{"id":73388,"date":"2026-08-30T18:16:17","date_gmt":"2026-08-30T21:16:17","guid":{"rendered":"https:\/\/a3aengenharia.com\/?post_type=articles&#038;p=73388"},"modified":"2026-08-30T18:16:17","modified_gmt":"2026-08-30T21:16:17","slug":"rfi-engineering-market-consultation-before-procurement","status":"publish","type":"articles","link":"https:\/\/a3aengenharia.com\/en-us\/content\/technical-articles\/rfi-engineering-market-consultation-before-procurement\/","title":{"rendered":"RFI in Engineering: how to consult the market before structuring procurement"},"content":{"rendered":"\n<p class=\"wp-block-paragraph\">An <strong>RFI in Engineering (Request for Information)<\/strong> is a structured market consultation used when the owner still needs to understand technical alternatives, supply capability, solution maturity, constraints, lead times or information required to properly define a future procurement. It comes before the formal request for a proposal or quotation and is intended to reduce uncertainty \u2014 not to silently select a supplier.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">An RFI is especially useful when the problem is clear but the solution is not yet sufficiently specified; when competing technologies or architectures exist; when certain requirements need to be validated with the market; or when suppliers\u2019 actual capability may change the procurement strategy. In Engineering projects, this step prevents an RFP or RFQ from being built on weak assumptions and later receiving incomparable or technically unfeasible offers.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The expected result is not a collection of catalogs. A good RFI produces <strong>traceable market intelligence<\/strong>: bounded questions, comparable responses, evidence, gaps and documented decisions about what needs to move into the next Procurement phase.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">What is an RFI and what problem does it solve?<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">RFI means <em>Request for Information<\/em>. In Procurement, it is a consultation document used to obtain information from suppliers, manufacturers, integrators, designers, contractors or service providers before a solicitation more directly tied to contracting.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The PMBOK\u00ae Guide \u2014 Eighth Edition places the RFI before proposal solicitation documents: it helps the buyer obtain more information from the market before moving to an RFP or RFQ. That position defines its boundary: <strong>RFI is a discovery and validation mechanism; RFP and RFQ are competitive solicitation mechanisms closer to supplier selection<\/strong>.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">In Engineering, uncertainty may concern technology availability, architecture alternatives, infrastructure requirements, lead times, interoperability, testing, documentation, certifications, technical support, warranty or the number of technically capable suppliers.<\/p>\n\n\n\n<figure class=\"a3a-mermaid\"><svg id=\"a3a-diagram-1\" width=\"100%\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" class=\"flowchart\" style=\"max-width:min(1800.875px, 100%);height:auto;display:block;margin:0 auto\" viewBox=\"0 0 1800.875 273.5\" role=\"graphics-document document\" aria-roledescription=\"flowchart-v2\" aria-labelledby=\"chart-title-a3a-diagram-1\"><title id=\"chart-title-a3a-diagram-1\">Position of the RFI in the technical definition and procurement flow<\/title><style>#a3a-diagram-1{font-family:Roboto,sans-serif;font-size:15px;fill:var(--a3a-diag-text, #0a0a0a);}@keyframes edge-animation-frame{from{stroke-dashoffset:0;}}@keyframes dash{to{stroke-dashoffset:0;}}#a3a-diagram-1 .edge-animation-slow{stroke-dasharray:9,5!important;stroke-dashoffset:900;animation:dash 50s linear infinite;stroke-linecap:round;}#a3a-diagram-1 .edge-animation-fast{stroke-dasharray:9,5!important;stroke-dashoffset:900;animation:dash 20s linear infinite;stroke-linecap:round;}#a3a-diagram-1 .error-icon{fill:var(--a3a-diag-canvas, #ffffff);}#a3a-diagram-1 .error-text{fill:#000000;stroke:#000000;}#a3a-diagram-1 .edge-thickness-normal{stroke-width:1px;}#a3a-diagram-1 .edge-thickness-thick{stroke-width:3.5px;}#a3a-diagram-1 .edge-pattern-solid{stroke-dasharray:0;}#a3a-diagram-1 .edge-thickness-invisible{stroke-width:0;fill:none;}#a3a-diagram-1 .edge-pattern-dashed{stroke-dasharray:3;}#a3a-diagram-1 .edge-pattern-dotted{stroke-dasharray:2;}#a3a-diagram-1 .marker{fill:var(--a3a-diag-stroke, #2e42a2);stroke:var(--a3a-diag-stroke, #2e42a2);}#a3a-diagram-1 .marker.cross{stroke:var(--a3a-diag-stroke, #2e42a2);}#a3a-diagram-1 svg{font-family:Roboto,sans-serif;font-size:15px;}#a3a-diagram-1 p{margin:0;}#a3a-diagram-1 .label{font-family:Roboto,sans-serif;color:var(--a3a-diag-text, #0a0a0a);}#a3a-diagram-1 .cluster-label text{fill:var(--a3a-diag-title, #0124af);}#a3a-diagram-1 .cluster-label span{color:var(--a3a-diag-title, #0124af);}#a3a-diagram-1 .cluster-label span p{background-color:transparent;}#a3a-diagram-1 .label text,#a3a-diagram-1 span{fill:var(--a3a-diag-text, #0a0a0a);color:var(--a3a-diag-text, #0a0a0a);}#a3a-diagram-1 .node rect,#a3a-diagram-1 .node circle,#a3a-diagram-1 .node ellipse,#a3a-diagram-1 .node polygon,#a3a-diagram-1 .node path{fill:var(--a3a-diag-fill, #eef2fd);stroke:var(--a3a-diag-stroke, #2e42a2);stroke-width:1px;}#a3a-diagram-1 .rough-node .label text,#a3a-diagram-1 .node .label text,#a3a-diagram-1 .image-shape .label,#a3a-diagram-1 .icon-shape .label{text-anchor:middle;}#a3a-diagram-1 .node .katex path{fill:#000;stroke:#000;stroke-width:1px;}#a3a-diagram-1 .rough-node .label,#a3a-diagram-1 .node .label,#a3a-diagram-1 .image-shape .label,#a3a-diagram-1 .icon-shape .label{text-align:center;}#a3a-diagram-1 .node.clickable{cursor:pointer;}#a3a-diagram-1 .root .anchor path{fill:var(--a3a-diag-stroke, #2e42a2)!important;stroke-width:0;stroke:var(--a3a-diag-stroke, #2e42a2);}#a3a-diagram-1 .arrowheadPath{fill:var(--a3a-diag-stroke, #0b0b0b);}#a3a-diagram-1 .edgePath .path{stroke:var(--a3a-diag-stroke, #2e42a2);stroke-width:2.0px;}#a3a-diagram-1 .flowchart-link{stroke:var(--a3a-diag-stroke, #2e42a2);fill:none;}#a3a-diagram-1 .edgeLabel{background-color:var(--a3a-diag-canvas, #ffffff);text-align:center;}#a3a-diagram-1 .edgeLabel p{background-color:var(--a3a-diag-canvas, #ffffff);}#a3a-diagram-1 .edgeLabel rect{opacity:0.5;background-color:var(--a3a-diag-canvas, #ffffff);fill:var(--a3a-diag-canvas, #ffffff);}#a3a-diagram-1 .labelBkg{background-color:rgba(255, 255, 255, 0.5);}#a3a-diagram-1 .cluster rect{fill:var(--a3a-diag-surface, #f8f8f8);stroke:var(--a3a-diag-border, #e2e8f0);stroke-width:1px;}#a3a-diagram-1 .cluster text{fill:var(--a3a-diag-title, #0124af);}#a3a-diagram-1 .cluster span{color:var(--a3a-diag-title, #0124af);}#a3a-diagram-1 div.mermaidTooltip{position:absolute;text-align:center;max-width:200px;padding:2px;font-family:Roboto,sans-serif;font-size:12px;background:var(--a3a-diag-canvas, #ffffff);border:1px solid hsl(0, 0%, 90%);border-radius:2px;pointer-events:none;z-index:100;}#a3a-diagram-1 .flowchartTitleText{text-anchor:middle;font-size:18px;fill:var(--a3a-diag-text, #0a0a0a);}#a3a-diagram-1 rect.text{fill:none;stroke-width:0;}#a3a-diagram-1 .icon-shape,#a3a-diagram-1 .image-shape{background-color:var(--a3a-diag-canvas, #ffffff);text-align:center;}#a3a-diagram-1 .icon-shape p,#a3a-diagram-1 .image-shape p{background-color:var(--a3a-diag-canvas, #ffffff);padding:2px;}#a3a-diagram-1 .icon-shape rect,#a3a-diagram-1 .image-shape rect{opacity:0.5;background-color:var(--a3a-diag-canvas, #ffffff);fill:var(--a3a-diag-canvas, #ffffff);}#a3a-diagram-1 .label-icon{display:inline-block;height:1em;overflow:visible;vertical-align:-0.125em;}#a3a-diagram-1 .node .label-icon path{fill:currentColor;stroke:revert;stroke-width:revert;}#a3a-diagram-1 :root{--mermaid-font-family:Roboto,sans-serif;}<\/style><g><marker id=\"a3a-diagram-1_flowchart-v2-pointEnd\" class=\"marker flowchart-v2\" viewBox=\"0 0 10 10\" refX=\"5\" refY=\"5\" markerUnits=\"userSpaceOnUse\" markerWidth=\"8\" markerHeight=\"8\" orient=\"auto\"><path d=\"M 0 0 L 10 5 L 0 10 z\" class=\"arrowMarkerPath\" style=\"stroke-width: 1; stroke-dasharray: 1, 0;\"><\/path><\/marker><marker id=\"a3a-diagram-1_flowchart-v2-pointStart\" class=\"marker flowchart-v2\" viewBox=\"0 0 10 10\" refX=\"4.5\" refY=\"5\" markerUnits=\"userSpaceOnUse\" markerWidth=\"8\" markerHeight=\"8\" orient=\"auto\"><path d=\"M 0 5 L 10 10 L 10 0 z\" class=\"arrowMarkerPath\" style=\"stroke-width: 1; stroke-dasharray: 1, 0;\"><\/path><\/marker><marker id=\"a3a-diagram-1_flowchart-v2-circleEnd\" class=\"marker flowchart-v2\" viewBox=\"0 0 10 10\" refX=\"11\" refY=\"5\" markerUnits=\"userSpaceOnUse\" markerWidth=\"11\" markerHeight=\"11\" orient=\"auto\"><circle cx=\"5\" cy=\"5\" r=\"5\" class=\"arrowMarkerPath\" style=\"stroke-width: 1; stroke-dasharray: 1, 0;\"><\/circle><\/marker><marker id=\"a3a-diagram-1_flowchart-v2-circleStart\" class=\"marker flowchart-v2\" viewBox=\"0 0 10 10\" refX=\"-1\" refY=\"5\" markerUnits=\"userSpaceOnUse\" markerWidth=\"11\" markerHeight=\"11\" orient=\"auto\"><circle cx=\"5\" cy=\"5\" r=\"5\" class=\"arrowMarkerPath\" style=\"stroke-width: 1; stroke-dasharray: 1, 0;\"><\/circle><\/marker><marker id=\"a3a-diagram-1_flowchart-v2-crossEnd\" class=\"marker cross flowchart-v2\" viewBox=\"0 0 11 11\" refX=\"12\" refY=\"5.2\" markerUnits=\"userSpaceOnUse\" markerWidth=\"11\" markerHeight=\"11\" orient=\"auto\"><path d=\"M 1,1 l 9,9 M 10,1 l -9,9\" class=\"arrowMarkerPath\" style=\"stroke-width: 2; stroke-dasharray: 1, 0;\"><\/path><\/marker><marker id=\"a3a-diagram-1_flowchart-v2-crossStart\" class=\"marker cross flowchart-v2\" viewBox=\"0 0 11 11\" refX=\"-1\" refY=\"5.2\" markerUnits=\"userSpaceOnUse\" markerWidth=\"11\" markerHeight=\"11\" orient=\"auto\"><path d=\"M 1,1 l 9,9 M 10,1 l -9,9\" class=\"arrowMarkerPath\" style=\"stroke-width: 2; stroke-dasharray: 1, 0;\"><\/path><\/marker><g class=\"root\"><g class=\"clusters\"><\/g><g class=\"edgePaths\"><path d=\"M186.531,136.75L190.698,136.75C194.865,136.75,203.198,136.75,210.865,136.75C218.531,136.75,225.531,136.75,229.031,136.75L232.531,136.75\" id=\"L_A_B_0\" class=\"edge-thickness-normal edge-pattern-solid edge-thickness-normal edge-pattern-solid flowchart-link\" style=\";\" data-edge=\"true\" data-et=\"edge\" data-id=\"L_A_B_0\" data-points=\"W3sieCI6MTg2LjUzMTI1LCJ5IjoxMzYuNzV9LHsieCI6MjExLjUzMTI1LCJ5IjoxMzYuNzV9LHsieCI6MjM2LjUzMTI1LCJ5IjoxMzYuNzV9XQ==\" marker-end=\"url(#a3a-diagram-1_flowchart-v2-pointEnd)\"><\/path><path d=\"M412.953,136.75L417.12,136.75C421.286,136.75,429.62,136.75,437.286,136.75C444.953,136.75,451.953,136.75,455.453,136.75L458.953,136.75\" id=\"L_B_C_0\" class=\"edge-thickness-normal edge-pattern-solid edge-thickness-normal edge-pattern-solid flowchart-link\" style=\";\" data-edge=\"true\" data-et=\"edge\" data-id=\"L_B_C_0\" data-points=\"W3sieCI6NDEyLjk1MzEyNSwieSI6MTM2Ljc1fSx7IngiOjQzNy45NTMxMjUsInkiOjEzNi43NX0seyJ4Ijo0NjIuOTUzMTI1LCJ5IjoxMzYuNzV9XQ==\" marker-end=\"url(#a3a-diagram-1_flowchart-v2-pointEnd)\"><\/path><path d=\"M640.016,136.75L644.182,136.75C648.349,136.75,656.682,136.75,664.349,136.75C672.016,136.75,679.016,136.75,682.516,136.75L686.016,136.75\" id=\"L_C_D_0\" class=\"edge-thickness-normal edge-pattern-solid edge-thickness-normal edge-pattern-solid flowchart-link\" style=\";\" data-edge=\"true\" data-et=\"edge\" data-id=\"L_C_D_0\" data-points=\"W3sieCI6NjQwLjAxNTYyNSwieSI6MTM2Ljc1fSx7IngiOjY2NS4wMTU2MjUsInkiOjEzNi43NX0seyJ4Ijo2OTAuMDE1NjI1LCJ5IjoxMzYuNzV9XQ==\" marker-end=\"url(#a3a-diagram-1_flowchart-v2-pointEnd)\"><\/path><path d=\"M917.281,136.75L921.448,136.75C925.615,136.75,933.948,136.75,941.615,136.75C949.281,136.75,956.281,136.75,959.781,136.75L963.281,136.75\" id=\"L_D_E_0\" class=\"edge-thickness-normal edge-pattern-solid edge-thickness-normal edge-pattern-solid flowchart-link\" style=\";\" data-edge=\"true\" data-et=\"edge\" data-id=\"L_D_E_0\" data-points=\"W3sieCI6OTE3LjI4MTI1LCJ5IjoxMzYuNzV9LHsieCI6OTQyLjI4MTI1LCJ5IjoxMzYuNzV9LHsieCI6OTY3LjI4MTI1LCJ5IjoxMzYuNzV9XQ==\" marker-end=\"url(#a3a-diagram-1_flowchart-v2-pointEnd)\"><\/path><path d=\"M1187.906,136.75L1192.073,136.75C1196.24,136.75,1204.573,136.75,1212.24,136.75C1219.906,136.75,1226.906,136.75,1230.406,136.75L1233.906,136.75\" id=\"L_E_F_0\" class=\"edge-thickness-normal edge-pattern-solid edge-thickness-normal edge-pattern-solid flowchart-link\" style=\";\" data-edge=\"true\" data-et=\"edge\" data-id=\"L_E_F_0\" data-points=\"W3sieCI6MTE4Ny45MDYyNSwieSI6MTM2Ljc1fSx7IngiOjEyMTIuOTA2MjUsInkiOjEzNi43NX0seyJ4IjoxMjM3LjkwNjI1LCJ5IjoxMzYuNzV9XQ==\" marker-end=\"url(#a3a-diagram-1_flowchart-v2-pointEnd)\"><\/path><path d=\"M1399.605,102.621L1420.901,91.225C1442.198,79.83,1484.79,57.04,1528.252,45.645C1571.714,34.25,1616.044,34.25,1638.21,34.25L1660.375,34.25\" id=\"L_F_G_0\" class=\"edge-thickness-normal edge-pattern-solid edge-thickness-normal edge-pattern-solid flowchart-link\" style=\";\" data-edge=\"true\" data-et=\"edge\" data-id=\"L_F_G_0\" data-points=\"W3sieCI6MTM5OS42MDQ5MjQ5NDY4NjUxLCJ5IjoxMDIuNjIwNTQ5OTQ2ODY1MDR9LHsieCI6MTUyNy4zODI4MTI1LCJ5IjozNC4yNX0seyJ4IjoxNjY0LjM3NSwieSI6MzQuMjV9XQ==\" marker-end=\"url(#a3a-diagram-1_flowchart-v2-pointEnd)\"><\/path><path d=\"M1433.734,136.75L1449.342,136.75C1464.951,136.75,1496.167,136.75,1533.823,136.75C1571.479,136.75,1615.576,136.75,1637.624,136.75L1659.672,136.75\" id=\"L_F_H_0\" class=\"edge-thickness-normal edge-pattern-solid edge-thickness-normal edge-pattern-solid flowchart-link\" style=\";\" data-edge=\"true\" data-et=\"edge\" data-id=\"L_F_H_0\" data-points=\"W3sieCI6MTQzMy43MzQzNzUsInkiOjEzNi43NX0seyJ4IjoxNTI3LjM4MjgxMjUsInkiOjEzNi43NX0seyJ4IjoxNjYzLjY3MTg3NSwieSI6MTM2Ljc1fV0=\" marker-end=\"url(#a3a-diagram-1_flowchart-v2-pointEnd)\"><\/path><path d=\"M1399.605,170.879L1420.901,182.275C1442.198,193.67,1484.79,216.46,1521.028,227.855C1557.266,239.25,1587.148,239.25,1602.09,239.25L1617.031,239.25\" id=\"L_F_I_0\" class=\"edge-thickness-normal edge-pattern-solid edge-thickness-normal edge-pattern-solid flowchart-link\" style=\";\" data-edge=\"true\" data-et=\"edge\" data-id=\"L_F_I_0\" data-points=\"W3sieCI6MTM5OS42MDQ5MjQ5NDY4NjUxLCJ5IjoxNzAuODc5NDUwMDUzMTM0OTd9LHsieCI6MTUyNy4zODI4MTI1LCJ5IjoyMzkuMjV9LHsieCI6MTYyMS4wMzEyNSwieSI6MjM5LjI1fV0=\" marker-end=\"url(#a3a-diagram-1_flowchart-v2-pointEnd)\"><\/path><\/g><g class=\"edgeLabels\"><g class=\"edgeLabel\"><g class=\"label\" data-id=\"L_A_B_0\" transform=\"translate(0, 0)\"><foreignObject width=\"0\" height=\"0\"><div xmlns=\"http:\/\/www.w3.org\/1999\/xhtml\" class=\"labelBkg\" style=\"display: table-cell; white-space: nowrap; line-height: 1.5; max-width: 200px; text-align: center;\"><span class=\"edgeLabel\"><\/span><\/div><\/foreignObject><\/g><\/g><g class=\"edgeLabel\"><g class=\"label\" data-id=\"L_B_C_0\" transform=\"translate(0, 0)\"><foreignObject width=\"0\" height=\"0\"><div xmlns=\"http:\/\/www.w3.org\/1999\/xhtml\" class=\"labelBkg\" style=\"display: table-cell; white-space: nowrap; line-height: 1.5; max-width: 200px; text-align: center;\"><span class=\"edgeLabel\"><\/span><\/div><\/foreignObject><\/g><\/g><g class=\"edgeLabel\"><g class=\"label\" data-id=\"L_C_D_0\" transform=\"translate(0, 0)\"><foreignObject width=\"0\" height=\"0\"><div xmlns=\"http:\/\/www.w3.org\/1999\/xhtml\" class=\"labelBkg\" style=\"display: table-cell; white-space: nowrap; line-height: 1.5; max-width: 200px; text-align: center;\"><span class=\"edgeLabel\"><\/span><\/div><\/foreignObject><\/g><\/g><g class=\"edgeLabel\"><g class=\"label\" data-id=\"L_D_E_0\" transform=\"translate(0, 0)\"><foreignObject width=\"0\" height=\"0\"><div xmlns=\"http:\/\/www.w3.org\/1999\/xhtml\" class=\"labelBkg\" style=\"display: table-cell; white-space: nowrap; line-height: 1.5; max-width: 200px; text-align: center;\"><span class=\"edgeLabel\"><\/span><\/div><\/foreignObject><\/g><\/g><g class=\"edgeLabel\"><g class=\"label\" data-id=\"L_E_F_0\" transform=\"translate(0, 0)\"><foreignObject width=\"0\" height=\"0\"><div xmlns=\"http:\/\/www.w3.org\/1999\/xhtml\" class=\"labelBkg\" style=\"display: table-cell; white-space: nowrap; line-height: 1.5; max-width: 200px; text-align: center;\"><span class=\"edgeLabel\"><\/span><\/div><\/foreignObject><\/g><\/g><g class=\"edgeLabel\" transform=\"translate(1527.3828125, 34.25)\"><g class=\"label\" data-id=\"L_F_G_0\" transform=\"translate(-59.1640625, -11.25)\"><foreignObject width=\"118.328125\" height=\"22.5\"><div xmlns=\"http:\/\/www.w3.org\/1999\/xhtml\" class=\"labelBkg\" style=\"display: table-cell; white-space: nowrap; line-height: 1.5; max-width: 200px; text-align: center;\"><span class=\"edgeLabel\"><p>Complex solution<\/p><\/span><\/div><\/foreignObject><\/g><\/g><g class=\"edgeLabel\" transform=\"translate(1527.3828125, 136.75)\"><g class=\"label\" data-id=\"L_F_H_0\" transform=\"translate(-68.15625, -11.25)\"><foreignObject width=\"136.3125\" height=\"22.5\"><div xmlns=\"http:\/\/www.w3.org\/1999\/xhtml\" class=\"labelBkg\" style=\"display: table-cell; white-space: nowrap; line-height: 1.5; max-width: 200px; text-align: center;\"><span class=\"edgeLabel\"><p>Standardized object<\/p><\/span><\/div><\/foreignObject><\/g><\/g><g class=\"edgeLabel\" transform=\"translate(1527.3828125, 239.25)\"><g class=\"label\" data-id=\"L_F_I_0\" transform=\"translate(-68.6484375, -11.25)\"><foreignObject width=\"137.296875\" height=\"22.5\"><div xmlns=\"http:\/\/www.w3.org\/1999\/xhtml\" class=\"labelBkg\" style=\"display: table-cell; white-space: nowrap; line-height: 1.5; max-width: 200px; text-align: center;\"><span class=\"edgeLabel\"><p>Uncertainty remains<\/p><\/span><\/div><\/foreignObject><\/g><\/g><\/g><g class=\"nodes\"><g class=\"node default\" id=\"flowchart-A-0\" transform=\"translate(97.265625, 136.75)\"><rect class=\"basic label-container\" style=\"\" x=\"-89.265625\" y=\"-26.25\" width=\"178.53125\" height=\"52.5\"><\/rect><g class=\"label\" style=\"\" transform=\"translate(-59.265625, -11.25)\"><rect><\/rect><foreignObject width=\"118.53125\" height=\"22.5\"><div xmlns=\"http:\/\/www.w3.org\/1999\/xhtml\" style=\"display: table-cell; white-space: nowrap; line-height: 1.5; max-width: 200px; text-align: center;\"><span class=\"nodeLabel\"><p>Engineering need<\/p><\/span><\/div><\/foreignObject><\/g><\/g><g class=\"node default\" id=\"flowchart-B-1\" transform=\"translate(324.7421875, 136.75)\"><rect class=\"basic label-container\" style=\"\" x=\"-88.2109375\" y=\"-26.25\" width=\"176.421875\" height=\"52.5\"><\/rect><g class=\"label\" style=\"\" transform=\"translate(-58.2109375, -11.25)\"><rect><\/rect><foreignObject width=\"116.421875\" height=\"22.5\"><div xmlns=\"http:\/\/www.w3.org\/1999\/xhtml\" style=\"display: table-cell; white-space: nowrap; line-height: 1.5; max-width: 200px; text-align: center;\"><span class=\"nodeLabel\"><p>Information gaps<\/p><\/span><\/div><\/foreignObject><\/g><\/g><g class=\"node default\" id=\"flowchart-C-3\" transform=\"translate(551.484375, 136.75)\"><rect class=\"basic label-container\" style=\"\" x=\"-88.53125\" y=\"-26.25\" width=\"177.0625\" height=\"52.5\"><\/rect><g class=\"label\" style=\"\" transform=\"translate(-58.53125, -11.25)\"><rect><\/rect><foreignObject width=\"117.0625\" height=\"22.5\"><div xmlns=\"http:\/\/www.w3.org\/1999\/xhtml\" style=\"display: table-cell; white-space: nowrap; line-height: 1.5; max-width: 200px; text-align: center;\"><span class=\"nodeLabel\"><p>RFI to the market<\/p><\/span><\/div><\/foreignObject><\/g><\/g><g class=\"node default\" id=\"flowchart-D-5\" transform=\"translate(803.6484375, 136.75)\"><rect class=\"basic label-container\" style=\"\" x=\"-113.6328125\" y=\"-26.25\" width=\"227.265625\" height=\"52.5\"><\/rect><g class=\"label\" style=\"\" transform=\"translate(-83.6328125, -11.25)\"><rect><\/rect><foreignObject width=\"167.265625\" height=\"22.5\"><div xmlns=\"http:\/\/www.w3.org\/1999\/xhtml\" style=\"display: table-cell; white-space: nowrap; line-height: 1.5; max-width: 200px; text-align: center;\"><span class=\"nodeLabel\"><p>Responses and evidence<\/p><\/span><\/div><\/foreignObject><\/g><\/g><g class=\"node default\" id=\"flowchart-E-7\" transform=\"translate(1077.59375, 136.75)\"><rect class=\"basic label-container\" style=\"\" x=\"-110.3125\" y=\"-26.25\" width=\"220.625\" height=\"52.5\"><\/rect><g class=\"label\" style=\"\" transform=\"translate(-80.3125, -11.25)\"><rect><\/rect><foreignObject width=\"160.625\" height=\"22.5\"><div xmlns=\"http:\/\/www.w3.org\/1999\/xhtml\" style=\"display: table-cell; white-space: nowrap; line-height: 1.5; max-width: 200px; text-align: center;\"><span class=\"nodeLabel\"><p>Technical consolidation<\/p><\/span><\/div><\/foreignObject><\/g><\/g><g class=\"node default\" id=\"flowchart-F-9\" transform=\"translate(1335.8203125, 136.75)\"><polygon points=\"97.9140625,0 195.828125,-97.9140625 97.9140625,-195.828125 0,-97.9140625\" class=\"label-container\" transform=\"translate(-97.4140625, 97.9140625)\"><\/polygon><g class=\"label\" style=\"\" transform=\"translate(-71.6640625, -11.25)\"><rect><\/rect><foreignObject width=\"143.328125\" height=\"22.5\"><div xmlns=\"http:\/\/www.w3.org\/1999\/xhtml\" style=\"display: table-cell; white-space: nowrap; line-height: 1.5; max-width: 200px; text-align: center;\"><span class=\"nodeLabel\"><p>Is the object mature?<\/p><\/span><\/div><\/foreignObject><\/g><\/g><g class=\"node default\" id=\"flowchart-G-11\" transform=\"translate(1706.953125, 34.25)\"><rect class=\"basic label-container\" style=\"\" x=\"-42.578125\" y=\"-26.25\" width=\"85.15625\" height=\"52.5\"><\/rect><g class=\"label\" style=\"\" transform=\"translate(-12.578125, -11.25)\"><rect><\/rect><foreignObject width=\"25.15625\" height=\"22.5\"><div xmlns=\"http:\/\/www.w3.org\/1999\/xhtml\" style=\"display: table-cell; white-space: nowrap; line-height: 1.5; max-width: 200px; text-align: center;\"><span class=\"nodeLabel\"><p>RFP<\/p><\/span><\/div><\/foreignObject><\/g><\/g><g class=\"node default\" id=\"flowchart-H-13\" transform=\"translate(1706.953125, 136.75)\"><rect class=\"basic label-container\" style=\"\" x=\"-43.28125\" y=\"-26.25\" width=\"86.5625\" height=\"52.5\"><\/rect><g class=\"label\" style=\"\" transform=\"translate(-13.28125, -11.25)\"><rect><\/rect><foreignObject width=\"26.5625\" height=\"22.5\"><div xmlns=\"http:\/\/www.w3.org\/1999\/xhtml\" style=\"display: table-cell; white-space: nowrap; line-height: 1.5; max-width: 200px; text-align: center;\"><span class=\"nodeLabel\"><p>RFQ<\/p><\/span><\/div><\/foreignObject><\/g><\/g><g class=\"node default\" id=\"flowchart-I-15\" transform=\"translate(1706.953125, 239.25)\"><rect class=\"basic label-container\" style=\"\" x=\"-85.921875\" y=\"-26.25\" width=\"171.84375\" height=\"52.5\"><\/rect><g class=\"label\" style=\"\" transform=\"translate(-55.921875, -11.25)\"><rect><\/rect><foreignObject width=\"111.84375\" height=\"22.5\"><div xmlns=\"http:\/\/www.w3.org\/1999\/xhtml\" style=\"display: table-cell; white-space: nowrap; line-height: 1.5; max-width: 200px; text-align: center;\"><span class=\"nodeLabel\"><p>Additional study<\/p><\/span><\/div><\/foreignObject><\/g><\/g><\/g><\/g><\/g><\/svg><figcaption>Position of the RFI in the technical definition and procurement flow<\/figcaption><\/figure>\n\n\n\n<h2 class=\"wp-block-heading\">RFI is not RFP or RFQ<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">The difference between RFI, RFP and RFQ lies in the <strong>maturity of the object and the type of response expected<\/strong>.<\/p>\n\n\n\n<figure class=\"wp-block-table\"><table><tbody><tr><td>Instrument<\/td><td>Core question<\/td><td>Typical situation<\/td><td>Expected response<\/td><\/tr><tr><td>RFI<\/td><td>What can the market offer and under what conditions?<\/td><td>requirements or alternatives still need to be understood<\/td><td>technical information, evidence, constraints and capabilities<\/td><\/tr><tr><td>RFP<\/td><td>What solution does the bidder offer to meet the problem and requirements?<\/td><td>complex object with room for differentiated solutions<\/td><td>structured technical proposal, methodology, solution, schedule and conditions<\/td><\/tr><tr><td>RFQ<\/td><td>How much does it cost to supply a sufficiently defined and comparable object?<\/td><td>standardized item or service, stable scope<\/td><td>commercial quotation linked to objective requirements<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p class=\"wp-block-paragraph\">This distinction is consistent with the current Procurement logic of PMI and World Bank practices, which reserve RFPs for situations where complexity justifies customized solutions and RFQs for more standardized, readily available acquisitions.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">When is it worth issuing an RFI?<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">An RFI adds value when there is a real question for the market to answer. If the object is already fully defined, suppliers are known, requirements are stable and price is the only relevant variable, an RFI may simply add an administrative step.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Evolving technology or multiple architectures<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Telecommunications, automation, electronic security, Data Center, electrical systems, energy and digital infrastructure projects often admit more than one technically valid architecture. Before turning an alternative into a prescriptive requirement, Engineering can use an RFI to understand limitations and dependencies.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Requirements whose feasibility needs to be validated<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">A requirement may appear desirable and still be impractical under actual schedule, availability, interface, certification or installation conditions. Prior consultation helps separate necessary requirements from infeasible or excessively restrictive ones.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Unknown market and supply capability<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">When there is no reliable base of capable suppliers, an RFI can support initial market mapping. The objective is not to automatically form a shortlist, but to identify who may have the required capability and what evidence should later be required during qualification.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Long lead items and supply-chain constraints<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">In projects with critical equipment, manufacturing and logistics lead times may affect the schedule before contracting. An RFI can investigate production capacity, manufacturing windows, obsolescence, alternatives and import requirements without turning early estimates into contractual commitments.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Integration with existing infrastructure<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">In retrofit and modernization projects, manufacturers may know compatibility limitations, versions, gateways, protocols or migration requirements that are not yet documented by the owner. The consultation helps anticipate these interfaces.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">What should exist before preparing the RFI?<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">An RFI does not require the same level of definition as an RFP, but it also should not be launched without a minimum baseline. Generic questions generate promotional and poorly comparable responses.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The team should at least consolidate the project context, the technical problem, known constraints, relevant existing systems, assumptions already validated, decisions the RFI is expected to support, open questions, response format and confidentiality rules when applicable.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Engineering needs to know <strong>which decision should be better after the RFI<\/strong>. Without that question, the document tends to become just an open-ended market survey.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">How to structure an Engineering RFI<\/h2>\n\n\n\n<h3 class=\"wp-block-heading\">1. Context and objective<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Present the project, the need and the purpose of the consultation. Provide enough context for the market to understand the application without exposing unnecessary confidential information.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">2. Information scope<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Define which parts of the system or service are within the RFI. A consultation may address only one subsystem, equipment family or specific technical capability.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">3. Technical questions<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Questions should be tied to decisions. For example, the RFI may request available architectures, infrastructure requirements, protocols, certifications, environmental limitations, interfaces, tests, documentation, lead time and local support.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">4. Requested evidence<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">The RFI may request datasheets, certificates, application references, typical diagrams, manuals, compatibility matrices and production-capacity information. The objective is not to turn the consultation into a full qualification process, but to separate verifiable information from commercial claims.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">5. Response format<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Standardize tables and fields when this improves comparability. Open-ended questions help explore alternatives; capabilities, lead times, certifications and interfaces can be answered in a matrix.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">6. Consultation conditions<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Make it explicit that the RFI is informational and that participation does not imply contracting, preference or a promise of inclusion in a future competition. In environments subject to specific procurement regimes, the wording should be adapted to the applicable rules.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">How to write questions that produce useful information<\/h2>\n\n\n\n<figure class=\"wp-block-table\"><table><tbody><tr><td>Weak question<\/td><td>Better-structured question<\/td><\/tr><tr><td>What is your best solution?<\/td><td>Which architectures meet requirements A, B and C, and what are the constraints of each alternative?<\/td><\/tr><tr><td>Can you deliver quickly?<\/td><td>State the typical lead time, manufacturing assumptions, critical dependencies and factors that change the schedule.<\/td><\/tr><tr><td>Is the product compatible?<\/td><td>List protocols, supported versions, required interfaces and known limitations.<\/td><\/tr><tr><td>Do you have certifications?<\/td><td>State the certification, issuing body, scope, validity and available evidence.<\/td><\/tr><tr><td>Do you perform commissioning?<\/td><td>Describe factory and field tests, acceptance criteria and evidence documentation.<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p class=\"wp-block-paragraph\">The principle is simple: <strong>every question must be connected to a future Engineering, Procurement, risk or contracting decision<\/strong>.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">How to analyze responses without turning the RFI into informal selection<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Consolidation should compare information, not create an early commercial ranking that was never disclosed to the market.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">An analysis matrix can contain the RFI question, response, evidence, constraint, divergence among suppliers, impact on the future requirement, need for additional study and decision or follow-up.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Identify convergences<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">When several respondents point to the same limitation, lead time, standard or infrastructure requirement, the team receives a signal that the condition should be validated and possibly incorporated into the baseline.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Separate preference from requirement<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">A manufacturer may present a particular characteristic as indispensable because it favors its architecture. Engineering should ask whether the characteristic is necessary to the project objective or merely a commercial differentiator.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Record divergences<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Conflicting responses are useful. They indicate a hypothesis to test, an ambiguous requirement or a technological difference that needs deeper analysis before the RFP or RFQ.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Preserve traceability<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">The later decision should be able to demonstrate how information obtained in the RFI changed the specification, schedule, procurement strategy or qualification approach.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">RFI and technology neutrality<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">An important contribution of the RFI is allowing the owner to understand the state of the market <strong>before closing the specification around a specific solution<\/strong>.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Technology neutrality does not mean accepting any technology. It means formulating requirements based on performance, function, interoperability, safety, life cycle and implementation conditions whenever technically feasible. When a proprietary characteristic is necessary, the justification should be technical and traceable.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The consultation may reveal that a requirement initially described by brand or architecture can be converted into a functional criterion. It may also reveal the opposite: an existing interface may make certain compatibility mandatory.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">How the RFI influences Procurement strategy<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">The information collected can change not only the specification, but the contracting model. If the consultation reveals few capable suppliers, incompatible lead times, dependence on the manufacturer\u2019s application engineering, inseparable equipment integration or major warranty differences, it may alter package strategy, package sequencing, schedule, selection criteria and the responsibility matrix.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">This reasoning connects to the cycle presented in <strong>Procurement in Engineering Projects: what it is, stages, criteria and supplier management<\/strong> and to the <strong>Technical Procurement<\/strong> service, which integrates specification, equalization and decision support.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">RFI, qualification and shortlist are not the same thing<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">The RFI seeks information about the market and solution; qualification verifies whether an organization demonstrates sufficient capability to participate in a specific procurement.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">A company may respond technically well to an RFI and still fail later qualification criteria. Likewise, a previously qualified supplier may not present the most compliant solution in a future competition.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">RFI results can inform the definition of prequalification criteria, but they do not replace evidence validation.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Common mistakes in Engineering RFIs<\/h2>\n\n\n\n<ul class=\"wp-block-list\"><li>issuing the consultation without a target decision;<\/li><li>requesting a complete proposal disguised as an RFI;<\/li><li>asking questions oriented toward a single manufacturer;<\/li><li>failing to standardize comparable data;<\/li><li>failing to control versions and clarifications;<\/li><li>copying responses directly into the specification without Engineering analysis;<\/li><li>confusing participation in the consultation with qualification or future preference.<\/li><\/ul>\n\n\n\n<h2 class=\"wp-block-heading\">Useful indicators for evaluating RFI quality<\/h2>\n\n\n\n<figure class=\"wp-block-table\"><table><tbody><tr><td>Indicator<\/td><td>What it reveals<\/td><\/tr><tr><td>technically usable responses<\/td><td>clarity of the consultation and quality of the market consulted<\/td><\/tr><tr><td>questions supported by evidence<\/td><td>reliability of the responses<\/td><\/tr><tr><td>requirements revised after consultation<\/td><td>impact of the RFI on object maturity<\/td><\/tr><tr><td>relevant technical divergences<\/td><td>topics requiring additional study<\/td><\/tr><tr><td>time from issuance to consolidation<\/td><td>cycle efficiency<\/td><\/tr><tr><td>open items transferred to RFP\/RFQ<\/td><td>maturity achieved before the formal solicitation<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p class=\"wp-block-paragraph\">These indicators should not become artificial targets. Their role is to show whether the consultation reduced uncertainty.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Final considerations<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">An RFI is most valuable when used early enough to influence decisions and late enough for the team to already know which uncertainties need to be eliminated. In Engineering, it helps validate assumptions, understand market capability, test requirements, anticipate interfaces and prepare a stronger baseline for RFP, RFQ, qualification and contracting.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The central point is not to confuse consultation with selection. The RFI should produce structured and traceable knowledge. The contracting decision comes later, supported by matured requirements, explicit criteria and a technically defensible Procurement process.<\/p>\n\n\n\n<div class=\"wp-block-a3a-destaque\">\n<p class=\"wp-block-paragraph\">Market consultation only creates value when there is governance to consolidate responses, separate evidence from commercial opinion and convert information into traceable requirements.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><a href=\"https:\/\/a3aengenharia.com.br\/servicos\/implementacao\/procurement\/\">Learn about Technical Procurement applied to contracting<\/a><\/p>\n<\/div>\n\n\n\n<details class=\"wp-block-details is-layout-flow wp-block-details-is-layout-flow\"><summary>Technical references<\/summary>\n<p class=\"wp-block-paragraph\">[1] PROJECT MANAGEMENT INSTITUTE. A Guide to the Project Management Body of Knowledge (PMBOK\u00ae Guide). 8th ed. Newtown Square: PMI, 2025. Available at: [<a href=\"https:\/\/www.pmi.org\/standards\/pmbok\">https:\/\/www.pmi.org\/standards\/pmbok<\/a>](<a href=\"https:\/\/www.pmi.org\/standards\/pmbok\">https:\/\/www.pmi.org\/standards\/pmbok<\/a>)<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">[2] WORLD BANK. Procurement Regulations for IPF Borrowers. 7th ed. Washington, DC, 2025. Available at: [<a href=\"https:\/\/thedocs.worldbank.org\/en\/doc\/c84273d1b230aeb2b0b8134de5dc8cd7-0290012025\/original\/Procurement-Regulations-7th-Edition-Sep-2025.pdf\">https:\/\/thedocs.worldbank.org\/en\/doc\/c84273d1b230aeb2b0b8134de5dc8cd7-0290012025\/original\/Procurement-Regulations-7th-Edition-Sep-2025.pdf<\/a>](<a href=\"https:\/\/thedocs.worldbank.org\/en\/doc\/c84273d1b230aeb2b0b8134de5dc8cd7-0290012025\/original\/Procurement-Regulations-7th-Edition-Sep-2025.pdf\">https:\/\/thedocs.worldbank.org\/en\/doc\/c84273d1b230aeb2b0b8134de5dc8cd7-0290012025\/original\/Procurement-Regulations-7th-Edition-Sep-2025.pdf<\/a>)<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">[3] WORLD BANK. Project Procurement Framework. Washington, DC. Available at: [<a href=\"https:\/\/www.worldbank.org\/ext\/en\/what-we-do\/project-procurement\/framework\">https:\/\/www.worldbank.org\/ext\/en\/what-we-do\/project-procurement\/framework<\/a>](<a href=\"https:\/\/www.worldbank.org\/ext\/en\/what-we-do\/project-procurement\/framework\">https:\/\/www.worldbank.org\/ext\/en\/what-we-do\/project-procurement\/framework<\/a>)<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">[4] WORLD BANK. Evaluating Bids and Proposals with Rated Criteria. Washington, DC, 2025. Available at: [<a href=\"https:\/\/thedocs.worldbank.org\/en\/doc\/9dcb7971706bf29b2732779c39922b77-0290012025\/original\/Evaluating-Bids-and-Proposals-with-Rated-Criteria-Feb-4-2025.pdf\">https:\/\/thedocs.worldbank.org\/en\/doc\/9dcb7971706bf29b2732779c39922b77-0290012025\/original\/Evaluating-Bids-and-Proposals-with-Rated-Criteria-Feb-4-2025.pdf<\/a>](<a href=\"https:\/\/thedocs.worldbank.org\/en\/doc\/9dcb7971706bf29b2732779c39922b77-0290012025\/original\/Evaluating-Bids-and-Proposals-with-Rated-Criteria-Feb-4-2025.pdf\">https:\/\/thedocs.worldbank.org\/en\/doc\/9dcb7971706bf29b2732779c39922b77-0290012025\/original\/Evaluating-Bids-and-Proposals-with-Rated-Criteria-Feb-4-2025.pdf<\/a>)<\/p>\n<\/details>\n\n\n\n<details class=\"wp-block-details is-layout-flow wp-block-details-is-layout-flow\"><summary>Frequently asked questions<\/summary>\n<div class=\"schema-faq wp-block-yoast-faq-block\"><div class=\"schema-faq-section\" id=\"faq-question-o-que-significa-rfi-em-engenharia-53377801\"><strong class=\"schema-faq-question\">What does RFI mean in Engineering?<\/strong> <p class=\"schema-faq-answer\">RFI means Request for Information. It is a structured market consultation used to obtain technical information, capabilities, alternatives and constraints before a formal request for proposal or quotation.<\/p><\/div><div class=\"schema-faq-section\" id=\"faq-question-qual-a-diferen-a-entre-rfi-e-rfp-362d47f3\"><strong class=\"schema-faq-question\">What is the difference between RFI and RFP?<\/strong> <p class=\"schema-faq-answer\">An RFI seeks information to reduce uncertainty and mature requirements. An RFP requests a structured solution for a more mature object and normally already defines requirements and evaluation criteria.<\/p><\/div><div class=\"schema-faq-section\" id=\"faq-question-qual-a-diferen-a-entre-rfi-e-rfq-e996eeca\"><strong class=\"schema-faq-question\">What is the difference between RFI and RFQ?<\/strong> <p class=\"schema-faq-answer\">An RFI is exploratory. An RFQ is appropriate when the object is sufficiently defined and comparable and the procurement can rely on quotations linked to objective requirements.<\/p><\/div><div class=\"schema-faq-section\" id=\"faq-question-uma-rfi-deve-pedir-pre-o-34dbb7d6\"><strong class=\"schema-faq-question\">Should an RFI request pricing?<\/strong> <p class=\"schema-faq-answer\">It may include indicative questions about cost structure or ranges when needed for planning, but an RFI should not be used to disguise a request for a firm commercial proposal.<\/p><\/div><div class=\"schema-faq-section\" id=\"faq-question-a-rfi-serve-para-escolher-fornecedor-32f814be\"><strong class=\"schema-faq-question\">Is an RFI used to select a supplier?<\/strong> <p class=\"schema-faq-answer\">Not as its primary objective. An RFI is used to produce market intelligence. Qualification, proposal evaluation and selection should have their own traceable criteria.<\/p><\/div><div class=\"schema-faq-section\" id=\"faq-question-quando-n-o-faz-sentido-emitir-uma-rfi-11ec9f91\"><strong class=\"schema-faq-question\">When does it not make sense to issue an RFI?<\/strong> <p class=\"schema-faq-answer\">When the object is already mature and standardized, requirements are clear, the market is known and the information needed to issue an RFP or RFQ directly already exists.<\/p><\/div><\/div>\n<\/details>\n\n\n\n<details class=\"wp-block-details is-layout-flow wp-block-details-is-layout-flow\"><summary>Complementary technical materials<\/summary>\n<h4 class=\"wp-block-heading\">Main content on the topic<\/h4>\n\n<ul class=\"wp-block-list\"><li><a href=\"https:\/\/a3aengenharia.com.br\/conteudo\/artigos-tecnicos\/procurement-projetos-engenharia-etapas-criterios\/\">Procurement in Engineering Projects: what it is, stages, criteria and supplier management<\/a><\/li><li><a href=\"https:\/\/a3aengenharia.com.br\/conteudo\/artigos-tecnicos\/rfi-rfp-rfq-diferencas-quando-usar-engenharia\/\">RFI vs. RFP vs. RFQ: differences and when to use each document in Engineering<\/a><\/li><\/ul>\n\n<h4 class=\"wp-block-heading\">Related technical content<\/h4>\n\n<ul class=\"wp-block-list\"><li><a href=\"https:\/\/a3aengenharia.com.br\/conteudo\/artigos-tecnicos\/rfp-engenharia-escopo-requisitos-criterios-selecao\/\">RFP in Engineering: how to structure scope, requirements and selection criteria<\/a><\/li><li><a href=\"https:\/\/a3aengenharia.com.br\/conteudo\/artigos-tecnicos\/rfq-engenharia-cotacoes-propostas-comparaveis\/\">RFQ in Engineering: how to request commercially comparable quotations<\/a><\/li><li><a href=\"https:\/\/a3aengenharia.com.br\/conteudo\/artigos-tecnicos\/avaliacao-proposta-tecnica-engenharia\/\">Engineering Technical Proposal Analysis: how to evaluate beyond the lowest price<\/a><\/li><\/ul>\n\n<h4 class=\"wp-block-heading\">Related services<\/h4>\n\n<ul class=\"wp-block-list\"><li><a href=\"https:\/\/a3aengenharia.com.br\/servicos\/implementacao\/procurement\/\">Technical Procurement: specification, equalization, suppliers and contracting support<\/a><\/li><li><a href=\"https:\/\/a3aengenharia.com.br\/servicos\/contratacao-integrada\/engenharia-do-proprietario\/\">Owner\u2019s Engineering: technical governance, inspection and acceptance<\/a><\/li><\/ul>\n<\/details>\n","protected":false},"excerpt":{"rendered":"<p>Learn how to use an RFI in Engineering to consult the market, reduce uncertainty, validate requirements and prepare technically stronger RFPs and RFQs.<\/p>\n","protected":false},"author":1,"featured_media":0,"parent":0,"template":"","meta":{"_a3a_global_related_solutions":[],"_a3a_global_related_services":[],"_a3a_global_related_materials":[],"_a3a_post_lang":"en-us","_a3a_translation_group_id":"3d4001c2-6492-4c83-82d7-25fc803dc1bc","_a3a_i18n_canonical_slug":"rfi-engineering-market-consultation-before-procurement"},"categories":[],"segments":[],"mercados":[],"etapas":[],"class_list":["post-73388","articles","type-articles","status-publish","hentry"],"_links":{"self":[{"href":"https:\/\/a3aengenharia.com\/en-us\/wp-json\/wp\/v2\/articles\/73388","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/a3aengenharia.com\/en-us\/wp-json\/wp\/v2\/articles"}],"about":[{"href":"https:\/\/a3aengenharia.com\/en-us\/wp-json\/wp\/v2\/types\/articles"}],"author":[{"embeddable":true,"href":"https:\/\/a3aengenharia.com\/en-us\/wp-json\/wp\/v2\/users\/1"}],"version-history":[{"count":1,"href":"https:\/\/a3aengenharia.com\/en-us\/wp-json\/wp\/v2\/articles\/73388\/revisions"}],"predecessor-version":[{"id":73389,"href":"https:\/\/a3aengenharia.com\/en-us\/wp-json\/wp\/v2\/articles\/73388\/revisions\/73389"}],"wp:attachment":[{"href":"https:\/\/a3aengenharia.com\/en-us\/wp-json\/wp\/v2\/media?parent=73388"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/a3aengenharia.com\/en-us\/wp-json\/wp\/v2\/categories?post=73388"},{"taxonomy":"segments","embeddable":true,"href":"https:\/\/a3aengenharia.com\/en-us\/wp-json\/wp\/v2\/segments?post=73388"},{"taxonomy":"mercados","embeddable":true,"href":"https:\/\/a3aengenharia.com\/en-us\/wp-json\/wp\/v2\/mercados?post=73388"},{"taxonomy":"etapas","embeddable":true,"href":"https:\/\/a3aengenharia.com\/en-us\/wp-json\/wp\/v2\/etapas?post=73388"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}