\/a><\/li><\/ul>\n<h4 class=\"wp-block-heading\">Contenidos t\u00e9cnicos relacionados<\/h4>\n<ul class=\"wp-block-list\"><li><a href=\"https:\/\/a3aengenharia.com.br\/conteudo\/artigos-tecnicos\/project-assurance-engenharia-revisao-independente-governanca\/\">Project Assurance en Ingenier\u00eda<\/a><\/li><li><a href=\"https:\/\/a3aengenharia.com.br\/conteudo\/artigos-tecnicos\/design-review-projetos-engenharia\/\">Design Review en Proyectos de Ingenier\u00eda<\/a><\/li><li><a href=\"https:\/\/a3aengenharia.com.br\/conteudo\/whitepapers\/owners-engineering-framework-contratacao-governanca\/\">Owner\u2019s Engineering: framework ejecutivo<\/a><\/li><li><a href=\"https:\/\/a3aengenharia.com.br\/conteudo\/guias-tecnicos\/guia-completo-sobre-comissionamento\/\">Gu\u00eda Completa sobre Puesta en Marcha<\/a><\/li><li><a href=\"https:\/\/a3aengenharia.com.br\/conteudo\/whitepapers\/framework-handover-tecnico-obras-sistemas-operacao\/\">Framework de Handover T\u00e9cnico<\/a><\/li><\/ul>\n<\/details>\n","protected":false},"excerpt":{"rendered":"<p>Cu\u00e1ndo contratar QA\/QC independiente en Ingenier\u00eda: riesgos, alcance, autoridad, inspecciones, auditor\u00edas, H\/W\/R Points, RNC y apoyo a la aceptaci\u00f3n del Owner.<\/p>\n","protected":false},"author":1,"featured_media":0,"parent":0,"template":"","meta":{"_a3a_global_related_solutions":[],"_a3a_global_related_services":[],"_a3a_global_related_materials":[],"_a3a_post_lang":"es-es","_a3a_translation_group_id":"7290872b-cdc1-4635-81bf-7fa88d053ab0","_a3a_i18n_canonical_slug":"qa-qc-independiente-ingenieria-owner-tercera-parte"},"categories":[],"segments":[],"mercados":[],"etapas":[],"class_list":["post-72805","articles","type-articles","status-publish","hentry"],"_links":{"self":[{"href":"https:\/\/a3aengenharia.com\/es-es\/wp-json\/wp\/v2\/articles\/72805","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/a3aengenharia.com\/es-es\/wp-json\/wp\/v2\/articles"}],"about":[{"href":"https:\/\/a3aengenharia.com\/es-es\/wp-json\/wp\/v2\/types\/articles"}],"author":[{"embeddable":true,"href":"https:\/\/a3aengenharia.com\/es-es\/wp-json\/wp\/v2\/users\/1"}],"version-history":[{"count":1,"href":"https:\/\/a3aengenharia.com\/es-es\/wp-json\/wp\/v2\/articles\/72805\/revisions"}],"predecessor-version":[{"id":72821,"href":"https:\/\/a3aengenharia.com\/es-es\/wp-json\/wp\/v2\/articles\/72805\/revisions\/72821"}],"wp:attachment":[{"href":"https:\/\/a3aengenharia.com\/es-es\/wp-json\/wp\/v2\/media?parent=72805"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/a3aengenharia.com\/es-es\/wp-json\/wp\/v2\/categories?post=72805"},{"taxonomy":"segments","embeddable":true,"href":"https:\/\/a3aengenharia.com\/es-es\/wp-json\/wp\/v2\/segments?post=72805"},{"taxonomy":"mercados","embeddable":true,"href":"https:\/\/a3aengenharia.com\/es-es\/wp-json\/wp\/v2\/mercados?post=72805"},{"taxonomy":"etapas","embeddable":true,"href":"https:\/\/a3aengenharia.com\/es-es\/wp-json\/wp\/v2\/etapas?post=72805"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}