{"id":73964,"date":"2026-09-01T16:52:58","date_gmt":"2026-09-01T19:52:58","guid":{"rendered":"https:\/\/a3aengenharia.com\/?post_type=articles&#038;p=73964"},"modified":"2026-09-01T16:52:58","modified_gmt":"2026-09-01T19:52:58","slug":"industrial-automation-company-evaluate-hire-system-integrator","status":"publish","type":"articles","link":"https:\/\/a3aengenharia.com\/en-us\/content\/technical-articles\/industrial-automation-company-evaluate-hire-system-integrator\/","title":{"rendered":"Industrial Automation Company: How to Evaluate, Compare, and Hire a System Integrator"},"content":{"rendered":"\n<p class=\"wp-block-paragraph\">An industrial automation company should be evaluated by its ability to transform process requirements into a verifiable, integrable, and sustainable control solution throughout the life cycle \u2014 not merely by the PLC brand it uses or the lowest bid price. To procure safely, the owner needs to define scope and criteria before competition, qualify experience and team, compare architecture and licensing, level interfaces, require FAT\/SAT\/commissioning, and clearly establish documentation, file ownership, access, support, and acceptance criteria.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">What Does an Industrial Automation Company Do?<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">An industrial automation company may work across different parts of the engineering life cycle: field surveys, design, panel and equipment supply, controller programming, SCADA development, OT network integration, implementation, legacy-system migration, testing, commissioning, and support.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The problem is that the market uses expressions such as \u201cautomation company,\u201d \u201csystem integrator,\u201d \u201cautomation supplier,\u201d and \u201cautomation engineering\u201d for organizations with very different capabilities. Two companies may submit proposals for the same scope and, in practice, be offering technically incomparable packages.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Therefore, the first step in procurement is not to request a price. It is to understand <strong>which role the supplier must perform within the project architecture<\/strong>.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Engineering Consulting, System Integrators, and Manufacturers Are Not the Same<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">An engineering consultancy can define requirements, architecture, specifications, test criteria, and procurement strategy without necessarily supplying the solution. A system integrator typically develops and integrates hardware and software. A manufacturer or OEM masters its own product ecosystem. A panel builder may focus on panels and assembly. A commissioning specialist may participate as an independent verification party.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">These roles can coexist within the same company, but that capability must be demonstrated. The mere presence of a manufacturer&#8217;s logo in a commercial presentation does not prove multidisciplinary engineering, integration, interface management, or commissioning capability.<\/p>\n\n\n\n<figure class=\"a3a-mermaid\"><svg id=\"a3a-diagram-4\" width=\"100%\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" class=\"flowchart\" style=\"max-width:min(992.578125px, 100%);height:auto;display:block;margin:0 auto\" viewBox=\"0 0 992.578125 398.5\" role=\"graphics-document document\" aria-roledescription=\"flowchart-v2\" aria-labelledby=\"chart-title-a3a-diagram-4\"><title id=\"chart-title-a3a-diagram-4\">Typical roles in an industrial automation procurement ecosystem<\/title><style>#a3a-diagram-4{font-family:Roboto,sans-serif;font-size:15px;fill:var(--a3a-diag-text, #0a0a0a);}@keyframes edge-animation-frame{from{stroke-dashoffset:0;}}@keyframes dash{to{stroke-dashoffset:0;}}#a3a-diagram-4 .edge-animation-slow{stroke-dasharray:9,5!important;stroke-dashoffset:900;animation:dash 50s linear infinite;stroke-linecap:round;}#a3a-diagram-4 .edge-animation-fast{stroke-dasharray:9,5!important;stroke-dashoffset:900;animation:dash 20s linear infinite;stroke-linecap:round;}#a3a-diagram-4 .error-icon{fill:var(--a3a-diag-canvas, #ffffff);}#a3a-diagram-4 .error-text{fill:#000000;stroke:#000000;}#a3a-diagram-4 .edge-thickness-normal{stroke-width:1px;}#a3a-diagram-4 .edge-thickness-thick{stroke-width:3.5px;}#a3a-diagram-4 .edge-pattern-solid{stroke-dasharray:0;}#a3a-diagram-4 .edge-thickness-invisible{stroke-width:0;fill:none;}#a3a-diagram-4 .edge-pattern-dashed{stroke-dasharray:3;}#a3a-diagram-4 .edge-pattern-dotted{stroke-dasharray:2;}#a3a-diagram-4 .marker{fill:var(--a3a-diag-stroke, #2e42a2);stroke:var(--a3a-diag-stroke, #2e42a2);}#a3a-diagram-4 .marker.cross{stroke:var(--a3a-diag-stroke, #2e42a2);}#a3a-diagram-4 svg{font-family:Roboto,sans-serif;font-size:15px;}#a3a-diagram-4 p{margin:0;}#a3a-diagram-4 .label{font-family:Roboto,sans-serif;color:var(--a3a-diag-text, #0a0a0a);}#a3a-diagram-4 .cluster-label text{fill:var(--a3a-diag-title, #0124af);}#a3a-diagram-4 .cluster-label span{color:var(--a3a-diag-title, #0124af);}#a3a-diagram-4 .cluster-label span p{background-color:transparent;}#a3a-diagram-4 .label text,#a3a-diagram-4 span{fill:var(--a3a-diag-text, #0a0a0a);color:var(--a3a-diag-text, #0a0a0a);}#a3a-diagram-4 .node rect,#a3a-diagram-4 .node circle,#a3a-diagram-4 .node ellipse,#a3a-diagram-4 .node polygon,#a3a-diagram-4 .node path{fill:var(--a3a-diag-fill, #eef2fd);stroke:var(--a3a-diag-stroke, #2e42a2);stroke-width:1px;}#a3a-diagram-4 .rough-node .label text,#a3a-diagram-4 .node .label text,#a3a-diagram-4 .image-shape .label,#a3a-diagram-4 .icon-shape .label{text-anchor:middle;}#a3a-diagram-4 .node .katex path{fill:#000;stroke:#000;stroke-width:1px;}#a3a-diagram-4 .rough-node .label,#a3a-diagram-4 .node .label,#a3a-diagram-4 .image-shape .label,#a3a-diagram-4 .icon-shape .label{text-align:center;}#a3a-diagram-4 .node.clickable{cursor:pointer;}#a3a-diagram-4 .root .anchor path{fill:var(--a3a-diag-stroke, #2e42a2)!important;stroke-width:0;stroke:var(--a3a-diag-stroke, #2e42a2);}#a3a-diagram-4 .arrowheadPath{fill:var(--a3a-diag-stroke, #0b0b0b);}#a3a-diagram-4 .edgePath .path{stroke:var(--a3a-diag-stroke, #2e42a2);stroke-width:2.0px;}#a3a-diagram-4 .flowchart-link{stroke:var(--a3a-diag-stroke, #2e42a2);fill:none;}#a3a-diagram-4 .edgeLabel{background-color:var(--a3a-diag-canvas, #ffffff);text-align:center;}#a3a-diagram-4 .edgeLabel p{background-color:var(--a3a-diag-canvas, #ffffff);}#a3a-diagram-4 .edgeLabel rect{opacity:0.5;background-color:var(--a3a-diag-canvas, #ffffff);fill:var(--a3a-diag-canvas, #ffffff);}#a3a-diagram-4 .labelBkg{background-color:rgba(255, 255, 255, 0.5);}#a3a-diagram-4 .cluster rect{fill:var(--a3a-diag-surface, #f8f8f8);stroke:var(--a3a-diag-border, #e2e8f0);stroke-width:1px;}#a3a-diagram-4 .cluster text{fill:var(--a3a-diag-title, #0124af);}#a3a-diagram-4 .cluster span{color:var(--a3a-diag-title, #0124af);}#a3a-diagram-4 div.mermaidTooltip{position:absolute;text-align:center;max-width:200px;padding:2px;font-family:Roboto,sans-serif;font-size:12px;background:var(--a3a-diag-canvas, #ffffff);border:1px solid hsl(0, 0%, 90%);border-radius:2px;pointer-events:none;z-index:100;}#a3a-diagram-4 .flowchartTitleText{text-anchor:middle;font-size:18px;fill:var(--a3a-diag-text, #0a0a0a);}#a3a-diagram-4 rect.text{fill:none;stroke-width:0;}#a3a-diagram-4 .icon-shape,#a3a-diagram-4 .image-shape{background-color:var(--a3a-diag-canvas, #ffffff);text-align:center;}#a3a-diagram-4 .icon-shape p,#a3a-diagram-4 .image-shape p{background-color:var(--a3a-diag-canvas, #ffffff);padding:2px;}#a3a-diagram-4 .icon-shape rect,#a3a-diagram-4 .image-shape rect{opacity:0.5;background-color:var(--a3a-diag-canvas, #ffffff);fill:var(--a3a-diag-canvas, #ffffff);}#a3a-diagram-4 .label-icon{display:inline-block;height:1em;overflow:visible;vertical-align:-0.125em;}#a3a-diagram-4 .node .label-icon path{fill:currentColor;stroke:revert;stroke-width:revert;}#a3a-diagram-4 :root{--mermaid-font-family:Roboto,sans-serif;}<\/style><g><marker id=\"a3a-diagram-4_flowchart-v2-pointEnd\" class=\"marker flowchart-v2\" viewBox=\"0 0 10 10\" refX=\"5\" refY=\"5\" markerUnits=\"userSpaceOnUse\" markerWidth=\"8\" markerHeight=\"8\" orient=\"auto\"><path d=\"M 0 0 L 10 5 L 0 10 z\" class=\"arrowMarkerPath\" style=\"stroke-width: 1; stroke-dasharray: 1, 0;\"><\/path><\/marker><marker id=\"a3a-diagram-4_flowchart-v2-pointStart\" class=\"marker flowchart-v2\" viewBox=\"0 0 10 10\" refX=\"4.5\" refY=\"5\" markerUnits=\"userSpaceOnUse\" markerWidth=\"8\" markerHeight=\"8\" orient=\"auto\"><path d=\"M 0 5 L 10 10 L 10 0 z\" class=\"arrowMarkerPath\" style=\"stroke-width: 1; stroke-dasharray: 1, 0;\"><\/path><\/marker><marker id=\"a3a-diagram-4_flowchart-v2-circleEnd\" class=\"marker flowchart-v2\" viewBox=\"0 0 10 10\" refX=\"11\" refY=\"5\" markerUnits=\"userSpaceOnUse\" markerWidth=\"11\" markerHeight=\"11\" orient=\"auto\"><circle cx=\"5\" cy=\"5\" r=\"5\" class=\"arrowMarkerPath\" style=\"stroke-width: 1; stroke-dasharray: 1, 0;\"><\/circle><\/marker><marker id=\"a3a-diagram-4_flowchart-v2-circleStart\" class=\"marker flowchart-v2\" viewBox=\"0 0 10 10\" refX=\"-1\" refY=\"5\" markerUnits=\"userSpaceOnUse\" markerWidth=\"11\" markerHeight=\"11\" orient=\"auto\"><circle cx=\"5\" cy=\"5\" r=\"5\" class=\"arrowMarkerPath\" style=\"stroke-width: 1; stroke-dasharray: 1, 0;\"><\/circle><\/marker><marker id=\"a3a-diagram-4_flowchart-v2-crossEnd\" class=\"marker cross flowchart-v2\" viewBox=\"0 0 11 11\" refX=\"12\" refY=\"5.2\" markerUnits=\"userSpaceOnUse\" markerWidth=\"11\" markerHeight=\"11\" orient=\"auto\"><path d=\"M 1,1 l 9,9 M 10,1 l -9,9\" class=\"arrowMarkerPath\" style=\"stroke-width: 2; stroke-dasharray: 1, 0;\"><\/path><\/marker><marker id=\"a3a-diagram-4_flowchart-v2-crossStart\" class=\"marker cross flowchart-v2\" viewBox=\"0 0 11 11\" refX=\"-1\" refY=\"5.2\" markerUnits=\"userSpaceOnUse\" markerWidth=\"11\" markerHeight=\"11\" orient=\"auto\"><path d=\"M 1,1 l 9,9 M 10,1 l -9,9\" class=\"arrowMarkerPath\" style=\"stroke-width: 2; stroke-dasharray: 1, 0;\"><\/path><\/marker><g class=\"root\"><g class=\"clusters\"><\/g><g class=\"edgePaths\"><path d=\"M302.48,50.612L284.021,56.427C265.561,62.242,228.642,73.871,210.182,88.227C191.723,102.583,191.723,119.667,191.723,136.75C191.723,153.833,191.723,170.917,192.284,182.967C192.845,195.017,193.968,202.033,194.529,205.542L195.091,209.05\" id=\"L_A_B_0\" class=\"edge-thickness-normal edge-pattern-solid edge-thickness-normal edge-pattern-solid flowchart-link\" style=\";\" data-edge=\"true\" data-et=\"edge\" data-id=\"L_A_B_0\" data-points=\"W3sieCI6MzAyLjQ4MDQ2ODc1LCJ5Ijo1MC42MTIyOTk1Mjk0MzQzNn0seyJ4IjoxOTEuNzIyNjU2MjUsInkiOjg1LjV9LHsieCI6MTkxLjcyMjY1NjI1LCJ5IjoxMzYuNzV9LHsieCI6MTkxLjcyMjY1NjI1LCJ5IjoxODh9LHsieCI6MTk1LjcyMjY1NjI1LCJ5IjoyMTN9XQ==\" marker-end=\"url(#a3a-diagram-4_flowchart-v2-pointEnd)\"><\/path><path d=\"M356.753,60.5L357.122,64.667C357.491,68.833,358.23,77.167,358.599,89.875C358.969,102.583,358.969,119.667,358.969,136.75C358.969,153.833,358.969,170.917,370.758,185.208C382.548,199.499,406.127,210.998,417.917,216.747L429.706,222.497\" id=\"L_A_C_0\" class=\"edge-thickness-normal edge-pattern-solid edge-thickness-normal edge-pattern-solid flowchart-link\" style=\";\" data-edge=\"true\" data-et=\"edge\" data-id=\"L_A_C_0\" data-points=\"W3sieCI6MzU2Ljc1MjY2NzY4MjkyNjgsInkiOjYwLjV9LHsieCI6MzU4Ljk2ODc1LCJ5Ijo4NS41fSx7IngiOjM1OC45Njg3NSwieSI6MTM2Ljc1fSx7IngiOjM1OC45Njg3NSwieSI6MTg4fSx7IngiOjQzMy4zMDE2NDA2MjUsInkiOjIyNC4yNX1d\" marker-end=\"url(#a3a-diagram-4_flowchart-v2-pointEnd)\"><\/path><path d=\"M381.723,268.557L338.482,275.964C295.242,283.371,208.762,298.186,165.521,309.093C122.281,320,122.281,327,122.281,330.5L122.281,334\" id=\"L_C_D_0\" class=\"edge-thickness-normal edge-pattern-solid edge-thickness-normal edge-pattern-solid flowchart-link\" style=\";\" data-edge=\"true\" data-et=\"edge\" data-id=\"L_C_D_0\" data-points=\"W3sieCI6MzgxLjcyMjY1NjI1LCJ5IjoyNjguNTU2NTUxODU3MDQ2NX0seyJ4IjoxMjIuMjgxMjUsInkiOjMxM30seyJ4IjoxMjIuMjgxMjUsInkiOjMzOH1d\" marker-end=\"url(#a3a-diagram-4_flowchart-v2-pointEnd)\"><\/path><path d=\"M434.499,276.75L422.386,282.792C410.273,288.833,386.047,300.917,373.933,310.458C361.82,320,361.82,327,361.82,330.5L361.82,334\" id=\"L_C_E_0\" class=\"edge-thickness-normal edge-pattern-solid edge-thickness-normal edge-pattern-solid flowchart-link\" style=\";\" data-edge=\"true\" data-et=\"edge\" data-id=\"L_C_E_0\" data-points=\"W3sieCI6NDM0LjQ5OTI5Njg3NSwieSI6Mjc2Ljc1fSx7IngiOjM2MS44MjAzMTI1LCJ5IjozMTN9LHsieCI6MzYxLjgyMDMxMjUsInkiOjMzOH1d\" marker-end=\"url(#a3a-diagram-4_flowchart-v2-pointEnd)\"><\/path><path d=\"M539.759,276.75L551.872,282.792C563.985,288.833,588.211,300.917,600.324,310.458C612.438,320,612.438,327,612.438,330.5L612.438,334\" id=\"L_C_F_0\" class=\"edge-thickness-normal edge-pattern-solid edge-thickness-normal edge-pattern-solid flowchart-link\" style=\";\" data-edge=\"true\" data-et=\"edge\" data-id=\"L_C_F_0\" data-points=\"W3sieCI6NTM5Ljc1ODUxNTYyNSwieSI6Mjc2Ljc1fSx7IngiOjYxMi40Mzc1LCJ5IjozMTN9LHsieCI6NjEyLjQzNzUsInkiOjMzOH1d\" marker-end=\"url(#a3a-diagram-4_flowchart-v2-pointEnd)\"><\/path><path d=\"M592.535,267.009L641.477,274.674C690.419,282.339,788.303,297.67,837.245,308.835C886.188,320,886.188,327,886.188,330.5L886.188,334\" id=\"L_C_G_0\" class=\"edge-thickness-normal edge-pattern-solid edge-thickness-normal edge-pattern-solid flowchart-link\" style=\";\" data-edge=\"true\" data-et=\"edge\" data-id=\"L_C_G_0\" data-points=\"W3sieCI6NTkyLjUzNTE1NjI1LCJ5IjoyNjcuMDA4NTc5NzYyOTE4Nn0seyJ4Ijo4ODYuMTg3NSwieSI6MzEzfSx7IngiOjg4Ni4xODc1LCJ5IjozMzh9XQ==\" marker-end=\"url(#a3a-diagram-4_flowchart-v2-pointEnd)\"><\/path><path d=\"M406.371,43.931L443.546,50.859C480.72,57.787,555.069,71.644,592.243,82.072C629.418,92.5,629.418,99.5,629.418,103L629.418,106.5\" id=\"L_A_H_0\" class=\"edge-thickness-normal edge-pattern-solid edge-thickness-normal edge-pattern-solid flowchart-link\" style=\";\" data-edge=\"true\" data-et=\"edge\" data-id=\"L_A_H_0\" data-points=\"W3sieCI6NDA2LjM3MTA5Mzc1LCJ5Ijo0My45MzA5OTIzNTc3Mzc0NH0seyJ4Ijo2MjkuNDE3OTY4NzUsInkiOjg1LjV9LHsieCI6NjI5LjQxNzk2ODc1LCJ5IjoxMTAuNX1d\" marker-end=\"url(#a3a-diagram-4_flowchart-v2-pointEnd)\"><\/path><path d=\"M530.16,154.264L498.295,159.887C466.43,165.509,402.699,176.755,362.291,186.268C321.883,195.781,304.797,203.562,296.254,207.452L287.711,211.342\" id=\"L_H_B_0\" class=\"edge-thickness-normal edge-pattern-solid edge-thickness-normal edge-pattern-solid flowchart-link\" style=\";\" data-edge=\"true\" data-et=\"edge\" data-id=\"L_H_B_0\" data-points=\"W3sieCI6NTMwLjE2MDE1NjI1LCJ5IjoxNTQuMjY0MTIxNDQ0NDIyMDJ9LHsieCI6MzM4Ljk2ODc1LCJ5IjoxODh9LHsieCI6Mjg0LjA3MDMxMjUsInkiOjIxM31d\" marker-end=\"url(#a3a-diagram-4_flowchart-v2-pointEnd)\"><\/path><path d=\"M621.523,163L620.27,167.167C619.017,171.333,616.51,179.667,603.591,189.58C590.671,199.494,567.338,210.988,555.671,216.735L544.005,222.482\" id=\"L_H_C_0\" class=\"edge-thickness-normal edge-pattern-solid edge-thickness-normal edge-pattern-solid flowchart-link\" style=\";\" data-edge=\"true\" data-et=\"edge\" data-id=\"L_H_C_0\" data-points=\"W3sieCI6NjIxLjUyMjk2MTEyODA0ODgsInkiOjE2M30seyJ4Ijo2MTQuMDAzOTA2MjUsInkiOjE4OH0seyJ4Ijo1NDAuNDE2NDA2MjUsInkiOjIyNC4yNX1d\" marker-end=\"url(#a3a-diagram-4_flowchart-v2-pointEnd)\"><\/path><path d=\"M692.098,163L702.047,167.167C711.996,171.333,731.895,179.667,741.844,189.208C751.793,198.75,751.793,209.5,751.793,214.875L751.793,220.25\" id=\"L_H_I_0\" class=\"edge-thickness-normal edge-pattern-solid edge-thickness-normal edge-pattern-solid flowchart-link\" style=\";\" data-edge=\"true\" data-et=\"edge\" data-id=\"L_H_I_0\" data-points=\"W3sieCI6NjkyLjA5Nzg0Njc5ODc4MDQsInkiOjE2M30seyJ4Ijo3NTEuNzkyOTY4NzUsInkiOjE4OH0seyJ4Ijo3NTEuNzkyOTY4NzUsInkiOjIyNC4yNX1d\" marker-end=\"url(#a3a-diagram-4_flowchart-v2-pointEnd)\"><\/path><\/g><g class=\"edgeLabels\"><g class=\"edgeLabel\"><g class=\"label\" data-id=\"L_A_B_0\" transform=\"translate(0, 0)\"><foreignObject width=\"0\" height=\"0\"><div xmlns=\"http:\/\/www.w3.org\/1999\/xhtml\" class=\"labelBkg\" style=\"display: table-cell; white-space: nowrap; line-height: 1.5; max-width: 200px; text-align: center;\"><span class=\"edgeLabel\"><\/span><\/div><\/foreignObject><\/g><\/g><g class=\"edgeLabel\"><g class=\"label\" data-id=\"L_A_C_0\" transform=\"translate(0, 0)\"><foreignObject width=\"0\" height=\"0\"><div xmlns=\"http:\/\/www.w3.org\/1999\/xhtml\" class=\"labelBkg\" style=\"display: table-cell; white-space: nowrap; line-height: 1.5; max-width: 200px; text-align: center;\"><span class=\"edgeLabel\"><\/span><\/div><\/foreignObject><\/g><\/g><g class=\"edgeLabel\"><g class=\"label\" data-id=\"L_C_D_0\" transform=\"translate(0, 0)\"><foreignObject width=\"0\" height=\"0\"><div xmlns=\"http:\/\/www.w3.org\/1999\/xhtml\" class=\"labelBkg\" style=\"display: table-cell; white-space: nowrap; line-height: 1.5; max-width: 200px; text-align: center;\"><span class=\"edgeLabel\"><\/span><\/div><\/foreignObject><\/g><\/g><g class=\"edgeLabel\"><g class=\"label\" data-id=\"L_C_E_0\" transform=\"translate(0, 0)\"><foreignObject width=\"0\" height=\"0\"><div xmlns=\"http:\/\/www.w3.org\/1999\/xhtml\" class=\"labelBkg\" style=\"display: table-cell; white-space: nowrap; line-height: 1.5; max-width: 200px; text-align: center;\"><span class=\"edgeLabel\"><\/span><\/div><\/foreignObject><\/g><\/g><g class=\"edgeLabel\"><g class=\"label\" data-id=\"L_C_F_0\" transform=\"translate(0, 0)\"><foreignObject width=\"0\" height=\"0\"><div xmlns=\"http:\/\/www.w3.org\/1999\/xhtml\" class=\"labelBkg\" style=\"display: table-cell; white-space: nowrap; line-height: 1.5; max-width: 200px; text-align: center;\"><span class=\"edgeLabel\"><\/span><\/div><\/foreignObject><\/g><\/g><g class=\"edgeLabel\"><g class=\"label\" data-id=\"L_C_G_0\" transform=\"translate(0, 0)\"><foreignObject width=\"0\" height=\"0\"><div xmlns=\"http:\/\/www.w3.org\/1999\/xhtml\" class=\"labelBkg\" style=\"display: table-cell; white-space: nowrap; line-height: 1.5; max-width: 200px; text-align: center;\"><span class=\"edgeLabel\"><\/span><\/div><\/foreignObject><\/g><\/g><g class=\"edgeLabel\"><g class=\"label\" data-id=\"L_A_H_0\" transform=\"translate(0, 0)\"><foreignObject width=\"0\" height=\"0\"><div xmlns=\"http:\/\/www.w3.org\/1999\/xhtml\" class=\"labelBkg\" style=\"display: table-cell; white-space: nowrap; line-height: 1.5; max-width: 200px; text-align: center;\"><span class=\"edgeLabel\"><\/span><\/div><\/foreignObject><\/g><\/g><g class=\"edgeLabel\"><g class=\"label\" data-id=\"L_H_B_0\" transform=\"translate(0, 0)\"><foreignObject width=\"0\" height=\"0\"><div xmlns=\"http:\/\/www.w3.org\/1999\/xhtml\" class=\"labelBkg\" style=\"display: table-cell; white-space: nowrap; line-height: 1.5; max-width: 200px; text-align: center;\"><span class=\"edgeLabel\"><\/span><\/div><\/foreignObject><\/g><\/g><g class=\"edgeLabel\"><g class=\"label\" data-id=\"L_H_C_0\" transform=\"translate(0, 0)\"><foreignObject width=\"0\" height=\"0\"><div xmlns=\"http:\/\/www.w3.org\/1999\/xhtml\" class=\"labelBkg\" style=\"display: table-cell; white-space: nowrap; line-height: 1.5; max-width: 200px; text-align: center;\"><span class=\"edgeLabel\"><\/span><\/div><\/foreignObject><\/g><\/g><g class=\"edgeLabel\"><g class=\"label\" data-id=\"L_H_I_0\" transform=\"translate(0, 0)\"><foreignObject width=\"0\" height=\"0\"><div xmlns=\"http:\/\/www.w3.org\/1999\/xhtml\" class=\"labelBkg\" style=\"display: table-cell; white-space: nowrap; line-height: 1.5; max-width: 200px; text-align: center;\"><span class=\"edgeLabel\"><\/span><\/div><\/foreignObject><\/g><\/g><\/g><g class=\"nodes\"><g class=\"node default\" id=\"flowchart-A-0\" transform=\"translate(354.42578125, 34.25)\"><rect class=\"basic label-container\" style=\"\" x=\"-51.9453125\" y=\"-26.25\" width=\"103.890625\" height=\"52.5\"><\/rect><g class=\"label\" style=\"\" transform=\"translate(-21.9453125, -11.25)\"><rect><\/rect><foreignObject width=\"43.890625\" height=\"22.5\"><div xmlns=\"http:\/\/www.w3.org\/1999\/xhtml\" style=\"display: table-cell; white-space: nowrap; line-height: 1.5; max-width: 200px; text-align: center;\"><span class=\"nodeLabel\"><p>Owner<\/p><\/span><\/div><\/foreignObject><\/g><\/g><g class=\"node default\" id=\"flowchart-B-1\" transform=\"translate(201.72265625, 250.5)\"><rect class=\"basic label-container\" style=\"\" x=\"-130\" y=\"-37.5\" width=\"260\" height=\"75\"><\/rect><g class=\"label\" style=\"\" transform=\"translate(-100, -22.5)\"><rect><\/rect><foreignObject width=\"200\" height=\"45\"><div xmlns=\"http:\/\/www.w3.org\/1999\/xhtml\" style=\"display: table; white-space: break-spaces; line-height: 1.5; max-width: 200px; text-align: center; width: 200px;\"><span class=\"nodeLabel\"><p>Engineering and requirements<\/p><\/span><\/div><\/foreignObject><\/g><\/g><g class=\"node default\" id=\"flowchart-C-3\" transform=\"translate(487.12890625, 250.5)\"><rect class=\"basic label-container\" style=\"\" x=\"-105.40625\" y=\"-26.25\" width=\"210.8125\" height=\"52.5\"><\/rect><g class=\"label\" style=\"\" transform=\"translate(-75.40625, -11.25)\"><rect><\/rect><foreignObject width=\"150.8125\" height=\"22.5\"><div xmlns=\"http:\/\/www.w3.org\/1999\/xhtml\" style=\"display: table-cell; white-space: nowrap; line-height: 1.5; max-width: 200px; text-align: center;\"><span class=\"nodeLabel\"><p>Automation integrator<\/p><\/span><\/div><\/foreignObject><\/g><\/g><g class=\"node default\" id=\"flowchart-D-5\" transform=\"translate(122.28125, 364.25)\"><rect class=\"basic label-container\" style=\"\" x=\"-114.28125\" y=\"-26.25\" width=\"228.5625\" height=\"52.5\"><\/rect><g class=\"label\" style=\"\" transform=\"translate(-84.28125, -11.25)\"><rect><\/rect><foreignObject width=\"168.5625\" height=\"22.5\"><div xmlns=\"http:\/\/www.w3.org\/1999\/xhtml\" style=\"display: table-cell; white-space: nowrap; line-height: 1.5; max-width: 200px; text-align: center;\"><span class=\"nodeLabel\"><p>Manufacturers and OEMs<\/p><\/span><\/div><\/foreignObject><\/g><\/g><g class=\"node default\" id=\"flowchart-E-7\" transform=\"translate(361.8203125, 364.25)\"><rect class=\"basic label-container\" style=\"\" x=\"-75.2578125\" y=\"-26.25\" width=\"150.515625\" height=\"52.5\"><\/rect><g class=\"label\" style=\"\" transform=\"translate(-45.2578125, -11.25)\"><rect><\/rect><foreignObject width=\"90.515625\" height=\"22.5\"><div xmlns=\"http:\/\/www.w3.org\/1999\/xhtml\" style=\"display: table-cell; white-space: nowrap; line-height: 1.5; max-width: 200px; text-align: center;\"><span class=\"nodeLabel\"><p>Panel builder<\/p><\/span><\/div><\/foreignObject><\/g><\/g><g class=\"node default\" id=\"flowchart-F-9\" transform=\"translate(612.4375, 364.25)\"><rect class=\"basic label-container\" style=\"\" x=\"-125.359375\" y=\"-26.25\" width=\"250.71875\" height=\"52.5\"><\/rect><g class=\"label\" style=\"\" transform=\"translate(-95.359375, -11.25)\"><rect><\/rect><foreignObject width=\"190.71875\" height=\"22.5\"><div xmlns=\"http:\/\/www.w3.org\/1999\/xhtml\" style=\"display: table-cell; white-space: nowrap; line-height: 1.5; max-width: 200px; text-align: center;\"><span class=\"nodeLabel\"><p>Networks and infrastructure<\/p><\/span><\/div><\/foreignObject><\/g><\/g><g class=\"node default\" id=\"flowchart-G-11\" transform=\"translate(886.1875, 364.25)\"><rect class=\"basic label-container\" style=\"\" x=\"-98.390625\" y=\"-26.25\" width=\"196.78125\" height=\"52.5\"><\/rect><g class=\"label\" style=\"\" transform=\"translate(-68.390625, -11.25)\"><rect><\/rect><foreignObject width=\"136.78125\" height=\"22.5\"><div xmlns=\"http:\/\/www.w3.org\/1999\/xhtml\" style=\"display: table-cell; white-space: nowrap; line-height: 1.5; max-width: 200px; text-align: center;\"><span class=\"nodeLabel\"><p>Software and SCADA<\/p><\/span><\/div><\/foreignObject><\/g><\/g><g class=\"node default\" id=\"flowchart-H-13\" transform=\"translate(629.41796875, 136.75)\"><rect class=\"basic label-container\" style=\"\" x=\"-99.2578125\" y=\"-26.25\" width=\"198.515625\" height=\"52.5\"><\/rect><g class=\"label\" style=\"\" transform=\"translate(-69.2578125, -11.25)\"><rect><\/rect><foreignObject width=\"138.515625\" height=\"22.5\"><div xmlns=\"http:\/\/www.w3.org\/1999\/xhtml\" style=\"display: table-cell; white-space: nowrap; line-height: 1.5; max-width: 200px; text-align: center;\"><span class=\"nodeLabel\"><p>Owner&#8217;s Engineering<\/p><\/span><\/div><\/foreignObject><\/g><\/g><g class=\"node default\" id=\"flowchart-I-19\" transform=\"translate(751.79296875, 250.5)\"><rect class=\"basic label-container\" style=\"\" x=\"-109.2578125\" y=\"-26.25\" width=\"218.515625\" height=\"52.5\"><\/rect><g class=\"label\" style=\"\" transform=\"translate(-79.2578125, -11.25)\"><rect><\/rect><foreignObject width=\"158.515625\" height=\"22.5\"><div xmlns=\"http:\/\/www.w3.org\/1999\/xhtml\" style=\"display: table-cell; white-space: nowrap; line-height: 1.5; max-width: 200px; text-align: center;\"><span class=\"nodeLabel\"><p>Testing and acceptance<\/p><\/span><\/div><\/foreignObject><\/g><\/g><\/g><\/g><\/g><\/svg><figcaption>Typical roles in an industrial automation procurement ecosystem<\/figcaption><\/figure>\n\n\n\n<h2 class=\"wp-block-heading\">When to Hire an Industrial Automation Company<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Hiring is necessary when a project needs to transform operating requirements into an implemented system or when an existing installation requires modernization, integration, expansion, or recovery of technical control.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Typical cases include new plants, process-line expansion, replacement of obsolete PLCs or SCADA systems, industrial-network migration, integration of equipment from different suppliers, deployment of historians, telemetry, supervisory systems, controlled remote access, and data collection for IIoT applications.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">In brownfield facilities, the need is usually more complex. The integrator must understand the legacy environment, preserve production, plan intervention windows, provide rollback capability, and control versions. In this scenario, field experience and migration methodology weigh as much as programming capability.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Before the RFP: the Owner Must Define the Problem<\/h2>\n\n\n\n<div class=\"wp-block-a3a-destaque\">\n<p class=\"wp-block-paragraph\">Requesting prices before defining requirements transfers engineering to the bidders and produces incomparable proposals. A well-structured technical scope, RFP, and evaluation criteria reduce gaps before the contract.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><a href=\"https:\/\/a3aengenharia.com.br\/conteudo\/artigos-tecnicos\/rfp-engenharia-escopo-requisitos-criterios-selecao\/\">See how to structure an Engineering RFP<\/a><\/p>\n<\/div>\n\n\n\n<p class=\"wp-block-paragraph\">Requesting a proposal based on a short description such as \u201cmodernize the automation system\u201d transfers responsibility for interpreting the scope to each supplier. The inevitable result is different solutions, non-comparable prices, and scope disputes during execution.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Procurement should begin with a minimum technical basis: existing condition, objectives, boundaries, required functions, interfaces, performance criteria, available documentation, operational constraints, and test requirements.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Existing-Condition Survey<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">In brownfield projects, existing documents must be checked against field conditions. Diagrams, I\/O lists, topologies, addressing, firmware and software versions, licenses, backups, panels, and devices may have been modified without corresponding document updates.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The survey should also identify less-visible dependencies: old servers, protocol converters, engineering workstations, dongles or physical licenses, time-synchronization clocks, unmanaged switches, and temporary connections that became permanent.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Requirements Definition<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Functional requirements should explain what the system will do and under which conditions. Non-functional requirements address performance, availability, security, retention, redundancy, expansion, diagnostics, and life cycle.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Verifiable criteria turn the proposal into a technical commitment. If a requirement merely says that the solution will be \u201cmodern,\u201d \u201crobust,\u201d or \u201chighly available,\u201d objective evaluation becomes difficult.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The pillar article on <a href=\"https:\/\/a3aengenharia.com.br\/conteudo\/artigos-tecnicos\/automacao-industrial-o-que-e-arquitetura-sistemas-aplicacoes\/\">industrial automation and its engineering architecture<\/a> explores in greater depth the layers that need to be considered before procurement.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">How to Structure the Scope for Comparable Proposals<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">The scope should clearly separate supply, engineering, development, installation, integration, testing, documentation, training, and support. It should also identify exclusions and interfaces with electrical, instrumentation, telecommunications, IT, process, mechanical, and operations disciplines.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">A well-structured <a href=\"https:\/\/a3aengenharia.com.br\/conteudo\/artigos-tecnicos\/scope-of-work-sow-escopo-trabalho-engenharia\/\">Engineering Scope of Work<\/a> reduces the number of hidden commercial assumptions in proposals and makes responsibilities visible before contract signature.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Battery Limits and Boundaries<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">The supply boundary needs to indicate where each party&#8217;s responsibility ends. Who provides power? Who pulls cables? Who configures switches? Who provides IP addresses? Who integrates third-party equipment? Who updates firmware? Who provides VM, storage, or operating system? Who provides process signals for FAT?<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Questions that appear minor become claims or delays when they are not answered before award.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Interface Matrix<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">An interface matrix records the discipline, information or resource, provider, receiver, due date, and closure criterion. It is especially important when there are separate electrical, instrumentation, telecommunications, IT, machine, and automation packages.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The integrator&#8217;s maturity can be observed in how it handles interfaces. Companies that assume \u201cthe client provides that\u201d without recording dependencies tend to move the discussion to the field.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">How to Qualify Industrial Automation Companies<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Technical qualification should verify fit with the scope, not merely company size. An integrator that excels at serial machinery may not have experience with distributed systems in a brownfield plant; a company strong in SCADA may not master instrumentation or OT networks; another may know the hardware but lack the engineering and documentation processes required by the project.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Relevant Experience<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Cases should be evaluated by similarity in complexity, criticality, technologies, interfaces, and operating environment. The raw number of projects is less important than the correspondence between prior experience and the risks of the new scope.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">It is useful to request examples of architectures, test procedures, final documentation, and migration approaches \u2014 while naturally preserving confidential information from other clients.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Key Team<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">The proposal should identify those responsible for engineering, development, networks, cybersecurity, commissioning, and project management when these functions are relevant.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Manufacturer certifications help demonstrate product knowledge, but do not replace project experience, process understanding, and integration capability. Likewise, a strong r\u00e9sum\u00e9 from one professional does not prove that the individual will actually be allocated to the contract.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Support and Life-Cycle Capability<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Automation does not end at acceptance. The owner needs to assess support availability, version management, replacement capability, manufacturer relationships, remote and onsite service structure, response time, and obsolescence strategy.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Architecture Before Brand<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">A technical proposal should explain the architecture and the decisions supporting the solution. When the response is merely an equipment list, there is still insufficient evidence that the supplier understood requirements and interfaces.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Topology, redundancy, controllers, servers, storage, workstations, networks, protocols, synchronization, integrations, security zones, and failure behavior need to be analyzed.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Vendor Lock-In and Technical Dependence<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Proprietary ecosystems are not necessarily inappropriate. The problem arises when the owner discovers only after implementation that expansion, maintenance, or access to project files depends exclusively on the original integrator.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Procurement should clarify project formats, ownership of code and configurations, engineering licenses, administrative passwords, certificates, backups, required tools, and manufacturer-support limits.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Standardization versus Interoperability<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Standardizing technologies can reduce inventory, training, and complexity. However, standardization should not prevent legitimate integration with third-party equipment. Interfaces need to be specified and tested.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Protocols such as <a href=\"https:\/\/a3aengenharia.com.br\/conteudo\/artigos-tecnicos\/opc-ua-o-que-e-seguranca-integracao-scada-modbus-mqtt\/\">OPC UA<\/a> can reduce dependence on ad hoc integrations, while legacy protocols such as <a href=\"https:\/\/a3aengenharia.com.br\/conteudo\/artigos-tecnicos\/modbus-o-que-e-rtu-tcp-seguranca-industrial\/\">Modbus<\/a> require careful documentation of registers, scaling, and failure handling.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">How to Compare Technical Proposals<\/h2>\n\n\n\n<div class=\"wp-block-a3a-destaque\">\n<p class=\"wp-block-paragraph\">In automation, the lowest proposal may simply be the one that left the most items out. TBE records compliance, deviations, and alternatives before commercial leveling and helps turn price comparison into comparison of equivalent scope.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><a href=\"https:\/\/a3aengenharia.com.br\/conteudo\/artigos-tecnicos\/tbe-technical-bid-evaluation-engenharia\/\">Explore technical proposal evaluation with TBE<\/a><\/p>\n<\/div>\n\n\n\n<p class=\"wp-block-paragraph\">Comparison should occur before commercial leveling. If one proposal includes redundancy, testing, licenses, and complete documentation while another does not, comparing only total price rewards incomplete scope.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><a href=\"https:\/\/a3aengenharia.com.br\/conteudo\/artigos-tecnicos\/tbe-technical-bid-evaluation-engenharia\/\">Technical Bid Evaluation \u2014 TBE<\/a> is useful for translating requirements into compliance criteria, recording deviations, and building a common technical basis for negotiation.<\/p>\n\n\n\n<figure class=\"a3a-mermaid\"><svg id=\"a3a-diagram-5\" width=\"100%\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" class=\"flowchart\" style=\"max-width:min(1722.828125px, 100%);height:auto;display:block;margin:0 auto\" viewBox=\"0 0 1722.828125 68.5\" role=\"graphics-document document\" aria-roledescription=\"flowchart-v2\" aria-labelledby=\"chart-title-a3a-diagram-5\"><title id=\"chart-title-a3a-diagram-5\">Recommended funnel for selecting an industrial automation company<\/title><style>#a3a-diagram-5{font-family:Roboto,sans-serif;font-size:15px;fill:var(--a3a-diag-text, #0a0a0a);}@keyframes edge-animation-frame{from{stroke-dashoffset:0;}}@keyframes dash{to{stroke-dashoffset:0;}}#a3a-diagram-5 .edge-animation-slow{stroke-dasharray:9,5!important;stroke-dashoffset:900;animation:dash 50s linear infinite;stroke-linecap:round;}#a3a-diagram-5 .edge-animation-fast{stroke-dasharray:9,5!important;stroke-dashoffset:900;animation:dash 20s linear infinite;stroke-linecap:round;}#a3a-diagram-5 .error-icon{fill:var(--a3a-diag-canvas, #ffffff);}#a3a-diagram-5 .error-text{fill:#000000;stroke:#000000;}#a3a-diagram-5 .edge-thickness-normal{stroke-width:1px;}#a3a-diagram-5 .edge-thickness-thick{stroke-width:3.5px;}#a3a-diagram-5 .edge-pattern-solid{stroke-dasharray:0;}#a3a-diagram-5 .edge-thickness-invisible{stroke-width:0;fill:none;}#a3a-diagram-5 .edge-pattern-dashed{stroke-dasharray:3;}#a3a-diagram-5 .edge-pattern-dotted{stroke-dasharray:2;}#a3a-diagram-5 .marker{fill:var(--a3a-diag-stroke, #2e42a2);stroke:var(--a3a-diag-stroke, #2e42a2);}#a3a-diagram-5 .marker.cross{stroke:var(--a3a-diag-stroke, #2e42a2);}#a3a-diagram-5 svg{font-family:Roboto,sans-serif;font-size:15px;}#a3a-diagram-5 p{margin:0;}#a3a-diagram-5 .label{font-family:Roboto,sans-serif;color:var(--a3a-diag-text, #0a0a0a);}#a3a-diagram-5 .cluster-label text{fill:var(--a3a-diag-title, #0124af);}#a3a-diagram-5 .cluster-label span{color:var(--a3a-diag-title, #0124af);}#a3a-diagram-5 .cluster-label span p{background-color:transparent;}#a3a-diagram-5 .label text,#a3a-diagram-5 span{fill:var(--a3a-diag-text, #0a0a0a);color:var(--a3a-diag-text, #0a0a0a);}#a3a-diagram-5 .node rect,#a3a-diagram-5 .node circle,#a3a-diagram-5 .node ellipse,#a3a-diagram-5 .node polygon,#a3a-diagram-5 .node path{fill:var(--a3a-diag-fill, #eef2fd);stroke:var(--a3a-diag-stroke, #2e42a2);stroke-width:1px;}#a3a-diagram-5 .rough-node .label text,#a3a-diagram-5 .node .label text,#a3a-diagram-5 .image-shape .label,#a3a-diagram-5 .icon-shape .label{text-anchor:middle;}#a3a-diagram-5 .node .katex path{fill:#000;stroke:#000;stroke-width:1px;}#a3a-diagram-5 .rough-node .label,#a3a-diagram-5 .node .label,#a3a-diagram-5 .image-shape .label,#a3a-diagram-5 .icon-shape .label{text-align:center;}#a3a-diagram-5 .node.clickable{cursor:pointer;}#a3a-diagram-5 .root .anchor path{fill:var(--a3a-diag-stroke, #2e42a2)!important;stroke-width:0;stroke:var(--a3a-diag-stroke, #2e42a2);}#a3a-diagram-5 .arrowheadPath{fill:var(--a3a-diag-stroke, #0b0b0b);}#a3a-diagram-5 .edgePath .path{stroke:var(--a3a-diag-stroke, #2e42a2);stroke-width:2.0px;}#a3a-diagram-5 .flowchart-link{stroke:var(--a3a-diag-stroke, #2e42a2);fill:none;}#a3a-diagram-5 .edgeLabel{background-color:var(--a3a-diag-canvas, #ffffff);text-align:center;}#a3a-diagram-5 .edgeLabel p{background-color:var(--a3a-diag-canvas, #ffffff);}#a3a-diagram-5 .edgeLabel rect{opacity:0.5;background-color:var(--a3a-diag-canvas, #ffffff);fill:var(--a3a-diag-canvas, #ffffff);}#a3a-diagram-5 .labelBkg{background-color:rgba(255, 255, 255, 0.5);}#a3a-diagram-5 .cluster rect{fill:var(--a3a-diag-surface, #f8f8f8);stroke:var(--a3a-diag-border, #e2e8f0);stroke-width:1px;}#a3a-diagram-5 .cluster text{fill:var(--a3a-diag-title, #0124af);}#a3a-diagram-5 .cluster span{color:var(--a3a-diag-title, #0124af);}#a3a-diagram-5 div.mermaidTooltip{position:absolute;text-align:center;max-width:200px;padding:2px;font-family:Roboto,sans-serif;font-size:12px;background:var(--a3a-diag-canvas, #ffffff);border:1px solid hsl(0, 0%, 90%);border-radius:2px;pointer-events:none;z-index:100;}#a3a-diagram-5 .flowchartTitleText{text-anchor:middle;font-size:18px;fill:var(--a3a-diag-text, #0a0a0a);}#a3a-diagram-5 rect.text{fill:none;stroke-width:0;}#a3a-diagram-5 .icon-shape,#a3a-diagram-5 .image-shape{background-color:var(--a3a-diag-canvas, #ffffff);text-align:center;}#a3a-diagram-5 .icon-shape p,#a3a-diagram-5 .image-shape p{background-color:var(--a3a-diag-canvas, #ffffff);padding:2px;}#a3a-diagram-5 .icon-shape rect,#a3a-diagram-5 .image-shape rect{opacity:0.5;background-color:var(--a3a-diag-canvas, #ffffff);fill:var(--a3a-diag-canvas, #ffffff);}#a3a-diagram-5 .label-icon{display:inline-block;height:1em;overflow:visible;vertical-align:-0.125em;}#a3a-diagram-5 .node .label-icon path{fill:currentColor;stroke:revert;stroke-width:revert;}#a3a-diagram-5 :root{--mermaid-font-family:Roboto,sans-serif;}<\/style><g><marker id=\"a3a-diagram-5_flowchart-v2-pointEnd\" class=\"marker flowchart-v2\" viewBox=\"0 0 10 10\" refX=\"5\" refY=\"5\" markerUnits=\"userSpaceOnUse\" markerWidth=\"8\" markerHeight=\"8\" orient=\"auto\"><path d=\"M 0 0 L 10 5 L 0 10 z\" class=\"arrowMarkerPath\" style=\"stroke-width: 1; stroke-dasharray: 1, 0;\"><\/path><\/marker><marker id=\"a3a-diagram-5_flowchart-v2-pointStart\" class=\"marker flowchart-v2\" viewBox=\"0 0 10 10\" refX=\"4.5\" refY=\"5\" markerUnits=\"userSpaceOnUse\" markerWidth=\"8\" markerHeight=\"8\" orient=\"auto\"><path d=\"M 0 5 L 10 10 L 10 0 z\" class=\"arrowMarkerPath\" style=\"stroke-width: 1; stroke-dasharray: 1, 0;\"><\/path><\/marker><marker id=\"a3a-diagram-5_flowchart-v2-circleEnd\" class=\"marker flowchart-v2\" viewBox=\"0 0 10 10\" refX=\"11\" refY=\"5\" markerUnits=\"userSpaceOnUse\" markerWidth=\"11\" markerHeight=\"11\" orient=\"auto\"><circle cx=\"5\" cy=\"5\" r=\"5\" class=\"arrowMarkerPath\" style=\"stroke-width: 1; stroke-dasharray: 1, 0;\"><\/circle><\/marker><marker id=\"a3a-diagram-5_flowchart-v2-circleStart\" class=\"marker flowchart-v2\" viewBox=\"0 0 10 10\" refX=\"-1\" refY=\"5\" markerUnits=\"userSpaceOnUse\" markerWidth=\"11\" markerHeight=\"11\" orient=\"auto\"><circle cx=\"5\" cy=\"5\" r=\"5\" class=\"arrowMarkerPath\" style=\"stroke-width: 1; stroke-dasharray: 1, 0;\"><\/circle><\/marker><marker id=\"a3a-diagram-5_flowchart-v2-crossEnd\" class=\"marker cross flowchart-v2\" viewBox=\"0 0 11 11\" refX=\"12\" refY=\"5.2\" markerUnits=\"userSpaceOnUse\" markerWidth=\"11\" markerHeight=\"11\" orient=\"auto\"><path d=\"M 1,1 l 9,9 M 10,1 l -9,9\" class=\"arrowMarkerPath\" style=\"stroke-width: 2; stroke-dasharray: 1, 0;\"><\/path><\/marker><marker id=\"a3a-diagram-5_flowchart-v2-crossStart\" class=\"marker cross flowchart-v2\" viewBox=\"0 0 11 11\" refX=\"-1\" refY=\"5.2\" markerUnits=\"userSpaceOnUse\" markerWidth=\"11\" markerHeight=\"11\" orient=\"auto\"><path d=\"M 1,1 l 9,9 M 10,1 l -9,9\" class=\"arrowMarkerPath\" style=\"stroke-width: 2; stroke-dasharray: 1, 0;\"><\/path><\/marker><g class=\"root\"><g class=\"clusters\"><\/g><g class=\"edgePaths\"><path d=\"M162.719,34.25L166.885,34.25C171.052,34.25,179.385,34.25,187.052,34.25C194.719,34.25,201.719,34.25,205.219,34.25L208.719,34.25\" id=\"L_A_B_0\" class=\"edge-thickness-normal edge-pattern-solid edge-thickness-normal edge-pattern-solid flowchart-link\" style=\";\" data-edge=\"true\" data-et=\"edge\" data-id=\"L_A_B_0\" data-points=\"W3sieCI6MTYyLjcxODc1LCJ5IjozNC4yNX0seyJ4IjoxODcuNzE4NzUsInkiOjM0LjI1fSx7IngiOjIxMi43MTg3NSwieSI6MzQuMjV9XQ==\" marker-end=\"url(#a3a-diagram-5_flowchart-v2-pointEnd)\"><\/path><path d=\"M365.375,34.25L369.542,34.25C373.708,34.25,382.042,34.25,389.708,34.25C397.375,34.25,404.375,34.25,407.875,34.25L411.375,34.25\" id=\"L_B_C_0\" class=\"edge-thickness-normal edge-pattern-solid edge-thickness-normal edge-pattern-solid flowchart-link\" style=\";\" data-edge=\"true\" data-et=\"edge\" data-id=\"L_B_C_0\" data-points=\"W3sieCI6MzY1LjM3NSwieSI6MzQuMjV9LHsieCI6MzkwLjM3NSwieSI6MzQuMjV9LHsieCI6NDE1LjM3NSwieSI6MzQuMjV9XQ==\" marker-end=\"url(#a3a-diagram-5_flowchart-v2-pointEnd)\"><\/path><path d=\"M562.109,34.25L566.276,34.25C570.443,34.25,578.776,34.25,586.443,34.25C594.109,34.25,601.109,34.25,604.609,34.25L608.109,34.25\" id=\"L_C_D_0\" class=\"edge-thickness-normal edge-pattern-solid edge-thickness-normal edge-pattern-solid flowchart-link\" style=\";\" data-edge=\"true\" data-et=\"edge\" data-id=\"L_C_D_0\" data-points=\"W3sieCI6NTYyLjEwOTM3NSwieSI6MzQuMjV9LHsieCI6NTg3LjEwOTM3NSwieSI6MzQuMjV9LHsieCI6NjEyLjEwOTM3NSwieSI6MzQuMjV9XQ==\" marker-end=\"url(#a3a-diagram-5_flowchart-v2-pointEnd)\"><\/path><path d=\"M697.016,34.25L701.182,34.25C705.349,34.25,713.682,34.25,721.349,34.25C729.016,34.25,736.016,34.25,739.516,34.25L743.016,34.25\" id=\"L_D_E_0\" class=\"edge-thickness-normal edge-pattern-solid edge-thickness-normal edge-pattern-solid flowchart-link\" style=\";\" data-edge=\"true\" data-et=\"edge\" data-id=\"L_D_E_0\" data-points=\"W3sieCI6Njk3LjAxNTYyNSwieSI6MzQuMjV9LHsieCI6NzIyLjAxNTYyNSwieSI6MzQuMjV9LHsieCI6NzQ3LjAxNTYyNSwieSI6MzQuMjV9XQ==\" marker-end=\"url(#a3a-diagram-5_flowchart-v2-pointEnd)\"><\/path><path d=\"M895.781,34.25L899.948,34.25C904.115,34.25,912.448,34.25,920.115,34.25C927.781,34.25,934.781,34.25,938.281,34.25L941.781,34.25\" id=\"L_E_F_0\" class=\"edge-thickness-normal edge-pattern-solid edge-thickness-normal edge-pattern-solid flowchart-link\" style=\";\" data-edge=\"true\" data-et=\"edge\" data-id=\"L_E_F_0\" data-points=\"W3sieCI6ODk1Ljc4MTI1LCJ5IjozNC4yNX0seyJ4Ijo5MjAuNzgxMjUsInkiOjM0LjI1fSx7IngiOjk0NS43ODEyNSwieSI6MzQuMjV9XQ==\" marker-end=\"url(#a3a-diagram-5_flowchart-v2-pointEnd)\"><\/path><path d=\"M1126.422,34.25L1130.589,34.25C1134.755,34.25,1143.089,34.25,1150.755,34.25C1158.422,34.25,1165.422,34.25,1168.922,34.25L1172.422,34.25\" id=\"L_F_G_0\" class=\"edge-thickness-normal edge-pattern-solid edge-thickness-normal edge-pattern-solid flowchart-link\" style=\";\" data-edge=\"true\" data-et=\"edge\" data-id=\"L_F_G_0\" data-points=\"W3sieCI6MTEyNi40MjE4NzUsInkiOjM0LjI1fSx7IngiOjExNTEuNDIxODc1LCJ5IjozNC4yNX0seyJ4IjoxMTc2LjQyMTg3NSwieSI6MzQuMjV9XQ==\" marker-end=\"url(#a3a-diagram-5_flowchart-v2-pointEnd)\"><\/path><path d=\"M1373.438,34.25L1377.604,34.25C1381.771,34.25,1390.104,34.25,1397.771,34.25C1405.438,34.25,1412.438,34.25,1415.938,34.25L1419.438,34.25\" id=\"L_G_H_0\" class=\"edge-thickness-normal edge-pattern-solid edge-thickness-normal edge-pattern-solid flowchart-link\" style=\";\" data-edge=\"true\" data-et=\"edge\" data-id=\"L_G_H_0\" data-points=\"W3sieCI6MTM3My40Mzc1LCJ5IjozNC4yNX0seyJ4IjoxMzk4LjQzNzUsInkiOjM0LjI1fSx7IngiOjE0MjMuNDM3NSwieSI6MzQuMjV9XQ==\" marker-end=\"url(#a3a-diagram-5_flowchart-v2-pointEnd)\"><\/path><path d=\"M1563.188,34.25L1567.354,34.25C1571.521,34.25,1579.854,34.25,1587.521,34.25C1595.188,34.25,1602.188,34.25,1605.688,34.25L1609.188,34.25\" id=\"L_H_I_0\" class=\"edge-thickness-normal edge-pattern-solid edge-thickness-normal edge-pattern-solid flowchart-link\" style=\";\" data-edge=\"true\" data-et=\"edge\" data-id=\"L_H_I_0\" data-points=\"W3sieCI6MTU2My4xODc1LCJ5IjozNC4yNX0seyJ4IjoxNTg4LjE4NzUsInkiOjM0LjI1fSx7IngiOjE2MTMuMTg3NSwieSI6MzQuMjV9XQ==\" marker-end=\"url(#a3a-diagram-5_flowchart-v2-pointEnd)\"><\/path><\/g><g class=\"edgeLabels\"><g class=\"edgeLabel\"><g class=\"label\" data-id=\"L_A_B_0\" transform=\"translate(0, 0)\"><foreignObject width=\"0\" height=\"0\"><div xmlns=\"http:\/\/www.w3.org\/1999\/xhtml\" class=\"labelBkg\" style=\"display: table-cell; white-space: nowrap; line-height: 1.5; max-width: 200px; text-align: center;\"><span class=\"edgeLabel\"><\/span><\/div><\/foreignObject><\/g><\/g><g class=\"edgeLabel\"><g class=\"label\" data-id=\"L_B_C_0\" transform=\"translate(0, 0)\"><foreignObject width=\"0\" height=\"0\"><div xmlns=\"http:\/\/www.w3.org\/1999\/xhtml\" class=\"labelBkg\" style=\"display: table-cell; white-space: nowrap; line-height: 1.5; max-width: 200px; text-align: center;\"><span class=\"edgeLabel\"><\/span><\/div><\/foreignObject><\/g><\/g><g class=\"edgeLabel\"><g class=\"label\" data-id=\"L_C_D_0\" transform=\"translate(0, 0)\"><foreignObject width=\"0\" height=\"0\"><div xmlns=\"http:\/\/www.w3.org\/1999\/xhtml\" class=\"labelBkg\" style=\"display: table-cell; white-space: nowrap; line-height: 1.5; max-width: 200px; text-align: center;\"><span class=\"edgeLabel\"><\/span><\/div><\/foreignObject><\/g><\/g><g class=\"edgeLabel\"><g class=\"label\" data-id=\"L_D_E_0\" transform=\"translate(0, 0)\"><foreignObject width=\"0\" height=\"0\"><div xmlns=\"http:\/\/www.w3.org\/1999\/xhtml\" class=\"labelBkg\" style=\"display: table-cell; white-space: nowrap; line-height: 1.5; max-width: 200px; text-align: center;\"><span class=\"edgeLabel\"><\/span><\/div><\/foreignObject><\/g><\/g><g class=\"edgeLabel\"><g class=\"label\" data-id=\"L_E_F_0\" transform=\"translate(0, 0)\"><foreignObject width=\"0\" height=\"0\"><div xmlns=\"http:\/\/www.w3.org\/1999\/xhtml\" class=\"labelBkg\" style=\"display: table-cell; white-space: nowrap; line-height: 1.5; max-width: 200px; text-align: center;\"><span class=\"edgeLabel\"><\/span><\/div><\/foreignObject><\/g><\/g><g class=\"edgeLabel\"><g class=\"label\" data-id=\"L_F_G_0\" transform=\"translate(0, 0)\"><foreignObject width=\"0\" height=\"0\"><div xmlns=\"http:\/\/www.w3.org\/1999\/xhtml\" class=\"labelBkg\" style=\"display: table-cell; white-space: nowrap; line-height: 1.5; max-width: 200px; text-align: center;\"><span class=\"edgeLabel\"><\/span><\/div><\/foreignObject><\/g><\/g><g class=\"edgeLabel\"><g class=\"label\" data-id=\"L_G_H_0\" transform=\"translate(0, 0)\"><foreignObject width=\"0\" height=\"0\"><div xmlns=\"http:\/\/www.w3.org\/1999\/xhtml\" class=\"labelBkg\" style=\"display: table-cell; white-space: nowrap; line-height: 1.5; max-width: 200px; text-align: center;\"><span class=\"edgeLabel\"><\/span><\/div><\/foreignObject><\/g><\/g><g class=\"edgeLabel\"><g class=\"label\" data-id=\"L_H_I_0\" transform=\"translate(0, 0)\"><foreignObject width=\"0\" height=\"0\"><div xmlns=\"http:\/\/www.w3.org\/1999\/xhtml\" class=\"labelBkg\" style=\"display: table-cell; white-space: nowrap; line-height: 1.5; max-width: 200px; text-align: center;\"><span class=\"edgeLabel\"><\/span><\/div><\/foreignObject><\/g><\/g><\/g><g class=\"nodes\"><g class=\"node default\" id=\"flowchart-A-0\" transform=\"translate(85.359375, 34.25)\"><rect class=\"basic label-container\" style=\"\" x=\"-77.359375\" y=\"-26.25\" width=\"154.71875\" height=\"52.5\"><\/rect><g class=\"label\" style=\"\" transform=\"translate(-47.359375, -11.25)\"><rect><\/rect><foreignObject width=\"94.71875\" height=\"22.5\"><div xmlns=\"http:\/\/www.w3.org\/1999\/xhtml\" style=\"display: table-cell; white-space: nowrap; line-height: 1.5; max-width: 200px; text-align: center;\"><span class=\"nodeLabel\"><p>Requirements<\/p><\/span><\/div><\/foreignObject><\/g><\/g><g class=\"node default\" id=\"flowchart-B-1\" transform=\"translate(289.046875, 34.25)\"><rect class=\"basic label-container\" style=\"\" x=\"-76.328125\" y=\"-26.25\" width=\"152.65625\" height=\"52.5\"><\/rect><g class=\"label\" style=\"\" transform=\"translate(-46.328125, -11.25)\"><rect><\/rect><foreignObject width=\"92.65625\" height=\"22.5\"><div xmlns=\"http:\/\/www.w3.org\/1999\/xhtml\" style=\"display: table-cell; white-space: nowrap; line-height: 1.5; max-width: 200px; text-align: center;\"><span class=\"nodeLabel\"><p>Technical RFP<\/p><\/span><\/div><\/foreignObject><\/g><\/g><g class=\"node default\" id=\"flowchart-C-2\" transform=\"translate(488.7421875, 34.25)\"><rect class=\"basic label-container\" style=\"\" x=\"-73.3671875\" y=\"-26.25\" width=\"146.734375\" height=\"52.5\"><\/rect><g class=\"label\" style=\"\" transform=\"translate(-43.3671875, -11.25)\"><rect><\/rect><foreignObject width=\"86.734375\" height=\"22.5\"><div xmlns=\"http:\/\/www.w3.org\/1999\/xhtml\" style=\"display: table-cell; white-space: nowrap; line-height: 1.5; max-width: 200px; text-align: center;\"><span class=\"nodeLabel\"><p>Qualification<\/p><\/span><\/div><\/foreignObject><\/g><\/g><g class=\"node default\" id=\"flowchart-D-3\" transform=\"translate(654.5625, 34.25)\"><rect class=\"basic label-container\" style=\"\" x=\"-42.453125\" y=\"-26.25\" width=\"84.90625\" height=\"52.5\"><\/rect><g class=\"label\" style=\"\" transform=\"translate(-12.453125, -11.25)\"><rect><\/rect><foreignObject width=\"24.90625\" height=\"22.5\"><div xmlns=\"http:\/\/www.w3.org\/1999\/xhtml\" style=\"display: table-cell; white-space: nowrap; line-height: 1.5; max-width: 200px; text-align: center;\"><span class=\"nodeLabel\"><p>TBE<\/p><\/span><\/div><\/foreignObject><\/g><\/g><g class=\"node default\" id=\"flowchart-E-4\" transform=\"translate(821.3984375, 34.25)\"><rect class=\"basic label-container\" style=\"\" x=\"-74.3828125\" y=\"-26.25\" width=\"148.765625\" height=\"52.5\"><\/rect><g class=\"label\" style=\"\" transform=\"translate(-44.3828125, -11.25)\"><rect><\/rect><foreignObject width=\"88.765625\" height=\"22.5\"><div xmlns=\"http:\/\/www.w3.org\/1999\/xhtml\" style=\"display: table-cell; white-space: nowrap; line-height: 1.5; max-width: 200px; text-align: center;\"><span class=\"nodeLabel\"><p>Clarifications<\/p><\/span><\/div><\/foreignObject><\/g><\/g><g class=\"node default\" id=\"flowchart-F-5\" transform=\"translate(1036.1015625, 34.25)\"><rect class=\"basic label-container\" style=\"\" x=\"-90.3203125\" y=\"-26.25\" width=\"180.640625\" height=\"52.5\"><\/rect><g class=\"label\" style=\"\" transform=\"translate(-60.3203125, -11.25)\"><rect><\/rect><foreignObject width=\"120.640625\" height=\"22.5\"><div xmlns=\"http:\/\/www.w3.org\/1999\/xhtml\" style=\"display: table-cell; white-space: nowrap; line-height: 1.5; max-width: 200px; text-align: center;\"><span class=\"nodeLabel\"><p>Technical leveling<\/p><\/span><\/div><\/foreignObject><\/g><\/g><g class=\"node default\" id=\"flowchart-G-6\" transform=\"translate(1274.9296875, 34.25)\"><rect class=\"basic label-container\" style=\"\" x=\"-98.5078125\" y=\"-26.25\" width=\"197.015625\" height=\"52.5\"><\/rect><g class=\"label\" style=\"\" transform=\"translate(-68.5078125, -11.25)\"><rect><\/rect><foreignObject width=\"137.015625\" height=\"22.5\"><div xmlns=\"http:\/\/www.w3.org\/1999\/xhtml\" style=\"display: table-cell; white-space: nowrap; line-height: 1.5; max-width: 200px; text-align: center;\"><span class=\"nodeLabel\"><p>Commercial leveling<\/p><\/span><\/div><\/foreignObject><\/g><\/g><g class=\"node default\" id=\"flowchart-H-7\" transform=\"translate(1493.3125, 34.25)\"><rect class=\"basic label-container\" style=\"\" x=\"-69.875\" y=\"-26.25\" width=\"139.75\" height=\"52.5\"><\/rect><g class=\"label\" style=\"\" transform=\"translate(-39.875, -11.25)\"><rect><\/rect><foreignObject width=\"79.75\" height=\"22.5\"><div xmlns=\"http:\/\/www.w3.org\/1999\/xhtml\" style=\"display: table-cell; white-space: nowrap; line-height: 1.5; max-width: 200px; text-align: center;\"><span class=\"nodeLabel\"><p>Negotiation<\/p><\/span><\/div><\/foreignObject><\/g><\/g><g class=\"node default\" id=\"flowchart-I-8\" transform=\"translate(1664.0078125, 34.25)\"><rect class=\"basic label-container\" style=\"\" x=\"-50.8203125\" y=\"-26.25\" width=\"101.640625\" height=\"52.5\"><\/rect><g class=\"label\" style=\"\" transform=\"translate(-20.8203125, -11.25)\"><rect><\/rect><foreignObject width=\"41.640625\" height=\"22.5\"><div xmlns=\"http:\/\/www.w3.org\/1999\/xhtml\" style=\"display: table-cell; white-space: nowrap; line-height: 1.5; max-width: 200px; text-align: center;\"><span class=\"nodeLabel\"><p>Award<\/p><\/span><\/div><\/foreignObject><\/g><\/g><\/g><\/g><\/g><\/svg><figcaption>Recommended funnel for selecting an industrial automation company<\/figcaption><\/figure>\n\n\n\n<h3 class=\"wp-block-heading\">Compliance, Deviation, and Alternative<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Each relevant requirement should receive a clear classification. An item may be compliant, partially compliant, noncompliant, or proposed as a technical alternative. Alternatives can be valuable, but they should not be silently mixed into the base proposal.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">It is advisable to require the bidder to explicitly declare all deviations. Without this discipline, limitations may appear only after contract award.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Mandatory and Scored Criteria<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Not everything should become a score. Minimum safety, compatibility, capacity, documentation, or qualification requirements may be mandatory. Other aspects, such as expansion capability, diagnostic resources, or implementation methodology, may receive scores.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Separating these two groups prevents a secondary advantage from compensating for a critical nonconformity.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Commercial Leveling Only Makes Sense after Technical Leveling<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">The lowest nominal price does not necessarily represent the lowest cost. Proposals may differ in licenses, engineering hours, number of screens, tags, servers, redundancy, FAT, travel, testing, training, documentation, and support.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Leveling should identify included, optional, excluded, and conditional items. Only then is it possible to compare CAPEX and, where relevant, life-cycle cost.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Licensing<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Understanding the licensing metric is essential. Some platforms license by tag, connection, driver, server, client, redundancy, history, user, or functional module.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The owner should understand both the initial configuration and the foreseeable expansion cost. A solution that is inexpensive to purchase can become costly if every expansion requires a new license package.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Engineering Hours and Assumptions<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Proposals with very few hours may conceal a simplified scope. It is important to understand which documents will be produced, how many revisions are included, how workshops, tests, and meetings will be conducted, and what assumption is used for third-party integration.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Cybersecurity Must Be Part of Integrator Qualification<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">The security of the solution depends on both architecture and supplier processes. The integrator will have privileged access to controllers, servers, engineering workstations, networks, and backups. Therefore, its security maturity is part of technical qualification.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">IEC 62443-2-4:2023 specifically addresses security-program requirements for IACS service providers during integration and maintenance activities. This is directly applicable to evaluating integrators and service providers working on automation systems.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">What to Evaluate<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Depending on project risk, due diligence may include:<\/p>\n\n\n\n<ul class=\"wp-block-list\"><li>credential and privileged-account control;<\/li><li>remote-access process;<\/li><li>management of laptops and engineering workstations;<\/li><li>vulnerability handling;<\/li><li>backup and configuration protection;<\/li><li>removable-media control;<\/li><li>change management;<\/li><li>activity logging;<\/li><li>incident-response process;<\/li><li>separation between development and production environments.<\/li><\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">Not every procurement needs to become an extensive cybersecurity audit. Depth should be proportional to system criticality and exposure.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">FAT: the First Evidence That the Solution Meets the Contract<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">FAT should be defined during procurement. Leaving test definition until after development creates a conflict of interest: the same supplier that implemented the solution then decides what will be considered sufficient for approval.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The procedure should derive from requirements and describe preconditions, steps, expected results, evidence, responsibilities, and treatment of nonconformities.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">What Can Be Tested at the Factory<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Depending on the project, FAT can verify:<\/p>\n\n\n\n<ul class=\"wp-block-list\"><li>logical architecture and versions;<\/li><li>startup and recovery;<\/li><li>screens and navigation;<\/li><li>alarms and events;<\/li><li>sequences and interlocks;<\/li><li>communication among controllers;<\/li><li>redundancy;<\/li><li>histories;<\/li><li>users and permissions;<\/li><li>simulated integration;<\/li><li>backups;<\/li><li>documentation and punch lists.<\/li><\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">Not everything can be reproduced outside the plant. The procedure needs to clearly identify what remains for SAT and commissioning.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">SAT, Commissioning, and Acceptance<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">After implementation, SAT verifies the solution in the real environment. Commissioning broadens the analysis to interfaces and integrated system behavior under operating and failure conditions.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The content on <a href=\"https:\/\/a3aengenharia.com.br\/conteudo\/artigos-tecnicos\/comissionamento-sistemas-criticos-prontos-para-operar\/\">Industrial Commissioning<\/a> details pre-commissioning, cold testing, hot testing, start-up, and readiness. When hiring the integrator, these milestones need to be connected to responsibilities and acceptance criteria.<\/p>\n\n\n\n<figure class=\"a3a-mermaid\"><svg id=\"a3a-diagram-6\" width=\"100%\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" class=\"flowchart\" style=\"max-width:min(1853.1875px, 100%);height:auto;display:block;margin:0 auto\" viewBox=\"0 0 1853.1875 68.5\" role=\"graphics-document document\" aria-roledescription=\"flowchart-v2\" aria-labelledby=\"chart-title-a3a-diagram-6\"><title id=\"chart-title-a3a-diagram-6\">Governance of automation delivery through technical acceptance<\/title><style>#a3a-diagram-6{font-family:Roboto,sans-serif;font-size:15px;fill:var(--a3a-diag-text, #0a0a0a);}@keyframes edge-animation-frame{from{stroke-dashoffset:0;}}@keyframes dash{to{stroke-dashoffset:0;}}#a3a-diagram-6 .edge-animation-slow{stroke-dasharray:9,5!important;stroke-dashoffset:900;animation:dash 50s linear infinite;stroke-linecap:round;}#a3a-diagram-6 .edge-animation-fast{stroke-dasharray:9,5!important;stroke-dashoffset:900;animation:dash 20s linear infinite;stroke-linecap:round;}#a3a-diagram-6 .error-icon{fill:var(--a3a-diag-canvas, #ffffff);}#a3a-diagram-6 .error-text{fill:#000000;stroke:#000000;}#a3a-diagram-6 .edge-thickness-normal{stroke-width:1px;}#a3a-diagram-6 .edge-thickness-thick{stroke-width:3.5px;}#a3a-diagram-6 .edge-pattern-solid{stroke-dasharray:0;}#a3a-diagram-6 .edge-thickness-invisible{stroke-width:0;fill:none;}#a3a-diagram-6 .edge-pattern-dashed{stroke-dasharray:3;}#a3a-diagram-6 .edge-pattern-dotted{stroke-dasharray:2;}#a3a-diagram-6 .marker{fill:var(--a3a-diag-stroke, #2e42a2);stroke:var(--a3a-diag-stroke, #2e42a2);}#a3a-diagram-6 .marker.cross{stroke:var(--a3a-diag-stroke, #2e42a2);}#a3a-diagram-6 svg{font-family:Roboto,sans-serif;font-size:15px;}#a3a-diagram-6 p{margin:0;}#a3a-diagram-6 .label{font-family:Roboto,sans-serif;color:var(--a3a-diag-text, #0a0a0a);}#a3a-diagram-6 .cluster-label text{fill:var(--a3a-diag-title, #0124af);}#a3a-diagram-6 .cluster-label span{color:var(--a3a-diag-title, #0124af);}#a3a-diagram-6 .cluster-label span p{background-color:transparent;}#a3a-diagram-6 .label text,#a3a-diagram-6 span{fill:var(--a3a-diag-text, #0a0a0a);color:var(--a3a-diag-text, #0a0a0a);}#a3a-diagram-6 .node rect,#a3a-diagram-6 .node circle,#a3a-diagram-6 .node ellipse,#a3a-diagram-6 .node polygon,#a3a-diagram-6 .node path{fill:var(--a3a-diag-fill, #eef2fd);stroke:var(--a3a-diag-stroke, #2e42a2);stroke-width:1px;}#a3a-diagram-6 .rough-node .label text,#a3a-diagram-6 .node .label text,#a3a-diagram-6 .image-shape .label,#a3a-diagram-6 .icon-shape .label{text-anchor:middle;}#a3a-diagram-6 .node .katex path{fill:#000;stroke:#000;stroke-width:1px;}#a3a-diagram-6 .rough-node .label,#a3a-diagram-6 .node .label,#a3a-diagram-6 .image-shape .label,#a3a-diagram-6 .icon-shape .label{text-align:center;}#a3a-diagram-6 .node.clickable{cursor:pointer;}#a3a-diagram-6 .root .anchor path{fill:var(--a3a-diag-stroke, #2e42a2)!important;stroke-width:0;stroke:var(--a3a-diag-stroke, #2e42a2);}#a3a-diagram-6 .arrowheadPath{fill:var(--a3a-diag-stroke, #0b0b0b);}#a3a-diagram-6 .edgePath .path{stroke:var(--a3a-diag-stroke, #2e42a2);stroke-width:2.0px;}#a3a-diagram-6 .flowchart-link{stroke:var(--a3a-diag-stroke, #2e42a2);fill:none;}#a3a-diagram-6 .edgeLabel{background-color:var(--a3a-diag-canvas, #ffffff);text-align:center;}#a3a-diagram-6 .edgeLabel p{background-color:var(--a3a-diag-canvas, #ffffff);}#a3a-diagram-6 .edgeLabel rect{opacity:0.5;background-color:var(--a3a-diag-canvas, #ffffff);fill:var(--a3a-diag-canvas, #ffffff);}#a3a-diagram-6 .labelBkg{background-color:rgba(255, 255, 255, 0.5);}#a3a-diagram-6 .cluster rect{fill:var(--a3a-diag-surface, #f8f8f8);stroke:var(--a3a-diag-border, #e2e8f0);stroke-width:1px;}#a3a-diagram-6 .cluster text{fill:var(--a3a-diag-title, #0124af);}#a3a-diagram-6 .cluster span{color:var(--a3a-diag-title, #0124af);}#a3a-diagram-6 div.mermaidTooltip{position:absolute;text-align:center;max-width:200px;padding:2px;font-family:Roboto,sans-serif;font-size:12px;background:var(--a3a-diag-canvas, #ffffff);border:1px solid hsl(0, 0%, 90%);border-radius:2px;pointer-events:none;z-index:100;}#a3a-diagram-6 .flowchartTitleText{text-anchor:middle;font-size:18px;fill:var(--a3a-diag-text, #0a0a0a);}#a3a-diagram-6 rect.text{fill:none;stroke-width:0;}#a3a-diagram-6 .icon-shape,#a3a-diagram-6 .image-shape{background-color:var(--a3a-diag-canvas, #ffffff);text-align:center;}#a3a-diagram-6 .icon-shape p,#a3a-diagram-6 .image-shape p{background-color:var(--a3a-diag-canvas, #ffffff);padding:2px;}#a3a-diagram-6 .icon-shape rect,#a3a-diagram-6 .image-shape rect{opacity:0.5;background-color:var(--a3a-diag-canvas, #ffffff);fill:var(--a3a-diag-canvas, #ffffff);}#a3a-diagram-6 .label-icon{display:inline-block;height:1em;overflow:visible;vertical-align:-0.125em;}#a3a-diagram-6 .node .label-icon path{fill:currentColor;stroke:revert;stroke-width:revert;}#a3a-diagram-6 :root{--mermaid-font-family:Roboto,sans-serif;}<\/style><g><marker id=\"a3a-diagram-6_flowchart-v2-pointEnd\" class=\"marker flowchart-v2\" viewBox=\"0 0 10 10\" refX=\"5\" refY=\"5\" markerUnits=\"userSpaceOnUse\" markerWidth=\"8\" markerHeight=\"8\" orient=\"auto\"><path d=\"M 0 0 L 10 5 L 0 10 z\" class=\"arrowMarkerPath\" style=\"stroke-width: 1; stroke-dasharray: 1, 0;\"><\/path><\/marker><marker id=\"a3a-diagram-6_flowchart-v2-pointStart\" class=\"marker flowchart-v2\" viewBox=\"0 0 10 10\" refX=\"4.5\" refY=\"5\" markerUnits=\"userSpaceOnUse\" markerWidth=\"8\" markerHeight=\"8\" orient=\"auto\"><path d=\"M 0 5 L 10 10 L 10 0 z\" class=\"arrowMarkerPath\" style=\"stroke-width: 1; stroke-dasharray: 1, 0;\"><\/path><\/marker><marker id=\"a3a-diagram-6_flowchart-v2-circleEnd\" class=\"marker flowchart-v2\" viewBox=\"0 0 10 10\" refX=\"11\" refY=\"5\" markerUnits=\"userSpaceOnUse\" markerWidth=\"11\" markerHeight=\"11\" orient=\"auto\"><circle cx=\"5\" cy=\"5\" r=\"5\" class=\"arrowMarkerPath\" style=\"stroke-width: 1; stroke-dasharray: 1, 0;\"><\/circle><\/marker><marker id=\"a3a-diagram-6_flowchart-v2-circleStart\" class=\"marker flowchart-v2\" viewBox=\"0 0 10 10\" refX=\"-1\" refY=\"5\" markerUnits=\"userSpaceOnUse\" markerWidth=\"11\" markerHeight=\"11\" orient=\"auto\"><circle cx=\"5\" cy=\"5\" r=\"5\" class=\"arrowMarkerPath\" style=\"stroke-width: 1; stroke-dasharray: 1, 0;\"><\/circle><\/marker><marker id=\"a3a-diagram-6_flowchart-v2-crossEnd\" class=\"marker cross flowchart-v2\" viewBox=\"0 0 11 11\" refX=\"12\" refY=\"5.2\" markerUnits=\"userSpaceOnUse\" markerWidth=\"11\" markerHeight=\"11\" orient=\"auto\"><path d=\"M 1,1 l 9,9 M 10,1 l -9,9\" class=\"arrowMarkerPath\" style=\"stroke-width: 2; stroke-dasharray: 1, 0;\"><\/path><\/marker><marker id=\"a3a-diagram-6_flowchart-v2-crossStart\" class=\"marker cross flowchart-v2\" viewBox=\"0 0 11 11\" refX=\"-1\" refY=\"5.2\" markerUnits=\"userSpaceOnUse\" markerWidth=\"11\" markerHeight=\"11\" orient=\"auto\"><path d=\"M 1,1 l 9,9 M 10,1 l -9,9\" class=\"arrowMarkerPath\" style=\"stroke-width: 2; stroke-dasharray: 1, 0;\"><\/path><\/marker><g class=\"root\"><g class=\"clusters\"><\/g><g class=\"edgePaths\"><path d=\"M148.453,34.25L152.62,34.25C156.786,34.25,165.12,34.25,172.786,34.25C180.453,34.25,187.453,34.25,190.953,34.25L194.453,34.25\" id=\"L_A_B_0\" class=\"edge-thickness-normal edge-pattern-solid edge-thickness-normal edge-pattern-solid flowchart-link\" style=\";\" data-edge=\"true\" data-et=\"edge\" data-id=\"L_A_B_0\" data-points=\"W3sieCI6MTQ4LjQ1MzEyNSwieSI6MzQuMjV9LHsieCI6MTczLjQ1MzEyNSwieSI6MzQuMjV9LHsieCI6MTk4LjQ1MzEyNSwieSI6MzQuMjV9XQ==\" marker-end=\"url(#a3a-diagram-6_flowchart-v2-pointEnd)\"><\/path><path d=\"M348.953,34.25L353.12,34.25C357.286,34.25,365.62,34.25,373.286,34.25C380.953,34.25,387.953,34.25,391.453,34.25L394.953,34.25\" id=\"L_B_C_0\" class=\"edge-thickness-normal edge-pattern-solid edge-thickness-normal edge-pattern-solid flowchart-link\" style=\";\" data-edge=\"true\" data-et=\"edge\" data-id=\"L_B_C_0\" data-points=\"W3sieCI6MzQ4Ljk1MzEyNSwieSI6MzQuMjV9LHsieCI6MzczLjk1MzEyNSwieSI6MzQuMjV9LHsieCI6Mzk4Ljk1MzEyNSwieSI6MzQuMjV9XQ==\" marker-end=\"url(#a3a-diagram-6_flowchart-v2-pointEnd)\"><\/path><path d=\"M481.172,34.25L485.339,34.25C489.505,34.25,497.839,34.25,505.505,34.25C513.172,34.25,520.172,34.25,523.672,34.25L527.172,34.25\" id=\"L_C_D_0\" class=\"edge-thickness-normal edge-pattern-solid edge-thickness-normal edge-pattern-solid flowchart-link\" style=\";\" data-edge=\"true\" data-et=\"edge\" data-id=\"L_C_D_0\" data-points=\"W3sieCI6NDgxLjE3MTg3NSwieSI6MzQuMjV9LHsieCI6NTA2LjE3MTg3NSwieSI6MzQuMjV9LHsieCI6NTMxLjE3MTg3NSwieSI6MzQuMjV9XQ==\" marker-end=\"url(#a3a-diagram-6_flowchart-v2-pointEnd)\"><\/path><path d=\"M700.344,34.25L704.51,34.25C708.677,34.25,717.01,34.25,724.677,34.25C732.344,34.25,739.344,34.25,742.844,34.25L746.344,34.25\" id=\"L_D_E_0\" class=\"edge-thickness-normal edge-pattern-solid edge-thickness-normal edge-pattern-solid flowchart-link\" style=\";\" data-edge=\"true\" data-et=\"edge\" data-id=\"L_D_E_0\" data-points=\"W3sieCI6NzAwLjM0Mzc1LCJ5IjozNC4yNX0seyJ4Ijo3MjUuMzQzNzUsInkiOjM0LjI1fSx7IngiOjc1MC4zNDM3NSwieSI6MzQuMjV9XQ==\" marker-end=\"url(#a3a-diagram-6_flowchart-v2-pointEnd)\"><\/path><path d=\"M834.047,34.25L838.214,34.25C842.38,34.25,850.714,34.25,858.38,34.25C866.047,34.25,873.047,34.25,876.547,34.25L880.047,34.25\" id=\"L_E_F_0\" class=\"edge-thickness-normal edge-pattern-solid edge-thickness-normal edge-pattern-solid flowchart-link\" style=\";\" data-edge=\"true\" data-et=\"edge\" data-id=\"L_E_F_0\" data-points=\"W3sieCI6ODM0LjA0Njg3NSwieSI6MzQuMjV9LHsieCI6ODU5LjA0Njg3NSwieSI6MzQuMjV9LHsieCI6ODg0LjA0Njg3NSwieSI6MzQuMjV9XQ==\" marker-end=\"url(#a3a-diagram-6_flowchart-v2-pointEnd)\"><\/path><path d=\"M1047.313,34.25L1051.479,34.25C1055.646,34.25,1063.979,34.25,1071.646,34.25C1079.313,34.25,1086.313,34.25,1089.813,34.25L1093.313,34.25\" id=\"L_F_G_0\" class=\"edge-thickness-normal edge-pattern-solid edge-thickness-normal edge-pattern-solid flowchart-link\" style=\";\" data-edge=\"true\" data-et=\"edge\" data-id=\"L_F_G_0\" data-points=\"W3sieCI6MTA0Ny4zMTI1LCJ5IjozNC4yNX0seyJ4IjoxMDcyLjMxMjUsInkiOjM0LjI1fSx7IngiOjEwOTcuMzEyNSwieSI6MzQuMjV9XQ==\" marker-end=\"url(#a3a-diagram-6_flowchart-v2-pointEnd)\"><\/path><path d=\"M1224.125,34.25L1228.292,34.25C1232.458,34.25,1240.792,34.25,1248.458,34.25C1256.125,34.25,1263.125,34.25,1266.625,34.25L1270.125,34.25\" id=\"L_G_H_0\" class=\"edge-thickness-normal edge-pattern-solid edge-thickness-normal edge-pattern-solid flowchart-link\" style=\";\" data-edge=\"true\" data-et=\"edge\" data-id=\"L_G_H_0\" data-points=\"W3sieCI6MTIyNC4xMjUsInkiOjM0LjI1fSx7IngiOjEyNDkuMTI1LCJ5IjozNC4yNX0seyJ4IjoxMjc0LjEyNSwieSI6MzQuMjV9XQ==\" marker-end=\"url(#a3a-diagram-6_flowchart-v2-pointEnd)\"><\/path><path d=\"M1400.234,34.25L1404.401,34.25C1408.568,34.25,1416.901,34.25,1424.568,34.25C1432.234,34.25,1439.234,34.25,1442.734,34.25L1446.234,34.25\" id=\"L_H_I_0\" class=\"edge-thickness-normal edge-pattern-solid edge-thickness-normal edge-pattern-solid flowchart-link\" style=\";\" data-edge=\"true\" data-et=\"edge\" data-id=\"L_H_I_0\" data-points=\"W3sieCI6MTQwMC4yMzQzNzUsInkiOjM0LjI1fSx7IngiOjE0MjUuMjM0Mzc1LCJ5IjozNC4yNX0seyJ4IjoxNDUwLjIzNDM3NSwieSI6MzQuMjV9XQ==\" marker-end=\"url(#a3a-diagram-6_flowchart-v2-pointEnd)\"><\/path><path d=\"M1586.969,34.25L1591.135,34.25C1595.302,34.25,1603.635,34.25,1611.302,34.25C1618.969,34.25,1625.969,34.25,1629.469,34.25L1632.969,34.25\" id=\"L_I_J_0\" class=\"edge-thickness-normal edge-pattern-solid edge-thickness-normal edge-pattern-solid flowchart-link\" style=\";\" data-edge=\"true\" data-et=\"edge\" data-id=\"L_I_J_0\" data-points=\"W3sieCI6MTU4Ni45Njg3NSwieSI6MzQuMjV9LHsieCI6MTYxMS45Njg3NSwieSI6MzQuMjV9LHsieCI6MTYzNi45Njg3NSwieSI6MzQuMjV9XQ==\" marker-end=\"url(#a3a-diagram-6_flowchart-v2-pointEnd)\"><\/path><\/g><g class=\"edgeLabels\"><g class=\"edgeLabel\"><g class=\"label\" data-id=\"L_A_B_0\" transform=\"translate(0, 0)\"><foreignObject width=\"0\" height=\"0\"><div xmlns=\"http:\/\/www.w3.org\/1999\/xhtml\" class=\"labelBkg\" style=\"display: table-cell; white-space: nowrap; line-height: 1.5; max-width: 200px; text-align: center;\"><span class=\"edgeLabel\"><\/span><\/div><\/foreignObject><\/g><\/g><g class=\"edgeLabel\"><g class=\"label\" data-id=\"L_B_C_0\" transform=\"translate(0, 0)\"><foreignObject width=\"0\" height=\"0\"><div xmlns=\"http:\/\/www.w3.org\/1999\/xhtml\" class=\"labelBkg\" style=\"display: table-cell; white-space: nowrap; line-height: 1.5; max-width: 200px; text-align: center;\"><span class=\"edgeLabel\"><\/span><\/div><\/foreignObject><\/g><\/g><g class=\"edgeLabel\"><g class=\"label\" data-id=\"L_C_D_0\" transform=\"translate(0, 0)\"><foreignObject width=\"0\" height=\"0\"><div xmlns=\"http:\/\/www.w3.org\/1999\/xhtml\" class=\"labelBkg\" style=\"display: table-cell; white-space: nowrap; line-height: 1.5; max-width: 200px; text-align: center;\"><span class=\"edgeLabel\"><\/span><\/div><\/foreignObject><\/g><\/g><g class=\"edgeLabel\"><g class=\"label\" data-id=\"L_D_E_0\" transform=\"translate(0, 0)\"><foreignObject width=\"0\" height=\"0\"><div xmlns=\"http:\/\/www.w3.org\/1999\/xhtml\" class=\"labelBkg\" style=\"display: table-cell; white-space: nowrap; line-height: 1.5; max-width: 200px; text-align: center;\"><span class=\"edgeLabel\"><\/span><\/div><\/foreignObject><\/g><\/g><g class=\"edgeLabel\"><g class=\"label\" data-id=\"L_E_F_0\" transform=\"translate(0, 0)\"><foreignObject width=\"0\" height=\"0\"><div xmlns=\"http:\/\/www.w3.org\/1999\/xhtml\" class=\"labelBkg\" style=\"display: table-cell; white-space: nowrap; line-height: 1.5; max-width: 200px; text-align: center;\"><span class=\"edgeLabel\"><\/span><\/div><\/foreignObject><\/g><\/g><g class=\"edgeLabel\"><g class=\"label\" data-id=\"L_F_G_0\" transform=\"translate(0, 0)\"><foreignObject width=\"0\" height=\"0\"><div xmlns=\"http:\/\/www.w3.org\/1999\/xhtml\" class=\"labelBkg\" style=\"display: table-cell; white-space: nowrap; line-height: 1.5; max-width: 200px; text-align: center;\"><span class=\"edgeLabel\"><\/span><\/div><\/foreignObject><\/g><\/g><g class=\"edgeLabel\"><g class=\"label\" data-id=\"L_G_H_0\" transform=\"translate(0, 0)\"><foreignObject width=\"0\" height=\"0\"><div xmlns=\"http:\/\/www.w3.org\/1999\/xhtml\" class=\"labelBkg\" style=\"display: table-cell; white-space: nowrap; line-height: 1.5; max-width: 200px; text-align: center;\"><span class=\"edgeLabel\"><\/span><\/div><\/foreignObject><\/g><\/g><g class=\"edgeLabel\"><g class=\"label\" data-id=\"L_H_I_0\" transform=\"translate(0, 0)\"><foreignObject width=\"0\" height=\"0\"><div xmlns=\"http:\/\/www.w3.org\/1999\/xhtml\" class=\"labelBkg\" style=\"display: table-cell; white-space: nowrap; line-height: 1.5; max-width: 200px; text-align: center;\"><span class=\"edgeLabel\"><\/span><\/div><\/foreignObject><\/g><\/g><g class=\"edgeLabel\"><g class=\"label\" data-id=\"L_I_J_0\" transform=\"translate(0, 0)\"><foreignObject width=\"0\" height=\"0\"><div xmlns=\"http:\/\/www.w3.org\/1999\/xhtml\" class=\"labelBkg\" style=\"display: table-cell; white-space: nowrap; line-height: 1.5; max-width: 200px; text-align: center;\"><span class=\"edgeLabel\"><\/span><\/div><\/foreignObject><\/g><\/g><\/g><g class=\"nodes\"><g class=\"node default\" id=\"flowchart-A-0\" transform=\"translate(78.2265625, 34.25)\"><rect class=\"basic label-container\" style=\"\" x=\"-70.2265625\" y=\"-26.25\" width=\"140.453125\" height=\"52.5\"><\/rect><g class=\"label\" style=\"\" transform=\"translate(-40.2265625, -11.25)\"><rect><\/rect><foreignObject width=\"80.453125\" height=\"22.5\"><div xmlns=\"http:\/\/www.w3.org\/1999\/xhtml\" style=\"display: table-cell; white-space: nowrap; line-height: 1.5; max-width: 200px; text-align: center;\"><span class=\"nodeLabel\"><p>Engineering<\/p><\/span><\/div><\/foreignObject><\/g><\/g><g class=\"node default\" id=\"flowchart-B-1\" transform=\"translate(273.703125, 34.25)\"><rect class=\"basic label-container\" style=\"\" x=\"-75.25\" y=\"-26.25\" width=\"150.5\" height=\"52.5\"><\/rect><g class=\"label\" style=\"\" transform=\"translate(-45.25, -11.25)\"><rect><\/rect><foreignObject width=\"90.5\" height=\"22.5\"><div xmlns=\"http:\/\/www.w3.org\/1999\/xhtml\" style=\"display: table-cell; white-space: nowrap; line-height: 1.5; max-width: 200px; text-align: center;\"><span class=\"nodeLabel\"><p>Development<\/p><\/span><\/div><\/foreignObject><\/g><\/g><g class=\"node default\" id=\"flowchart-C-2\" transform=\"translate(440.0625, 34.25)\"><rect class=\"basic label-container\" style=\"\" x=\"-41.109375\" y=\"-26.25\" width=\"82.21875\" height=\"52.5\"><\/rect><g class=\"label\" style=\"\" transform=\"translate(-11.109375, -11.25)\"><rect><\/rect><foreignObject width=\"22.21875\" height=\"22.5\"><div xmlns=\"http:\/\/www.w3.org\/1999\/xhtml\" style=\"display: table-cell; white-space: nowrap; line-height: 1.5; max-width: 200px; text-align: center;\"><span class=\"nodeLabel\"><p>FAT<\/p><\/span><\/div><\/foreignObject><\/g><\/g><g class=\"node default\" id=\"flowchart-D-3\" transform=\"translate(615.7578125, 34.25)\"><rect class=\"basic label-container\" style=\"\" x=\"-84.5859375\" y=\"-26.25\" width=\"169.171875\" height=\"52.5\"><\/rect><g class=\"label\" style=\"\" transform=\"translate(-54.5859375, -11.25)\"><rect><\/rect><foreignObject width=\"109.171875\" height=\"22.5\"><div xmlns=\"http:\/\/www.w3.org\/1999\/xhtml\" style=\"display: table-cell; white-space: nowrap; line-height: 1.5; max-width: 200px; text-align: center;\"><span class=\"nodeLabel\"><p>Implementation<\/p><\/span><\/div><\/foreignObject><\/g><\/g><g class=\"node default\" id=\"flowchart-E-4\" transform=\"translate(792.1953125, 34.25)\"><rect class=\"basic label-container\" style=\"\" x=\"-41.8515625\" y=\"-26.25\" width=\"83.703125\" height=\"52.5\"><\/rect><g class=\"label\" style=\"\" transform=\"translate(-11.8515625, -11.25)\"><rect><\/rect><foreignObject width=\"23.703125\" height=\"22.5\"><div xmlns=\"http:\/\/www.w3.org\/1999\/xhtml\" style=\"display: table-cell; white-space: nowrap; line-height: 1.5; max-width: 200px; text-align: center;\"><span class=\"nodeLabel\"><p>SAT<\/p><\/span><\/div><\/foreignObject><\/g><\/g><g class=\"node default\" id=\"flowchart-F-5\" transform=\"translate(965.6796875, 34.25)\"><rect class=\"basic label-container\" style=\"\" x=\"-81.6328125\" y=\"-26.25\" width=\"163.265625\" height=\"52.5\"><\/rect><g class=\"label\" style=\"\" transform=\"translate(-51.6328125, -11.25)\"><rect><\/rect><foreignObject width=\"103.265625\" height=\"22.5\"><div xmlns=\"http:\/\/www.w3.org\/1999\/xhtml\" style=\"display: table-cell; white-space: nowrap; line-height: 1.5; max-width: 200px; text-align: center;\"><span class=\"nodeLabel\"><p>Commissioning<\/p><\/span><\/div><\/foreignObject><\/g><\/g><g class=\"node default\" id=\"flowchart-G-6\" transform=\"translate(1160.71875, 34.25)\"><rect class=\"basic label-container\" style=\"\" x=\"-63.40625\" y=\"-26.25\" width=\"126.8125\" height=\"52.5\"><\/rect><g class=\"label\" style=\"\" transform=\"translate(-33.40625, -11.25)\"><rect><\/rect><foreignObject width=\"66.8125\" height=\"22.5\"><div xmlns=\"http:\/\/www.w3.org\/1999\/xhtml\" style=\"display: table-cell; white-space: nowrap; line-height: 1.5; max-width: 200px; text-align: center;\"><span class=\"nodeLabel\"><p>Punch list<\/p><\/span><\/div><\/foreignObject><\/g><\/g><g class=\"node default\" id=\"flowchart-H-7\" transform=\"translate(1337.1796875, 34.25)\"><rect class=\"basic label-container\" style=\"\" x=\"-63.0546875\" y=\"-26.25\" width=\"126.109375\" height=\"52.5\"><\/rect><g class=\"label\" style=\"\" transform=\"translate(-33.0546875, -11.25)\"><rect><\/rect><foreignObject width=\"66.109375\" height=\"22.5\"><div xmlns=\"http:\/\/www.w3.org\/1999\/xhtml\" style=\"display: table-cell; white-space: nowrap; line-height: 1.5; max-width: 200px; text-align: center;\"><span class=\"nodeLabel\"><p>Handover<\/p><\/span><\/div><\/foreignObject><\/g><\/g><g class=\"node default\" id=\"flowchart-I-8\" transform=\"translate(1518.6015625, 34.25)\"><rect class=\"basic label-container\" style=\"\" x=\"-68.3671875\" y=\"-26.25\" width=\"136.734375\" height=\"52.5\"><\/rect><g class=\"label\" style=\"\" transform=\"translate(-38.3671875, -11.25)\"><rect><\/rect><foreignObject width=\"76.734375\" height=\"22.5\"><div xmlns=\"http:\/\/www.w3.org\/1999\/xhtml\" style=\"display: table-cell; white-space: nowrap; line-height: 1.5; max-width: 200px; text-align: center;\"><span class=\"nodeLabel\"><p>Acceptance<\/p><\/span><\/div><\/foreignObject><\/g><\/g><g class=\"node default\" id=\"flowchart-J-9\" transform=\"translate(1741.078125, 34.25)\"><rect class=\"basic label-container\" style=\"\" x=\"-104.109375\" y=\"-26.25\" width=\"208.21875\" height=\"52.5\"><\/rect><g class=\"label\" style=\"\" transform=\"translate(-74.109375, -11.25)\"><rect><\/rect><foreignObject width=\"148.21875\" height=\"22.5\"><div xmlns=\"http:\/\/www.w3.org\/1999\/xhtml\" style=\"display: table-cell; white-space: nowrap; line-height: 1.5; max-width: 200px; text-align: center;\"><span class=\"nodeLabel\"><p>Warranty and support<\/p><\/span><\/div><\/foreignObject><\/g><\/g><\/g><\/g><\/g><\/svg><figcaption>Governance of automation delivery through technical acceptance<\/figcaption><\/figure>\n\n\n\n<h3 class=\"wp-block-heading\">Test Failures, Not Only Normal Conditions<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Redundancy is demonstrated only when a controlled failure of the primary component occurs. Backup is demonstrated only when restoration is tested. Server failover needs to be observed. Loss of communication must produce the specified behavior.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Testing only the nominal scenario leaves the main resilience mechanisms without evidence.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Minimum Handover Documentation<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">The contract should list mandatory documents and digital assets. \u201cDeliver As-Built\u201d is too generic for automation systems.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The final package may include, according to scope:<\/p>\n\n\n\n<ul class=\"wp-block-list\"><li>As-Built architecture;<\/li><li>topology and addressing;<\/li><li>I\/O list;<\/li><li>equipment and firmware list;<\/li><li>control philosophy and functional narratives;<\/li><li>cause-and-effect matrix;<\/li><li>alarm list;<\/li><li>source programs and engineering projects;<\/li><li>controller, HMI, and server backups;<\/li><li>switch and gateway configuration files;<\/li><li>licenses and evidence of entitlement;<\/li><li>administrative credentials according to agreed governance;<\/li><li>FAT\/SAT procedures and reports;<\/li><li>commissioning records;<\/li><li>manuals and training;<\/li><li>closed punch list.<\/li><\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">The article <a href=\"https:\/\/a3aengenharia.com.br\/conteudo\/artigos-tecnicos\/sistema-instalado-nao-e-sistema-entregue-entrega-tecnica-aceite\/\">An Installed System Is Not a Delivered System<\/a> is particularly relevant: physical completion is not equivalent to accepted technical handover.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Intellectual Property, Files, and Owner Access<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Procurement should distinguish supplier intellectual property, third-party licenses, and the owner&#8217;s right to operate and maintain the acquired system.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Access to programs, backups, projects, parameters, documentation, and credentials needs to be clarified. Legitimate restrictions should be explicit before procurement, not discovered when another company needs to provide maintenance.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Source Code and Engineering Projects<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Not every solution requires delivery of proprietary software source code. However, applications developed specifically for the project \u2014 PLC logic, screens, tag databases, scripts, and configurations \u2014 need a clearly defined access and ownership regime.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Administrative Accounts<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">The integrator should not remain the sole holder of administrative access after handover. The owner needs governance over accounts, certificates, and recovery mechanisms, even if support remains outsourced.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Warranty, SLA, and Support<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Equipment warranty and engineering support are different matters. A CPU may be covered by the manufacturer while logic, integration, or configuration requires service from the integrator.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Procurement should define service hours, criticality, response time, remote support, onsite mobilization, escalation, software updates, and responsibility for interaction with manufacturers.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Spare Parts and Obsolescence<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">For long-life systems, availability of modules, power supplies, switches, servers, and licenses needs to be analyzed. The supplier should disclose end-of-sale or near-obsolescence items when that information is available.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Automation Companies in Brownfield Projects<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Brownfield work requires additional capability because the existing system remains part of the process during transition. The company needs to demonstrate a methodology for surveys, coexistence, migration, cutover, and rollback.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The content on <a href=\"https:\/\/a3aengenharia.com.br\/conteudo\/artigos-tecnicos\/projetos-brownfield-engenharia-instalacoes-existentes-retrofit\/\">Brownfield Projects<\/a> presents engineering risks in existing facilities. In automation, these risks are amplified because software changes can have immediate physical impact.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Migration Plan<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">The plan should organize sequence, prerequisites, backups, responsibilities, window, intermediate tests, go\/no-go criteria, and rollback conditions.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Migrating \u201cover the weekend\u201d is not a plan. The available period needs to be broken down into verifiable activities with margins and decision points.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Red Flags in an Integrator&#8217;s Proposal<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Some signs justify additional due diligence:<\/p>\n\n\n\n<ul class=\"wp-block-list\"><li>a proposal essentially composed of a bill of materials;<\/li><li>absence of architecture or integration assumptions;<\/li><li>FAT described only as \u201cfactory test\u201d;<\/li><li>final documentation without a list of deliverables;<\/li><li>broad and generic exclusions;<\/li><li>no cybersecurity approach for remote access;<\/li><li>licenses without defined metrics or quantities;<\/li><li>dependence on a single professional without formal commitment;<\/li><li>no migration strategy for brownfield work;<\/li><li>a much lower price without a corresponding technical explanation;<\/li><li>absence of responsibilities for third-party interfaces.<\/li><\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">A red flag does not automatically mean incapability. It identifies a point that needs clarification before contract award.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">How to Use RFP and TBE in Procurement<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">An <a href=\"https:\/\/a3aengenharia.com.br\/conteudo\/artigos-tecnicos\/rfp-engenharia-escopo-requisitos-criterios-selecao\/\">Engineering RFP<\/a> organizes scope, requirements, instructions to bidders, and response format. This reduces incomparable submissions.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Then TBE records compliance and deviations. Commercial negotiation should occur on a technically leveled basis.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The sequence is especially important in automation because hidden costs appear in integration, licensing, testing, and documentation, not necessarily in the major hardware items.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">The Role of Owner&#8217;s Engineering<\/h2>\n\n\n\n<div class=\"wp-block-a3a-destaque\">\n<p class=\"wp-block-paragraph\">When multiple integrators offer different architectures, an independent owner function helps preserve requirements, witness FAT\/SAT, control interfaces, and verify documentation before acceptance.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><a href=\"https:\/\/a3aengenharia.com.br\/servicos\/contratacao-integrada\/engenharia-do-proprietario\/\">Learn about Owner&#8217;s Engineering services<\/a><\/p>\n<\/div>\n\n\n\n<p class=\"wp-block-paragraph\">When the owner does not have sufficient internal staff to structure and oversee procurement, <a href=\"https:\/\/a3aengenharia.com.br\/servicos\/contratacao-integrada\/engenharia-do-proprietario\/\">Owner&#8217;s Engineering<\/a> can act as an independent technical function.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The role may include surveys, requirements, reference architecture, RFP, technical evaluation, leveling, development monitoring, FAT witnessing, implementation oversight, commissioning, punch-list management, and handover verification.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Independence is valuable when each integrator proposes the solution it knows best. The owner needs to compare alternatives according to the project&#8217;s interests, not the portfolio of a specific supplier.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Technical Checklist before Award<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Before closing the procurement, it is advisable to be able to answer objectively:<\/p>\n\n\n\n<ul class=\"wp-block-list\"><li>are the scope and exclusions clear?<\/li><li>are critical requirements testable?<\/li><li>do interfaces have defined owners?<\/li><li>has the proposed architecture been reviewed?<\/li><li>are versions, licenses, and growth understood?<\/li><li>is there a preliminary FAT, SAT, and commissioning plan?<\/li><li>is final documentation listed in the contract?<\/li><li>are owner files, backups, and access rights defined?<\/li><li>are cybersecurity and remote-access criteria established?<\/li><li>have brownfield strategy and rollback been addressed where applicable?<\/li><li>have warranty and support been conceptually separated?<\/li><li>are technical deviations from the proposal formalized?<\/li><\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">If these answers depend on \u201cwe&#8217;ll check with the supplier later,\u201d procurement is not yet technically mature.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Final Considerations<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Selecting an industrial automation company is not merely selecting hardware, software, or price. It is contracting engineering capability to transform process requirements into a controllable, testable, documented, and sustainable solution throughout its service life.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The better the owner structures requirements, interfaces, evaluation criteria, and acceptance before award, the less dependence there is on negotiations during implementation. Suppliers stop competing based on different interpretations of scope and start competing on a comparable technical basis.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">This process improves procurement quality, protects operations, and strengthens governance over FAT, SAT, commissioning, documentation, support, and future expansions.<\/p>\n\n\n\n<details class=\"wp-block-details is-layout-flow wp-block-details-is-layout-flow\"><summary>Technical references<\/summary>\n<p class=\"wp-block-paragraph\">[1] 1. INTERNATIONAL ELECTROTECHNICAL COMMISSION. IEC 62443-2-4:2023 \u2014 Security for industrial automation and control systems \u2014 Part 2-4: Security program requirements for IACS service providers. Geneva: IEC, 2023. Available at: [<a href=\"https:\/\/webstore.iec.ch\/en\/publication\/67631\">https:\/\/webstore.iec.ch\/en\/publication\/67631<\/a>](<a href=\"https:\/\/webstore.iec.ch\/en\/publication\/67631\">https:\/\/webstore.iec.ch\/en\/publication\/67631<\/a>)<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">[2] 2. NATIONAL INSTITUTE OF STANDARDS AND TECHNOLOGY. Guide to Operational Technology (OT) Security. NIST SP 800-82 Rev. 3. Gaithersburg: NIST, 2023. Available at: [<a href=\"https:\/\/csrc.nist.gov\/pubs\/sp\/800\/82\/r3\/final\">https:\/\/csrc.nist.gov\/pubs\/sp\/800\/82\/r3\/final<\/a>](<a href=\"https:\/\/csrc.nist.gov\/pubs\/sp\/800\/82\/r3\/final\">https:\/\/csrc.nist.gov\/pubs\/sp\/800\/82\/r3\/final<\/a>)<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">[3] 3. INTERNATIONAL SOCIETY OF AUTOMATION. ANSI\/ISA-95.00.01-2025 (IEC 62264-1 Mod), Enterprise-Control System Integration \u2014 Part 1: Models and Terminology. Research Triangle Park: ISA, 2025. Available at: [<a href=\"https:\/\/www.isa.org\/products\/ansi-isa-95-00-01-2025-iec-62264-1-mod-enterprise\">https:\/\/www.isa.org\/products\/ansi-isa-95-00-01-2025-iec-62264-1-mod-enterprise<\/a>](<a href=\"https:\/\/www.isa.org\/products\/ansi-isa-95-00-01-2025-iec-62264-1-mod-enterprise\">https:\/\/www.isa.org\/products\/ansi-isa-95-00-01-2025-iec-62264-1-mod-enterprise<\/a>)<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">[4] 4. INTERNATIONAL ELECTROTECHNICAL COMMISSION. IEC 62443-3-2:2020 \u2014 Security for industrial automation and control systems \u2014 Part 3-2: Security risk assessment for system design. Geneva: IEC, 2020. Available at: [<a href=\"https:\/\/webstore.iec.ch\/en\/publication\/30727\">https:\/\/webstore.iec.ch\/en\/publication\/30727<\/a>](<a href=\"https:\/\/webstore.iec.ch\/en\/publication\/30727\">https:\/\/webstore.iec.ch\/en\/publication\/30727<\/a>)<\/p>\n<\/details>\n\n\n\n<details class=\"wp-block-details is-layout-flow wp-block-details-is-layout-flow\"><summary>Frequently asked questions<\/summary>\n<div class=\"schema-faq wp-block-yoast-faq-block\"><div class=\"schema-faq-section\" id=\"faq-question-como-escolher-uma-empresa-de-automa-o-industrial-8bd39c25\"><strong class=\"schema-faq-question\">How do you choose an industrial automation company?<\/strong> <p class=\"schema-faq-answer\">First define requirements, scope, interfaces, and acceptance criteria; then evaluate relevant experience, team, proposed architecture, interoperability, licensing, cybersecurity, testing methodology, documentation, support, and field capability.<\/p><\/div><div class=\"schema-faq-section\" id=\"faq-question-qual-a-diferen-a-entre-integradora-e-fabricante--87e4a268\"><strong class=\"schema-faq-question\">What is the difference between an automation integrator and a manufacturer?<\/strong> <p class=\"schema-faq-answer\">The manufacturer develops products and platforms; the integrator combines equipment and software to deliver a solution applied to the process. Some companies perform both roles, but responsibilities need to be clearly defined.<\/p><\/div><div class=\"schema-faq-section\" id=\"faq-question-o-menor-pre-o-o-melhor-crit-rio-para-contratar-a-60dd243e\"><strong class=\"schema-faq-question\">Is the lowest price the best criterion for automation procurement?<\/strong> <p class=\"schema-faq-answer\">Not by itself. Proposals may have different scopes for redundancy, licensing, engineering, FAT, integration, documentation, and support. Technical leveling should precede commercial comparison.<\/p><\/div><div class=\"schema-faq-section\" id=\"faq-question-o-que-deve-ser-exigido-no-fat-fb89e7ca\"><strong class=\"schema-faq-question\">What should be required in FAT?<\/strong> <p class=\"schema-faq-answer\">An approved procedure with traceable requirements, preconditions, steps, expected results, evidence, and treatment of punch items. Depending on the system, logic, alarms, screens, integrations, redundancy, histories, and backups should be tested.<\/p><\/div><div class=\"schema-faq-section\" id=\"faq-question-quais-documentos-a-integradora-deve-entregar-24b2749b\"><strong class=\"schema-faq-question\">Which documents should the integrator deliver?<\/strong> <p class=\"schema-faq-answer\">Depending on scope: As-Built architecture, topologies, I\/O lists, control philosophy, programs and backups, configurations, licenses, test procedures and reports, commissioning records, manuals, and handover documentation.<\/p><\/div><div class=\"schema-faq-section\" id=\"faq-question-como-avaliar-ciberseguran-a-de-uma-empresa-de-au-c17182c4\"><strong class=\"schema-faq-question\">How should the cybersecurity of an automation company be evaluated?<\/strong> <p class=\"schema-faq-answer\">Assess processes for credentials, remote access, engineering workstations, vulnerabilities, backups, change management, and incident response. IEC 62443-2-4 specifically addresses security requirements for IACS service providers.<\/p><\/div><div class=\"schema-faq-section\" id=\"faq-question-quando-owner-s-engineering-ajuda-na-contrata-o-d-0f5d4ee7\"><strong class=\"schema-faq-question\">When does Owner&#x27;s Engineering help with automation procurement?<\/strong> <p class=\"schema-faq-answer\">When the owner needs independent support to structure requirements and the RFP, compare proposals, monitor development and implementation, witness FAT\/SAT, manage interfaces, and verify technical acceptance.<\/p><\/div><\/div>\n<\/details>\n\n\n\n<details class=\"wp-block-details is-layout-flow wp-block-details-is-layout-flow\"><summary>Complementary technical materials<\/summary>\n<h4 class=\"wp-block-heading\">Related solutions<\/h4>\n\n<ul class=\"wp-block-list\"><li><a href=\"https:\/\/a3aengenharia.com.br\/solucoes\/engenharia-de-automacao-industrial\/sistemas-scada\/\">SCADA Systems: supervision, control, alarms, and operational data<\/a><\/li><li><a href=\"https:\/\/a3aengenharia.com.br\/solucoes\/engenharia-de-automacao-industrial\/sistemas-de-supervisao-e-controle-sdsc\/\">Digital Supervision and Control Systems (SDSC): automation and integrated operation<\/a><\/li><\/ul>\n\n<h4 class=\"wp-block-heading\">Related services<\/h4>\n\n<ul class=\"wp-block-list\"><li><a href=\"https:\/\/a3aengenharia.com.br\/servicos\/planejamento\/projeto-de-automacao-industrial\/\">Industrial Automation Design: control, supervision, OT networks, and integration<\/a><\/li><li><a href=\"https:\/\/a3aengenharia.com.br\/servicos\/contratacao-integrada\/engenharia-do-proprietario\/\">Owner\u2019s Engineering: technical governance, oversight, and acceptance<\/a><\/li><\/ul>\n\n<h4 class=\"wp-block-heading\">Main content on the topic<\/h4>\n\n<ul class=\"wp-block-list\"><li><a href=\"https:\/\/a3aengenharia.com.br\/conteudo\/artigos-tecnicos\/automacao-industrial-o-que-e-arquitetura-sistemas-aplicacoes\/\">Industrial Automation: what it is, architecture, systems, and Engineering applications<\/a><\/li><li><a href=\"https:\/\/a3aengenharia.com.br\/conteudo\/artigos-tecnicos\/rfp-engenharia-escopo-requisitos-criterios-selecao\/\">Engineering RFP: how to structure scope, requirements, and selection criteria<\/a><\/li><li><a href=\"https:\/\/a3aengenharia.com.br\/conteudo\/artigos-tecnicos\/tbe-technical-bid-evaluation-engenharia\/\">TBE \u2014 Technical Bid Evaluation in Engineering<\/a><\/li><\/ul>\n\n<h4 class=\"wp-block-heading\">Related technical content<\/h4>\n\n<ul class=\"wp-block-list\"><li><a href=\"https:\/\/a3aengenharia.com.br\/conteudo\/artigos-tecnicos\/strategic-sourcing-engenharia-estrategia-fornecimento-fornecedores\/\">Strategic Sourcing in Engineering: supply strategy, market, and suppliers<\/a><\/li><li><a href=\"https:\/\/a3aengenharia.com.br\/conteudo\/artigos-tecnicos\/scope-of-work-sow-escopo-trabalho-engenharia\/\">Engineering Scope of Work (SOW): how to define the work scope of a procurement<\/a><\/li><li><a href=\"https:\/\/a3aengenharia.com.br\/conteudo\/artigos-tecnicos\/comissionamento-sistemas-criticos-prontos-para-operar\/\">Industrial Commissioning: pre-commissioning, start-up, cold and hot tests<\/a><\/li><li><a href=\"https:\/\/a3aengenharia.com.br\/conteudo\/artigos-tecnicos\/projetos-brownfield-engenharia-instalacoes-existentes-retrofit\/\">Brownfield Projects: engineering in existing facilities, surveys, As-Built, and retrofit<\/a><\/li><\/ul>\n<\/details>\n","protected":false},"excerpt":{"rendered":"<p>Learn how to evaluate and hire an industrial automation company: requirements, qualification, architecture, TBE, licensing, cybersecurity, FAT, SAT, commissioning, and acceptance.<\/p>\n","protected":false},"author":1,"featured_media":0,"parent":0,"template":"","meta":{"_a3a_global_related_solutions":[],"_a3a_global_related_services":[],"_a3a_global_related_materials":[],"_a3a_post_lang":"en-us","_a3a_translation_group_id":"89662c1e-2114-49e2-9044-ff8df774f83b","_a3a_i18n_canonical_slug":"industrial-automation-company-evaluate-hire-system-integrator"},"categories":[],"segments":[],"mercados":[],"etapas":[],"class_list":["post-73964","articles","type-articles","status-publish","hentry"],"_links":{"self":[{"href":"https:\/\/a3aengenharia.com\/en-us\/wp-json\/wp\/v2\/articles\/73964","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/a3aengenharia.com\/en-us\/wp-json\/wp\/v2\/articles"}],"about":[{"href":"https:\/\/a3aengenharia.com\/en-us\/wp-json\/wp\/v2\/types\/articles"}],"author":[{"embeddable":true,"href":"https:\/\/a3aengenharia.com\/en-us\/wp-json\/wp\/v2\/users\/1"}],"version-history":[{"count":6,"href":"https:\/\/a3aengenharia.com\/en-us\/wp-json\/wp\/v2\/articles\/73964\/revisions"}],"predecessor-version":[{"id":73974,"href":"https:\/\/a3aengenharia.com\/en-us\/wp-json\/wp\/v2\/articles\/73964\/revisions\/73974"}],"wp:attachment":[{"href":"https:\/\/a3aengenharia.com\/en-us\/wp-json\/wp\/v2\/media?parent=73964"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/a3aengenharia.com\/en-us\/wp-json\/wp\/v2\/categories?post=73964"},{"taxonomy":"segments","embeddable":true,"href":"https:\/\/a3aengenharia.com\/en-us\/wp-json\/wp\/v2\/segments?post=73964"},{"taxonomy":"mercados","embeddable":true,"href":"https:\/\/a3aengenharia.com\/en-us\/wp-json\/wp\/v2\/mercados?post=73964"},{"taxonomy":"etapas","embeddable":true,"href":"https:\/\/a3aengenharia.com\/en-us\/wp-json\/wp\/v2\/etapas?post=73964"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}