{"id":83190,"date":"2026-09-26T14:25:28","date_gmt":"2026-09-26T17:25:28","guid":{"rendered":"https:\/\/a3aengenharia.com\/?post_type=articles&#038;p=83190"},"modified":"2026-09-26T14:25:28","modified_gmt":"2026-09-26T17:25:28","slug":"construction-monitoring-engineering-inspection-daily-log-measurement","status":"publish","type":"articles","link":"https:\/\/a3aengenharia.com\/en-us\/content\/technical-articles\/construction-monitoring-engineering-inspection-daily-log-measurement\/","title":{"rendered":"Construction Monitoring in Engineering: Technical Inspection, Daily Log, and Measurement"},"content":{"rendered":"\n<p class=\"wp-block-paragraph\"><strong>Construction monitoring<\/strong> in engineering should not be treated merely as field presence. In technical contracts, it should integrate technical inspection, the construction daily log, inspection reports, construction measurement, measurement statements, the outstanding-items matrix, commissioning, technical acceptance, and provisional or final acceptance.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">This view is especially important when the client needs to protect scope, schedule, quality, documentation, performance, traceability, and technical responsibility. Without structured monitoring, construction may progress physically while remaining weak from documentary, contractual, and operational perspectives.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">In practice, construction monitoring functions as a layer of technical control on behalf of the client. It verifies whether execution adheres to the contracted scope, reference documents, submitted measurements, collected evidence, recorded outstanding items, and defined acceptance criteria.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">This topic is directly connected to <a href=\"\/conteudo\/artigos-tecnicos\/fiscalizacao-tecnica-obras-servicos-engenharia-escopo-evidencias-medicao-aceite\/\">Technical Inspection of Construction Works and Engineering Services<\/a>, ao <a href=\"\/conteudo\/artigos-tecnicos\/relatorio-de-fiscalizacao-tecnica-engenharia-evidencias-pendencias-medicoes\/\">Engineering Technical Inspection Report<\/a>, ao <a href=\"\/conteudo\/artigos-tecnicos\/boletim-de-medicao-engenharia-consultiva-evidencias-entregaveis-aceite-tecnico\/\">Measurement Statement in Engineering Consulting<\/a> e ao servi\u00e7o de <a href=\"\/servicos\/contratacao-integrada\/oe-owners-engineering\/\">Owner\u2019s Engineering<\/a>.<\/p>\n\n\n\n\n<h2 class=\"wp-block-heading\">What is construction monitoring in engineering<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Construction monitoring is the activity of verifying, recording, and technically supporting the execution of construction works, a deployment, or an engineering service throughout the contract.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">It may involve scope analysis, document checking, monitoring of work fronts, evidence recording, measurement validation, outstanding-item control, commissioning support, risk analysis, and support for technical acceptance.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">In a structured contract, construction monitoring helps answer:<\/p>\n\n\n\n<ul class=\"wp-block-list\"><li>what was executed;<\/li><li>what was measured;<\/li><li>which evidence was presented;<\/li><li>which outstanding items remain open;<\/li><li>which risks were identified;<\/li><li>which documents are missing;<\/li><li>which services depend on testing or commissioning;<\/li><li>which deliverables can advance to acceptance or handover.<\/li><\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">This control reduces dependence on memory, perception, or informal negotiation during execution.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Construction monitoring is not merely a technical visit<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">The common mistake is to treat construction monitoring as a sequence of site visits. The visit is only a means. The objective is to produce technical verification and traceability.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Field presence creates value only when it results in records, evidence, findings, outstanding-item control, measurement validation, and objective recommendations to the client.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Therefore, construction monitoring should be connected to instruments such as the construction daily log, inspection report, measurement statement, outstanding-items matrix, technical acceptance record, and provisional or final acceptance.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Without this connection, monitoring may become mere observation without technical consequence.<\/p>\n\n\n\n\n<h2 class=\"wp-block-heading\">Relationship between construction monitoring and technical inspection<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Construction inspection is one of the central functions of technical monitoring.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The <a href=\"\/conteudo\/artigos-tecnicos\/fiscalizacao-tecnica-obras-servicos-engenharia-escopo-evidencias-medicao-aceite\/\">technical inspection<\/a> verifies whether execution complies with scope, design, requirements, documentation, measurement criteria, and acceptance conditions. Construction monitoring organizes this verification over time, allowing the client to follow progress, deviations, outstanding items, and decisions.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">In complex contracts, contract inspection is also connected to this process. It requires decisions, measurements, occurrences, and outstanding items to be clearly recorded to support governance, accountability, and technical closeout.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Construction daily log as documentary evidence<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">The <strong>construction daily log<\/strong> is one of the main chronological records of execution. It can document completed activities, teams present, field conditions, interferences, occurrences, releases, delays, mobilized resources, weather, photographic records, and technical observations.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Despite its high search volume, the construction daily log should not be treated merely as a template, spreadsheet, or application. In engineering consulting, it should function as documentary evidence of execution.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">When properly used, the construction daily log supports:<\/p>\n\n\n\n<ul class=\"wp-block-list\"><li>construction monitoring;<\/li><li>technical inspection;<\/li><li>inspection reporting;<\/li><li>construction measurement;<\/li><li>outstanding-item control;<\/li><li>delay analysis;<\/li><li>commissioning;<\/li><li>technical acceptance;<\/li><li>provisional and final acceptance.<\/li><\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">The construction daily log should feed the technical analysis, not replace the inspection report.<\/p>\n\n\n\n\n<h2 class=\"wp-block-heading\">Relat\u00f3rio de technical inspection<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">The <a href=\"\/conteudo\/artigos-tecnicos\/relatorio-de-fiscalizacao-tecnica-engenharia-evidencias-pendencias-medicoes\/\">relat\u00f3rio de technical inspection<\/a> consolidates the analysis of execution.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">While the construction daily log records chronological facts, the inspection report technically interprets those records, evaluates compliance, identifies deviations, consolidates evidence, organizes outstanding items, and recommends actions.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">In well-structured monitoring, the report should indicate:<\/p>\n\n\n\n<ul class=\"wp-block-list\"><li>inspected scope;<\/li><li>reference documents;<\/li><li>verified activities;<\/li><li>collected evidence;<\/li><li>analyzed measurements;<\/li><li>open or closed outstanding items;<\/li><li>technical risks;<\/li><li>recommendations;<\/li><li>impacts on acceptance or handover.<\/li><\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">This document creates a basis for the client&#8217;s technical decisions.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Construction measurement, measurement statement, and evidence<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">The <strong>medi\u00e7\u00e3o de obra<\/strong> n\u00e3o deve ser apenas c\u00e1lculo de avan\u00e7o f\u00edsico-financeiro. Ela precisa ser sustentada por technical inspection, evid\u00eancias documentais e verifica\u00e7\u00e3o de ader\u00eancia ao escopo.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The <a href=\"\/conteudo\/artigos-tecnicos\/boletim-de-medicao-engenharia-consultiva-evidencias-entregaveis-aceite-tecnico\/\">measurement statement<\/a> registra servi\u00e7os executados, etapas conclu\u00eddas ou entreg\u00e1veis medidos. The acompanhamento de obra verifica se o que foi medido foi efetivamente executado, se atende ao escopo e se possui evid\u00eancias suficientes para valida\u00e7\u00e3o.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">This relationship prevents measurement from being treated only as a financial step. In engineering, measurement is also technical control.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The artigo sobre <a href=\"\/conteudo\/artigos-tecnicos\/medicao-por-entregaveis-engenharia-consultiva-escopo-producao-tecnica-aceite\/\">deliverable-based measurement in engineering consulting<\/a> explores this logic in greater depth for technical and consulting services.<\/p>\n\n\n\n\n<h2 class=\"wp-block-heading\">Construction measurement in the context of commissioning<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">In critical systems, construction measurement needs to consider the context of commissioning.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">An installation may be physically complete but not yet tested, integrated, documented, or ready for operation. Therefore, construction monitoring should separate physical execution, measurement, testing, outstanding items, commissioning, and technical acceptance.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The <a href=\"\/conteudo\/artigos-tecnicos\/comissionamento-sistemas-criticos-prontos-para-operar\/\">commissioning of critical systems<\/a> verifies whether systems, subsystems, automation, alarms, integrations, operating flows, documentation, and operating conditions are consistent with the design and the client&#8217;s requirements.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Nesse contexto, a medi\u00e7\u00e3o deve ser analisada com cautela. The servi\u00e7o pode estar instalado, mas a valida\u00e7\u00e3o final pode depender de FAT, SAT, testes integrados, documenta\u00e7\u00e3o e corre\u00e7\u00e3o de pend\u00eancias. The conte\u00fado sobre <a href=\"\/conteudo\/artigos-tecnicos\/fat-sat-testes-integrados-sistemas-criticos\/\">FAT, SAT, and integrated testing<\/a> complements this stage.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Outstanding-items matrix and correction control<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Construction monitoring without outstanding-item control tends to result in loss of traceability.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The <a href=\"\/conteudo\/artigos-tecnicos\/matriz-de-pendencias-engenharia-classificacao-correcao-aceite\/\">outstanding-items matrix<\/a> organizes open items by impact, responsible party, deadline, correction evidence, and closeout condition.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">During monitoring, this matrix makes it possible to record execution problems, incomplete documentation, scope discrepancies, integration failures, pending tests, nonconformities, and conditional items.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">This control is essential for deciding whether the delivery can advance to measurement, commissioning, acceptance with reservations, provisional acceptance, or final acceptance.<\/p>\n\n\n\n\n<h2 class=\"wp-block-heading\">Construction monitoring and Owner\u2019s Engineering<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">The acompanhamento de obra se conecta diretamente ao <a href=\"\/servicos\/contratacao-integrada\/oe-owners-engineering\/\">Owner\u2019s Engineering<\/a>.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">In Owner\u2019s Engineering, the consultant acts on behalf of the owner or client, supporting technical decisions, verifying deliverables, monitoring implementation, evaluating risks, validating measurements, organizing evidence, and supporting acceptance.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">This work is relevant when the client needs an independent view of schedule, quality, scope, documentation, integration, commissioning, and performance.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">In this context, construction monitoring does not replace the contractor&#8217;s responsibilities. It creates a technical-governance layer to protect the client&#8217;s interests.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Relationship with technical acceptance and provisional\/final acceptance<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">The acompanhamento de obra deve preparar o caminho para o technical acceptance.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The <a href=\"\/conteudo\/artigos-tecnicos\/criterios-de-aceite-engenharia-requisitos-evidencias-validacao-tecnica\/\">acceptance criteria<\/a> definem como a entrega ser\u00e1 validada. The <a href=\"\/conteudo\/artigos-tecnicos\/aceite-tecnico-projetos-engenharia-validar-entregaveis\/\">technical acceptance<\/a> formalizes validation of the delivery based on scope, evidence, tests, outstanding items, and documentation.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The <a href=\"\/conteudo\/artigos-tecnicos\/termo-de-aceite-tecnico-engenharia-validacao-pendencias-encerramento\/\">termo de technical acceptance<\/a> records this decision. The <a href=\"\/conteudo\/artigos-tecnicos\/recebimento-provisorio-definitivo-engenharia-diferencas-riscos-documentacao\/\">provisional and final acceptance<\/a> formalizes stages of submission, verification, and acceptance of the delivery.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">When monitoring is well conducted, technical closeout no longer depends on a late assessment. It becomes the consequence of records accumulated throughout execution.<\/p>\n\n\n\n\n<h2 class=\"wp-block-heading\">Risks of monitoring construction without a technical method<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Monitoring construction without a method, evidence, and consistent records can create significant risks:<\/p>\n\n\n\n<ul class=\"wp-block-list\"><li>measurements without sufficient evidence;<\/li><li>physical progress without equivalent documentation;<\/li><li>outstanding items without a responsible party;<\/li><li>technical acceptance subjetivo;<\/li><li>premature final acceptance;<\/li><li>difficulty invoking warranties;<\/li><li>falhas de commissioning;<\/li><li>conflicts between client and contractor;<\/li><li>loss of technical history;<\/li><li>low contractual traceability.<\/li><\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">These risks increase in contracts with multiple suppliers, integrated systems, critical environments, public agencies, or accountability requirements.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Como a A3The apoia o acompanhamento t\u00e9cnico de obras<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">The A3The apoia empresas privadas, ind\u00fastrias, \u00f3rg\u00e3os p\u00fablicos e institui\u00e7\u00f5es no acompanhamento t\u00e9cnico de obras, implanta\u00e7\u00f5es e servi\u00e7os de engenharia.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Essa atua\u00e7\u00e3o pode incluir an\u00e1lise de escopo, revis\u00e3o documental, technical inspection, relat\u00f3rio de fiscaliza\u00e7\u00e3o, valida\u00e7\u00e3o de medi\u00e7\u00e3o de obra, revis\u00e3o de measurement statement, controle de pend\u00eancias, apoio ao comissionamento, apoio ao technical acceptance e suporte ao recebimento provis\u00f3rio ou definitivo.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">This work may be integrated with:<\/p>\n\n\n\n<ul class=\"wp-block-list\"><li><a href=\"\/servicos\/contratacao-integrada\/oe-owners-engineering\/\">Owner\u2019s Engineering<\/a>;<\/li><li><a href=\"\/servicos\/contratacao-integrada\/epcm\/\">EPCM<\/a>;<\/li><li><a href=\"\/servicos\/contratacao-integrada\/servicos-continuados-de-engenharia-consultiva\/\">Ongoing Engineering Consulting Services<\/a>;<\/li><li><a href=\"\/servicos\/implementacao\/procurement\/\">Technical Procurement<\/a>;<\/li><li><a href=\"\/servicos\/planejamento\/projeto-executivo\/\">Detailed Design<\/a>;<\/li><li><a href=\"\/servicos\/diagnostico\/due-diligence\/\">Technical Due Diligence<\/a>.<\/li><\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">The objetivo \u00e9 permitir que o contratante acompanhe a obra com m\u00e9todo, evid\u00eancias, rastreabilidade documental e responsabilidade t\u00e9cnica.<\/p>\n\n\n\n\n<h2 class=\"wp-block-heading\">Recommended complementary content<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Para aprofundar acompanhamento de obra, fiscaliza\u00e7\u00e3o, medi\u00e7\u00e3o e technical acceptance, consulte tamb\u00e9m:<\/p>\n\n\n\n<ul class=\"wp-block-list\"><li><a href=\"\/conteudo\/artigos-tecnicos\/fiscalizacao-tecnica-obras-servicos-engenharia-escopo-evidencias-medicao-aceite\/\">Technical Inspection of Construction Works and Engineering Services<\/a>;<\/li><li><a href=\"\/conteudo\/artigos-tecnicos\/relatorio-de-fiscalizacao-tecnica-engenharia-evidencias-pendencias-medicoes\/\">Engineering Technical Inspection Report<\/a>;<\/li><li><a href=\"\/conteudo\/artigos-tecnicos\/boletim-de-medicao-engenharia-consultiva-evidencias-entregaveis-aceite-tecnico\/\">Measurement Statement in Engineering Consulting<\/a>;<\/li><li><a href=\"\/conteudo\/artigos-tecnicos\/medicao-por-entregaveis-engenharia-consultiva-escopo-producao-tecnica-aceite\/\">Deliverable-Based Measurement in Engineering Consulting<\/a>;<\/li><li><a href=\"\/conteudo\/artigos-tecnicos\/matriz-de-pendencias-engenharia-classificacao-correcao-aceite\/\">Matriz de Pend\u00eancias em Engenharia<\/a>;<\/li><li><a href=\"\/conteudo\/artigos-tecnicos\/recebimento-provisorio-definitivo-engenharia-diferencas-riscos-documentacao\/\">Recebimento Provis\u00f3rio e Definitivo em Engenharia<\/a>.<\/li><\/ul>\n\n\n\n\n<h2 class=\"wp-block-heading\">Conclusion<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Acompanhamento de obra em engenharia \u00e9 uma atividade de governan\u00e7a t\u00e9cnica. Ele deve integrar fiscaliza\u00e7\u00e3o de obras, di\u00e1rio de obra, relat\u00f3rio de fiscaliza\u00e7\u00e3o, medi\u00e7\u00e3o de obra, measurement statement, outstanding-items matrix, comissionamento, technical acceptance e recebimento.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">When well structured, monitoring protects the client, improves execution quality, reduces conflicts, and creates a documentary basis for technical and contractual decisions.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">In engineering consulting, monitoring construction is not merely visiting the site. It means verifying, recording, measuring, identifying findings, validating, and technically supporting decision-making.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Talk to our Engineering Department<\/strong><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Se sua organiza\u00e7\u00e3o precisa de acompanhamento de obra, technical inspection, valida\u00e7\u00e3o de medi\u00e7\u00f5es, controle de pend\u00eancias, comissionamento ou apoio ao aceite e recebimento t\u00e9cnico, fale com o Departamento de Engenharia da A3A.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The A3The apoia empresas privadas, ind\u00fastrias, \u00f3rg\u00e3os p\u00fablicos e institui\u00e7\u00f5es no acompanhamento t\u00e9cnico de obras e servi\u00e7os de engenharia com m\u00e9todo, evid\u00eancias e rastreabilidade documental.<\/p>\n\n\n\n<details class=\"wp-block-details is-layout-flow wp-block-details-is-layout-flow\"><summary>Technical references<\/summary>\n<p class=\"wp-block-paragraph\">[1] A3The Consulting Engineering. Complete Guide to Engineering Consulting. Dispon\u00edvel em: https:\/\/a3aengenharia.com.br\/conteudo\/guias-tecnicos\/guia-completo-sobre-engenharia-consultiva\/.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">[2] A3The Consulting Engineering. Procurement of Engineering Consulting with Traceability, Governance, and Cost Engineering. Dispon\u00edvel em: https:\/\/a3aengenharia.com.br\/conteudo\/whitepapers\/contratacao-engenharia-consultiva-governanca-rastreabilidade\/.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">[3] PMI. PMBOK Guide.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">[4] AACE International. Recommended Practices for Cost Engineering.<\/p>\n<\/details>\n\n\n\n<details class=\"wp-block-details is-layout-flow wp-block-details-is-layout-flow\"><summary>Frequently asked questions<\/summary>\n<div class=\"schema-faq wp-block-yoast-faq-block\"><div class=\"schema-faq-section\" id=\"faq-question-o-que-acompanhamento-de-obra-em-engenharia-301c2973\"><strong class=\"schema-faq-question\">What is construction monitoring in engineering?<\/strong> <p class=\"schema-faq-answer\">It is the verification and technical recording of the execution of construction works, a deployment, or an engineering service, focusing on scope, evidence, measurements, outstanding items, commissioning, and acceptance.<\/p><\/div><div class=\"schema-faq-section\" id=\"faq-question-qual-a-diferen-a-entre-acompanhamento-de-obra-e--a60f7981\"><strong class=\"schema-faq-question\">Qual \u00e9 a diferen\u00e7a entre acompanhamento de obra e technical inspection?<\/strong> <p class=\"schema-faq-answer\">The acompanhamento organiza a verifica\u00e7\u00e3o ao longo do contrato. The technical inspection verifica conformidade com escopo, projeto, requisitos, documenta\u00e7\u00e3o, crit\u00e9rios de medi\u00e7\u00e3o e condi\u00e7\u00f5es de aceite.<\/p><\/div><div class=\"schema-faq-section\" id=\"faq-question-como-o-di-rio-de-obra-ajuda-no-acompanhamento-de-ae6ec4a0\"><strong class=\"schema-faq-question\">How does the construction daily log support construction monitoring?<\/strong> <p class=\"schema-faq-answer\">The di\u00e1rio de obra registra atividades, equipes, ocorr\u00eancias, condi\u00e7\u00f5es de campo e evid\u00eancias, servindo como base documental para fiscaliza\u00e7\u00e3o, medi\u00e7\u00e3o e relat\u00f3rio t\u00e9cnico.<\/p><\/div><div class=\"schema-faq-section\" id=\"faq-question-qual-a-rela-o-entre-acompanhamento-de-obra-e-med-7cbca659\"><strong class=\"schema-faq-question\">What is the relationship between construction monitoring and construction measurement?<\/strong> <p class=\"schema-faq-answer\">The acompanhamento verifica se os servi\u00e7os medidos foram executados conforme escopo e se possuem evid\u00eancias suficientes para valida\u00e7\u00e3o do measurement statement.<\/p><\/div><div class=\"schema-faq-section\" id=\"faq-question-como-o-acompanhamento-de-obra-se-conecta-ao-owne-83ebf61e\"><strong class=\"schema-faq-question\">How is construction monitoring connected to Owner\u2019s Engineering?<\/strong> <p class=\"schema-faq-answer\">In Owner\u2019s Engineering, technical monitoring supports the client with an independent view of scope, schedule, quality, measurements, risks, outstanding items, commissioning, and acceptance.<\/p><\/div><\/div>\n<\/details>\n\n\n\n<details class=\"wp-block-details is-layout-flow wp-block-details-is-layout-flow\"><summary>Complementary technical materials<\/summary>\n<ul class=\"wp-block-list\"><li><a href=\"\/conteudo\/guias-tecnicos\/guia-completo-sobre-engenharia-consultiva\/\">Complete Guide to Engineering Consulting<\/a><\/li><li><a href=\"\/conteudo\/artigos-tecnicos\/fiscalizacao-tecnica-obras-servicos-engenharia-escopo-evidencias-medicao-aceite\/\">Technical Inspection of Construction Works and Engineering Services<\/a><\/li><li><a href=\"\/conteudo\/artigos-tecnicos\/relatorio-de-fiscalizacao-tecnica-engenharia-evidencias-pendencias-medicoes\/\">Engineering Technical Inspection Report<\/a><\/li><li><a href=\"\/servicos\/contratacao-integrada\/oe-owners-engineering\/\">Owner\u2019s Engineering<\/a><\/li><li><a href=\"\/servicos\/contratacao-integrada\/epcm\/\">EPCM<\/a><\/li><li><a href=\"\/servicos\/contratacao-integrada\/servicos-continuados-de-engenharia-consultiva\/\">Ongoing Engineering Consulting Services<\/a><\/li><li><a href=\"\/servicos\/implementacao\/procurement\/\">Technical Procurement<\/a><\/li><li><a href=\"\/conteudo\/whitepapers\/contratacao-engenharia-consultiva-governanca-rastreabilidade\/\">Whitepaper: Procurement of Engineering Consulting<\/a><\/li><\/ul>\n<\/details>\n","protected":false},"excerpt":{"rendered":"<p>Understand how construction monitoring in engineering integrates technical inspection, the construction daily log, construction measurement, measurement statements, commissioning, outstanding items, and acceptance.<\/p>\n","protected":false},"author":1,"featured_media":78651,"parent":0,"template":"","meta":{"_a3a_global_related_solutions":[],"_a3a_global_related_services":[],"_a3a_global_related_materials":[],"_a3a_post_lang":"en-us","_a3a_translation_group_id":"31cf94c9-93c0-4fa7-a590-12e298f681bc","_a3a_i18n_canonical_slug":"construction-monitoring-engineering-inspection-daily-log-measurement","_a3a_prod_post_id":"","_a3a_lang_url_en-us":"","_a3a_lang_url_es-es":""},"categories":[],"segments":[],"mercados":[],"etapas":[],"class_list":["post-83190","articles","type-articles","status-publish","has-post-thumbnail","hentry"],"_links":{"self":[{"href":"https:\/\/a3aengenharia.com\/en-us\/wp-json\/wp\/v2\/articles\/83190","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/a3aengenharia.com\/en-us\/wp-json\/wp\/v2\/articles"}],"about":[{"href":"https:\/\/a3aengenharia.com\/en-us\/wp-json\/wp\/v2\/types\/articles"}],"author":[{"embeddable":true,"href":"https:\/\/a3aengenharia.com\/en-us\/wp-json\/wp\/v2\/users\/1"}],"version-history":[{"count":1,"href":"https:\/\/a3aengenharia.com\/en-us\/wp-json\/wp\/v2\/articles\/83190\/revisions"}],"predecessor-version":[{"id":83192,"href":"https:\/\/a3aengenharia.com\/en-us\/wp-json\/wp\/v2\/articles\/83190\/revisions\/83192"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/a3aengenharia.com\/en-us\/wp-json\/wp\/v2\/media\/78651"}],"wp:attachment":[{"href":"https:\/\/a3aengenharia.com\/en-us\/wp-json\/wp\/v2\/media?parent=83190"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/a3aengenharia.com\/en-us\/wp-json\/wp\/v2\/categories?post=83190"},{"taxonomy":"segments","embeddable":true,"href":"https:\/\/a3aengenharia.com\/en-us\/wp-json\/wp\/v2\/segments?post=83190"},{"taxonomy":"mercados","embeddable":true,"href":"https:\/\/a3aengenharia.com\/en-us\/wp-json\/wp\/v2\/mercados?post=83190"},{"taxonomy":"etapas","embeddable":true,"href":"https:\/\/a3aengenharia.com\/en-us\/wp-json\/wp\/v2\/etapas?post=83190"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}