{"id":74573,"date":"2026-09-04T16:52:18","date_gmt":"2026-09-04T19:52:18","guid":{"rendered":"https:\/\/a3aengenharia.com\/?post_type=articles&#038;p=74573"},"modified":"2026-09-04T16:52:18","modified_gmt":"2026-09-04T19:52:18","slug":"public-works-terms-of-reference-avoid-contract-amendments","status":"publish","type":"articles","link":"https:\/\/a3aengenharia.com\/en-us\/content\/technical-articles\/public-works-terms-of-reference-avoid-contract-amendments\/","title":{"rendered":"How to Write Public-Works Terms of Reference That Do Not Turn Into Avoidable Contract Amendments"},"content":{"rendered":"\n<p class=\"wp-block-paragraph\">Well-structured <strong>Terms of Reference for public works<\/strong> do not eliminate the legal possibility of contract amendments, because changes may result from supervening facts, legitimate needs of the Administration or events provided for under the contractual regime. What they do is reduce <strong>avoidable amendments<\/strong>: those arising from a poorly defined object, inconsistent design and budget, quantities without traceability, omitted interfaces, vague measurement criteria, undefined responsibilities or execution conditions discovered only after contracting.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">In practice, writing Terms of Reference for a public work means transforming a public need and an engineering solution into a set of obligations that the market can <strong>understand, price, execute and demonstrate<\/strong>. This requires much more than filling out a template. The document needs to align with the Preliminary Technical Study, the applicable Basic Design or Detailed Design, the estimated budget, schedule, risk matrix, tender documents and draft contract. If each annex describes a different reality, the procurement transfers into the contract an uncertainty that should have been resolved during the preparatory phase.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Under the current framework of Law 14,133, Brazil\u2019s Attorney General\u2019s Office uses a unified Terms of Reference template for services, engineering services and construction works and emphasizes that <strong>Terms of Reference and Basic Design perform different functions<\/strong>. Basic Design is an engineering document; the Terms of Reference structure the procurement in its technical-administrative dimension and need to correctly incorporate what the designs, studies and preparatory decisions have established. Therefore, good Terms of Reference do not \u201ccompensate\u201d for an immature design: they make a solution contractible when it already has a technical basis sufficient for the chosen regime.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Public-works Terms of Reference are not the design, but they need to align with it<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">One of the most common mistakes in engineering procurement is trying to make the Terms of Reference perform functions that belong to the design. The result is often a long document full of broad statements but without enough information to resolve engineering decisions.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Brazil\u2019s Attorney General\u2019s Office itself highlights, in its guidance for Law 14,133 templates, that the old simplified association between Terms of Reference and electronic bidding on one side, and Basic Design and other procedures on the other, is no longer appropriate. The documents have distinct functions. In construction works and special services, the Terms of Reference remain relevant as a procurement artifact, while Basic Design retains its own engineering content.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">This distinction should appear in practice:<\/p>\n\n\n\n<figure class=\"wp-block-table\"><table><tbody><tr><td>Document<\/td><td>Primary function<\/td><td>Question it should answer<\/td><\/tr><tr><td>ETP<\/td><td>decision on the solution<\/td><td>why contract and which solution best meets the need?<\/td><\/tr><tr><td>Basic Design<\/td><td>technical definition<\/td><td>what will be built and under which technical conditions?<\/td><\/tr><tr><td>Detailed Design<\/td><td>detailing for execution<\/td><td>how will the solution actually be executed?<\/td><\/tr><tr><td>Budget<\/td><td>reference-price formation<\/td><td>how much does the defined solution cost?<\/td><\/tr><tr><td>Terms of Reference<\/td><td>procurement structure<\/td><td>what must the contractor deliver, how must it execute, measure and demonstrate?<\/td><\/tr><tr><td>Tender documents<\/td><td>rules of the competition<\/td><td>how will the market be selected and which rules will govern competition?<\/td><\/tr><tr><td>Contract<\/td><td>binding obligations<\/td><td>how will responsibilities, payments, risks and changes be managed?<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p class=\"wp-block-paragraph\">The article on <a href=\"https:\/\/a3aengenharia.com.br\/conteudo\/artigos-tecnicos\/termo-de-referencia-engenharia-escopo-criterios-tecnicos-medicao-aceite\/\">Engineering Terms of Reference<\/a> addresses the general structure of this document. In public works, the additional challenge is maintaining consistency among all technical and contractual annexes.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">What Law 14,133 requires to be defined during the preparatory phase<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Law 14,133 structures the preparatory phase as a planning process. Article 18 requires compatibility with the Annual Procurement Plan when one exists and with budget laws, as well as consideration of technical, market and management issues capable of affecting the procurement.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Elements of this preparation include describing the need based on the ETP, defining the object through the appropriate document, execution and payment conditions, guarantees, acceptance, estimated budget, tender documents, draft contract, execution regime, procurement procedure, award criterion and bidding mode.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">This shows why public-works Terms of Reference cannot be written in isolation. They are one component of a decision system.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The <a href=\"https:\/\/a3aengenharia.com.br\/conteudo\/artigos-tecnicos\/estudo-tecnico-preliminar-etp-obras-servicos-engenharia-contratacao\/\">Preliminary Technical Study for construction works and engineering services<\/a> should explain the need and the chosen solution. The Terms of Reference receive that decision and convert it into a contractible scope. If the ETP has not yet stabilized the problem and the solution, the Terms of Reference author will be forced to make decisions that belonged to an earlier stage.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Avoidable contract amendments usually begin before the contract is signed<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Contract amendments formally appear during execution, but many of their causes are introduced before the tender.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">An underestimated quantity may originate in an incomplete record survey. A scope change may result from an omitted requirement. A solution change may arise from a Basic Design incompatible with actual conditions. A time extension may begin with a work front that was never effectively available. A new item may appear because an interface between two suppliers was assigned to nobody.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The control point, therefore, is not to write a clause saying that \u201call necessary services are included.\u201d It is to remove material uncertainty from the object before competition.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The content on <a href=\"https:\/\/a3aengenharia.com.br\/conteudo\/artigos-tecnicos\/aditivo-contratual-obras-servicos-engenharia-lei-14133\/\">Contract Amendments in Construction Works and Engineering Services<\/a> shows how changes are handled during the contract. The Terms of Reference act one stage earlier: they should reduce avoidable triggers that would lead to that treatment.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Start with the need and expected result, not a list of services<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Weak Terms of Reference often begin by copying a bill of quantities or the description of a previous procurement. This creates scope without context.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The technical opening should make clear:<\/p>\n\n\n\n<ul class=\"wp-block-list\"><li>which public or operational problem will be solved;<\/li><li>which asset, facility or infrastructure will be affected;<\/li><li>which performance result is expected;<\/li><li>which physical and functional boundaries exist;<\/li><li>which assumptions were adopted;<\/li><li>which relevant constraints are already known;<\/li><li>what relationship exists with current designs, studies and contracts.<\/li><\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">This framing prevents the document from being read as a disconnected list of obligations. In an electrical renovation, for example, \u201creplace panels\u201d may be insufficient if the actual need is to upgrade capacity, protection, selectivity, safety and operational continuity. In an electronic-security project, \u201cinstall cameras\u201d does not define coverage, retention, integration, infrastructure, licensing or performance criteria.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><a href=\"https:\/\/a3aengenharia.com.br\/solucoes\/gestao-e-governanca-de-engenharia\/gestao-requisitos-evidencias-criterios-aceite\/\">Requirements, evidence and acceptance-criteria management<\/a> helps maintain this line from need to requirement to proof.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Define the object so different suppliers understand the same procurement<\/h2>\n\n\n\n<div class=\"wp-block-a3a-destaque\">\n<p class=\"wp-block-paragraph\">Once the need and engineering solution have been defined, the Terms of Reference should turn that basis into scope, responsibilities, measurement, acceptance and documentation that the market can price on a comparable basis.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><a href=\"https:\/\/a3aengenharia.com.br\/servicos\/planejamento\/termo-referencia-obras-servicos-engenharia\/\">Terms of Reference for Construction Works and Engineering Services structured from the technical basis<\/a><\/p>\n<\/div>\n\n\n\n<p class=\"wp-block-paragraph\">The most useful test for defining the object is to ask whether independent companies, when reading the document, would prepare bids for <strong>the same deliverable<\/strong>.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">If one company considers certain infrastructure included and another interprets that it will be provided by the Administration, prices are no longer directly comparable. If one bidder includes integrated testing and another only equipment testing, the apparent price difference hides a scope difference.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The definition of the object needs to contain its nature, extent, location, systems, boundaries, relevant quantity or magnitude, schedule and expected result. Where there are lots, stages or packages, the boundary between them should be explicit.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The article on <a href=\"https:\/\/a3aengenharia.com.br\/conteudo\/artigos-tecnicos\/scope-of-work-sow-engenharia-como-definir-escopo-contratacao\/\">Scope of Work in Engineering<\/a> and the content on <a href=\"https:\/\/a3aengenharia.com.br\/conteudo\/artigos-tecnicos\/escopo-contratual-engenharia-inclusoes-exclusoes-premissas\/\">Contract Scope in Engineering<\/a> explore how to construct these boundaries.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Inclusions, exclusions and interfaces need to be explicit<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">One of the largest sources of avoidable amendments lies in the gray zone between contracts, disciplines and responsibilities.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Good Terms of Reference should explicitly state what is included, what is excluded and which interfaces depend on third parties or on the Administration itself.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">In a multidisciplinary procurement, this may include:<\/p>\n\n\n\n<ul class=\"wp-block-list\"><li>supply of materials and equipment;<\/li><li>supporting civil infrastructure;<\/li><li>electrical power supply;<\/li><li>grounding;<\/li><li>networks and connectivity;<\/li><li>software licenses;<\/li><li>configuration;<\/li><li>integration with existing systems;<\/li><li>removal and reinstatement;<\/li><li>disposal;<\/li><li>mobilization and site facilities;<\/li><li>scaffolding and access means;<\/li><li>testing;<\/li><li>training;<\/li><li>As-Built;<\/li><li>Data Book;<\/li><li>assisted operation;<\/li><li>warranties and support.<\/li><\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">It is not necessary to turn the Terms of Reference into an encyclopedia. It is necessary to make visible the interfaces that affect price and execution.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">An interface matrix can record origin, destination, responsible party, deliverable, deadline and release criterion. This simple discipline reduces statements such as \u201cthat was the other supplier\u2019s responsibility\u201d during construction.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Basic Design, Detailed Design and Terms of Reference need to use the same solution version<\/h2>\n\n\n\n<div class=\"wp-block-a3a-destaque\">\n<p class=\"wp-block-paragraph\">When the technical basis still does not allow quantities, interfaces and execution criteria to be defined, the solution is not to increase the number of clauses in the Terms of Reference. It is to mature the design before contracting the work.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><a href=\"https:\/\/a3aengenharia.com.br\/servicos\/planejamento\/projeto-executivo\/\">Detailed Engineering Design to eliminate uncertainties before execution<\/a><\/p>\n<\/div>\n\n\n\n<p class=\"wp-block-paragraph\">The existence of good isolated documents does not guarantee a good procurement. The set needs to be consistent.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Imagine that the Basic Design specifies 100 units, the budget sheet contains 90 and the Terms of Reference state \u201cquantity according to design.\u201d Which number will be priced? If the narrative specifies one characteristic and the cost sheet uses another composition, which prevails? If the schedule assumes a solution that has already been changed, which duration is valid?<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Before publication, document reconciliation should be performed. <a href=\"https:\/\/a3aengenharia.com.br\/conteudo\/artigos-tecnicos\/projeto-executivo-lei-14133-obra-sem-projeto\/\">Detailed Design under Law 14,133<\/a> should be considered according to the execution regime and development stage. The Terms of Reference cannot generically cite \u201cattached designs\u201d without controlling revision, master list and document hierarchy.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">A minimum master list identifies document, code, title, revision, date and status. If there is a conflict among annexes, the hierarchy should be technically deliberate; it should not be assumed that a generic clause will resolve any contradiction between design and budget.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Quantities need a traceable origin<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">A quantity should not be merely a number in a spreadsheet. For relevant items, it should be possible to reconstruct where it came from.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Traceability can connect a budget item to a drawing, calculation sheet, survey, material list, BIM model or estimating criterion.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">This is particularly important in lump-sum contracts. A lump-sum price does not make poorly defined quantities irrelevant. Bidders need to understand the object to build their price, and the Administration needs a basis to assess consistency, changes and possible accountability for design failures.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Where there is substantial quantity uncertainty by the nature of the service, the choice of measurement regime itself needs to reflect that reality. The article on <a href=\"https:\/\/a3aengenharia.com.br\/conteudo\/artigos-tecnicos\/empreitada-preco-global-unitario-diferencas-medicao-riscos\/\">Lump-Sum vs. Unit-Price Construction Contracts<\/a> helps relate object maturity and remuneration method.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">The reference budget needs to reflect exactly the contracted scope<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Design, Terms of Reference and budget need to be developed as a set. It is not sufficient to update indices in an old spreadsheet while keeping items that no longer correspond to the solution.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The review should verify:<\/p>\n\n\n\n<ol class=\"wp-block-list\"><li>whether all items required by the scope are budgeted;<\/li><li>whether there are no budgeted items that disappeared from the design;<\/li><li>whether quantities correspond to the current revision;<\/li><li>whether units and measurement criteria are compatible;<\/li><li>whether cost compositions represent the intended execution method;<\/li><li>whether mobilization, testing, documentation and support costs were addressed;<\/li><li>whether special site conditions were considered;<\/li><li>whether environmental, safety and logistics obligations have coverage;<\/li><li>whether specified equipment is compatible with the pricing references.<\/li><\/ol>\n\n\n\n<p class=\"wp-block-paragraph\">The article on <a href=\"https:\/\/a3aengenharia.com.br\/conteudo\/artigos-tecnicos\/pesquisa-precos-obras-servicos-engenharia-lei-14133\/\">Price Research for Construction Works and Engineering Services under Law 14,133<\/a> complements the discussion on forming the market reference.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Measurement criteria should be defined before bids are submitted<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Measurement is one of the areas in which apparently technical Terms of Reference can fail during execution.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">\u201cPercentage completed\u201d is insufficient when it is unclear what constitutes completion of a stage. How much is equipment delivered to the site worth? Can an installed but untested system be measured in full? Does pending documentation prevent payment? How should design developed by the contractor be measured?<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The rule needs to link payment to verifiable deliverables.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Example breakdown for a system:<\/p>\n\n\n\n<figure class=\"wp-block-table\"><table><tbody><tr><td>Milestone<\/td><td>Evidence<\/td><td>Possible measurement<\/td><\/tr><tr><td>approved design<\/td><td>released document\/revision<\/td><td>engineering portion<\/td><\/tr><tr><td>material received<\/td><td>inspection and documentation<\/td><td>supply portion, if provided<\/td><\/tr><tr><td>installation complete<\/td><td>checklist and inspection<\/td><td>installation portion<\/td><\/tr><tr><td>functional test approved<\/td><td>test report<\/td><td>commissioning portion<\/td><\/tr><tr><td>final documentation<\/td><td>As-Built\/Data Book<\/td><td>handover portion<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p class=\"wp-block-paragraph\">This structure is not universal, but it illustrates the logic: <strong>payment follows evidence of progress<\/strong>, not subjective perception.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Acceptance criteria should be written as verifiable requirements<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">\u201cIn perfect working order\u201d is not a good acceptance criterion when the contract does not explain how operation will be demonstrated.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Robust criteria indicate expected behavior, verification method, tolerance, documentation and the party responsible for evaluation.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">When the object involves systems, the Terms of Reference should distinguish:<\/p>\n\n\n\n<ul class=\"wp-block-list\"><li>receipt inspection;<\/li><li>installation inspection;<\/li><li>quality tests;<\/li><li>functional tests;<\/li><li>integration tests;<\/li><li>performance tests;<\/li><li>training;<\/li><li>document handover;<\/li><li>provisional acceptance;<\/li><li>final acceptance.<\/li><\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">The article on <a href=\"https:\/\/a3aengenharia.com.br\/conteudo\/artigos-tecnicos\/art-140-lei-14133-recebimento-obras-servicos-engenharia\/\">Article 140 of Law 14,133 applied to acceptance of construction works<\/a> helps connect formal acceptance acts to the technical evidence that needs to be provided for from the Terms of Reference stage.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Technical specifications should define performance without creating undue restrictions<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">A poor specification can create two opposite problems. If it is too vague, the market offers technically non-comparable solutions. If it is restrictive without justification, it can reduce competition or trigger clarification requests and challenges.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The goal is to specify requirements that represent the actual need: performance, capacity, compatibility, durability, safety, interfaces, standards, environmental conditions and test criteria.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Where reference to a brand or model is permitted, the justification and equivalence criteria need to be handled technically. \u201cSimilar\u201d without comparison attributes does not solve the problem.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">For complex equipment, a table of minimum requirements is often more useful than a long descriptive text. Reproducing an entire manufacturer catalog should be avoided when attributes do not correspond to a project need.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Technical qualification needs to be proportionate to risk and the object<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Technical qualification requirements should protect execution without creating barriers disconnected from the actual risk.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The Terms of Reference and technical documents should identify portions of greatest relevance, complexity and criticality and the competencies actually required. It is not appropriate to demand specific experience merely because it appears to increase security; the requirement needs to be related to what must be demonstrated.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The content on <a href=\"https:\/\/a3aengenharia.com.br\/conteudo\/artigos-tecnicos\/habilitacao-qualificacao-tecnica-licitacoes-engenharia\/\">Technical Eligibility and Qualification in Engineering Procurement<\/a> explores this analysis further.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">A prior technical review should also verify whether requirements for team, certificates, relationships, equipment and experience are compatible with the market and execution. A procurement can fail before construction if tender documents exclude capable competitors through criteria that add no real control.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">The schedule should reflect real predecessors, not merely desired dates<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Deadlines are often defined by the administrative calendar rather than the engineering sequence.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">A robust contractual schedule considers:<\/p>\n\n\n\n<ul class=\"wp-block-list\"><li>mobilization;<\/li><li>design approvals;<\/li><li>manufacturing and lead time;<\/li><li>area releases;<\/li><li>licenses and authorizations;<\/li><li>scheduled outages;<\/li><li>operating windows;<\/li><li>third-party interfaces;<\/li><li>testing;<\/li><li>corrections;<\/li><li>handover;<\/li><li>acceptance.<\/li><\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">The Terms of Reference should make clear which dependencies belong to the contractor and which belong to the Administration. If a work front depends on authorization from the public entity itself, that predecessor cannot disappear from the schedule for convenience.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The article on <a href=\"https:\/\/a3aengenharia.com.br\/conteudo\/artigos-tecnicos\/desapropriacao-licenciamento-obras-publicas-risco-edital\/\">Expropriation and licensing in public works<\/a> shows how territorial and environmental constraints need to be integrated into planning before contracting.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">The risk matrix should not be a generic annex<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">The risk matrix needs to reflect the specific uncertainties of the project. An event described merely as \u201cconstruction delay\u201d does not identify cause, control or responsibility.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Useful events are clearly formulated: delay in releasing an area under the Administration\u2019s responsibility; need to relocate an unrecorded interference; quantity variation within a known condition; change in solution proposed by the contractor; manufacturer delay; unavailability of an operating window; geotechnical condition beyond the provided basis.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The article on <a href=\"https:\/\/a3aengenharia.com.br\/conteudo\/artigos-tecnicos\/matriz-alocacao-riscos-contratos-engenharia-lei-14133\/\">Risk Allocation Matrix in Engineering Contracts<\/a> presents the logic of allocating risks according to control, foreseeability and management capacity.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The Terms of Reference need to be consistent with the matrix. It makes no sense for one clause to assign a responsibility to the Administration while another generically transfers \u201call risks\u201d to the contractor.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Assumptions should be declared so they can be tested<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Every procurement has assumptions. The problem is when they remain implicit.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Examples:<\/p>\n\n\n\n<ul class=\"wp-block-list\"><li>site access will be available during business hours;<\/li><li>the existing electrical supply has sufficient capacity;<\/li><li>a certain legacy system allows integration;<\/li><li>the area will be unoccupied;<\/li><li>the provided survey represents current conditions;<\/li><li>existing equipment can be reused;<\/li><li>a specific license will be provided before mobilization.<\/li><\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">If an assumption affects price or schedule, it should be documented. There should also be treatment for the event that it proves incorrect.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">An assumption is not a mechanism for transferring any uncertainty. It is a known condition needed for bid preparation and subject to confirmation or a treatment rule.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Changes need a process before they occur<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">In complex construction works, changes are inevitable to some degree. What should be avoided is informal change.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The Terms of Reference and contract should provide how a need for change will be identified, documented, technically analyzed, priced, approved and incorporated into current documents.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">A design change can affect quantity, specification, schedule, testing, training, documentation and licensing. Changing only the drawing creates inconsistency with the other annexes.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The content on <a href=\"https:\/\/a3aengenharia.com.br\/conteudo\/artigos-tecnicos\/management-of-change-moc-gestao-mudancas-processos-instalacoes\/\">Management of Change in Engineering<\/a> provides a disciplined approach to change control in complex systems.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">QA\/QC, inspections and tests need to be part of the procurement<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">If the Administration intends to require a given quality control, bidders need to know about it before pricing.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The Terms of Reference can establish requirements for a Quality Plan, Inspection and Test Plan, certificates, material traceability, procedures, hold points, witness points and nonconformity handling.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">It is not necessary to prescribe all of the contractor\u2019s execution procedures, but it is necessary to define the evidence that demonstrates compliance with requirements.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">For technical systems, this also means planning commissioning. The <a href=\"https:\/\/a3aengenharia.com.br\/conteudo\/artigos-tecnicos\/plano-comissionamento-obras-publicas-testes-aceite\/\">Commissioning Plan for Public Works<\/a> shows how requirements, tests, documentation and acceptance connect. If the Terms of Reference require \u201ccommissioning\u201d without explaining scope and evidence, each bidder may price a different activity.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Handover and final documentation should not be left until closeout<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">As-Built documents, manuals, certificates, warranties, configuration records, training, asset lists and Data Books often receive attention only when the work is nearing completion. At that stage, the ability to require retroactive documentation has already decreased.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The Terms of Reference should specify from the beginning:<\/p>\n\n\n\n<ul class=\"wp-block-list\"><li>which final documents will be required;<\/li><li>formats and standards;<\/li><li>delivery frequency during execution;<\/li><li>review responsibilities;<\/li><li>linkage to measurement;<\/li><li>acceptance criteria;<\/li><li>training needs;<\/li><li>assisted-operation requirements where applicable.<\/li><\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">This way, documentation stops being a \u201cfinal package\u201d and is built throughout the contract.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Use the Terms of Reference to define responsibilities, not hide gaps<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Broad clauses such as \u201cthe contractor shall be responsible for everything necessary for proper operation\u201d can be useful as complementary obligations, but they should not replace objective definition of the object.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">When the Administration knows an interface exists, it should assign it. When it knows a constraint, it should disclose it. When it does not know a material condition, it should assess whether it needs to investigate it before the tender or expressly allocate it as a risk.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><a href=\"https:\/\/a3aengenharia.com.br\/solucoes\/gestao-e-governanca-de-engenharia\/gestao-contratos-escopo-entregaveis\/\">Contract, Scope and Deliverables Management<\/a> works with exactly this discipline: converting responsibilities and deliverables into a controllable structure.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">A cross-review should compare all annexes before publication<\/h2>\n\n\n\n<div class=\"wp-block-a3a-destaque\">\n<p class=\"wp-block-paragraph\">If the design, budget and Terms of Reference were produced at different times, an independent review needs to reconcile the set before the tender. The goal is to eliminate contradictions that would turn into clarification requests, scope changes or contract amendments.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><a href=\"https:\/\/a3aengenharia.com.br\/servicos\/planejamento\/revisao-tecnica-termo-referencia-obras-servicos-engenharia\/\">Technical Review of Terms of Reference before publication<\/a><\/p>\n<\/div>\n\n\n\n<p class=\"wp-block-paragraph\">The Terms of Reference author sees only part of the risk. The final review needs to be cross-functional.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">A consistency matrix can compare:<\/p>\n\n\n\n<figure class=\"wp-block-table\"><table><tbody><tr><td>Topic<\/td><td>Design<\/td><td>Terms of Reference<\/td><td>Budget<\/td><td>Tender\/Contract<\/td><\/tr><tr><td>object<\/td><td>solution and boundaries<\/td><td>contract description<\/td><td>corresponding items<\/td><td>legal object<\/td><\/tr><tr><td>quantity<\/td><td>sizing<\/td><td>magnitudes<\/td><td>quantities<\/td><td>bid rule<\/td><\/tr><tr><td>schedule<\/td><td>technical sequence<\/td><td>schedule<\/td><td>time-related costs<\/td><td>term and execution<\/td><\/tr><tr><td>risk<\/td><td>assumptions<\/td><td>responsibilities<\/td><td>contingencies<\/td><td>matrix\/clauses<\/td><\/tr><tr><td>quality<\/td><td>specifications<\/td><td>evidence<\/td><td>control costs<\/td><td>obligations<\/td><\/tr><tr><td>acceptance<\/td><td>performance<\/td><td>criteria<\/td><td>final items<\/td><td>acceptance\/payment<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p class=\"wp-block-paragraph\">Relevant contradictions should be resolved before disclosure, not explained through a later circular after they have already affected bid formation.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">A <a href=\"https:\/\/a3aengenharia.com.br\/servicos\/planejamento\/revisao-tecnica-edital-anexos-licitacoes-engenharia\/\">Technical Review of Tender Documents and Annexes<\/a> is appropriate when the public entity needs this integrated verification of procurement documentation.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Technical Terms-of-Reference checklist before forwarding to the tender<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Before considering the document ready, the team can verify whether:<\/p>\n\n\n\n<ol class=\"wp-block-list\"><li>the need and expected result are clear;<\/li><li>the object has defined physical and functional boundaries;<\/li><li>inclusions, exclusions and interfaces are identified;<\/li><li>Basic\/Detailed Design and Terms of Reference represent the same solution;<\/li><li>the document and revision list is controlled;<\/li><li>quantities have a traceable origin;<\/li><li>the budget corresponds to the current revision;<\/li><li>the execution regime is compatible with object maturity;<\/li><li>measurement criteria are objective;<\/li><li>acceptance criteria are verifiable;<\/li><li>technical requirements do not create undue restrictions;<\/li><li>technical qualification is proportionate;<\/li><li>the schedule includes real predecessors;<\/li><li>areas, licenses and interferences were addressed;<\/li><li>the risk matrix aligns with the Terms of Reference;<\/li><li>changes have a control process;<\/li><li>QA\/QC and testing were provided for;<\/li><li>final documentation and handover are specified;<\/li><li>Administration responsibilities are explicit;<\/li><li>the annexes contain no material contradictions.<\/li><\/ol>\n\n\n\n<p class=\"wp-block-paragraph\">If several of these items cannot be answered, the problem may not lie in the wording of the Terms of Reference: the procurement still needs to mature.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">How to contract preparation of public-works Terms of Reference<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Preparing Terms of Reference for engineering is a procurement-structuring service, not simple document editing.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The work should begin by reading the ETP, designs, surveys, budget, constraints and execution strategy. The consultant then converts this information into requirements, scope, interfaces, responsibilities, measurement criteria, acceptance, documentation and risks.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The <a href=\"https:\/\/a3aengenharia.com.br\/servicos\/planejamento\/termo-referencia-obras-servicos-engenharia\/\">Terms of Reference for Construction Works and Engineering Services<\/a> page describes this service as a planning stage connecting engineering and procurement.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">When the basis is still incomplete, surveys, Due Diligence or Detailed Design may need to be contracted first. Writing Terms of Reference over gaps does not eliminate the gaps.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">When to contract a technical review instead of preparing another Terms of Reference document from scratch<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">If the public entity already has a document produced by an internal team, designer or consultant, an independent review may be more efficient than restarting the work.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The review should identify inconsistencies, gaps and risks, classify criticality and propose corrections. The goal is not to rewrite for style; it is to verify whether the procurement is technically executable and whether different bidders will receive enough information to prepare comparable bids.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The <a href=\"https:\/\/a3aengenharia.com.br\/servicos\/planejamento\/revisao-tecnica-termo-referencia-obras-servicos-engenharia\/\">Technical Review of Terms of Reference for Construction Works and Services<\/a> addresses exactly this stage.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">When the problem goes beyond the Terms of Reference and involves designs, budget, tender documents, risk matrix and contracting strategy, the review should cover the entire procurement package.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Owner\u2019s Engineering is useful when the Terms of Reference are part of a larger program<\/h2>\n\n\n\n<div class=\"wp-block-a3a-destaque\">\n<p class=\"wp-block-paragraph\">In projects with multiple contracts and disciplines, keeping Terms of Reference, designs, procurement and owner decisions consistent requires continuous governance, not merely a one-off document review.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><a href=\"https:\/\/a3aengenharia.com.br\/servicos\/contratacao-integrada\/engenharia-do-proprietario\/\">Owner\u2019s Engineering to coordinate requirements, interfaces and contracting<\/a><\/p>\n<\/div>\n\n\n\n<p class=\"wp-block-paragraph\">In complex projects, the Terms of Reference are only one of the documents that evolve during preparation. Design decisions change the budget; the budget influences strategy; the market may require adjustments; risks change; and interfaces among contracts need to be coordinated.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">In these cases, contracting only a document deliverable may not solve the governance problem.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><a href=\"https:\/\/a3aengenharia.com.br\/servicos\/contratacao-integrada\/engenharia-do-proprietario\/\">Owner\u2019s Engineering<\/a> can technically represent the public entity throughout planning, procurement and implementation, coordinating requirements, designers, documents, suppliers, risks and decisions without replacing the legal duties of public officials.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">How poor Terms of Reference turn into a contract amendment during execution<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">The cause-and-effect chain can be direct.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">An omitted requirement does not enter the budget. The bidder prices without it. During execution, the need appears. The inspection team understands that the item is indispensable. The contractor states that it was not included. The public entity needs to decide whether it is an original obligation, a design failure or a legitimate change. Meanwhile, the work front may stop.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Another example: the Terms of Reference require integration with an existing system but do not provide protocol, version, access or responsibility for development. The contractor prices a standard integration. Later it discovers that an additional module or manufacturer intervention will be required. The difference turns into a scope dispute.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Another: the schedule assumes the area will be released, but the public entity only realizes after contract signature that access depends on an external authorization. Resources are mobilized and remain idle.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">No text eliminates every risk. The role of the Terms of Reference is to make predictable and manageable those risks that can already be known during the preparatory phase.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">The Terms of Reference should function as a bridge between engineering and contract management<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Good Terms of Reference allow designer, estimator, procurement team, contractor, inspection team and operations to read the same object from different perspectives and still reach a consistent understanding.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">They do not need to contain all technical knowledge about the project; they should point to the correct documents and define how each requirement becomes a contractual obligation.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">For this reason, the quality of the Terms of Reference can be tested at four moments:<\/p>\n\n\n\n<ul class=\"wp-block-list\"><li><strong>bid:<\/strong> can the bidder price without hidden assumptions?<\/li><li><strong>execution:<\/strong> does the contractor know what to deliver and who resolves each interface?<\/li><li><strong>measurement:<\/strong> can the inspection team demonstrate progress and payment?<\/li><li><strong>acceptance:<\/strong> can the Administration demonstrate compliance with requirements?<\/li><\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">If the document works only at the first stage, it is still incomplete as a contracting instrument.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Final considerations<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Public-works Terms of Reference that reduce avoidable contract amendments are not the longest or the ones with the most clauses. They are the ones that translate a technically mature solution into <strong>clear scope, assigned interfaces, traceable quantities, a consistent budget, defined responsibilities, objective measurement, allocated risks and verifiable acceptance<\/strong>.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Law 14,133 requires integrated procurement planning, and current Attorney General\u2019s Office templates reinforce the specific function of the Terms of Reference even for construction works and engineering services. This does not reduce the role of Basic Design or Detailed Design; on the contrary, it requires each document to perform its function and all of them to describe the same solution.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">When the public entity tries to use the Terms of Reference to cover an incomplete design, it creates generic clauses and transfers the discussion to the construction site. When it first structures the technical reality and then the procurement, it reduces the number of critical decisions taken under schedule, mobilization and cost pressure.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The safest approach is to treat the Terms of Reference as an engineering-consulting product: start from the need, validate solution maturity, cross-check annexes, test contractibility and only then turn the set into obligations. This is how the document stops being a form and begins to work as an instrument for preventing conflicts, contract amendments and avoidable stoppages.<\/p>\n\n\n\n<details class=\"wp-block-details is-layout-flow wp-block-details-is-layout-flow\"><summary>Technical references<\/summary>\n<p class=\"wp-block-paragraph\">[1] BRAZIL. Law No. 14,133 of April 1, 2021 \u2014 Public Procurement and Administrative Contracts Law. Available at: <a href=\"https:\/\/www.planalto.gov.br\/ccivil_03\/_ato2019-2022\/2021\/lei\/l14133.htm\">https:\/\/www.planalto.gov.br\/ccivil_03\/_ato2019-2022\/2021\/lei\/l14133.htm<\/a>.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">[2] ATTORNEY GENERAL\u2019S OFFICE OF BRAZIL. Templates under Law No. 14,133\/21 for electronic bidding and competitive bidding \u2014 Unified Terms of Reference for services, engineering and construction works, May 2026. Available at: <a href=\"https:\/\/www.gov.br\/agu\/pt-br\/composicao\/cgu\/cgu\/modelos\/licitacoesecontratos\/14133\/pregao-e-concorrencia\">https:\/\/www.gov.br\/agu\/pt-br\/composicao\/cgu\/cgu\/modelos\/licitacoesecontratos\/14133\/pregao-e-concorrencia<\/a>.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">[3] ATTORNEY GENERAL\u2019S OFFICE OF BRAZIL. Presentation and General Guidance for Procurement and Contract Templates. Available at: <a href=\"https:\/\/www.gov.br\/agu\/pt-br\/composicao\/cgu\/cgu\/modelos\/licitacoesecontratos\/apresentacao-e-orientacoes-gerais\/apresentacao\">https:\/\/www.gov.br\/agu\/pt-br\/composicao\/cgu\/cgu\/modelos\/licitacoesecontratos\/apresentacao-e-orientacoes-gerais\/apresentacao<\/a>.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">[4] FEDERAL COURT OF ACCOUNTS. Procurement and Contracts \u2014 Basic Design. Available at: <a href=\"https:\/\/licitacoesecontratos.tcu.gov.br\/4-4-3-projeto-basico-pb\/\">https:\/\/licitacoesecontratos.tcu.gov.br\/4-4-3-projeto-basico-pb\/<\/a>.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">[5] BRAZILIAN CHAMBER OF THE CONSTRUCTION INDUSTRY. Stalled public works in Brazil: diagnosis and proposals. 2023. Available at: <a href=\"https:\/\/brasil.cbic.org.br\/acervo-coinfra-publicacao-obras-publicas-paralisadas-no-brasil-diagnostico-e-propostas\">https:\/\/brasil.cbic.org.br\/acervo-coinfra-publicacao-obras-publicas-paralisadas-no-brasil-diagnostico-e-propostas<\/a>.<\/p>\n<\/details>\n\n\n\n<details class=\"wp-block-details is-layout-flow wp-block-details-is-layout-flow\"><summary>Frequently asked questions<\/summary>\n<div class=\"schema-faq wp-block-yoast-faq-block\"><div class=\"schema-faq-section\" id=\"faq-question-um-bom-termo-de-refer-ncia-impede-qualquer-aditi-e48c0405\"><strong class=\"schema-faq-question\">Do good Terms of Reference prevent every construction contract amendment?<\/strong> <p class=\"schema-faq-answer\">No. Amendments may result from supervening facts and legitimate changes. Technically well-structured Terms of Reference mainly reduce avoidable amendments caused by incomplete scope, contradictions, omitted interfaces, weak quantities and vague criteria.<\/p><\/div><div class=\"schema-faq-section\" id=\"faq-question-termo-de-refer-ncia-substitui-projeto-b-sico-em--e441420a\"><strong class=\"schema-faq-question\">Do Terms of Reference replace Basic Design in public works?<\/strong> <p class=\"schema-faq-answer\">Not generally. Brazil\u2019s Attorney General\u2019s Office emphasizes that Terms of Reference and Basic Design have distinct functions under Law 14,133. Basic Design is an engineering document and the Terms of Reference structure the procurement; both must remain consistent when applicable.<\/p><\/div><div class=\"schema-faq-section\" id=\"faq-question-o-que-n-o-pode-faltar-em-um-tr-de-obra-f7eef828\"><strong class=\"schema-faq-question\">What cannot be missing from public-works Terms of Reference?<\/strong> <p class=\"schema-faq-answer\">Definition of the object, boundaries, inclusions and exclusions, interfaces, technical documents, quantities, responsibilities, execution conditions, measurement, acceptance, deadlines, risks, quality, testing and final documentation, proportionate to the object\u2019s complexity.<\/p><\/div><div class=\"schema-faq-section\" id=\"faq-question-como-evitar-contradi-o-entre-tr-projeto-e-or-ame-6361a1fd\"><strong class=\"schema-faq-question\">How can contradictions among Terms of Reference, design and budget be avoided?<\/strong> <p class=\"schema-faq-answer\">Revisions need to be controlled and a cross-review performed before publication, connecting requirements, quantities, specifications, schedule, risk matrix, measurement criteria and contractual annexes.<\/p><\/div><div class=\"schema-faq-section\" id=\"faq-question-o-tr-deve-definir-crit-rios-de-medi-o-aed62d06\"><strong class=\"schema-faq-question\">Should the Terms of Reference define measurement criteria?<\/strong> <p class=\"schema-faq-answer\">Yes. The procurement needs to make clear which evidence characterizes each progress milestone and how it will be paid. Vague criteria increase the likelihood of disagreement between the inspection team and contractor.<\/p><\/div><div class=\"schema-faq-section\" id=\"faq-question-como-especificar-equipamentos-sem-restringir-a-c-468ef9d8\"><strong class=\"schema-faq-question\">How can equipment be specified without restricting competition?<\/strong> <p class=\"schema-faq-answer\">Specifications should prioritize necessary performance, capacity, safety, compatibility and quality attributes. Where reference to a brand or model is permitted, it needs to be justified and objective equivalence criteria established.<\/p><\/div><div class=\"schema-faq-section\" id=\"faq-question-quando-revisar-um-tr-antes-de-publicar-o-edital-f86291bb\"><strong class=\"schema-faq-question\">When should Terms of Reference be reviewed before tender publication?<\/strong> <p class=\"schema-faq-answer\">Whenever the object is technically relevant or there are multiple designs and annexes. Independent review is especially useful in renovations, brownfield projects, multidisciplinary contracts, critical projects and situations with a history of changes or failed procurements.<\/p><\/div><div class=\"schema-faq-section\" id=\"faq-question-que-servi-o-contratar-para-elaborar-um-tr-de-obr-6830e507\"><strong class=\"schema-faq-question\">Which service should be contracted to prepare public-works Terms of Reference?<\/strong> <p class=\"schema-faq-answer\">Engineering consulting can be engaged to prepare the Terms of Reference, supported by Detailed Design, Due Diligence, record surveys or Owner\u2019s Engineering when the technical definition still needs to mature.<\/p><\/div><\/div>\n<\/details>\n\n\n\n<details class=\"wp-block-details is-layout-flow wp-block-details-is-layout-flow\"><summary>Complementary technical materials<\/summary>\n<h4 class=\"wp-block-heading\">Related solutions<\/h4>\n\n<ul class=\"wp-block-list\"><li><a href=\"https:\/\/a3aengenharia.com.br\/solucoes\/gestao-e-governanca-de-engenharia\/gestao-contratos-escopo-entregaveis\/\">Contract, Scope and Deliverables Management<\/a><\/li><li><a href=\"https:\/\/a3aengenharia.com.br\/solucoes\/gestao-e-governanca-de-engenharia\/gestao-requisitos-evidencias-criterios-aceite\/\">Requirements, Evidence and Acceptance Criteria Management<\/a><\/li><li><a href=\"https:\/\/a3aengenharia.com.br\/solucoes\/gestao-e-governanca-de-engenharia\/governanca-de-projetos-programas-e-portfolios\/\">Project, Program and Portfolio Governance<\/a><\/li><\/ul>\n\n<h4 class=\"wp-block-heading\">Related services<\/h4>\n\n<ul class=\"wp-block-list\"><li><a href=\"https:\/\/a3aengenharia.com.br\/servicos\/planejamento\/termo-referencia-obras-servicos-engenharia\/\">Terms of Reference for Construction Works and Engineering Services<\/a><\/li><li><a href=\"https:\/\/a3aengenharia.com.br\/servicos\/planejamento\/revisao-tecnica-termo-referencia-obras-servicos-engenharia\/\">Technical Review of Terms of Reference<\/a><\/li><li><a href=\"https:\/\/a3aengenharia.com.br\/servicos\/planejamento\/projeto-executivo\/\">Detailed Engineering Design<\/a><\/li><li><a href=\"https:\/\/a3aengenharia.com.br\/servicos\/planejamento\/revisao-tecnica-edital-anexos-licitacoes-engenharia\/\">Technical Review of Tender Documents and Annexes<\/a><\/li><li><a href=\"https:\/\/a3aengenharia.com.br\/servicos\/contratacao-integrada\/engenharia-do-proprietario\/\">Owner\u2019s Engineering<\/a><\/li><\/ul>\n\n<h4 class=\"wp-block-heading\">Main content on this topic<\/h4>\n\n<ul class=\"wp-block-list\"><li><a href=\"https:\/\/a3aengenharia.com.br\/conteudo\/artigos-tecnicos\/termo-de-referencia-engenharia-escopo-criterios-tecnicos-medicao-aceite\/\">Engineering Terms of Reference: scope, technical criteria, measurement and acceptance<\/a><\/li><li><a href=\"https:\/\/a3aengenharia.com.br\/conteudo\/artigos-tecnicos\/estudo-tecnico-preliminar-etp-obras-servicos-engenharia-contratacao\/\">Preliminary Technical Study for Construction Works and Engineering Services<\/a><\/li><li><a href=\"https:\/\/a3aengenharia.com.br\/conteudo\/artigos-tecnicos\/projeto-executivo-lei-14133-obra-sem-projeto\/\">Detailed Design under Law 14,133<\/a><\/li><li><a href=\"https:\/\/a3aengenharia.com.br\/conteudo\/artigos-tecnicos\/edital-licitacao-obras-servicos-engenharia-requisitos-tecnicos\/\">Tender Documents for Construction Works and Engineering Services<\/a><\/li><\/ul>\n\n<h4 class=\"wp-block-heading\">Related technical content<\/h4>\n\n<ul class=\"wp-block-list\"><li><a href=\"https:\/\/a3aengenharia.com.br\/conteudo\/artigos-tecnicos\/aditivo-contratual-obras-servicos-engenharia-lei-14133\/\">Contract Amendments in Construction Works and Engineering Services<\/a><\/li><li><a href=\"https:\/\/a3aengenharia.com.br\/conteudo\/artigos-tecnicos\/matriz-alocacao-riscos-contratos-engenharia-lei-14133\/\">Risk Allocation Matrix in Engineering Contracts<\/a><\/li><li><a href=\"https:\/\/a3aengenharia.com.br\/conteudo\/artigos-tecnicos\/escopo-contratual-engenharia-inclusoes-exclusoes-premissas\/\">Contract Scope in Engineering<\/a><\/li><li><a href=\"https:\/\/a3aengenharia.com.br\/conteudo\/artigos-tecnicos\/scope-of-work-sow-engenharia-como-definir-escopo-contratacao\/\">Scope of Work in Engineering<\/a><\/li><li><a href=\"https:\/\/a3aengenharia.com.br\/conteudo\/artigos-tecnicos\/empreitada-preco-global-unitario-diferencas-medicao-riscos\/\">Lump-Sum vs. Unit-Price Construction Contracts<\/a><\/li><li><a href=\"https:\/\/a3aengenharia.com.br\/conteudo\/artigos-tecnicos\/habilitacao-qualificacao-tecnica-licitacoes-engenharia\/\">Technical Eligibility and Qualification in Engineering Procurement<\/a><\/li><li><a href=\"https:\/\/a3aengenharia.com.br\/conteudo\/artigos-tecnicos\/plano-comissionamento-obras-publicas-testes-aceite\/\">Commissioning Plan for Public Works<\/a><\/li><li><a href=\"https:\/\/a3aengenharia.com.br\/conteudo\/guias-tecnicos\/guia-completo-sobre-licitacoes-e-contratos-de-engenharia\/\">Complete Guide to Public Procurement and Contracts for Construction Works and Engineering Services<\/a><\/li><li><a href=\"https:\/\/a3aengenharia.com.br\/conteudo\/whitepapers\/owners-engineering-framework-contratacao-governanca\/\">Owner\u2019s Engineering: executive framework for contracting and governance<\/a><\/li><\/ul>\n<\/details>\n","protected":false},"excerpt":{"rendered":"<p>Learn how to structure public-works Terms of Reference to reduce avoidable contract amendments: scope, designs, quantities, budget, measurement, risks, testing and acceptance.<\/p>\n","protected":false},"author":1,"featured_media":0,"parent":0,"template":"","meta":{"_a3a_global_related_solutions":[],"_a3a_global_related_services":[],"_a3a_global_related_materials":[],"_a3a_post_lang":"en-us","_a3a_translation_group_id":"09fec1a1-2d3c-4127-9e5a-1303ba494ccd","_a3a_i18n_canonical_slug":"public-works-terms-of-reference-avoid-contract-amendments"},"categories":[],"segments":[],"mercados":[],"etapas":[],"class_list":["post-74573","articles","type-articles","status-publish","hentry"],"_links":{"self":[{"href":"https:\/\/a3aengenharia.com\/en-us\/wp-json\/wp\/v2\/articles\/74573","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/a3aengenharia.com\/en-us\/wp-json\/wp\/v2\/articles"}],"about":[{"href":"https:\/\/a3aengenharia.com\/en-us\/wp-json\/wp\/v2\/types\/articles"}],"author":[{"embeddable":true,"href":"https:\/\/a3aengenharia.com\/en-us\/wp-json\/wp\/v2\/users\/1"}],"version-history":[{"count":1,"href":"https:\/\/a3aengenharia.com\/en-us\/wp-json\/wp\/v2\/articles\/74573\/revisions"}],"predecessor-version":[{"id":74579,"href":"https:\/\/a3aengenharia.com\/en-us\/wp-json\/wp\/v2\/articles\/74573\/revisions\/74579"}],"wp:attachment":[{"href":"https:\/\/a3aengenharia.com\/en-us\/wp-json\/wp\/v2\/media?parent=74573"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/a3aengenharia.com\/en-us\/wp-json\/wp\/v2\/categories?post=74573"},{"taxonomy":"segments","embeddable":true,"href":"https:\/\/a3aengenharia.com\/en-us\/wp-json\/wp\/v2\/segments?post=74573"},{"taxonomy":"mercados","embeddable":true,"href":"https:\/\/a3aengenharia.com\/en-us\/wp-json\/wp\/v2\/mercados?post=74573"},{"taxonomy":"etapas","embeddable":true,"href":"https:\/\/a3aengenharia.com\/en-us\/wp-json\/wp\/v2\/etapas?post=74573"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}