{"id":83186,"date":"2026-09-26T14:22:59","date_gmt":"2026-09-26T17:22:59","guid":{"rendered":"https:\/\/a3aengenharia.com\/?post_type=articles&#038;p=83186"},"modified":"2026-09-26T14:22:59","modified_gmt":"2026-09-26T17:22:59","slug":"engineering-technical-inspection-report-evidence-measurements","status":"publish","type":"articles","link":"https:\/\/a3aengenharia.com\/en-us\/content\/technical-articles\/engineering-technical-inspection-report-evidence-measurements\/","title":{"rendered":"Engineering Technical Inspection Report: Evidence, Outstanding Items, and Measurements"},"content":{"rendered":"\n<p class=\"wp-block-paragraph\">The <strong>engineering technical inspection report<\/strong> is one of the main traceability instruments used in the execution of construction works, technical services, deployments, and critical systems. It records what was verified, which evidence was collected, which outstanding items were identified, which measurements were evaluated, and which technical recommendations were issued to the client.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">An inspection report should not be merely a narrative record of a site visit. It should organize technical information in a verifiable manner, connecting scope, execution, documentation, quality, measurements, outstanding items, risks, commissioning, acceptance, and handover.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">This topic is directly connected to <a href=\"\/conteudo\/artigos-tecnicos\/fiscalizacao-tecnica-obras-servicos-engenharia-escopo-evidencias-medicao-aceite\/\">Technical Inspection of Construction Works and Engineering Services<\/a>, ao <a href=\"\/conteudo\/artigos-tecnicos\/boletim-de-medicao-engenharia-consultiva-evidencias-entregaveis-aceite-tecnico\/\">Measurement Statement in Engineering Consulting<\/a>, \u00e0 <a href=\"\/conteudo\/artigos-tecnicos\/matriz-de-pendencias-engenharia-classificacao-correcao-aceite\/\">Engineering Outstanding Items Matrix<\/a> e ao <a href=\"\/conteudo\/artigos-tecnicos\/recebimento-provisorio-definitivo-engenharia-diferencas-riscos-documentacao\/\">Provisional and Final Acceptance in Engineering<\/a>.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">What is a technical inspection report<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">The technical inspection report is the document that records the analysis of technical execution over a given period, visit, stage, work front, or contractual milestone.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">It can be used to monitor construction works, engineering services, installations, commissioning, system deployment, delivery acceptance, outstanding-item analysis, and validation of measurements.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The good report should answer:<\/p>\n\n\n\n<ul class=\"wp-block-list\"><li>what was inspected;<\/li><li>which scope or contract was considered;<\/li><li>which documents served as references;<\/li><li>which activities were verified;<\/li><li>which evidence was recorded;<\/li><li>which deviations were identified;<\/li><li>which outstanding items remain open;<\/li><li>which measurements were analyzed;<\/li><li>which risks or impacts were observed;<\/li><li>which technical recommendations were issued.<\/li><\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">Without this level of organization, the report becomes merely a descriptive record with limited value for technical control and decision-making.<\/p>\n\n\n\n\n<h2 class=\"wp-block-heading\">An inspection report is not merely a construction daily log<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">The <strong>construction daily log<\/strong> records events, activities, team presence, field conditions, occurrences, and chronological execution information. It is important, but it does not replace the technical inspection report.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The inspection report technically interprets the records, analyzes compliance, identifies deviations, associates evidence, organizes outstanding items, and recommends actions.<\/p>\n\n\n\n<figure class=\"wp-block-table\"><table><tbody><tr><td>Document<\/td><td>Main function<\/td><\/tr><tr><td>Construction daily log<\/td><td>Record facts and activities over time<\/td><\/tr><tr><td>Construction report<\/td><td>Consolidate information on progress and execution<\/td><\/tr><tr><td>Inspection report<\/td><td>Technically assess scope, quality, evidence, outstanding items, and measurements<\/td><\/tr><tr><td>Measurement statement<\/td><td>Record executed services and measured deliverables<\/td><\/tr><tr><td>Outstanding items matrix<\/td><td>Control open items, responsible parties, deadlines, and evidence<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p class=\"wp-block-paragraph\">The construction daily log can feed the inspection report, but the report must add technical analysis.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">When to prepare an inspection report<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">The report can be prepared at different points during the contract.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">In simple projects, it may be issued per visit or stage. In complex contracts, it may be issued periodically and linked to milestones, measurements, tests, commissioning, acceptance, or handover.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Typical situations include technical inspection visits, weekly or monthly monitoring, measurement validation, recording of technical deviations, outstanding-item analysis, verification of corrections, commissioning support, technical-acceptance support, provisional acceptance, final acceptance, and contract closeout.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The frequency should be compatible with the criticality of the scope and the technical risk of the contract.<\/p>\n\n\n\n\n<h2 class=\"wp-block-heading\">Recommended report structure<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">The report structure should be clear, traceable, and proportional to the complexity of the execution.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Recommended fields include contract identification, inspection period or date, location or work front, participants, reference documents, inspected scope, verified activities, collected evidence, deviations, open outstanding items, analyzed measurements, risks, recommendations, parties responsible for corrective actions, deadlines, and technical conclusion.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">This structure allows the report to be used as a management document, not merely as a visit record.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Evidence in the inspection report<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Evidence is the basis of the report.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">They may include photographs, videos, checklists, certificates, test reports, commissioning records, measurement statements, meeting minutes, revised drawings, training records, outstanding-item lists, and delivery documents.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Evidence must be linked to the technical finding. Attaching photographs without context is not enough. Each piece of evidence should indicate what it proves, which requirement it relates to, and which technical decision it supports.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">In contracts requiring traceability, the report should make it possible to reconstruct the history: what was observed, when it was observed, which evidence was collected, who received the finding, and what action was taken.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Relationship with construction measurement and measurement statements<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Construction or service measurements should be technically verified before acceptance.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The inspection report can support this validation by recording whether the measured services were executed, whether they are consistent with the scope, whether sufficient evidence exists, and whether outstanding items affect the measurement.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The <a href=\"\/conteudo\/artigos-tecnicos\/boletim-de-medicao-engenharia-consultiva-evidencias-entregaveis-aceite-tecnico\/\">measurement statement<\/a> registra o que foi medido. The relat\u00f3rio de fiscaliza\u00e7\u00e3o pode sustentar tecnicamente essa medi\u00e7\u00e3o, apontando conformidade, restri\u00e7\u00f5es, ressalvas ou inconsist\u00eancias.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">This relationship reduces the risk of payment without sufficient technical evidence.<\/p>\n\n\n\n\n<h2 class=\"wp-block-heading\">Relationship with the outstanding items matrix<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">During inspection, technical outstanding items should be recorded in a structured manner.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The <a href=\"\/conteudo\/artigos-tecnicos\/matriz-de-pendencias-engenharia-classificacao-correcao-aceite\/\">outstanding items matrix<\/a> consolidates these items, indicating classification, responsible party, deadline, required evidence, and closeout condition.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The relat\u00f3rio de fiscaliza\u00e7\u00e3o pode abrir novas pend\u00eancias, atualizar pend\u00eancias existentes ou registrar a baixa de itens corrigidos.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">For this purpose, each outstanding item should be described objectively, with technical impact, evidence, and recommendation. Generic outstanding items make correction, validation, and closeout more difficult.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Relationship with acceptance criteria<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">The relat\u00f3rio de fiscaliza\u00e7\u00e3o deve dialogar com os <a href=\"\/conteudo\/artigos-tecnicos\/criterios-de-aceite-engenharia-requisitos-evidencias-validacao-tecnica\/\">acceptance criteria<\/a> defined for the contract.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">If the criteria require testing, documentation, as-built records, training, performance, or integration, the report should record whether these requirements were met, remain pending, or could not be verified.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Sem acceptance criteria, o relat\u00f3rio tende a registrar percep\u00e7\u00f5es. Com crit\u00e9rios claros, ele registra avalia\u00e7\u00e3o t\u00e9cnica objetiva.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Relationship with commissioning<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">In critical systems, the inspection report can support commissioning by recording readiness, test execution, integration outstanding items, configuration inconsistencies, missing documents, and evidence of operation.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The <a href=\"\/conteudo\/artigos-tecnicos\/comissionamento-sistemas-criticos-prontos-para-operar\/\">commissioning of critical systems<\/a> depende de registros consistentes. The relat\u00f3rio de fiscaliza\u00e7\u00e3o pode indicar se a instala\u00e7\u00e3o est\u00e1 pronta para testes, se h\u00e1 pr\u00e9-requisitos pendentes e se as evid\u00eancias de valida\u00e7\u00e3o foram entregues.<\/p>\n\n\n\n\n<h2 class=\"wp-block-heading\">Relationship with acceptance and handover<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">The relat\u00f3rio de fiscaliza\u00e7\u00e3o tamb\u00e9m apoia o technical acceptance, o recebimento provis\u00f3rio e o recebimento definitivo.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The <a href=\"\/conteudo\/artigos-tecnicos\/aceite-tecnico-projetos-engenharia-validar-entregaveis\/\">technical acceptance<\/a> valida se a entrega atende ao escopo, aos requisitos, \u00e0s evid\u00eancias e \u00e0s condi\u00e7\u00f5es de opera\u00e7\u00e3o previstas. The <a href=\"\/conteudo\/artigos-tecnicos\/recebimento-provisorio-definitivo-engenharia-diferencas-riscos-documentacao\/\">provisional and final acceptance<\/a> formalizes stages for submission, verification, and acceptance of the delivery.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The relat\u00f3rio de fiscaliza\u00e7\u00e3o contribui para essa decis\u00e3o ao registrar hist\u00f3rico de execu\u00e7\u00e3o, pend\u00eancias, evid\u00eancias e recomenda\u00e7\u00f5es.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Technical recommendations in the report<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">An inspection report should go beyond identifying problems.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">It should indicate technical recommendations proportional to the identified impact. These recommendations may involve corrections, additional documentation, retesting, scope adjustment, stronger evidence, rescheduling of activities, opening a formal technical inquiry, or withholding acceptance.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Examples include correcting an outstanding item before a new measurement, completing as-built documentation, repeating a test after a configuration adjustment, not recommending final acceptance while a blocking item remains open, accepting with reservations only when a deadline and responsible party are defined, or requesting additional evidence before acceptance.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Risks of weak inspection reports<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Weak inspection reports can compromise the entire technical control of the contract.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Risks include insufficient evidence, difficulty proving deviations, measurement without technical validation, outstanding items without responsible parties, premature acceptance, final acceptance without documentary support, supplier disputes, difficulty invoking warranties, loss of technical history, and poor-quality decision-making.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">For this reason, the report must be objective, technical, and traceable.<\/p>\n\n\n\n\n<h2 class=\"wp-block-heading\">Como a A3The estrutura relat\u00f3rios de fiscaliza\u00e7\u00e3o<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">The A3The estrutura relat\u00f3rios de fiscaliza\u00e7\u00e3o como instrumentos de governan\u00e7a t\u00e9cnica, com foco em escopo, evid\u00eancias, medi\u00e7\u00f5es, pend\u00eancias, riscos, recomenda\u00e7\u00f5es e aceite.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">This work may be integrated with:<\/p>\n\n\n\n<ul class=\"wp-block-list\"><li><a href=\"\/conteudo\/artigos-tecnicos\/fiscalizacao-tecnica-obras-servicos-engenharia-escopo-evidencias-medicao-aceite\/\">Technical Inspection of Construction Works and Engineering Services<\/a>;<\/li><li><a href=\"\/servicos\/implementacao\/procurement\/\">Technical Procurement<\/a>;<\/li><li><a href=\"\/servicos\/contratacao-integrada\/servicos-continuados-de-engenharia-consultiva\/\">Ongoing Engineering Consulting Services<\/a>;<\/li><li><a href=\"\/servicos\/contratacao-integrada\/oe-owners-engineering\/\">Owner\u2019s Engineering<\/a>;<\/li><li><a href=\"\/servicos\/contratacao-integrada\/epcm\/\">EPCM<\/a>;<\/li><li><a href=\"\/servicos\/diagnostico\/due-diligence\/\">Technical Due Diligence<\/a>.<\/li><\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">The objetivo \u00e9 apoiar o contratante com documenta\u00e7\u00e3o t\u00e9cnica verific\u00e1vel, reduzindo subjetividade na medi\u00e7\u00e3o, no aceite e no encerramento contratual.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Recommended complementary content<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Para aprofundar fiscaliza\u00e7\u00e3o, medi\u00e7\u00e3o, pend\u00eancias e technical acceptance, consulte tamb\u00e9m:<\/p>\n\n\n\n<ul class=\"wp-block-list\"><li><a href=\"\/conteudo\/artigos-tecnicos\/fiscalizacao-tecnica-obras-servicos-engenharia-escopo-evidencias-medicao-aceite\/\">Technical Inspection of Construction Works and Engineering Services<\/a>;<\/li><li><a href=\"\/conteudo\/artigos-tecnicos\/boletim-de-medicao-engenharia-consultiva-evidencias-entregaveis-aceite-tecnico\/\">Measurement Statement in Engineering Consulting<\/a>;<\/li><li><a href=\"\/conteudo\/artigos-tecnicos\/matriz-de-pendencias-engenharia-classificacao-correcao-aceite\/\">Engineering Outstanding Items Matrix<\/a>;<\/li><li><a href=\"\/conteudo\/artigos-tecnicos\/criterios-de-aceite-engenharia-requisitos-evidencias-validacao-tecnica\/\">Engineering Acceptance Criteria<\/a>;<\/li><li><a href=\"\/conteudo\/artigos-tecnicos\/aceite-tecnico-projetos-engenharia-validar-entregaveis\/\">Technical Acceptance in Engineering Projects<\/a>;<\/li><li><a href=\"\/conteudo\/artigos-tecnicos\/recebimento-provisorio-definitivo-engenharia-diferencas-riscos-documentacao\/\">Provisional and Final Acceptance in Engineering<\/a>.<\/li><\/ul>\n\n\n\n\n<h2 class=\"wp-block-heading\">Conclusion<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">The relat\u00f3rio de fiscaliza\u00e7\u00e3o t\u00e9cnica \u00e9 uma pe\u00e7a central para controlar obras e servi\u00e7os de engenharia com rastreabilidade.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">It should record evidence, outstanding items, measurements, deviations, risks, recommendations, and conditions for acceptance or handover. When well structured, it reduces subjectivity, improves decision-making, and protects the client during execution and technical closeout.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Em engenharia, fiscalizar bem exige documentar bem. The relat\u00f3rio transforma observa\u00e7\u00f5es de campo em evid\u00eancia t\u00e9cnica para gest\u00e3o contratual.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Talk to our Engineering Department<\/strong><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">If your organization needs to structure technical inspection reports, control outstanding items, validate measurements, monitor commissioning, or support technical acceptance and handover, contact A3A&#8217;s Engineering Department.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The A3The apoia empresas privadas, ind\u00fastrias, \u00f3rg\u00e3os p\u00fablicos e institui\u00e7\u00f5es na fiscaliza\u00e7\u00e3o e documenta\u00e7\u00e3o t\u00e9cnica de obras e servi\u00e7os de engenharia com m\u00e9todo, evid\u00eancias e rastreabilidade documental.<\/p>\n\n\n\n<details class=\"wp-block-details is-layout-flow wp-block-details-is-layout-flow\"><summary>Technical references<\/summary>\n<p class=\"wp-block-paragraph\">[1] A3The Consulting Engineering. Complete Guide to Engineering Consulting. Dispon\u00edvel em: https:\/\/a3aengenharia.com.br\/conteudo\/guias-tecnicos\/guia-completo-sobre-engenharia-consultiva\/.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">[2] A3The Consulting Engineering. Procurement of Engineering Consulting with Traceability, Governance, and Cost Engineering. Dispon\u00edvel em: https:\/\/a3aengenharia.com.br\/conteudo\/whitepapers\/contratacao-engenharia-consultiva-governanca-rastreabilidade\/.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">[3] PMI. PMBOK Guide.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">[4] AACE International. Recommended Practices for Cost Engineering.<\/p>\n<\/details>\n\n\n\n<details class=\"wp-block-details is-layout-flow wp-block-details-is-layout-flow\"><summary>Frequently asked questions<\/summary>\n<div class=\"schema-faq wp-block-yoast-faq-block\"><div class=\"schema-faq-section\" id=\"faq-question-o-que-relat-rio-de-fiscaliza-o-t-cnica-em-engenh-b8b485a0\"><strong class=\"schema-faq-question\">What is a technical inspection report em engenharia?<\/strong> <p class=\"schema-faq-answer\">It is the document that records the technical analysis of execution, including inspected scope, evidence, outstanding items, measurements, deviations, risks, and recommendations.<\/p><\/div><div class=\"schema-faq-section\" id=\"faq-question-relat-rio-de-fiscaliza-o-a-mesma-coisa-que-di-ri-d264a31b\"><strong class=\"schema-faq-question\">Inspection report \u00e9 a mesma coisa que di\u00e1rio de obra?<\/strong> <p class=\"schema-faq-answer\">N\u00e3o. The di\u00e1rio de obra registra eventos cronol\u00f3gicos. The relat\u00f3rio de fiscaliza\u00e7\u00e3o analisa tecnicamente conformidade, evid\u00eancias, pend\u00eancias, medi\u00e7\u00f5es e recomenda\u00e7\u00f5es.<\/p><\/div><div class=\"schema-faq-section\" id=\"faq-question-o-que-deve-constar-em-um-relat-rio-de-fiscaliza--9d0974d9\"><strong class=\"schema-faq-question\">The que deve constar em um relat\u00f3rio de fiscaliza\u00e7\u00e3o?<\/strong> <p class=\"schema-faq-answer\">Contract, period, inspected scope, reference documents, verified activities, evidence, outstanding items, measurements, risks, recommendations, responsible parties, and technical conclusion.<\/p><\/div><div class=\"schema-faq-section\" id=\"faq-question-como-o-relat-rio-de-fiscaliza-o-apoia-a-medi-o-d-787da6df\"><strong class=\"schema-faq-question\">How does the inspection report support construction measurement?<\/strong> <p class=\"schema-faq-answer\">It records whether measured services were executed according to scope and whether there is sufficient evidence to validate the measurement or accept it with reservations.<\/p><\/div><div class=\"schema-faq-section\" id=\"faq-question-qual-a-rela-o-entre-relat-rio-de-fiscaliza-o-e-a-1ec427c8\"><strong class=\"schema-faq-question\">Qual \u00e9 a rela\u00e7\u00e3o entre relat\u00f3rio de fiscaliza\u00e7\u00e3o e technical acceptance?<\/strong> <p class=\"schema-faq-answer\">The relat\u00f3rio fornece hist\u00f3rico, evid\u00eancias, pend\u00eancias e recomenda\u00e7\u00f5es que ajudam a decidir se a entrega pode ser aceita, aceita com ressalvas ou rejeitada tecnicamente.<\/p><\/div><\/div>\n<\/details>\n\n\n\n<details class=\"wp-block-details is-layout-flow wp-block-details-is-layout-flow\"><summary>Complementary technical materials<\/summary>\n<ul class=\"wp-block-list\"><li><a href=\"\/conteudo\/guias-tecnicos\/guia-completo-sobre-engenharia-consultiva\/\">Complete Guide to Engineering Consulting<\/a><\/li><li><a href=\"\/conteudo\/artigos-tecnicos\/fiscalizacao-tecnica-obras-servicos-engenharia-escopo-evidencias-medicao-aceite\/\">Technical Inspection of Construction Works and Engineering Services<\/a><\/li><li><a href=\"\/conteudo\/artigos-tecnicos\/boletim-de-medicao-engenharia-consultiva-evidencias-entregaveis-aceite-tecnico\/\">Measurement Statement in Engineering Consulting<\/a><\/li><li><a href=\"\/servicos\/contratacao-integrada\/servicos-continuados-de-engenharia-consultiva\/\">Ongoing Engineering Consulting Services<\/a><\/li><li><a href=\"\/servicos\/implementacao\/procurement\/\">Technical Procurement<\/a><\/li><li><a href=\"\/servicos\/planejamento\/projeto-executivo\/\">Projeto Executivo<\/a><\/li><li><a href=\"\/servicos\/contratacao-integrada\/oe-owners-engineering\/\">Owner\u2019s Engineering<\/a><\/li><li><a href=\"\/conteudo\/whitepapers\/contratacao-engenharia-consultiva-governanca-rastreabilidade\/\">Whitepaper: Procurement of Engineering Consulting<\/a><\/li><\/ul>\n<\/details>\n","protected":false},"excerpt":{"rendered":"<p>Learn how to structure an engineering technical inspection report with evidence, construction daily logs, measurements, outstanding items, recommendations, acceptance, and handover.<\/p>\n","protected":false},"author":1,"featured_media":78650,"parent":0,"template":"","meta":{"_a3a_global_related_solutions":[],"_a3a_global_related_services":[],"_a3a_global_related_materials":[],"_a3a_post_lang":"en-us","_a3a_translation_group_id":"25bc4ef6-bb1d-41bd-93a6-9636543bbaf0","_a3a_i18n_canonical_slug":"engineering-technical-inspection-report-evidence-measurements","_a3a_prod_post_id":"","_a3a_lang_url_en-us":"","_a3a_lang_url_es-es":""},"categories":[],"segments":[],"mercados":[],"etapas":[],"class_list":["post-83186","articles","type-articles","status-publish","has-post-thumbnail","hentry"],"_links":{"self":[{"href":"https:\/\/a3aengenharia.com\/en-us\/wp-json\/wp\/v2\/articles\/83186","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/a3aengenharia.com\/en-us\/wp-json\/wp\/v2\/articles"}],"about":[{"href":"https:\/\/a3aengenharia.com\/en-us\/wp-json\/wp\/v2\/types\/articles"}],"author":[{"embeddable":true,"href":"https:\/\/a3aengenharia.com\/en-us\/wp-json\/wp\/v2\/users\/1"}],"version-history":[{"count":1,"href":"https:\/\/a3aengenharia.com\/en-us\/wp-json\/wp\/v2\/articles\/83186\/revisions"}],"predecessor-version":[{"id":83188,"href":"https:\/\/a3aengenharia.com\/en-us\/wp-json\/wp\/v2\/articles\/83186\/revisions\/83188"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/a3aengenharia.com\/en-us\/wp-json\/wp\/v2\/media\/78650"}],"wp:attachment":[{"href":"https:\/\/a3aengenharia.com\/en-us\/wp-json\/wp\/v2\/media?parent=83186"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/a3aengenharia.com\/en-us\/wp-json\/wp\/v2\/categories?post=83186"},{"taxonomy":"segments","embeddable":true,"href":"https:\/\/a3aengenharia.com\/en-us\/wp-json\/wp\/v2\/segments?post=83186"},{"taxonomy":"mercados","embeddable":true,"href":"https:\/\/a3aengenharia.com\/en-us\/wp-json\/wp\/v2\/mercados?post=83186"},{"taxonomy":"etapas","embeddable":true,"href":"https:\/\/a3aengenharia.com\/en-us\/wp-json\/wp\/v2\/etapas?post=83186"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}