{"id":73516,"date":"2026-08-31T15:57:18","date_gmt":"2026-08-31T18:57:18","guid":{"rendered":"https:\/\/a3aengenharia.com\/?post_type=articles&#038;p=73516"},"modified":"2026-08-31T15:57:18","modified_gmt":"2026-08-31T18:57:18","slug":"annual-procurement-plan-engineering-works-designs-investments","status":"publish","type":"articles","link":"https:\/\/a3aengenharia.com\/en-us\/content\/technical-articles\/annual-procurement-plan-engineering-works-designs-investments\/","title":{"rendered":"Annual Procurement Plan in Engineering: How to Organize Works, Designs, and Investments"},"content":{"rendered":"\n<p class=\"wp-block-paragraph\">The <strong>Annual Procurement Plan (PCA)<\/strong> is the instrument that consolidates procurement demands expected for the following fiscal year and, within the federal framework regulated by Decree No. 10,947\/2022, seeks to rationalize procurement, align it with strategic planning, support preparation of budget laws, prevent expenditure splitting, and signal the agency&#8217;s purchasing intentions to the market.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">For engineering works and services, however, the PCA needs to be more than a list of items and dates. An Engineering demand is rarely born ready for bidding. Between identifying the problem and contracting, there may be stages of survey, diagnosis, requirements consolidation, Preliminary Technical Study, feasibility study, conceptual design, preliminary design, Basic Design, Detailed Design, budgeting, licensing, internal approval, and definition of the procurement strategy.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">If these stages are not recognized in annual planning, the agency may include in the PCA a \u201cconstruction project\u201d that still lacks sufficient technical information for procurement. The schedule then reflects the desired execution date, but not the time required to mature the scope technically. The result appears later as a superficial ETP, rushed design, weak budget, incomplete tender documents, low competition, amendments, or execution delays.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Therefore, in the Engineering context, the PCA should be understood as an <strong>instrument for managing a portfolio of demands at different maturity levels<\/strong>. The objective is not only to decide what to procure, but to identify what must happen before each procurement so that it reaches the market with scope, requirements, design, budget, and acceptance criteria compatible with its complexity.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">What the Annual Procurement Plan should represent for Engineering<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Decree No. 10,947\/2022 establishes that the PCA consolidates the demands that an agency or entity intends to procure in the following fiscal year. These demands are formalized through Demand Formalization Documents (DFDs) and subsequently consolidated by the procurement unit.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">In Engineering, this consolidation needs to recognize an essential distinction: <strong>a demand is not synonymous with a procurement-ready scope<\/strong>.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">An agency may know that it needs to modernize electrical infrastructure, renovate an administrative building, replace an electronic-security system, or expand a Data Center. This may be enough to justify planning, but it may not be enough to define the execution contract.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The portfolio should therefore show not only the final destination, but also the required maturity chain. In some cases, the first contract of the year will not be construction; it will be a survey. In others, it will be the Basic Design. In others, a Preliminary Technical Study or a Due Diligence. Only after that stage can execution be tendered with greater confidence.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">This approach brings the PCA closer to portfolio management: each demand has priority, dependencies, constraints, expected cost, risk, and a preparation stage.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">DFD and PCA: how a demand enters annual planning<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">The <a href=\"https:\/\/a3aengenharia.com.br\/conteudo\/artigos-tecnicos\/dfd-obras-servicos-engenharia-formalizacao-demanda\/\">DFD for engineering works and services<\/a> formalizes the need that will feed planning. Decree No. 10,947\/2022 provides that the document contain, among other elements, justification of the need, a concise description of the scope, estimated quantity, preliminary value estimate, intended date for completion of the procurement, priority, and any dependency on another demand.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">This information is especially important for Engineering because it helps detect demands that are not yet technically mature. If the requesting area asks for a \u201ccomplete building renovation\u201d but there is no existing-conditions survey, diagnosis, Needs Program, scope definition, or design, the PCA should not hide that gap.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Planning should record the demand and organize the path to reduce that uncertainty. This may mean dividing an institutional need into technically sequenced procurements: first diagnosis and survey; then design; later construction; finally commissioning, acceptance, and documentation.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The dependency between DFDs provided for in the Decree is particularly useful in this scenario. It allows the organization to recognize that one procurement can only begin after another has produced the necessary information.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">How to classify the maturity of Engineering demands<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">A practical way to improve the PCA is to classify each demand according to its technical maturity level. The objective is not to create additional bureaucracy, but to prevent demands that are still conceptual from being treated as if they were ready for tender documents.<\/p>\n\n\n\n<figure class=\"wp-block-table\"><table><tbody><tr><td>Maturity level<\/td><td>Condition of the demand<\/td><td>Likely next need<\/td><\/tr><tr><td>Need identified<\/td><td>The problem is known, but the solution has not yet been studied<\/td><td>DFD, requirements gathering, diagnosis<\/td><\/tr><tr><td>Existing condition partially known<\/td><td>Data exists, but field or documentation gaps remain<\/td><td>Site Survey, existing-conditions survey, Due Diligence<\/td><\/tr><tr><td>Requirements consolidated<\/td><td>Users, capacities, performance, and constraints have been defined<\/td><td>Needs Program, ETP, feasibility study<\/td><\/tr><tr><td>Solution selected<\/td><td>Alternatives have been compared and a technical direction has been defined<\/td><td>Conceptual Design, preliminary design, or Basic Design<\/td><\/tr><tr><td>Procurement design available<\/td><td>Scope, drawings, narratives, specifications, and quantities have compatible maturity<\/td><td>Budget, TR, technical review, tender documents<\/td><\/tr><tr><td>Procurement prepared<\/td><td>Technical documents, budget, and procurement strategy are consolidated<\/td><td>Tender process or applicable procurement<\/td><\/tr><tr><td>Execution contracted<\/td><td>Supplier selected and mobilization authorized<\/td><td>Technical supervision, Owner&#8217;s Engineering, contract management<\/td><\/tr><tr><td>Implementation completed<\/td><td>Systems executed, but still dependent on verification and acceptance<\/td><td>Commissioning, As Built, handover, and acceptance<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p class=\"wp-block-paragraph\">The value of this classification is to allow management to see <strong>where the portfolio preparation bottleneck lies<\/strong>. A PCA with ten planned construction projects may, in reality, have ten demands still at the first level. Without recognizing this, the agency discovers too late that the problem is not the availability of companies to execute the work, but the absence of procurement-ready Engineering.<\/p>\n\n\n\n<figure class=\"a3a-mermaid\"><svg id=\"a3a-diagram-1\" width=\"100%\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" class=\"flowchart\" viewBox=\"0 0 1461.453125 68.5\" role=\"graphics-document document\" aria-roledescription=\"flowchart-v2\" aria-labelledby=\"chart-title-a3a-diagram-1\"><title id=\"chart-title-a3a-diagram-1\">Technical maturity of an Engineering procurement portfolio<\/title><g><marker id=\"a3a-diagram-1_flowchart-v2-pointEnd\" class=\"marker flowchart-v2\"><path class=\"arrowMarkerPath\"><\/path><\/marker><marker id=\"a3a-diagram-1_flowchart-v2-pointStart\" class=\"marker flowchart-v2\"><path class=\"arrowMarkerPath\"><\/path><\/marker><marker id=\"a3a-diagram-1_flowchart-v2-circleEnd\" class=\"marker flowchart-v2\"><circle class=\"arrowMarkerPath\"><\/circle><\/marker><marker id=\"a3a-diagram-1_flowchart-v2-circleStart\" class=\"marker flowchart-v2\"><circle class=\"arrowMarkerPath\"><\/circle><\/marker><marker id=\"a3a-diagram-1_flowchart-v2-crossEnd\" class=\"marker cross flowchart-v2\"><path class=\"arrowMarkerPath\"><\/path><\/marker><marker id=\"a3a-diagram-1_flowchart-v2-crossStart\" class=\"marker cross flowchart-v2\"><path class=\"arrowMarkerPath\"><\/path><\/marker><g class=\"root\"><g class=\"clusters\"><\/g><g class=\"edgePaths\"><path id=\"L_A_B_0\" class=\"edge-thickness-normal edge-pattern-solid edge-thickness-normal edge-pattern-solid flowchart-link\"><\/path><path id=\"L_B_C_0\" class=\"edge-thickness-normal edge-pattern-solid edge-thickness-normal edge-pattern-solid flowchart-link\"><\/path><path id=\"L_C_D_0\" class=\"edge-thickness-normal edge-pattern-solid edge-thickness-normal edge-pattern-solid flowchart-link\"><\/path><path id=\"L_D_E_0\" class=\"edge-thickness-normal edge-pattern-solid edge-thickness-normal edge-pattern-solid flowchart-link\"><\/path><path id=\"L_E_F_0\" class=\"edge-thickness-normal edge-pattern-solid edge-thickness-normal edge-pattern-solid flowchart-link\"><\/path><path id=\"L_F_G_0\" class=\"edge-thickness-normal edge-pattern-solid edge-thickness-normal edge-pattern-solid flowchart-link\"><\/path><path id=\"L_G_H_0\" class=\"edge-thickness-normal edge-pattern-solid edge-thickness-normal edge-pattern-solid flowchart-link\"><\/path><\/g><g class=\"edgeLabels\"><g class=\"edgeLabel\"><g class=\"label\"><foreignObject><div class=\"labelBkg\"><span class=\"edgeLabel\"><\/span><\/div><\/foreignObject><\/g><\/g><g class=\"edgeLabel\"><g class=\"label\"><foreignObject><div class=\"labelBkg\"><span class=\"edgeLabel\"><\/span><\/div><\/foreignObject><\/g><\/g><g class=\"edgeLabel\"><g class=\"label\"><foreignObject><div class=\"labelBkg\"><span class=\"edgeLabel\"><\/span><\/div><\/foreignObject><\/g><\/g><g class=\"edgeLabel\"><g class=\"label\"><foreignObject><div class=\"labelBkg\"><span class=\"edgeLabel\"><\/span><\/div><\/foreignObject><\/g><\/g><g class=\"edgeLabel\"><g class=\"label\"><foreignObject><div class=\"labelBkg\"><span class=\"edgeLabel\"><\/span><\/div><\/foreignObject><\/g><\/g><g class=\"edgeLabel\"><g class=\"label\"><foreignObject><div class=\"labelBkg\"><span class=\"edgeLabel\"><\/span><\/div><\/foreignObject><\/g><\/g><g class=\"edgeLabel\"><g class=\"label\"><foreignObject><div class=\"labelBkg\"><span class=\"edgeLabel\"><\/span><\/div><\/foreignObject><\/g><\/g><\/g><g class=\"nodes\"><g class=\"node default\" id=\"flowchart-A-0\"><rect class=\"basic label-container\"><\/rect><g class=\"label\"><rect><\/rect><foreignObject><div><span class=\"nodeLabel\"><p>Need<\/p><\/span><\/div><\/foreignObject><\/g><\/g><g class=\"node default\" id=\"flowchart-B-1\"><rect class=\"basic label-container\"><\/rect><g class=\"label\"><rect><\/rect><foreignObject><div><span class=\"nodeLabel\"><p>Survey<\/p><\/span><\/div><\/foreignObject><\/g><\/g><g class=\"node default\" id=\"flowchart-C-3\"><rect class=\"basic label-container\"><\/rect><g class=\"label\"><rect><\/rect><foreignObject><div><span class=\"nodeLabel\"><p>Requirements and ETP<\/p><\/span><\/div><\/foreignObject><\/g><\/g><g class=\"node default\" id=\"flowchart-D-5\"><rect class=\"basic label-container\"><\/rect><g class=\"label\"><rect><\/rect><foreignObject><div><span class=\"nodeLabel\"><p>Design<\/p><\/span><\/div><\/foreignObject><\/g><\/g><g class=\"node default\" id=\"flowchart-E-7\"><rect class=\"basic label-container\"><\/rect><g class=\"label\"><rect><\/rect><foreignObject><div><span class=\"nodeLabel\"><p>Budget and TR<\/p><\/span><\/div><\/foreignObject><\/g><\/g><g class=\"node default\" id=\"flowchart-F-9\"><rect class=\"basic label-container\"><\/rect><g class=\"label\"><rect><\/rect><foreignObject><div><span class=\"nodeLabel\"><p>Tender<\/p><\/span><\/div><\/foreignObject><\/g><\/g><g class=\"node default\" id=\"flowchart-G-11\"><rect class=\"basic label-container\"><\/rect><g class=\"label\"><rect><\/rect><foreignObject><div><span class=\"nodeLabel\"><p>Execution<\/p><\/span><\/div><\/foreignObject><\/g><\/g><g class=\"node default\" id=\"flowchart-H-13\"><rect class=\"basic label-container\"><\/rect><g class=\"label\"><rect><\/rect><foreignObject><div><span class=\"nodeLabel\"><p>Acceptance<\/p><\/span><\/div><\/foreignObject><\/g><\/g><\/g><\/g><\/g><\/svg><figcaption>Technical maturity of an Engineering procurement portfolio<\/figcaption><\/figure>\n\n\n\n<h2 class=\"wp-block-heading\">The PCA schedule must consider the Engineering work that comes before bidding<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">When consolidating the plan, Decree No. 10,947\/2022 provides for preparation of a procurement calendar by priority level, considering the estimated date for starting the process and budgetary and financial availability.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">In Engineering, the process start date needs to be worked backward from the date when the organization actually needs the work or system in operation. If modernization must be completed in December, for example, planning does not begin with publication of the tender a few months earlier. It must incorporate the time required for surveys, studies, design, review, budgeting, approval, bidding, mobilization, execution, testing, and acceptance.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">This reasoning can be structured backward:<\/p>\n\n\n\n<ol class=\"wp-block-list\"><li>define when the asset, system, or building needs to be available;<\/li><li>estimate execution and commissioning duration;<\/li><li>estimate the procurement-process duration;<\/li><li>identify the time required for budgeting, review, and technical documentation;<\/li><li>identify the time required for design development;<\/li><li>identify surveys and studies that feed the designs;<\/li><li>schedule demand formalization and the necessary budget decisions.<\/li><\/ol>\n\n\n\n<p class=\"wp-block-paragraph\">The consequence is simple: <strong>an Engineering PCA needs preparation logic, not merely a purchasing calendar<\/strong>.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">How to identify dependencies among works, designs, and services<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Infrastructure demands often compete for the same spaces, resources, and operational windows. A civil-works project may depend on electrical relocation; Data Center modernization may require reinforcement of power and cooling; a new CCTV system may depend on network, storage, and licenses; a building renovation may require coordination among architecture, electrical, HVAC, security, telecommunications, and fire-protection systems.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Ignoring these interfaces creates two types of problems. The first is chronological: procurement B starts before procurement A delivers the required condition. The second is technical: two designs are developed independently and produce incompatible solutions.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Dependency management can be performed with a simple matrix:<\/p>\n\n\n\n<figure class=\"wp-block-table\"><table><tbody><tr><td>Demand<\/td><td>Depends on<\/td><td>Type of dependency<\/td><td>Consequence if ignored<\/td><\/tr><tr><td>Technical-room renovation<\/td><td>Electrical and HVAC survey<\/td><td>Technical<\/td><td>Design may undersize capacity and overlook interferences<\/td><\/tr><tr><td>CCTV expansion<\/td><td>Network and storage upgrade<\/td><td>Capacity<\/td><td>Cameras may exceed available throughput or retention<\/td><\/tr><tr><td>Substation modernization<\/td><td>Load and protection study<\/td><td>Engineering<\/td><td>Equipment may be specified without proper coordination<\/td><\/tr><tr><td>Building adaptation<\/td><td>Needs Program<\/td><td>Requirements<\/td><td>Design may solve layout without meeting actual operations<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p class=\"wp-block-paragraph\">When the existing condition is uncertain, an <a href=\"https:\/\/a3aengenharia.com.br\/servicos\/levantamento-e-diagnostico\/site-survey\/\">Engineering Site Survey<\/a> or <a href=\"https:\/\/a3aengenharia.com.br\/servicos\/levantamento-e-diagnostico\/levantamento-cadastral-edificacoes-instalacoes-infraestruturas\/\">Engineering Existing-Conditions Survey<\/a> can be planned as a preceding contract. When the problem is broader and involves risks, compliance, criticality, and CAPEX, an <a href=\"https:\/\/a3aengenharia.com.br\/servicos\/levantamento-e-diagnostico\/due-diligence\/\">Engineering Technical Due Diligence<\/a> provides another layer of diagnosis.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">How to prioritize Engineering demands in the PCA<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Decree No. 10,947\/2022 allows demands to be classified as low, medium, or high priority. For an Engineering portfolio, however, the selected level should be supported by criteria that allow different demands to be compared.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Priority should not simply mean pressure from the requesting area. A more consistent methodology combines factors such as:<\/p>\n\n\n\n<ul class=\"wp-block-list\"><li>risk to life, safety, or service continuity;<\/li><li>legal, standards, or regulatory requirement;<\/li><li>condition and obsolescence of assets;<\/li><li>impact of failure on institutional operations;<\/li><li>available capacity versus current and future demand;<\/li><li>dependency on other works or designs;<\/li><li>opportunity to execute during a specific operational window;<\/li><li>cost of postponing the intervention;<\/li><li>technical maturity of the solution;<\/li><li>budget availability;<\/li><li>expected benefit and affected population.<\/li><\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">The <a href=\"https:\/\/a3aengenharia.com.br\/conteudo\/artigos-tecnicos\/matriz-de-priorizacao-projetos-engenharia\/\">Prioritization Matrix in Engineering projects<\/a> can transform qualitative criteria into a transparent comparison among demands. The objective is not to produce an automatic score that replaces management judgment, but to make explicit why one intervention should precede another.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">When the agency manages dozens of assets, buildings, or systems, this process can evolve into an <a href=\"https:\/\/a3aengenharia.com.br\/servicos\/planejamento\/planos-diretores\/\">Engineering Master Plan<\/a>, connecting diagnosis, priorities, roadmap, and investments.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">PCA and Engineering Master Plan are not the same thing<\/h2>\n\n\n\n<div class=\"wp-block-a3a-destaque\">\n<p class=\"wp-block-paragraph\">When several demands compete for budget, the decision should not be based only on the urgency perceived by each area. Condition, risk, dependencies, maturity, and investment horizon need to be managed as a technical portfolio.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">An Engineering Master Plan organizes this view before converting each intervention into a procurement.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><a href=\"https:\/\/a3aengenharia.com.br\/servicos\/planejamento\/planos-diretores\/\">Engineering Master Plans<\/a><\/p>\n<\/div>\n\n\n\n<p class=\"wp-block-paragraph\">The PCA is a formal instrument for planning expected procurements according to the regulations applicable to the entity. The Engineering Master Plan, by contrast, is a technical infrastructure-planning instrument capable of organizing existing condition, gaps, risks, interventions, priorities, dependencies, investments, and implementation horizon.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The two can strongly complement one another.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The Master Plan can produce the technical intelligence that feeds DFDs and the PCA. For example, a facility assessment may conclude that a complex requires ten interventions over three years. Not all will be procured immediately. The technical plan organizes the sequence, and the PCA incorporates, in each fiscal year, the procurements that need to advance.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">This relationship prevents the PCA from being produced merely as the sum of individual requests from different areas. Instead, it begins to reflect an integrated view of infrastructure.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">How to address demands across multiple sites or buildings<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Agencies with multiple sites face an additional problem: similar needs arise in different locations, but with different criticality levels and physical conditions.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Imagine twenty administrative units with electronic-security systems of different ages, standards, and architectures. If each unit formulates an independent procurement, the agency may lose opportunities for standardization, scale, governance, and interoperability. On the other hand, grouping everything into a single scope without diagnosis may mask relevant differences among sites.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">A more robust approach combines:<\/p>\n\n\n\n<ol class=\"wp-block-list\"><li>inventory of sites and systems;<\/li><li>condition and capacity survey;<\/li><li>criticality classification;<\/li><li>identification of common and site-specific requirements;<\/li><li>definition of a corporate technical standard;<\/li><li>technically justified grouping or lotting;<\/li><li>phasing of designs and procurements;<\/li><li>annual and multi-year investment scheduling.<\/li><\/ol>\n\n\n\n<p class=\"wp-block-paragraph\">The solution may be a single procurement, several lots, separate contracts, or a sequence of designs and works. This decision should only be made after the technical and operational characteristics are understood.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">How the Needs Program improves portfolio planning<\/h2>\n\n\n\n<div class=\"wp-block-a3a-destaque\">\n<p class=\"wp-block-paragraph\">Demands with users, capacities, and interfaces still undefined are not ready for design. The first step may be to consolidate requirements and performance criteria before selecting a solution.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><a href=\"https:\/\/a3aengenharia.com.br\/servicos\/planejamento\/programa-necessidades-requisitos-engenharia\/\">Engineering Needs Program and Requirements<\/a><\/p>\n<\/div>\n\n\n\n<p class=\"wp-block-paragraph\">In many demands, the problem is not lack of design; it is lack of consolidated requirements. Different areas request overlapping solutions, users have conflicting expectations, and future capacity has not yet been defined.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The <a href=\"https:\/\/a3aengenharia.com.br\/servicos\/planejamento\/programa-necessidades-requisitos-engenharia\/\">Engineering Needs Program and Requirements<\/a> organizes users, functions, capacities, performance, interfaces, constraints, and criteria before solution development. This stage helps distinguish institutional need from preference or solution hypothesis.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Within the PCA, this allows certain demands to be treated as \u201cschedule the Engineering work that will define the scope\u201d instead of directly registering a construction project whose definition does not yet exist.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The same applies to the <a href=\"https:\/\/a3aengenharia.com.br\/servicos\/planejamento\/estudo-tecnico-preliminar-etp-engenharia\/\">Preliminary Technical Study in Engineering<\/a>. When relevant alternatives exist, the ETP allows options to be compared and the adequacy of the solution to be demonstrated before it is translated into design, Terms of Reference, or tender documents.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">How to estimate investments when designs are not yet ready<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">A recurring PCA difficulty is estimating values before a detailed Basic Design exists. The Decree requires a preliminary value estimate in the DFD, but that does not mean a planning estimate has the same level of accuracy as a reference budget developed for procurement.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Management should treat cost and maturity together. Early-stage estimates need to state their basis, assumptions, reference date, and uncertainty range. As surveys and designs advance, the value should be refined.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The A3A Engenharia website already contains content on <a href=\"https:\/\/a3aengenharia.com.br\/conteudo\/artigos-tecnicos\/orcamento-parametrico-o-que-e-quando-usar-limitacoes\/\">parametric estimating<\/a>, <a href=\"https:\/\/a3aengenharia.com.br\/conteudo\/artigos-tecnicos\/orcamento-de-obra-como-elaborar-informacoes-necessarias\/\">construction estimating<\/a>, and <a href=\"https:\/\/a3aengenharia.com.br\/conteudo\/artigos-tecnicos\/business-case-projetos-engenharia-decisao-investimento\/\">Business Case in Engineering projects<\/a>. These methods support different decision levels and should not be confused.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The PCA needs a number sufficient for planning. The procurement process will later require a budget with methodology and accuracy compatible with the scope and design stage.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">The role of the ETP within the Annual Procurement Plan<\/h2>\n\n\n\n<div class=\"wp-block-a3a-destaque\">\n<p class=\"wp-block-paragraph\">The ETP transforms a prioritized need into a technically substantiated decision. When there are alternatives, costs, risks, and different ways to meet the need, this analysis should occur before the scope is crystallized in the tender documents.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><a href=\"https:\/\/a3aengenharia.com.br\/servicos\/planejamento\/estudo-tecnico-preliminar-etp-engenharia\/\">Preliminary Technical Study for Engineering<\/a><\/p>\n<\/div>\n\n\n\n<p class=\"wp-block-paragraph\">SEGES Normative Instruction No. 58\/2022 defines the ETP as the first stage in planning a procurement, characterizing the public interest involved and the best solution, and serving as a basis for preliminary design, Terms of Reference, or Basic Design when the procurement is feasible.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The PCA does not replace this analysis. It organizes <strong>when<\/strong> and <strong>which<\/strong> demands should enter the pipeline. The ETP deepens a specific demand and evaluates the solution.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">This distinction is especially relevant when the organization has a large portfolio. Without pipeline management, several teams may start ETPs simultaneously for demands that do not have budget, requirements, surveys, or consolidated priority. The plan should help sequence technical effort.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">When the ETP concludes that the solution depends on design, that design also needs to be scheduled. When it identifies that the existing condition is unknown, it may be necessary to return to the survey stage. The process is not purely documentary; it is iterative and evidence-based.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Basic Design, Terms of Reference, and readiness to procure<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">An Engineering demand should be considered procurement-ready only when the documents required by its delivery model and scope are sufficiently mature. The <a href=\"https:\/\/a3aengenharia.com.br\/servicos\/planejamento\/projeto-basico\/\">Engineering Basic Design<\/a> materializes technical definition, sizing, budgeting, and the procurement basis when this deliverable applies. The <a href=\"https:\/\/a3aengenharia.com.br\/servicos\/planejamento\/termo-referencia-obras-servicos-engenharia\/\">Terms of Reference for engineering works and services<\/a> organizes scope, requirements, execution, measurement, and acceptance.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The mere existence of these files does not prove readiness. They need to be coherent with one another, reflect existing conditions, incorporate approved requirements, and have resolved interfaces.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The article on <a href=\"https:\/\/a3aengenharia.com.br\/conteudo\/artigos-tecnicos\/project-readiness-engenharia-avaliacao-prontidao-projeto\/\">Project Readiness in Engineering<\/a> addresses readiness assessment before authorizing the next stage. This logic can be applied to the PCA portfolio: high-priority but low-maturity demands require immediate Engineering effort; mature demands can advance to procurement according to resources and schedule.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">An example of a PCA for public infrastructure<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Consider an agency responsible for an administrative complex consisting of headquarters and regional units. During planning for the following fiscal year, the following needs were identified:<\/p>\n\n\n\n<ul class=\"wp-block-list\"><li>modernize the headquarters CCTV system;<\/li><li>upgrade the medium-voltage substation;<\/li><li>renovate two regional units;<\/li><li>update the structured cabling of six buildings;<\/li><li>upgrade SPDA and surge protection;<\/li><li>replace cooling in critical areas;<\/li><li>expand Data Center capacity;<\/li><li>review access-control systems.<\/li><\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">If these eight needs are entered in the PCA merely as eight future tenders, the organization loses critical information. A maturity analysis could reveal something different:<\/p>\n\n\n\n<figure class=\"wp-block-table\"><table><tbody><tr><td>Demand<\/td><td>Actual situation<\/td><td>Action to schedule first<\/td><\/tr><tr><td>Headquarters CCTV<\/td><td>System mapped, but risks and coverage not reviewed<\/td><td>Site Survey and electronic-security design<\/td><\/tr><tr><td>Substation<\/td><td>Outdated diagrams and increased loads<\/td><td>Survey, electrical studies, and Basic Design<\/td><\/tr><tr><td>Regional renovations<\/td><td>Users have not yet defined needs<\/td><td>Needs Program and existing-conditions survey<\/td><\/tr><tr><td>Cabling<\/td><td>Partial As Built and different standards<\/td><td>Survey and corporate design<\/td><\/tr><tr><td>SPDA<\/td><td>Standard requirements and system condition need assessment<\/td><td>Inspection, risk analysis, and upgrade design<\/td><\/tr><tr><td>Critical cooling<\/td><td>Known failures, future capacity undefined<\/td><td>Diagnosis and alternatives study<\/td><\/tr><tr><td>Data Center<\/td><td>Growth expected, but integrated infrastructure not assessed<\/td><td>Due Diligence and feasibility study<\/td><\/tr><tr><td>Access control<\/td><td>Heterogeneous solutions among buildings<\/td><td>Corporate requirements and integrated design<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p class=\"wp-block-paragraph\">The PCA remains a procurement plan. The difference is that Engineering makes it possible to identify <strong>which procurement should happen first in each investment line<\/strong>.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Frequent mistakes in annual planning of Engineering works and services<\/h2>\n\n\n\n<h3 class=\"wp-block-heading\">Treating every need as a procurement-ready construction project<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">This error compresses diagnosis, study, design, and execution into a single planning line. The date looks simple in the PCA, but the complexity reappears later.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Planning by tender date rather than availability date<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">The institutional objective is generally to put the asset into operation, not to publish a tender. The schedule needs to include every stage through acceptance.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Ignoring internal capacity to produce and review designs<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Even when budget exists, several simultaneous procurements may exceed the technical team&#8217;s capacity to prepare ETPs, review designs, answer clarifications, supervise works, and accept deliverables.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Prioritizing only by value or pressure from the user area<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Risk, continuity, standards requirements, obsolescence, dependencies, and maturity also need to be part of the decision.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Failing to update the portfolio when new evidence emerges<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Surveys and studies may change scope, value, priority, and strategy. Planning needs to be governed as a living portfolio, while respecting the formal procedures applicable to PCA changes.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">How Consulting Engineering can support the PCA without assuming administrative functions<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">The procurement unit and competent authorities remain responsible for the administrative process established by legislation and the agency&#8217;s regulations. Consulting Engineering acts on the technical portion that supports these decisions.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">This support can organize the demand inventory, assess maturity, conduct surveys, produce diagnoses, consolidate requirements, prepare the technical component of ETPs, develop designs, estimate investments, map dependencies, and establish roadmaps.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">In complex portfolios, <a href=\"https:\/\/a3aengenharia.com.br\/solucoes\/gestao-e-governanca-de-engenharia\/governanca-de-projetos-programas-e-portfolios\/\">Project, Program, and Portfolio Governance<\/a> helps treat demands as an integrated set rather than independent processes. <a href=\"https:\/\/a3aengenharia.com.br\/solucoes\/gestao-e-governanca-de-engenharia\/gestao-requisitos-evidencias-criterios-aceite\/\">Requirements, Evidence, and Acceptance Criteria Management<\/a> creates traceability between the problem that originated the demand and what will later be verified at delivery.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The objective of consulting is not to assemble an \u201cadministrative\u201d PCA for the agency. It is to provide <strong>Engineering intelligence so that the PCA is executable<\/strong>.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">What to procure when the agency has many demands and little technical definition<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">When the portfolio is large, contracting isolated designs may not be the first answer. It may first be necessary to structure a technical diagnosis and planning program.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">A support scope may include:<\/p>\n\n\n\n<ul class=\"wp-block-list\"><li>inventory of buildings, facilities, systems, and open demands;<\/li><li>analysis of available technical documents;<\/li><li>classification of condition, criticality, and maturity;<\/li><li>map of dependencies between interventions;<\/li><li>gathering of corporate and local requirements;<\/li><li>standardization strategy;<\/li><li>preliminary investment estimates;<\/li><li>prioritization matrix;<\/li><li>roadmap of studies, designs, and works;<\/li><li>definition of procurement packages;<\/li><li>schedule for Engineering development;<\/li><li>support for preparing DFDs, ETPs, and subsequent technical documents.<\/li><\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">This type of work is close to an Engineering Master Plan or Engineering program. It is particularly useful when the organization knows it has a significant infrastructure backlog but cannot yet transform that backlog into a consistent sequence of designs and procurements.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Final considerations<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">The Annual Procurement Plan does not by itself solve the technical preparation of Engineering works and services. It organizes the portfolio the agency intends to procure; technical planning must ensure that each demand passes through the necessary stages before reaching the market.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The main difference between a merely formal PCA and one that is genuinely useful for infrastructure lies in visibility of maturity. Demands that still require surveys, requirements, ETP, or design need to be identified as such. Dependencies must be explicit. Priorities need to be justified. The schedule must incorporate Engineering time, not only bidding time.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">When this logic is applied, the agency stops managing a list of future purchases and begins governing a portfolio of interventions. Procurement becomes the consequence of a planned technical sequence \u2014 not the starting point for discovering what should have been defined beforehand.<\/p>\n\n\n\n<div class=\"wp-block-a3a-destaque\">\n<p class=\"wp-block-paragraph\">An extensive portfolio of works, upgrades, and modernizations requires more than isolated documents. Consulting Engineering can structure diagnosis, prioritization, designs, and investment sequencing so that each procurement advances with appropriate maturity.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><a href=\"https:\/\/a3aengenharia.com.br\/conteudo\/guias-tecnicos\/guia-completo-sobre-engenharia-consultiva\/\">Complete Guide to Consulting Engineering<\/a><\/p>\n<\/div>\n\n\n\n<details class=\"wp-block-details is-layout-flow wp-block-details-is-layout-flow\"><summary>Technical references<\/summary>\n<p class=\"wp-block-paragraph\">[1] BRASIL. Presidency of the Republic. Decree No. 10,947, January 25, 2022. Regulates the Annual Procurement Plan and establishes the Procurement Planning and Management System within the federal direct, autonomous, and foundation public administration. Available at: <a href=\"https:\/\/www.planalto.gov.br\/ccivil_03\/_ato2019-2022\/2022\/decreto\/d10947.htm\">https:\/\/www.planalto.gov.br\/ccivil_03\/_ato2019-2022\/2022\/decreto\/d10947.htm<\/a><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">[2] BRASIL. Law No. 14,133, April 1, 2021. Public Procurement and Administrative Contracts Law. Available at: <a href=\"https:\/\/www.planalto.gov.br\/ccivil_03\/_ato2019-2022\/2021\/lei\/l14133.htm\">https:\/\/www.planalto.gov.br\/ccivil_03\/_ato2019-2022\/2021\/lei\/l14133.htm<\/a><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">[3] BRASIL. Ministry of Management and Innovation in Public Services. SEGES Normative Instruction No. 58, August 8, 2022. Provides for preparation of Preliminary Technical Studies \u2014 ETP. Available at: <a href=\"https:\/\/www.gov.br\/compras\/pt-br\/acesso-a-informacao\/legislacao\/instrucoes-normativas\/instrucao-normativa-seges-no-58-de-8-de-agosto-de-2022\">https:\/\/www.gov.br\/compras\/pt-br\/acesso-a-informacao\/legislacao\/instrucoes-normativas\/instrucao-normativa-seges-no-58-de-8-de-agosto-de-2022<\/a><\/p>\n<\/details>\n\n\n\n<details class=\"wp-block-details is-layout-flow wp-block-details-is-layout-flow\"><summary>Frequently asked questions<\/summary>\n<div class=\"schema-faq wp-block-yoast-faq-block\"><div class=\"schema-faq-section\" id=\"faq-question-o-que-o-plano-de-contrata-es-anual-68a8310a\"><strong class=\"schema-faq-question\">What is the Annual Procurement Plan?<\/strong> <p class=\"schema-faq-answer\">It is the instrument that consolidates procurement demands expected for the following fiscal year. Within the federal framework regulated by Decree No. 10,947\/2022, the PCA seeks to rationalize procurement, align it with planning, support budgeting, prevent expenditure splitting, and signal intentions to the market.<\/p><\/div><div class=\"schema-faq-section\" id=\"faq-question-toda-obra-prevista-no-pca-precisa-estar-com-o-pr-279d29e5\"><strong class=\"schema-faq-question\">Does every construction project included in the PCA need to have a completed design?<\/strong> <p class=\"schema-faq-answer\">Not necessarily at the initial planning stage, but the organization needs to recognize the maturity level of the demand and schedule the missing stages. A work may first require a survey, ETP, Needs Program, preliminary design, or Basic Design before contracting execution.<\/p><\/div><div class=\"schema-faq-section\" id=\"faq-question-qual-a-rela-o-entre-dfd-e-pca-21524415\"><strong class=\"schema-faq-question\">What is the relationship between DFD and PCA?<\/strong> <p class=\"schema-faq-answer\">Under Decree No. 10,947\/2022, the DFD formalizes and details the procurement need and supports preparation of the PCA. The formalized demands are consolidated by the procurement unit.<\/p><\/div><div class=\"schema-faq-section\" id=\"faq-question-como-priorizar-obras-e-projetos-no-pca-d67007ec\"><strong class=\"schema-faq-question\">How should works and designs be prioritized in the PCA?<\/strong> <p class=\"schema-faq-answer\">In addition to the formal priority level, the portfolio can consider risk to life, continuity, legal requirements, asset condition, capacity, dependencies, cost of postponement, benefit, technical maturity, and budget availability.<\/p><\/div><div class=\"schema-faq-section\" id=\"faq-question-pca-e-plano-diretor-de-engenharia-s-o-a-mesma-co-45bad4e2\"><strong class=\"schema-faq-question\">Are the PCA and the Engineering Master Plan the same thing?<\/strong> <p class=\"schema-faq-answer\">No. The PCA is a procurement-planning instrument. The Engineering Master Plan technically organizes diagnosis, priorities, interventions, investments, and the infrastructure roadmap and can provide the technical basis that feeds DFDs and the PCA.<\/p><\/div><div class=\"schema-faq-section\" id=\"faq-question-a-engenharia-consultiva-pode-apoiar-a-elabora-o--a2796186\"><strong class=\"schema-faq-question\">Can Consulting Engineering support preparation of the PCA?<\/strong> <p class=\"schema-faq-answer\">It can support the technical portion of planning \u2014 diagnosis, maturity, requirements, designs, estimates, dependencies, and prioritization \u2014 without replacing the administrative responsibilities of the procurement unit and agency authorities.<\/p><\/div><\/div>\n<\/details>\n\n\n\n<details class=\"wp-block-details is-layout-flow wp-block-details-is-layout-flow\"><summary>Additional technical materials<\/summary>\n<h4 class=\"wp-block-heading\">Related solutions<\/h4>\n\n<ul class=\"wp-block-list\"><li><a href=\"https:\/\/a3aengenharia.com.br\/solucoes\/gestao-e-governanca-de-engenharia\/governanca-de-projetos-programas-e-portfolios\/\">Project, Program, and Portfolio Governance<\/a><\/li><li><a href=\"https:\/\/a3aengenharia.com.br\/solucoes\/gestao-e-governanca-de-engenharia\/gestao-contratos-escopo-entregaveis\/\">Contracts, Scope, and Deliverables Management<\/a><\/li><li><a href=\"https:\/\/a3aengenharia.com.br\/solucoes\/gestao-e-governanca-de-engenharia\/gestao-requisitos-evidencias-criterios-aceite\/\">Requirements, Evidence, and Acceptance Criteria Management<\/a><\/li><li><a href=\"https:\/\/a3aengenharia.com.br\/solucoes\/gestao-e-governanca-de-engenharia\/gestao-processos-workflows-aprovacoes-tecnicas\/\">Processes, Workflows, and Technical Approvals Management<\/a><\/li><\/ul>\n\n<h4 class=\"wp-block-heading\">Related services<\/h4>\n\n<ul class=\"wp-block-list\"><li><a href=\"https:\/\/a3aengenharia.com.br\/servicos\/planejamento\/planos-diretores\/\">Engineering Master Plans<\/a><\/li><li><a href=\"https:\/\/a3aengenharia.com.br\/servicos\/planejamento\/programa-necessidades-requisitos-engenharia\/\">Engineering Needs Program and Requirements<\/a><\/li><li><a href=\"https:\/\/a3aengenharia.com.br\/servicos\/planejamento\/estudo-tecnico-preliminar-etp-engenharia\/\">Preliminary Technical Study for Engineering Works and Services<\/a><\/li><li><a href=\"https:\/\/a3aengenharia.com.br\/servicos\/levantamento-e-diagnostico\/site-survey\/\">Engineering Site Survey<\/a><\/li><li><a href=\"https:\/\/a3aengenharia.com.br\/servicos\/levantamento-e-diagnostico\/levantamento-cadastral-edificacoes-instalacoes-infraestruturas\/\">Engineering Existing-Conditions Survey<\/a><\/li><li><a href=\"https:\/\/a3aengenharia.com.br\/servicos\/planejamento\/analise-de-viabilidade-financeira\/\">Technical and Economic Feasibility Study<\/a><\/li><li><a href=\"https:\/\/a3aengenharia.com.br\/servicos\/planejamento\/projeto-basico\/\">Engineering Basic Design<\/a><\/li><\/ul>\n\n<h4 class=\"wp-block-heading\">Main content on this topic<\/h4>\n\n<ul class=\"wp-block-list\"><li><a href=\"https:\/\/a3aengenharia.com.br\/conteudo\/artigos-tecnicos\/dfd-obras-servicos-engenharia-formalizacao-demanda\/\">DFD for Engineering Works and Services<\/a><\/li><li><a href=\"https:\/\/a3aengenharia.com.br\/conteudo\/artigos-tecnicos\/estudo-tecnico-preliminar-etp-obras-servicos-engenharia-contratacao\/\">Preliminary Technical Study for Engineering Works and Services<\/a><\/li><li><a href=\"https:\/\/a3aengenharia.com.br\/conteudo\/artigos-tecnicos\/matriz-de-priorizacao-projetos-engenharia\/\">Prioritization Matrix in Engineering Projects<\/a><\/li><li><a href=\"https:\/\/a3aengenharia.com.br\/conteudo\/artigos-tecnicos\/o-que-e-projeto-basico\/\">Engineering Basic Design: what it is, stages, and readiness criteria<\/a><\/li><li><a href=\"https:\/\/a3aengenharia.com.br\/conteudo\/artigos-tecnicos\/termo-de-referencia-engenharia-escopo-criterios-tecnicos-medicao-aceite\/\">Terms of Reference in Engineering<\/a><\/li><\/ul>\n\n<h4 class=\"wp-block-heading\">Related technical content<\/h4>\n\n<ul class=\"wp-block-list\"><li><a href=\"https:\/\/a3aengenharia.com.br\/conteudo\/artigos-tecnicos\/project-readiness-engenharia-avaliacao-prontidao-projeto\/\">Project Readiness in Engineering<\/a><\/li><li><a href=\"https:\/\/a3aengenharia.com.br\/conteudo\/artigos-tecnicos\/business-case-projetos-engenharia-decisao-investimento\/\">Business Case in Engineering Projects<\/a><\/li><li><a href=\"https:\/\/a3aengenharia.com.br\/conteudo\/artigos-tecnicos\/orcamento-parametrico-o-que-e-quando-usar-limitacoes\/\">Parametric Estimating<\/a><\/li><li><a href=\"https:\/\/a3aengenharia.com.br\/conteudo\/guias-tecnicos\/guia-completo-sobre-licitacoes-e-contratos-de-engenharia\/\">Complete Guide to Public Procurement and Engineering Contracts<\/a><\/li><li><a href=\"https:\/\/a3aengenharia.com.br\/conteudo\/guias-tecnicos\/guia-completo-sobre-engenharia-consultiva\/\">Complete Guide to Consulting Engineering<\/a><\/li><li><a href=\"https:\/\/a3aengenharia.com.br\/conteudo\/whitepapers\/owners-engineering-framework-contratacao-governanca\/\">Owner\u2019s Engineering: Executive Framework for Procurement, Governance, and Acceptance<\/a><\/li><\/ul>\n<\/details>\n","protected":false},"excerpt":{"rendered":"<p>Understand how to apply the Annual Procurement Plan to engineering works and services, organizing maturity, priorities, dependencies, designs, and investments.<\/p>\n","protected":false},"author":1,"featured_media":0,"parent":0,"template":"","meta":{"_a3a_global_related_solutions":[],"_a3a_global_related_services":[],"_a3a_global_related_materials":[],"_a3a_post_lang":"en-us","_a3a_translation_group_id":"34217765-c29f-4815-b7a8-9f93c904167f","_a3a_i18n_canonical_slug":"annual-procurement-plan-engineering-works-designs-investments"},"categories":[],"segments":[],"mercados":[],"etapas":[],"class_list":["post-73516","articles","type-articles","status-publish","hentry"],"_links":{"self":[{"href":"https:\/\/a3aengenharia.com\/en-us\/wp-json\/wp\/v2\/articles\/73516","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/a3aengenharia.com\/en-us\/wp-json\/wp\/v2\/articles"}],"about":[{"href":"https:\/\/a3aengenharia.com\/en-us\/wp-json\/wp\/v2\/types\/articles"}],"author":[{"embeddable":true,"href":"https:\/\/a3aengenharia.com\/en-us\/wp-json\/wp\/v2\/users\/1"}],"version-history":[{"count":1,"href":"https:\/\/a3aengenharia.com\/en-us\/wp-json\/wp\/v2\/articles\/73516\/revisions"}],"predecessor-version":[{"id":73518,"href":"https:\/\/a3aengenharia.com\/en-us\/wp-json\/wp\/v2\/articles\/73516\/revisions\/73518"}],"wp:attachment":[{"href":"https:\/\/a3aengenharia.com\/en-us\/wp-json\/wp\/v2\/media?parent=73516"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/a3aengenharia.com\/en-us\/wp-json\/wp\/v2\/categories?post=73516"},{"taxonomy":"segments","embeddable":true,"href":"https:\/\/a3aengenharia.com\/en-us\/wp-json\/wp\/v2\/segments?post=73516"},{"taxonomy":"mercados","embeddable":true,"href":"https:\/\/a3aengenharia.com\/en-us\/wp-json\/wp\/v2\/mercados?post=73516"},{"taxonomy":"etapas","embeddable":true,"href":"https:\/\/a3aengenharia.com\/en-us\/wp-json\/wp\/v2\/etapas?post=73516"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}