{"id":83097,"date":"2026-09-26T09:45:01","date_gmt":"2026-09-26T12:45:01","guid":{"rendered":"https:\/\/a3aengenharia.com\/?post_type=articles&#038;p=83097"},"modified":"2026-09-26T09:45:01","modified_gmt":"2026-09-26T12:45:01","slug":"distributed-generation-photovoltaic-systems-grid-connection","status":"publish","type":"articles","link":"https:\/\/a3aengenharia.com\/en-us\/content\/technical-articles\/distributed-generation-photovoltaic-systems-grid-connection\/","title":{"rendered":"Distributed Generation: How Photovoltaic Systems Connect to the Electrical Grid"},"content":{"rendered":"\n<p class=\"wp-block-paragraph\">Distributed generation is one of the most important concepts for understanding solar energy connected to the electrical grid.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">When a company, condominium, or residence installs a grid-connected photovoltaic system, it is no longer only an energy consumer and becomes a unit capable of generating electricity close to the point of consumption.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">This change may seem simple, but it involves electrical engineering, metering, inverters, protection, utility requirements, technical documentation, operational safety, and connection rules.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">This article explains how distributed generation works in photovoltaic systems, the role of the bidirectional meter, why anti-islanding is essential, and which technical aspects should be evaluated before connecting a system to the electrical grid.<\/p>\n\n\n\n<h2 id=\"h-o-que-e-geracao-distribuida\" class=\"wp-block-heading\">What is distributed generation?<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Distributed generation is a model in which electrical energy is generated close to the point of consumption or connected directly to the distribution grid.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">In solar energy, this usually occurs through photovoltaic systems installed on roofs, land, parking areas, businesses, condominiums, or rural properties.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The consumer begins to generate part of its own energy and interact with the electrical grid according to the applicable rules.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">There are classifications such as distributed microgeneration and minigeneration, which depend on regulatory criteria and installed capacity. In this article, the focus is not legal but technical: understanding how distributed generation connects to the electrical installation and the grid.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">In practice, distributed generation makes the power system more decentralized. Energy no longer comes only from large, distant power plants. Part of it can be generated at the points of consumption themselves.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">This decentralization creates opportunities, but it also requires control, protection, metering, and proper design.<\/p>\n\n\n\n<h2 id=\"h-como-um-sistema-fotovoltaico-se-conecta-a-rede-eletrica\" class=\"wp-block-heading\">How a photovoltaic system connects to the electrical grid<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">A photovoltaic system connected to the electrical grid is also known as an on-grid system.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">In this model, the solar modules generate direct-current energy. This energy passes through the solar inverter, which converts direct current into alternating current compatible with the electrical installation.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">From there, the energy can be consumed locally by the consumer unit. When generation exceeds local demand, the surplus may be sent to the grid according to applicable rules. When solar generation is insufficient, the unit continues to consume energy from the utility.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">This flow requires the photovoltaic system to operate in coordination with the electrical grid. The inverter must comply with voltage, frequency, synchronization, and safety parameters.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">For this reason, grid-connected solar energy is not simply the installation of panels. It is an integration between generation, the internal electrical installation, metering, and the distribution grid.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">To understand the basis of this operation, also see <a href=\"\/conteudo\/artigos-tecnicos\/como-funciona-a-energia-solar\/\">How solar energy works<\/a>.<\/p>\n\n\n\n<h2 id=\"h-consumo-local-excedente-e-medidor-bidirecional\" class=\"wp-block-heading\">Local consumption, surplus, and bidirectional meter<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">In distributed generation, part of the generated energy can be consumed at the site at the moment it is produced.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">If a company operates during the day, for example, part of the solar generation can supply lighting, computers, machinery, HVAC, security systems, pumps, administrative loads, or production equipment.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">When generation is higher than instantaneous consumption, the surplus may flow to the electrical grid under the applicable compensation rules.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">To record this exchange, many systems use a bidirectional meter. This equipment measures both the energy consumed from the grid and the energy injected into the grid by the generating unit.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Bidirectional metering is important because it records energy flows in both directions.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Without adequate metering, it is not possible to correctly control what was consumed, what was injected, and how these values will be treated by the utility.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">For this reason, the bidirectional meter is not merely an operational detail. It is part of the interface between the prosumer and the electrical grid.<\/p>\n\n\n\n<h2 id=\"h-o-papel-do-inversor-on-grid-na-geracao-distribuida\" class=\"wp-block-heading\">The role of the on-grid inverter in distributed generation<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">The on-grid inverter is one of the central components of solar distributed generation.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">It converts the direct-current energy generated by photovoltaic modules into alternating current compatible with the electrical installation and the grid.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">In addition, the inverter must synchronize its operation with the electrical grid. This involves parameters such as voltage, frequency, phase, and power quality.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">In grid-connected systems, the inverter also participates in protection functions. It monitors abnormal conditions, records faults, and interrupts operation when the grid is outside acceptable limits.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">This behavior is essential for the safety of the installation, the grid, and maintenance personnel.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">For more detail on this component, see <a href=\"\/conteudo\/artigos-tecnicos\/inversor-solar-como-funciona-projeto-fotovoltaico\/\">Solar inverter: how it works, why it is critical, and what to evaluate in photovoltaic design<\/a>.<\/p>\n\n\n\n<h2 id=\"h-anti-ilhamento-seguranca-para-rede-pessoas-e-manutencao\" class=\"wp-block-heading\">Anti-islanding: safety for the grid, people, and maintenance<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Anti-islanding is an essential safety function in grid-connected photovoltaic systems.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Islanding occurs when part of the grid remains energized by a local source even after the main supply has been interrupted.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">This situation can be dangerous because a maintenance crew may believe that a given section is de-energized when it is actually still receiving energy from a distributed source.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">For this reason, grid-connected inverters must identify the absence or abnormality of the grid and stop injecting energy when necessary.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">ABNT NBR IEC 62116 addresses the anti-islanding test procedure for inverters used in grid-connected photovoltaic systems.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The anti-islanding function shows that distributed generation cannot be treated only as a cost-saving solution. It must operate safely for the installation, the grid, and the people involved in electrical operation.<\/p>\n\n\n\n<h2 id=\"h-homologacao-parecer-de-acesso-e-documentacao-tecnica\" class=\"wp-block-heading\">Approval, access opinion, and technical documentation<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Connecting a photovoltaic system to the grid normally requires technical documentation and interaction with the electricity distribution utility.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Terms such as solar-system approval, access opinion, and connection request appear in this process.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The purpose is to assess whether the proposed system meets technical requirements and can operate connected to the distribution grid.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Documentation may include consumer-unit data, electrical design, diagrams, equipment specifications, inverters, protection devices, technical responsibility, and information required by the utility.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Although many users see this stage as bureaucratic, it serves an important technical function.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">A poorly documented or poorly designed connection can cause delays, rework, rejection, safety risks, or difficulties during commissioning.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">For companies, approval should be treated as part of the technical project schedule, not as a secondary activity.<\/p>\n\n\n\n<h2 id=\"h-requisitos-tecnicos-de-conexao-por-que-nao-e-so-burocracia\" class=\"wp-block-heading\">Technical connection requirements: why they are not just bureaucracy<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Technical connection requirements exist to protect the grid, the installation, and users.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">A grid-connected photovoltaic system must comply with electrical parameters, protection, power quality, synchronization, inverter operation, and anti-islanding safety.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">ABNT NBR 16149 addresses the interface characteristics for connecting photovoltaic systems to the electrical distribution grid.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">ABNT NBR 16150 addresses conformity test procedures related to this interface.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">ABNT NBR 16690 addresses design requirements for photovoltaic-array electrical installations.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">These references help demonstrate that grid connection is not merely an administrative approval. It involves engineering, testing, protection, compatibility, and technical responsibility.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">When the design considers these requirements from the beginning, the risk of rework is reduced and system reliability is increased.<\/p>\n\n\n\n<h2 id=\"h-riscos-de-uma-conexao-mal-projetada\" class=\"wp-block-heading\">Risks of a poorly designed connection<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">A poorly designed connection can compromise commissioning and photovoltaic-system performance.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Among the most common risks are:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>delays in approval;<\/li>\n\n\n\n<li>incomplete documentation;<\/li>\n\n\n\n<li>inverter incompatibility with grid requirements;<\/li>\n\n\n\n<li>inadequate protection;<\/li>\n\n\n\n<li>metering failures;<\/li>\n\n\n\n<li>lack of assessment of the existing electrical installation;<\/li>\n\n\n\n<li>poorly defined connection point;<\/li>\n\n\n\n<li>risk of rework;<\/li>\n\n\n\n<li>low operational reliability;<\/li>\n\n\n\n<li>maintenance difficulties;<\/li>\n\n\n\n<li>electrical-safety problems.<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">In companies, these risks can affect schedule, financial return, operations, and supplier relationships.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">For this reason, grid connection should be considered from the photovoltaic-design phase.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The goal is not merely to make the system work, but to make it operate safely, with proper documentation and compatibility with the grid.<\/p>\n\n\n\n<h2 id=\"h-geracao-distribuida-em-empresas-o-que-avaliar-antes-de-instalar\" class=\"wp-block-heading\">Distributed generation for companies: what to evaluate before installation<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Companies need to evaluate distributed generation more broadly than residential consumers.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">In addition to expected savings, it is necessary to consider consumption profile, demand, operating hours, critical loads, available area, electrical infrastructure, maintenance, future expansion, and utility requirements.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Some important points are:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>does the company consume energy during solar-generation hours?<\/li>\n\n\n\n<li>can the electrical installation support connection of the system?<\/li>\n\n\n\n<li>are there transformers, substations, or panels that need to be assessed?<\/li>\n\n\n\n<li>has the connection point been correctly defined?<\/li>\n\n\n\n<li>does the inverter meet grid requirements?<\/li>\n\n\n\n<li>is metering adequate?<\/li>\n\n\n\n<li>is the approval process included in the schedule?<\/li>\n\n\n\n<li>who will be responsible for maintenance and monitoring?<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">These questions help transform a commercial decision into a technical decision.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">For more detail on the corporate context, see <a href=\"\/conteudo\/artigos-tecnicos\/energia-solar-para-empresas-viabilidade-riscos-tecnicos\/\">Solar energy for companies<\/a>.<\/p>\n\n\n\n<h2 id=\"h-o-que-a-geracao-distribuida-ensina-sobre-engenharia-eletrica-aplicada\" class=\"wp-block-heading\">What distributed generation teaches us about applied electrical engineering<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Distributed generation shows that solar energy is not only local generation. It is integration with a larger electrical system.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The consumer begins to interact actively with the grid, generating, consuming and, at certain times, injecting energy.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">For this to work, modules, inverters, panels, protection devices, metering, the utility, documentation, and the electrical grid must be coordinated.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">This is the role of applied electrical engineering: ensuring that a technically feasible solution works in the real world with safety, performance, and predictability.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">When grid connection is properly designed, distributed generation stops being merely a promise of savings and becomes reliable energy infrastructure.<\/p>\n\n\n\n<div class=\"bloco-apoio-artigo\">\n<p><strong>Where A3A Engenharia fits into this context<\/strong><\/p>\n<p>A3A Engenharia works with technical consulting, design, diagnostics, audits, infrastructure, commissioning, maintenance engineering, and project management.<\/p>\n<p>In distributed generation, technical analysis helps assess grid connection, documentation, inverter compatibility, metering, protection, risks, electrical infrastructure, and implementation quality.<\/p>\n<\/div>\n\n\n\n<div class=\"bloco-apoio-artigo\">\n<p><strong>Related technical content<\/strong><\/p>\n<ul>\n<li><a href=\"\/conteudo\/artigos-tecnicos\/como-funciona-a-energia-solar\/\">How solar energy works<\/a><\/li>\n<li><a href=\"\/conteudo\/artigos-tecnicos\/projeto-fotovoltaico-dimensionamento-protecao-infraestrutura\/\">Photovoltaic design<\/a><\/li>\n<li><a href=\"\/conteudo\/artigos-tecnicos\/energia-solar-para-empresas-viabilidade-riscos-tecnicos\/\">Solar energy for companies<\/a><\/li>\n<li><a href=\"\/conteudo\/artigos-tecnicos\/inversor-solar-como-funciona-projeto-fotovoltaico\/\">Solar inverter<\/a><\/li>\n<li><a href=\"\/conteudo\/artigos-tecnicos\/protecao-contra-surtos-sistemas-fotovoltaicos\/\">Surge protection in photovoltaic systems<\/a><\/li>\n<li><a href=\"\/conteudo\/artigos-tecnicos\/seguranca-eletrica\/\">Electrical Safety<\/a><\/li>\n<li><a href=\"\/conteudo\/artigos-tecnicos\/avaliacao-proposta-tecnica-engenharia\/\">Engineering Technical Proposal Analysis<\/a><\/li>\n<li><a href=\"\/conteudo\/artigos-tecnicos\/como-engenharia-consultiva-apoia-decisoes-tecnicas-contratante\/\">Engineering Consulting<\/a><\/li>\n<\/ul>\n<\/div>\n\n\n\n<div class=\"bloco-apoio-artigo\">\n<p><strong>Related services<\/strong><\/p>\n<ul>\n<li><a href=\"\/servicos\/planejamento\/consultoria-tecnica\/\">Technical Consulting<\/a><\/li>\n<li><a href=\"\/servicos\/levantamento-e-diagnostico\/auditoria-tecnica\/\">Technical Audit<\/a><\/li>\n<li><a href=\"\/servicos\/implementacao\/gestao-de-projetos\/\">Project Management<\/a><\/li>\n<li><a href=\"\/servicos\/implementacao\/comissionamento\/\">Commissioning<\/a><\/li>\n<li><a href=\"\/servicos\/operacao\/engenharia-de-manutencao\/\">Maintenance Engineering<\/a><\/li>\n<li><a href=\"\/servicos\/servicos-complementares\/emissao-de-pareceres-tecnicos\/\">Technical Opinion Services<\/a><\/li>\n<\/ul>\n<\/div>\n\n\n\n<div class=\"bloco-apoio-artigo\">\n<p><strong>Technical references<\/strong><\/p>\n<ul>\n<li>ABNT NBR 16149 \u2014 Photovoltaic systems: characteristics of the interface for connection to the electrical distribution grid.<\/li>\n<li>ABNT NBR 16150 \u2014 Photovoltaic systems: conformity test procedure.<\/li>\n<li>ABNT NBR IEC 62116 \u2014 Anti-islanding test procedure for grid-connected photovoltaic-system inverters.<\/li>\n<li>ABNT NBR 16690 \u2014 Electrical installations of photovoltaic arrays \u2014 design requirements.<\/li>\n<li>ABNT NBR 5410 \u2014 Low-voltage electrical installations.<\/li>\n<li>NR-10 \u2014 Safety in electrical installations and services.<\/li>\n<\/ul>\n<\/div>\n\n\n\n<div class=\"bloco-apoio-artigo\">\n<p><strong>Recommended complementary materials<\/strong><\/p>\n<ul>\n<li><a href=\"\/conteudo\/artigos-tecnicos\/projeto-fotovoltaico-dimensionamento-protecao-infraestrutura\/\">Photovoltaic design and electrical infrastructure<\/a><\/li>\n<li><a href=\"\/conteudo\/artigos-tecnicos\/inversor-solar-como-funciona-projeto-fotovoltaico\/\">Solar inverter and grid connection<\/a><\/li>\n<li><a href=\"\/conteudo\/artigos-tecnicos\/energia-solar-para-empresas-viabilidade-riscos-tecnicos\/\">Solar energy for companies<\/a><\/li>\n<li><a href=\"\/conteudo\/artigos-tecnicos\/protecao-contra-surtos-sistemas-fotovoltaicos\/\">Surge protection in photovoltaic systems<\/a><\/li>\n<li><a href=\"\/conteudo\/artigos-tecnicos\/avaliacao-proposta-tecnica-engenharia\/\">Technical proposal evaluation<\/a><\/li>\n<\/ul>\n<\/div>\n\n\n\n<div class=\"bloco-apoio-artigo faq-artigo\">\n<p><strong>FAQ<\/strong><\/p>\n<p><strong>1. What is distributed generation?<\/strong><br>It is the model in which electrical energy is generated close to the point of consumption or connected to the distribution grid, as occurs in solar photovoltaic systems.<\/p>\n<p><strong>2. What is an on-grid system?<\/strong><br>It is a photovoltaic system connected to the electrical grid, capable of consuming energy locally and interacting with the distribution utility&#8217;s grid.<\/p>\n<p><strong>3. What is a bidirectional meter used for?<\/strong><br>It measures the energy consumed from the grid and the energy injected into the grid by the generating unit.<\/p>\n<p><strong>4. What is anti-islanding?<\/strong><br>It is a safety function that prevents the photovoltaic system from improperly keeping part of the grid energized when the main grid is absent or abnormal.<\/p>\n<p><strong>5. What is solar-system approval?<\/strong><br>It is the technical approval process for a photovoltaic system with the distribution utility, according to the applicable grid-connection requirements.<\/p>\n<p><strong>6. What is an access opinion?<\/strong><br>It is a document related to the analysis of connecting a generating unit to the grid, according to the applicable procedures and utility requirements.<\/p>\n<p><strong>7. Does distributed generation require technical design?<\/strong><br>Yes. Grid connection requires design, appropriate equipment, protection, metering, documentation, and compliance with technical requirements.<\/p>\n<\/div>\n\n\n\n<div class=\"conclusao-artigo\">\n<p><strong>Conclusion<\/strong><\/p>\n<p>Distributed generation is the link between solar energy, the electrical installation, and the distribution grid.<\/p>\n<p>It allows consumers to generate energy close to the point of consumption, but requires safe connection, adequate metering, compatible inverters, anti-islanding, documentation, and compliance with technical requirements.<\/p>\n<p>For this reason, grid-connected photovoltaic systems should be treated as electrical-engineering projects.<\/p>\n<p>When properly planned, distributed generation can provide savings, predictability, and greater energy control. When poorly designed, it can create delays, rework, and technical risks.<\/p>\n<\/div>\n\n\n\n<div class=\"cta-final-artigo\">\n<p><strong>Is your company evaluating distributed generation or connecting a photovoltaic system to the grid?<\/strong><\/p>\n<p>Before contracting, it is essential to assess electrical infrastructure, inverters, protection, metering, documentation, approval, and technical risks.<\/p>\n<p><a href=\"\/contato\/\"><strong>Talk to an A3A Engenharia specialist<\/strong><\/a>.<\/p>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>Understand how distributed generation works, how photovoltaic systems connect to the electrical grid, bidirectional metering, approval, on-grid inverters, and anti-islanding.<\/p>\n","protected":false},"author":1,"featured_media":78635,"parent":0,"template":"","meta":{"_a3a_global_related_solutions":[],"_a3a_global_related_services":[],"_a3a_global_related_materials":[],"_a3a_post_lang":"en-us","_a3a_translation_group_id":"26c2d397-0580-4c63-a77f-a67d3e09c634","_a3a_i18n_canonical_slug":"distributed-generation-photovoltaic-systems-grid-connection","_a3a_prod_post_id":"","_a3a_lang_url_en-us":"","_a3a_lang_url_es-es":""},"categories":[],"segments":[],"mercados":[],"etapas":[],"class_list":["post-83097","articles","type-articles","status-publish","has-post-thumbnail","hentry"],"_links":{"self":[{"href":"https:\/\/a3aengenharia.com\/en-us\/wp-json\/wp\/v2\/articles\/83097","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/a3aengenharia.com\/en-us\/wp-json\/wp\/v2\/articles"}],"about":[{"href":"https:\/\/a3aengenharia.com\/en-us\/wp-json\/wp\/v2\/types\/articles"}],"author":[{"embeddable":true,"href":"https:\/\/a3aengenharia.com\/en-us\/wp-json\/wp\/v2\/users\/1"}],"version-history":[{"count":1,"href":"https:\/\/a3aengenharia.com\/en-us\/wp-json\/wp\/v2\/articles\/83097\/revisions"}],"predecessor-version":[{"id":83099,"href":"https:\/\/a3aengenharia.com\/en-us\/wp-json\/wp\/v2\/articles\/83097\/revisions\/83099"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/a3aengenharia.com\/en-us\/wp-json\/wp\/v2\/media\/78635"}],"wp:attachment":[{"href":"https:\/\/a3aengenharia.com\/en-us\/wp-json\/wp\/v2\/media?parent=83097"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/a3aengenharia.com\/en-us\/wp-json\/wp\/v2\/categories?post=83097"},{"taxonomy":"segments","embeddable":true,"href":"https:\/\/a3aengenharia.com\/en-us\/wp-json\/wp\/v2\/segments?post=83097"},{"taxonomy":"mercados","embeddable":true,"href":"https:\/\/a3aengenharia.com\/en-us\/wp-json\/wp\/v2\/mercados?post=83097"},{"taxonomy":"etapas","embeddable":true,"href":"https:\/\/a3aengenharia.com\/en-us\/wp-json\/wp\/v2\/etapas?post=83097"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}