{"id":73272,"date":"2026-08-30T16:18:06","date_gmt":"2026-08-30T19:18:06","guid":{"rendered":"https:\/\/a3aengenharia.com\/?post_type=articles&#038;p=73272"},"modified":"2026-08-30T16:18:06","modified_gmt":"2026-08-30T19:18:06","slug":"project-communication-plan-audiences-channels-responsibilities","status":"publish","type":"articles","link":"https:\/\/a3aengenharia.com\/en-us\/content\/technical-articles\/project-communication-plan-audiences-channels-responsibilities\/","title":{"rendered":"Project Communication Plan: how to structure audiences, channels and responsibilities"},"content":{"rendered":"\n<p class=\"wp-block-paragraph\">A project communication plan is the instrument that defines what information needs to flow, to whom, for what purpose, at what time, through which channel, with which owner, what response is expected and how evidence will be recorded. It turns information and engagement needs into a planned, traceable communication system tailored to the project context.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">A good plan is not a generic table of weekly meetings and monthly reports. It must respond to the real needs of stakeholders and project decisions. This means distinguishing executive, technical, contractual, operational and external communication; defining triggers in addition to fixed frequencies; protecting sensitive information; requiring feedback when necessary; and connecting communication to requirements, risks, changes, interfaces, schedule and acceptance.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">In engineering projects, communication failures are rarely just writing or sending problems. They can produce misinterpreted requirements, late approvals, uncoordinated interfaces, reopened decisions, informal commitments without validity, mobilization without authorization or rejected deliverables. Therefore, the communication plan should be treated as part of project governance.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">What is a project communication plan<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">The <strong>communication plan<\/strong> organizes the flow of information and interaction required so that people and organizations understand what they need to know, participate when necessary and make decisions within the defined deadlines and authority.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">It should be derived from <a href=\"https:\/\/a3aengenharia.com.br\/conteudo\/artigos-tecnicos\/gestao-de-stakeholders\/\">stakeholder management<\/a>. First, the team identifies who affects or is affected by the project, understands interests, influence, impact and needs; then it defines how each stakeholder or group needs to be engaged and informed.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The distinction is important:<\/p>\n\n\n\n<figure class=\"wp-block-table\"><table><tbody><tr><td>Element<\/td><td>Core question<\/td><\/tr><tr><td>Stakeholder management<\/td><td>Who needs to participate, why and at what level?<\/td><\/tr><tr><td>Stakeholder mapping<\/td><td>How do these parties relate and which connections matter?<\/td><\/tr><tr><td>Communication plan<\/td><td>What information or interaction must occur, when, through which channel and with what feedback?<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p class=\"wp-block-paragraph\">The communication plan does not replace meetings, minutes, reports or systems. It defines when and how these mechanisms will be used.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Why the communication plan is critical in engineering projects<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Engineering depends on distributed decisions. Designers need requirements; suppliers need approvals; contractors depend on releases; operations need to understand impacts; sponsors need to decide on exceptions; external authorities may condition milestones; inspection teams need to receive evidence; users need to be prepared for transition.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Without a coherent communication system, the project tends to generate familiar symptoms:<\/p>\n\n\n\n<ul class=\"wp-block-list\"><li>repeated questions because information is not accessible;<\/li><li>delayed decisions because the correct recipient was not involved;<\/li><li>long emails without an explicit decision;<\/li><li>too many people copied without defined responsibility;<\/li><li>meetings without agenda, authority or records;<\/li><li>verbal approval without traceability;<\/li><li>changes executed without change control;<\/li><li>reports sent without confirmation of understanding;<\/li><li>outdated technical information circulating in parallel;<\/li><li>contractual communication outside the required channel;<\/li><li>operations informed only near acceptance.<\/li><\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">Effective communication is not the largest quantity of messages. It is sufficient circulation of the right information among the right parties at the moment when it can change a decision or action.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">How the communication plan derives from stakeholder mapping<\/h2>\n\n\n\n<div class=\"wp-block-a3a-destaque\">\n<p class=\"wp-block-paragraph\">A communication plan is useful only when it is connected to real stakeholder needs. Frequency is a consequence; objective, decision and expected feedback come first.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><a href=\"https:\/\/a3aengenharia.com.br\/conteudo\/artigos-tecnicos\/mapeamento-stakeholders-como-identificar-analisar-mapa\/\">See how to map stakeholders<\/a><\/p>\n<\/div>\n\n\n\n<p class=\"wp-block-paragraph\"><a href=\"https:\/\/a3aengenharia.com.br\/conteudo\/artigos-tecnicos\/mapeamento-stakeholders-como-identificar-analisar-mapa\/\">Stakeholder mapping<\/a> provides the foundation for the plan. It reveals groups, relationships, influence, impact and critical moments.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">A stakeholder with high authority may need short, decision-oriented communication. A technical specialist may need detailed data and time for analysis. Operations may require workshops before design freezes. A utility may require formal protocols and specific deadlines. A supplier may need controlled submittals instead of informal file exchanges.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Therefore, every line in the plan needs a project and business rationale, not just a periodicity.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">What information should be included in the communication plan<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">A useful plan can be structured with the following fields:<\/p>\n\n\n\n<figure class=\"wp-block-table\"><table><tbody><tr><td>Field<\/td><td>Question answered<\/td><\/tr><tr><td>Stakeholder or audience<\/td><td>Who needs to receive or provide the information?<\/td><\/tr><tr><td>Objective<\/td><td>Inform, consult, decide, coordinate, approve, alert or report?<\/td><\/tr><tr><td>Content<\/td><td>What information is required?<\/td><\/tr><tr><td>Level of detail<\/td><td>Executive, managerial, technical or operational?<\/td><\/tr><tr><td>Sender<\/td><td>Who prepares and transmits it?<\/td><\/tr><tr><td>Response owner<\/td><td>Who needs to act or decide?<\/td><\/tr><tr><td>Channel<\/td><td>Meeting, system, document, email, dashboard, workshop or formal protocol?<\/td><\/tr><tr><td>Frequency or trigger<\/td><td>When does it occur?<\/td><\/tr><tr><td>Response deadline<\/td><td>How much time is available for feedback?<\/td><\/tr><tr><td>Classification<\/td><td>Public, internal, restricted, confidential or contractual?<\/td><\/tr><tr><td>Record<\/td><td>Where is the evidence kept?<\/td><\/tr><tr><td>Effectiveness measure<\/td><td>How do we know it worked?<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p class=\"wp-block-paragraph\">These fields should be adjusted to the project. Adding columns nobody uses creates bureaucracy; omitting responsibility and feedback turns communication into one-way distribution.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">How to define the objective of each communication<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Before choosing a channel or format, define the expected outcome. Communication may have different objectives:<\/p>\n\n\n\n<ul class=\"wp-block-list\"><li><strong>inform:<\/strong> communicate a situation without requesting immediate action;<\/li><li><strong>consult:<\/strong> obtain an opinion, requirement, validation or data;<\/li><li><strong>coordinate:<\/strong> align activities and dependencies;<\/li><li><strong>decide:<\/strong> present alternatives and obtain a decision within authority;<\/li><li><strong>approve:<\/strong> formalize agreement with a document, stage or change;<\/li><li><strong>alert:<\/strong> communicate a risk, deviation, incident or critical condition;<\/li><li><strong>report:<\/strong> present performance, use of resources and trends;<\/li><li><strong>mobilize:<\/strong> prepare people for action, transition or change;<\/li><li><strong>record:<\/strong> preserve evidence of guidance, commitment or decision.<\/li><\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">When the objective is unclear, communication tends to produce an equally uncertain response.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">How to segment project audiences<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Not every stakeholder needs the same information. Segmentation reduces noise and improves understanding.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Sponsor and committee<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">They need an executive view: value, milestones, trends, relevant risks, pending decisions, exceptions and recommendations. Too much technical detail can hide the decision that is actually required.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Engineering team<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">It needs requirements, interfaces, assumptions, revisions, comments, decisions and controlled documents. Traceability and version control are essential.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Operations and maintenance<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">They need to understand impact, operating requirements, maintainability, windows, training, testing, documentation and transition.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Suppliers and contractors<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">They need formal channels compatible with the contract, submittals, clarifications, decisions, acceptance criteria, punch items and authorized changes.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Authorities and utilities<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">They usually require formal protocols, specific documents, deadlines and authorized representatives. The plan must respect the applicable process.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Users and external parties<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">They may require accessible language, advance notice, transparency about impacts and mechanisms for consultation or feedback.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">How to choose the communication channel<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">The channel should be chosen according to purpose, criticality, complexity and evidence requirements.<\/p>\n\n\n\n<figure class=\"wp-block-table\"><table><tbody><tr><td>Situation<\/td><td>Appropriate channel<\/td><\/tr><tr><td>Complex decision<\/td><td>Meeting or workshop with pre-read material and subsequent record<\/td><\/tr><tr><td>Executive information<\/td><td>Concise report, dashboard and governance meeting<\/td><\/tr><tr><td>Technical review<\/td><td>CDE, document system, controlled markup or review meeting<\/td><\/tr><tr><td>Critical alert<\/td><td>Immediate channel with receipt confirmation and escalation<\/td><\/tr><tr><td>Contractual obligation<\/td><td>Formal channel defined in the contract<\/td><\/tr><tr><td>Routine coordination<\/td><td>Short meeting and tracking system<\/td><\/tr><tr><td>Approval<\/td><td>Workflow or document with decision trail<\/td><\/tr><tr><td>Broad communication<\/td><td>Portal, notice, presentation or institutional channel<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p class=\"wp-block-paragraph\">Email is a tool, not a strategy. It may be suitable for recording or distributing information, but tends to fail when used as a substitute for structured decisions, workflow or document management.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Synchronous and asynchronous communication<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Projects need to combine both formats.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Synchronous communication<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Meetings, workshops and calls are useful when there is ambiguity, negotiation, multiple perspectives or a need for interactive decision-making. The cost is higher, so they should be reserved for situations that justify real-time interaction.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Asynchronous communication<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Reports, systems, dashboards, documents, comments and emails allow reflection, traceability and work across different schedules. They are better for structured information, but require clarity about deadlines and expected feedback.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">A good practice is to use synchronous communication to build understanding and asynchronous communication to preserve evidence and track execution.<\/p>\n\n\n\n<figure class=\"a3a-mermaid\"><svg id=\"a3a-diagram-1\" width=\"100%\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" class=\"flowchart\" style=\"max-width:min(489.140625px, 100%);height:auto;display:block;margin:0 auto\" viewBox=\"0 0 489.140625 1328.640625\" role=\"graphics-document document\" aria-roledescription=\"flowchart-v2\" aria-labelledby=\"chart-title-a3a-diagram-1\"><title id=\"chart-title-a3a-diagram-1\">Decision-oriented communication flow in engineering projects<\/title><style>#a3a-diagram-1{font-family:Roboto,sans-serif;font-size:15px;fill:var(--a3a-diag-text, #0a0a0a);}@keyframes edge-animation-frame{from{stroke-dashoffset:0;}}@keyframes dash{to{stroke-dashoffset:0;}}#a3a-diagram-1 .edge-animation-slow{stroke-dasharray:9,5!important;stroke-dashoffset:900;animation:dash 50s linear infinite;stroke-linecap:round;}#a3a-diagram-1 .edge-animation-fast{stroke-dasharray:9,5!important;stroke-dashoffset:900;animation:dash 20s linear infinite;stroke-linecap:round;}#a3a-diagram-1 .error-icon{fill:var(--a3a-diag-canvas, #ffffff);}#a3a-diagram-1 .error-text{fill:#000000;stroke:#000000;}#a3a-diagram-1 .edge-thickness-normal{stroke-width:1px;}#a3a-diagram-1 .edge-thickness-thick{stroke-width:3.5px;}#a3a-diagram-1 .edge-pattern-solid{stroke-dasharray:0;}#a3a-diagram-1 .edge-thickness-invisible{stroke-width:0;fill:none;}#a3a-diagram-1 .edge-pattern-dashed{stroke-dasharray:3;}#a3a-diagram-1 .edge-pattern-dotted{stroke-dasharray:2;}#a3a-diagram-1 .marker{fill:var(--a3a-diag-stroke, #2e42a2);stroke:var(--a3a-diag-stroke, #2e42a2);}#a3a-diagram-1 .marker.cross{stroke:var(--a3a-diag-stroke, #2e42a2);}#a3a-diagram-1 svg{font-family:Roboto,sans-serif;font-size:15px;}#a3a-diagram-1 p{margin:0;}#a3a-diagram-1 .label{font-family:Roboto,sans-serif;color:var(--a3a-diag-text, #0a0a0a);}#a3a-diagram-1 .cluster-label text{fill:var(--a3a-diag-title, #0124af);}#a3a-diagram-1 .cluster-label span{color:var(--a3a-diag-title, #0124af);}#a3a-diagram-1 .cluster-label span p{background-color:transparent;}#a3a-diagram-1 .label text,#a3a-diagram-1 span{fill:var(--a3a-diag-text, #0a0a0a);color:var(--a3a-diag-text, #0a0a0a);}#a3a-diagram-1 .node rect,#a3a-diagram-1 .node circle,#a3a-diagram-1 .node ellipse,#a3a-diagram-1 .node polygon,#a3a-diagram-1 .node path{fill:var(--a3a-diag-fill, #eef2fd);stroke:var(--a3a-diag-stroke, #2e42a2);stroke-width:1px;}#a3a-diagram-1 .rough-node .label text,#a3a-diagram-1 .node .label text,#a3a-diagram-1 .image-shape .label,#a3a-diagram-1 .icon-shape .label{text-anchor:middle;}#a3a-diagram-1 .node .katex path{fill:#000;stroke:#000;stroke-width:1px;}#a3a-diagram-1 .rough-node .label,#a3a-diagram-1 .node .label,#a3a-diagram-1 .image-shape .label,#a3a-diagram-1 .icon-shape .label{text-align:center;}#a3a-diagram-1 .node.clickable{cursor:pointer;}#a3a-diagram-1 .root .anchor path{fill:var(--a3a-diag-stroke, #2e42a2)!important;stroke-width:0;stroke:var(--a3a-diag-stroke, #2e42a2);}#a3a-diagram-1 .arrowheadPath{fill:var(--a3a-diag-stroke, #0b0b0b);}#a3a-diagram-1 .edgePath .path{stroke:var(--a3a-diag-stroke, #2e42a2);stroke-width:2.0px;}#a3a-diagram-1 .flowchart-link{stroke:var(--a3a-diag-stroke, #2e42a2);fill:none;}#a3a-diagram-1 .edgeLabel{background-color:var(--a3a-diag-canvas, #ffffff);text-align:center;}#a3a-diagram-1 .edgeLabel p{background-color:var(--a3a-diag-canvas, #ffffff);}#a3a-diagram-1 .edgeLabel rect{opacity:0.5;background-color:var(--a3a-diag-canvas, #ffffff);fill:var(--a3a-diag-canvas, #ffffff);}#a3a-diagram-1 .labelBkg{background-color:rgba(255, 255, 255, 0.5);}#a3a-diagram-1 .cluster rect{fill:var(--a3a-diag-surface, #f8f8f8);stroke:var(--a3a-diag-border, #e2e8f0);stroke-width:1px;}#a3a-diagram-1 .cluster text{fill:var(--a3a-diag-title, #0124af);}#a3a-diagram-1 .cluster span{color:var(--a3a-diag-title, #0124af);}#a3a-diagram-1 div.mermaidTooltip{position:absolute;text-align:center;max-width:200px;padding:2px;font-family:Roboto,sans-serif;font-size:12px;background:var(--a3a-diag-canvas, #ffffff);border:1px solid hsl(0, 0%, 90%);border-radius:2px;pointer-events:none;z-index:100;}#a3a-diagram-1 .flowchartTitleText{text-anchor:middle;font-size:18px;fill:var(--a3a-diag-text, #0a0a0a);}#a3a-diagram-1 rect.text{fill:none;stroke-width:0;}#a3a-diagram-1 .icon-shape,#a3a-diagram-1 .image-shape{background-color:var(--a3a-diag-canvas, #ffffff);text-align:center;}#a3a-diagram-1 .icon-shape p,#a3a-diagram-1 .image-shape p{background-color:var(--a3a-diag-canvas, #ffffff);padding:2px;}#a3a-diagram-1 .icon-shape rect,#a3a-diagram-1 .image-shape rect{opacity:0.5;background-color:var(--a3a-diag-canvas, #ffffff);fill:var(--a3a-diag-canvas, #ffffff);}#a3a-diagram-1 .label-icon{display:inline-block;height:1em;overflow:visible;vertical-align:-0.125em;}#a3a-diagram-1 .node .label-icon path{fill:currentColor;stroke:revert;stroke-width:revert;}#a3a-diagram-1 :root{--mermaid-font-family:Roboto,sans-serif;}<\/style><g><marker id=\"a3a-diagram-1_flowchart-v2-pointEnd\" class=\"marker flowchart-v2\" viewBox=\"0 0 10 10\" refX=\"5\" refY=\"5\" markerUnits=\"userSpaceOnUse\" markerWidth=\"8\" markerHeight=\"8\" orient=\"auto\"><path d=\"M 0 0 L 10 5 L 0 10 z\" class=\"arrowMarkerPath\" style=\"stroke-width: 1; stroke-dasharray: 1, 0;\"><\/path><\/marker><marker id=\"a3a-diagram-1_flowchart-v2-pointStart\" class=\"marker flowchart-v2\" viewBox=\"0 0 10 10\" refX=\"4.5\" refY=\"5\" markerUnits=\"userSpaceOnUse\" markerWidth=\"8\" markerHeight=\"8\" orient=\"auto\"><path d=\"M 0 5 L 10 10 L 10 0 z\" class=\"arrowMarkerPath\" style=\"stroke-width: 1; stroke-dasharray: 1, 0;\"><\/path><\/marker><marker id=\"a3a-diagram-1_flowchart-v2-circleEnd\" class=\"marker flowchart-v2\" viewBox=\"0 0 10 10\" refX=\"11\" refY=\"5\" markerUnits=\"userSpaceOnUse\" markerWidth=\"11\" markerHeight=\"11\" orient=\"auto\"><circle cx=\"5\" cy=\"5\" r=\"5\" class=\"arrowMarkerPath\" style=\"stroke-width: 1; stroke-dasharray: 1, 0;\"><\/circle><\/marker><marker id=\"a3a-diagram-1_flowchart-v2-circleStart\" class=\"marker flowchart-v2\" viewBox=\"0 0 10 10\" refX=\"-1\" refY=\"5\" markerUnits=\"userSpaceOnUse\" markerWidth=\"11\" markerHeight=\"11\" orient=\"auto\"><circle cx=\"5\" cy=\"5\" r=\"5\" class=\"arrowMarkerPath\" style=\"stroke-width: 1; stroke-dasharray: 1, 0;\"><\/circle><\/marker><marker id=\"a3a-diagram-1_flowchart-v2-crossEnd\" class=\"marker cross flowchart-v2\" viewBox=\"0 0 11 11\" refX=\"12\" refY=\"5.2\" markerUnits=\"userSpaceOnUse\" markerWidth=\"11\" markerHeight=\"11\" orient=\"auto\"><path d=\"M 1,1 l 9,9 M 10,1 l -9,9\" class=\"arrowMarkerPath\" style=\"stroke-width: 2; stroke-dasharray: 1, 0;\"><\/path><\/marker><marker id=\"a3a-diagram-1_flowchart-v2-crossStart\" class=\"marker cross flowchart-v2\" viewBox=\"0 0 11 11\" refX=\"-1\" refY=\"5.2\" markerUnits=\"userSpaceOnUse\" markerWidth=\"11\" markerHeight=\"11\" orient=\"auto\"><path d=\"M 1,1 l 9,9 M 10,1 l -9,9\" class=\"arrowMarkerPath\" style=\"stroke-width: 2; stroke-dasharray: 1, 0;\"><\/path><\/marker><g class=\"root\"><g class=\"clusters\"><\/g><g class=\"edgePaths\"><path d=\"M255.035,60.5L255.035,64.667C255.035,68.833,255.035,77.167,255.035,84.833C255.035,92.5,255.035,99.5,255.035,103L255.035,106.5\" id=\"L_A_B_0\" class=\"edge-thickness-normal edge-pattern-solid edge-thickness-normal edge-pattern-solid flowchart-link\" style=\";\" data-edge=\"true\" data-et=\"edge\" data-id=\"L_A_B_0\" data-points=\"W3sieCI6MjU1LjAzNTE1NjI1LCJ5Ijo2MC41fSx7IngiOjI1NS4wMzUxNTYyNSwieSI6ODUuNX0seyJ4IjoyNTUuMDM1MTU2MjUsInkiOjExMC41fV0=\" marker-end=\"url(#a3a-diagram-1_flowchart-v2-pointEnd)\"><\/path><path d=\"M255.035,185.5L255.035,189.667C255.035,193.833,255.035,202.167,255.035,209.833C255.035,217.5,255.035,224.5,255.035,228L255.035,231.5\" id=\"L_B_C_0\" class=\"edge-thickness-normal edge-pattern-solid edge-thickness-normal edge-pattern-solid flowchart-link\" style=\";\" data-edge=\"true\" data-et=\"edge\" data-id=\"L_B_C_0\" data-points=\"W3sieCI6MjU1LjAzNTE1NjI1LCJ5IjoxODUuNX0seyJ4IjoyNTUuMDM1MTU2MjUsInkiOjIxMC41fSx7IngiOjI1NS4wMzUxNTYyNSwieSI6MjM1LjV9XQ==\" marker-end=\"url(#a3a-diagram-1_flowchart-v2-pointEnd)\"><\/path><path d=\"M255.035,288L255.035,292.167C255.035,296.333,255.035,304.667,255.035,312.333C255.035,320,255.035,327,255.035,330.5L255.035,334\" id=\"L_C_D_0\" class=\"edge-thickness-normal edge-pattern-solid edge-thickness-normal edge-pattern-solid flowchart-link\" style=\";\" data-edge=\"true\" data-et=\"edge\" data-id=\"L_C_D_0\" data-points=\"W3sieCI6MjU1LjAzNTE1NjI1LCJ5IjoyODh9LHsieCI6MjU1LjAzNTE1NjI1LCJ5IjozMTN9LHsieCI6MjU1LjAzNTE1NjI1LCJ5IjozMzh9XQ==\" marker-end=\"url(#a3a-diagram-1_flowchart-v2-pointEnd)\"><\/path><path d=\"M255.035,413L255.035,417.167C255.035,421.333,255.035,429.667,255.035,437.333C255.035,445,255.035,452,255.035,455.5L255.035,459\" id=\"L_D_E_0\" class=\"edge-thickness-normal edge-pattern-solid edge-thickness-normal edge-pattern-solid flowchart-link\" style=\";\" data-edge=\"true\" data-et=\"edge\" data-id=\"L_D_E_0\" data-points=\"W3sieCI6MjU1LjAzNTE1NjI1LCJ5Ijo0MTN9LHsieCI6MjU1LjAzNTE1NjI1LCJ5Ijo0Mzh9LHsieCI6MjU1LjAzNTE1NjI1LCJ5Ijo0NjN9XQ==\" marker-end=\"url(#a3a-diagram-1_flowchart-v2-pointEnd)\"><\/path><path d=\"M202.185,612.791L185.994,627.641C169.802,642.491,137.419,672.191,121.227,697.457C105.035,722.724,105.035,743.557,105.035,764.391C105.035,785.224,105.035,806.057,105.035,841.682C105.035,877.307,105.035,927.724,105.035,978.141C105.035,1028.557,105.035,1078.974,106.385,1109.577C107.735,1140.18,110.434,1150.97,111.784,1156.365L113.134,1161.76\" id=\"L_E_F_0\" class=\"edge-thickness-normal edge-pattern-solid edge-thickness-normal edge-pattern-solid flowchart-link\" style=\";\" data-edge=\"true\" data-et=\"edge\" data-id=\"L_E_F_0\" data-points=\"W3sieCI6MjAyLjE4NTMwOTc0NTA2OTEzLCJ5Ijo2MTIuNzkwNzc4NDk1MDY5Mn0seyJ4IjoxMDUuMDM1MTU2MjUsInkiOjcwMS44OTA2MjV9LHsieCI6MTA1LjAzNTE1NjI1LCJ5Ijo3NjQuMzkwNjI1fSx7IngiOjEwNS4wMzUxNTYyNSwieSI6ODI2Ljg5MDYyNX0seyJ4IjoxMDUuMDM1MTU2MjUsInkiOjk3OC4xNDA2MjV9LHsieCI6MTA1LjAzNTE1NjI1LCJ5IjoxMTI5LjM5MDYyNX0seyJ4IjoxMTQuMTA0NDUzMTI1LCJ5IjoxMTY1LjY0MDYyNX1d\" marker-end=\"url(#a3a-diagram-1_flowchart-v2-pointEnd)\"><\/path><path d=\"M290.783,629.892L297.325,641.892C303.867,653.892,316.951,677.891,323.493,695.266C330.035,712.641,330.035,723.391,330.035,728.766L330.035,734.141\" id=\"L_E_G_0\" class=\"edge-thickness-normal edge-pattern-solid edge-thickness-normal edge-pattern-solid flowchart-link\" style=\";\" data-edge=\"true\" data-et=\"edge\" data-id=\"L_E_G_0\" data-points=\"W3sieCI6MjkwLjc4MzQzODA2ODUxNTksInkiOjYyOS44OTIzNDMxODE0ODQxfSx7IngiOjMzMC4wMzUxNTYyNSwieSI6NzAxLjg5MDYyNX0seyJ4IjozMzAuMDM1MTU2MjUsInkiOjczOC4xNDA2MjV9XQ==\" marker-end=\"url(#a3a-diagram-1_flowchart-v2-pointEnd)\"><\/path><path d=\"M298.535,790.641L291.285,796.682C284.035,802.724,269.535,814.807,262.285,826.224C255.035,837.641,255.035,848.391,255.035,853.766L255.035,859.141\" id=\"L_G_H_0\" class=\"edge-thickness-normal edge-pattern-solid edge-thickness-normal edge-pattern-solid flowchart-link\" style=\";\" data-edge=\"true\" data-et=\"edge\" data-id=\"L_G_H_0\" data-points=\"W3sieCI6Mjk4LjUzNTE1NjI1LCJ5Ijo3OTAuNjQwNjI1fSx7IngiOjI1NS4wMzUxNTYyNSwieSI6ODI2Ljg5MDYyNX0seyJ4IjoyNTUuMDM1MTU2MjUsInkiOjg2My4xNDA2MjV9XQ==\" marker-end=\"url(#a3a-diagram-1_flowchart-v2-pointEnd)\"><\/path><path d=\"M222.621,1060.727L218.13,1072.171C213.638,1083.615,204.655,1106.503,193.426,1123.562C182.196,1140.62,168.72,1151.85,161.983,1157.465L155.245,1163.08\" id=\"L_H_F_0\" class=\"edge-thickness-normal edge-pattern-solid edge-thickness-normal edge-pattern-solid flowchart-link\" style=\";\" data-edge=\"true\" data-et=\"edge\" data-id=\"L_H_F_0\" data-points=\"W3sieCI6MjIyLjYyMTM1MzU1MzI2MjQyLCJ5IjoxMDYwLjcyNjgyMjMwMzI2MjV9LHsieCI6MTk1LjY3MTg3NSwieSI6MTEyOS4zOTA2MjV9LHsieCI6MTUyLjE3MTg3NSwieSI6MTE2NS42NDA2MjV9XQ==\" marker-end=\"url(#a3a-diagram-1_flowchart-v2-pointEnd)\"><\/path><path d=\"M287.794,1060.382L292.375,1071.884C296.956,1083.385,306.119,1106.388,317.438,1123.504C328.757,1140.62,342.233,1151.85,348.971,1157.465L355.708,1163.08\" id=\"L_H_I_0\" class=\"edge-thickness-normal edge-pattern-solid edge-thickness-normal edge-pattern-solid flowchart-link\" style=\";\" data-edge=\"true\" data-et=\"edge\" data-id=\"L_H_I_0\" data-points=\"W3sieCI6Mjg3Ljc5MzY4NDU5MTYxMzksInkiOjEwNjAuMzgyMDk2NjU4Mzg2Mn0seyJ4IjozMTUuMjgxMjUsInkiOjExMjkuMzkwNjI1fSx7IngiOjM1OC43ODEyNSwieSI6MTE2NS42NDA2MjV9XQ==\" marker-end=\"url(#a3a-diagram-1_flowchart-v2-pointEnd)\"><\/path><path d=\"M396.478,1165.641L397.904,1159.599C399.33,1153.557,402.183,1141.474,403.609,1110.224C405.035,1078.974,405.035,1028.557,405.035,978.141C405.035,927.724,405.035,877.307,398.297,846.484C391.559,815.661,378.084,804.431,371.346,798.816L364.608,793.201\" id=\"L_I_G_0\" class=\"edge-thickness-normal edge-pattern-solid edge-thickness-normal edge-pattern-solid flowchart-link\" style=\";\" data-edge=\"true\" data-et=\"edge\" data-id=\"L_I_G_0\" data-points=\"W3sieCI6Mzk2LjQ3Nzg5MDYyNSwieSI6MTE2NS42NDA2MjV9LHsieCI6NDA1LjAzNTE1NjI1LCJ5IjoxMTI5LjM5MDYyNX0seyJ4Ijo0MDUuMDM1MTU2MjUsInkiOjk3OC4xNDA2MjV9LHsieCI6NDA1LjAzNTE1NjI1LCJ5Ijo4MjYuODkwNjI1fSx7IngiOjM2MS41MzUxNTYyNSwieSI6NzkwLjY0MDYyNX1d\" marker-end=\"url(#a3a-diagram-1_flowchart-v2-pointEnd)\"><\/path><path d=\"M120.672,1218.141L120.672,1222.307C120.672,1226.474,120.672,1234.807,120.672,1242.474C120.672,1250.141,120.672,1257.141,120.672,1260.641L120.672,1264.141\" id=\"L_F_J_0\" class=\"edge-thickness-normal edge-pattern-solid edge-thickness-normal edge-pattern-solid flowchart-link\" style=\";\" data-edge=\"true\" data-et=\"edge\" data-id=\"L_F_J_0\" data-points=\"W3sieCI6MTIwLjY3MTg3NSwieSI6MTIxOC4xNDA2MjV9LHsieCI6MTIwLjY3MTg3NSwieSI6MTI0My4xNDA2MjV9LHsieCI6MTIwLjY3MTg3NSwieSI6MTI2OC4xNDA2MjV9XQ==\" marker-end=\"url(#a3a-diagram-1_flowchart-v2-pointEnd)\"><\/path><\/g><g class=\"edgeLabels\"><g class=\"edgeLabel\"><g class=\"label\" data-id=\"L_A_B_0\" transform=\"translate(0, 0)\"><foreignObject width=\"0\" height=\"0\"><div xmlns=\"http:\/\/www.w3.org\/1999\/xhtml\" class=\"labelBkg\" style=\"display: table-cell; white-space: nowrap; line-height: 1.5; max-width: 200px; text-align: center;\"><span class=\"edgeLabel\"><\/span><\/div><\/foreignObject><\/g><\/g><g class=\"edgeLabel\"><g class=\"label\" data-id=\"L_B_C_0\" transform=\"translate(0, 0)\"><foreignObject width=\"0\" height=\"0\"><div xmlns=\"http:\/\/www.w3.org\/1999\/xhtml\" class=\"labelBkg\" style=\"display: table-cell; white-space: nowrap; line-height: 1.5; max-width: 200px; text-align: center;\"><span class=\"edgeLabel\"><\/span><\/div><\/foreignObject><\/g><\/g><g class=\"edgeLabel\"><g class=\"label\" data-id=\"L_C_D_0\" transform=\"translate(0, 0)\"><foreignObject width=\"0\" height=\"0\"><div xmlns=\"http:\/\/www.w3.org\/1999\/xhtml\" class=\"labelBkg\" style=\"display: table-cell; white-space: nowrap; line-height: 1.5; max-width: 200px; text-align: center;\"><span class=\"edgeLabel\"><\/span><\/div><\/foreignObject><\/g><\/g><g class=\"edgeLabel\"><g class=\"label\" data-id=\"L_D_E_0\" transform=\"translate(0, 0)\"><foreignObject width=\"0\" height=\"0\"><div xmlns=\"http:\/\/www.w3.org\/1999\/xhtml\" class=\"labelBkg\" style=\"display: table-cell; white-space: nowrap; line-height: 1.5; max-width: 200px; text-align: center;\"><span class=\"edgeLabel\"><\/span><\/div><\/foreignObject><\/g><\/g><g class=\"edgeLabel\" transform=\"translate(105.03515625, 826.890625)\"><g class=\"label\" data-id=\"L_E_F_0\" transform=\"translate(-9.5078125, -11.25)\"><foreignObject width=\"19.015625\" height=\"22.5\"><div xmlns=\"http:\/\/www.w3.org\/1999\/xhtml\" class=\"labelBkg\" style=\"display: table-cell; white-space: nowrap; line-height: 1.5; max-width: 200px; text-align: center;\"><span class=\"edgeLabel\"><p>No<\/p><\/span><\/div><\/foreignObject><\/g><\/g><g class=\"edgeLabel\" transform=\"translate(330.03515625, 701.890625)\"><g class=\"label\" data-id=\"L_E_G_0\" transform=\"translate(-11.2734375, -11.25)\"><foreignObject width=\"22.546875\" height=\"22.5\"><div xmlns=\"http:\/\/www.w3.org\/1999\/xhtml\" class=\"labelBkg\" style=\"display: table-cell; white-space: nowrap; line-height: 1.5; max-width: 200px; text-align: center;\"><span class=\"edgeLabel\"><p>Yes<\/p><\/span><\/div><\/foreignObject><\/g><\/g><g class=\"edgeLabel\"><g class=\"label\" data-id=\"L_G_H_0\" transform=\"translate(0, 0)\"><foreignObject width=\"0\" height=\"0\"><div xmlns=\"http:\/\/www.w3.org\/1999\/xhtml\" class=\"labelBkg\" style=\"display: table-cell; white-space: nowrap; line-height: 1.5; max-width: 200px; text-align: center;\"><span class=\"edgeLabel\"><\/span><\/div><\/foreignObject><\/g><\/g><g class=\"edgeLabel\" transform=\"translate(198.80272, 1121.41365)\"><g class=\"label\" data-id=\"L_H_F_0\" transform=\"translate(-11.2734375, -11.25)\"><foreignObject width=\"22.546875\" height=\"22.5\"><div xmlns=\"http:\/\/www.w3.org\/1999\/xhtml\" class=\"labelBkg\" style=\"display: table-cell; white-space: nowrap; line-height: 1.5; max-width: 200px; text-align: center;\"><span class=\"edgeLabel\"><p>Yes<\/p><\/span><\/div><\/foreignObject><\/g><\/g><g class=\"edgeLabel\" transform=\"translate(312.01426, 1121.18873)\"><g class=\"label\" data-id=\"L_H_I_0\" transform=\"translate(-9.5078125, -11.25)\"><foreignObject width=\"19.015625\" height=\"22.5\"><div xmlns=\"http:\/\/www.w3.org\/1999\/xhtml\" class=\"labelBkg\" style=\"display: table-cell; white-space: nowrap; line-height: 1.5; max-width: 200px; text-align: center;\"><span class=\"edgeLabel\"><p>No<\/p><\/span><\/div><\/foreignObject><\/g><\/g><g class=\"edgeLabel\"><g class=\"label\" data-id=\"L_I_G_0\" transform=\"translate(0, 0)\"><foreignObject width=\"0\" height=\"0\"><div xmlns=\"http:\/\/www.w3.org\/1999\/xhtml\" class=\"labelBkg\" style=\"display: table-cell; white-space: nowrap; line-height: 1.5; max-width: 200px; text-align: center;\"><span class=\"edgeLabel\"><\/span><\/div><\/foreignObject><\/g><\/g><g class=\"edgeLabel\"><g class=\"label\" data-id=\"L_F_J_0\" transform=\"translate(0, 0)\"><foreignObject width=\"0\" height=\"0\"><div xmlns=\"http:\/\/www.w3.org\/1999\/xhtml\" class=\"labelBkg\" style=\"display: table-cell; white-space: nowrap; line-height: 1.5; max-width: 200px; text-align: center;\"><span class=\"edgeLabel\"><\/span><\/div><\/foreignObject><\/g><\/g><\/g><g class=\"nodes\"><g class=\"node default\" id=\"flowchart-A-0\" transform=\"translate(255.03515625, 34.25)\"><rect class=\"basic label-container\" style=\"\" x=\"-129.390625\" y=\"-26.25\" width=\"258.78125\" height=\"52.5\"><\/rect><g class=\"label\" style=\"\" transform=\"translate(-99.390625, -11.25)\"><rect><\/rect><foreignObject width=\"198.78125\" height=\"22.5\"><div xmlns=\"http:\/\/www.w3.org\/1999\/xhtml\" style=\"display: table-cell; white-space: nowrap; line-height: 1.5; max-width: 200px; text-align: center;\"><span class=\"nodeLabel\"><p>Information or decision need<\/p><\/span><\/div><\/foreignObject><\/g><\/g><g class=\"node default\" id=\"flowchart-B-1\" transform=\"translate(255.03515625, 148)\"><rect class=\"basic label-container\" style=\"\" x=\"-130\" y=\"-37.5\" width=\"260\" height=\"75\"><\/rect><g class=\"label\" style=\"\" transform=\"translate(-100, -22.5)\"><rect><\/rect><foreignObject width=\"200\" height=\"45\"><div xmlns=\"http:\/\/www.w3.org\/1999\/xhtml\" style=\"display: table; white-space: break-spaces; line-height: 1.5; max-width: 200px; text-align: center; width: 200px;\"><span class=\"nodeLabel\"><p>Define audience and objective<\/p><\/span><\/div><\/foreignObject><\/g><\/g><g class=\"node default\" id=\"flowchart-C-3\" transform=\"translate(255.03515625, 261.75)\"><rect class=\"basic label-container\" style=\"\" x=\"-126.9296875\" y=\"-26.25\" width=\"253.859375\" height=\"52.5\"><\/rect><g class=\"label\" style=\"\" transform=\"translate(-96.9296875, -11.25)\"><rect><\/rect><foreignObject width=\"193.859375\" height=\"22.5\"><div xmlns=\"http:\/\/www.w3.org\/1999\/xhtml\" style=\"display: table-cell; white-space: nowrap; line-height: 1.5; max-width: 200px; text-align: center;\"><span class=\"nodeLabel\"><p>Choose content and channel<\/p><\/span><\/div><\/foreignObject><\/g><\/g><g class=\"node default\" id=\"flowchart-D-5\" transform=\"translate(255.03515625, 375.5)\"><rect class=\"basic label-container\" style=\"\" x=\"-130\" y=\"-37.5\" width=\"260\" height=\"75\"><\/rect><g class=\"label\" style=\"\" transform=\"translate(-100, -22.5)\"><rect><\/rect><foreignObject width=\"200\" height=\"45\"><div xmlns=\"http:\/\/www.w3.org\/1999\/xhtml\" style=\"display: table; white-space: break-spaces; line-height: 1.5; max-width: 200px; text-align: center; width: 200px;\"><span class=\"nodeLabel\"><p>Transmit or conduct interaction<\/p><\/span><\/div><\/foreignObject><\/g><\/g><g class=\"node default\" id=\"flowchart-E-7\" transform=\"translate(255.03515625, 564.3203125)\"><polygon points=\"101.3203125,0 202.640625,-101.3203125 101.3203125,-202.640625 0,-101.3203125\" class=\"label-container\" transform=\"translate(-100.8203125, 101.3203125)\"><\/polygon><g class=\"label\" style=\"\" transform=\"translate(-75.0703125, -11.25)\"><rect><\/rect><foreignObject width=\"150.140625\" height=\"22.5\"><div xmlns=\"http:\/\/www.w3.org\/1999\/xhtml\" style=\"display: table-cell; white-space: nowrap; line-height: 1.5; max-width: 200px; text-align: center;\"><span class=\"nodeLabel\"><p>Is feedback expected?<\/p><\/span><\/div><\/foreignObject><\/g><\/g><g class=\"node default\" id=\"flowchart-F-9\" transform=\"translate(120.671875, 1191.890625)\"><rect class=\"basic label-container\" style=\"\" x=\"-85.828125\" y=\"-26.25\" width=\"171.65625\" height=\"52.5\"><\/rect><g class=\"label\" style=\"\" transform=\"translate(-55.828125, -11.25)\"><rect><\/rect><foreignObject width=\"111.65625\" height=\"22.5\"><div xmlns=\"http:\/\/www.w3.org\/1999\/xhtml\" style=\"display: table-cell; white-space: nowrap; line-height: 1.5; max-width: 200px; text-align: center;\"><span class=\"nodeLabel\"><p>Record evidence<\/p><\/span><\/div><\/foreignObject><\/g><\/g><g class=\"node default\" id=\"flowchart-G-11\" transform=\"translate(330.03515625, 764.390625)\"><rect class=\"basic label-container\" style=\"\" x=\"-88.96875\" y=\"-26.25\" width=\"177.9375\" height=\"52.5\"><\/rect><g class=\"label\" style=\"\" transform=\"translate(-58.96875, -11.25)\"><rect><\/rect><foreignObject width=\"117.9375\" height=\"22.5\"><div xmlns=\"http:\/\/www.w3.org\/1999\/xhtml\" style=\"display: table-cell; white-space: nowrap; line-height: 1.5; max-width: 200px; text-align: center;\"><span class=\"nodeLabel\"><p>Receive response<\/p><\/span><\/div><\/foreignObject><\/g><\/g><g class=\"node default\" id=\"flowchart-H-13\" transform=\"translate(255.03515625, 978.140625)\"><polygon points=\"115,0 230,-115 115,-230 0,-115\" class=\"label-container\" transform=\"translate(-114.5, 115)\"><\/polygon><g class=\"label\" style=\"\" transform=\"translate(-88.75, -11.25)\"><rect><\/rect><foreignObject width=\"177.5\" height=\"22.5\"><div xmlns=\"http:\/\/www.w3.org\/1999\/xhtml\" style=\"display: table-cell; white-space: nowrap; line-height: 1.5; max-width: 200px; text-align: center;\"><span class=\"nodeLabel\"><p>Is the response sufficient?<\/p><\/span><\/div><\/foreignObject><\/g><\/g><g class=\"node default\" id=\"flowchart-I-17\" transform=\"translate(390.28125, 1191.890625)\"><rect class=\"basic label-container\" style=\"\" x=\"-90.859375\" y=\"-26.25\" width=\"181.71875\" height=\"52.5\"><\/rect><g class=\"label\" style=\"\" transform=\"translate(-60.859375, -11.25)\"><rect><\/rect><foreignObject width=\"121.71875\" height=\"22.5\"><div xmlns=\"http:\/\/www.w3.org\/1999\/xhtml\" style=\"display: table-cell; white-space: nowrap; line-height: 1.5; max-width: 200px; text-align: center;\"><span class=\"nodeLabel\"><p>Clarify or escalate<\/p><\/span><\/div><\/foreignObject><\/g><\/g><g class=\"node default\" id=\"flowchart-J-21\" transform=\"translate(120.671875, 1294.390625)\"><rect class=\"basic label-container\" style=\"\" x=\"-112.671875\" y=\"-26.25\" width=\"225.34375\" height=\"52.5\"><\/rect><g class=\"label\" style=\"\" transform=\"translate(-82.671875, -11.25)\"><rect><\/rect><foreignObject width=\"165.34375\" height=\"22.5\"><div xmlns=\"http:\/\/www.w3.org\/1999\/xhtml\" style=\"display: table-cell; white-space: nowrap; line-height: 1.5; max-width: 200px; text-align: center;\"><span class=\"nodeLabel\"><p>Update project and plan<\/p><\/span><\/div><\/foreignObject><\/g><\/g><\/g><\/g><\/g><\/svg><figcaption>Decision-oriented communication flow in engineering projects<\/figcaption><\/figure>\n\n\n\n<h2 class=\"wp-block-heading\">How to define frequency and triggers<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Fixed frequency is useful for governance cadences, but it does not cover critical events.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Examples of cadence:<\/p>\n\n\n\n<ul class=\"wp-block-list\"><li>weekly coordination meeting;<\/li><li>monthly executive report;<\/li><li>biweekly risk review;<\/li><li>daily meeting during a critical intervention.<\/li><\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">Examples of triggers:<\/p>\n\n\n\n<ul class=\"wp-block-list\"><li>scope change;<\/li><li>risk occurrence;<\/li><li>delay above threshold;<\/li><li>document rejection;<\/li><li>need for executive decision;<\/li><li>FAT\/SAT preparation;<\/li><li>supplier onboarding;<\/li><li>requirement change;<\/li><li>cost deviation;<\/li><li>approach of an energization milestone;<\/li><li>start of assisted operation.<\/li><\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">Event-driven communication avoids waiting for the next report to address an issue that already requires action.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">How to define response deadlines<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Many communication failures are actually response-time failures. Sending information without a deadline makes feedback optional or unpredictable.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The deadline should consider:<\/p>\n\n\n\n<ul class=\"wp-block-list\"><li>criticality of the decision;<\/li><li>time available in the schedule;<\/li><li>complexity of the analysis;<\/li><li>contractual obligations;<\/li><li>dependencies on other areas;<\/li><li>stakeholder availability;<\/li><li>need for reanalysis after comments.<\/li><\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">For critical decisions, the schedule should include the approval activity and duration, not merely a note in the communication plan.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">How to assign responsibility for communication<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Every communication needs an owner. The owner is not necessarily the person shown in the \u201cFrom\u201d field. They must ensure that content, timing, channel and feedback are appropriate.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The <a href=\"https:\/\/a3aengenharia.com.br\/conteudo\/artigos-tecnicos\/matriz-raci-projetos-engenharia\/\">RACI Matrix<\/a> can complement the plan by distinguishing who prepares, approves, is consulted and receives information.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Example:<\/p>\n\n\n\n<figure class=\"wp-block-table\"><table><tbody><tr><td>Communication<\/td><td>Prepares<\/td><td>Approves<\/td><td>Receives<\/td><td>Expected feedback<\/td><\/tr><tr><td>Executive report<\/td><td>Project Controls<\/td><td>Project manager<\/td><td>Sponsor<\/td><td>decision on exceptions<\/td><\/tr><tr><td>Design review<\/td><td>Designer<\/td><td>Discipline lead<\/td><td>Owner\u2019s Engineering<\/td><td>comments and technical acceptance<\/td><\/tr><tr><td>Intervention notice<\/td><td>Planning<\/td><td>Operations<\/td><td>affected users<\/td><td>awareness and contingency<\/td><\/tr><tr><td>Contractual request<\/td><td>Contract manager<\/td><td>Authorized manager<\/td><td>contractor<\/td><td>formal response<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<h2 class=\"wp-block-heading\">How to plan executive communication<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Executive communication should enable rapid decisions without losing integrity.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">A good executive report normally highlights:<\/p>\n\n\n\n<ul class=\"wp-block-list\"><li>overall status;<\/li><li>trend;<\/li><li>main deviations;<\/li><li>emerging risks;<\/li><li>pending decisions;<\/li><li>schedule and cost impacts;<\/li><li>alternatives;<\/li><li>recommendation;<\/li><li>required action and deadline.<\/li><\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">The mistake is turning an executive presentation into a summary of every activity. Leadership needs to understand where it must act.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">How to plan technical communication<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Technical communication needs to preserve context and traceability. An isolated decision in an email may be impossible to interpret months later.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Important elements include:<\/p>\n\n\n\n<ul class=\"wp-block-list\"><li>document or requirement identification;<\/li><li>applicable revision;<\/li><li>assumptions;<\/li><li>technical basis;<\/li><li>affected interfaces;<\/li><li>comments;<\/li><li>decision;<\/li><li>owner;<\/li><li>effective date;<\/li><li>impact on other documents.<\/li><\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">When there is strong interdependence among disciplines, the plan should connect to <a href=\"https:\/\/a3aengenharia.com.br\/conteudo\/artigos-tecnicos\/gestao-interfaces-projetos-engenharia-matriz-icd-responsabilidades-mudancas\/\">interface management in engineering projects<\/a>.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">How to plan contractual communication<\/h2>\n\n\n\n<div class=\"wp-block-a3a-destaque\">\n<p class=\"wp-block-paragraph\">Technical and contractual communication can coexist, but they should not be confused. Collaboration does not eliminate the form, deadline, authority and evidence required by the contract.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><a href=\"https:\/\/a3aengenharia.com.br\/solucoes\/gestao-e-governanca-de-engenharia\/gestao-contratos-escopo-entregaveis\/\">Learn about contract, scope and deliverables management<\/a><\/p>\n<\/div>\n\n\n\n<p class=\"wp-block-paragraph\">Contractual communication must comply with the form, recipient, deadline and authority defined in the contract. Collaborative meetings do not replace formal notices when those are required.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The plan should distinguish:<\/p>\n\n\n\n<ul class=\"wp-block-list\"><li>routine technical communication;<\/li><li>submittals and approvals;<\/li><li>requests for clarification;<\/li><li>notices;<\/li><li>authorized changes;<\/li><li>delay records;<\/li><li>claims;<\/li><li>acceptance and closeout.<\/li><\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">This separation protects traceability and reduces conflict between technical collaboration and formal obligations.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">How to integrate communication with document management<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Documents need an official source. If a project distributes files through email, local folders and messaging apps without control, communication can multiply conflicting versions.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">A controlled environment should define:<\/p>\n\n\n\n<ul class=\"wp-block-list\"><li>official repository;<\/li><li>naming convention;<\/li><li>status and revision;<\/li><li>permissions;<\/li><li>comment workflow;<\/li><li>approval;<\/li><li>distribution;<\/li><li>retention and history.<\/li><\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">Communication tells people that something happened; the document system preserves which content was valid.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">How to integrate communication with requirements<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Requirements originate from stakeholders and decisions. The plan should ensure that consultations and approvals occur before design freezes.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">When working with <a href=\"https:\/\/a3aengenharia.com.br\/conteudo\/artigos-tecnicos\/gestao-requisitos-engenharia-definicao-rastreabilidade-mudancas-aceite\/\">requirements management in engineering<\/a>, communication needs to ensure that:<\/p>\n\n\n\n<ul class=\"wp-block-list\"><li>the requirement source is known;<\/li><li>questions have an owner;<\/li><li>changes are formalized;<\/li><li>impact is assessed;<\/li><li>acceptance is recorded;<\/li><li>previous versions do not continue circulating.<\/li><\/ul>\n\n\n\n<h2 class=\"wp-block-heading\">How to integrate communication with risks and issues<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">A risk that does not reach the decision-maker within the appropriate window is a poorly managed risk. The <a href=\"https:\/\/a3aengenharia.com.br\/conteudo\/artigos-tecnicos\/registro-riscos-risk-register-projetos-engenharia\/\">risk register<\/a> should include escalation and communication criteria.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Likewise, issues need:<\/p>\n\n\n\n<ul class=\"wp-block-list\"><li>owner;<\/li><li>priority;<\/li><li>required decision;<\/li><li>deadline;<\/li><li>escalation;<\/li><li>closure evidence.<\/li><\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">The communication plan provides the channels and governance routines that keep risks and issues from becoming trapped in silos.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">How to handle sensitive information<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Not all information should circulate to every stakeholder. The plan needs to establish classification and need-to-know criteria.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Examples include:<\/p>\n\n\n\n<ul class=\"wp-block-list\"><li>commercial information;<\/li><li>supplier evaluations;<\/li><li>security vulnerabilities;<\/li><li>personal data;<\/li><li>risks still under investigation;<\/li><li>proposals and negotiations;<\/li><li>documentation controlled by contract.<\/li><\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">Transparency does not mean indiscriminate exposure. It means providing appropriate information to legitimate parties with traceability and suitable protection.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">How to measure communication effectiveness<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">The number of meetings and emails is a measure of activity, not effectiveness.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">More useful indicators include:<\/p>\n\n\n\n<ul class=\"wp-block-list\"><li>decisions made on time;<\/li><li>percentage of requests answered within the SLA;<\/li><li>comments closed within the planned cycle;<\/li><li>rework caused by incorrect information;<\/li><li>late changes caused by uncommunicated requirements;<\/li><li>pending approvals;<\/li><li>overdue actions;<\/li><li>recurring questions;<\/li><li>average escalation time;<\/li><li>understanding confirmed through surveys or interviews;<\/li><li>reduction in conflicts through early alignment.<\/li><\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">The indicator should reflect the expected result of that communication.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">How to review the communication plan<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">The plan is a living artifact. It should be reviewed when:<\/p>\n\n\n\n<ul class=\"wp-block-list\"><li>a new stakeholder joins;<\/li><li>the governance structure changes;<\/li><li>a critical supplier appears;<\/li><li>the project changes phase;<\/li><li>scope or execution strategy changes;<\/li><li>conflicts or decision delays increase;<\/li><li>the current channel proves ineffective;<\/li><li>regulatory requirements change;<\/li><li>commissioning or acceptance approaches;<\/li><li>the client or project team is reorganized.<\/li><\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">The review may be simple: add an audience, change frequency, change the channel, redefine the owner or create a new trigger.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Example of a communication plan for an industrial modernization<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Consider a modernization project in an operating facility.<\/p>\n\n\n\n<figure class=\"wp-block-table\"><table><tbody><tr><td>Audience<\/td><td>Objective<\/td><td>Communication<\/td><td>Timing<\/td><td>Owner<\/td><td>Feedback<\/td><\/tr><tr><td>Sponsor<\/td><td>Decide exceptions<\/td><td>Executive report + meeting<\/td><td>Monthly and by trigger<\/td><td>Project manager<\/td><td>recorded decision<\/td><\/tr><tr><td>Operations<\/td><td>Validate impact<\/td><td>Technical workshop<\/td><td>before freeze<\/td><td>Engineering lead<\/td><td>closed requirements<\/td><\/tr><tr><td>Maintenance<\/td><td>Validate maintainability<\/td><td>Design review<\/td><td>design milestones<\/td><td>Coordinator<\/td><td>closed comments<\/td><\/tr><tr><td>Supplier<\/td><td>Coordinate data<\/td><td>Controlled submittal<\/td><td>according to need date<\/td><td>Procurement\/Engineering<\/td><td>approved document<\/td><\/tr><tr><td>Utility<\/td><td>Obtain authorization<\/td><td>Formal protocol<\/td><td>before milestone<\/td><td>Interface owner<\/td><td>authorization<\/td><\/tr><tr><td>Contractor<\/td><td>Coordinate execution<\/td><td>Meeting + system<\/td><td>weekly<\/td><td>Inspection<\/td><td>actions and deadlines<\/td><\/tr><tr><td>Affected users<\/td><td>Prepare for downtime<\/td><td>Targeted notice<\/td><td>before intervention<\/td><td>Operations<\/td><td>acknowledgement<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p class=\"wp-block-paragraph\">The plan turns different needs into a coherent system. There is no single message or channel capable of serving all these audiences.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Common mistakes when preparing the plan<\/h2>\n\n\n\n<h3 class=\"wp-block-heading\">Copying another project\u2019s template<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">A template helps with structure, but stakeholders, channels, contracts and decisions are project-specific.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Defining frequency only<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">\u201cWeekly\u201d does not explain objective, content, owner or feedback.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Using meetings for everything<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Meetings consume time and do not always produce a better result. Use them when interaction is necessary.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Using email for everything<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Email does not replace workflow, document control, formal decisions or issue management.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Communicating without requesting a response<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">If an action is expected, it must be explicit, with an owner and deadline.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Failing to distinguish technical from contractual communication<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">This can create informal commitments and disputes over validity.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Not measuring effectiveness<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Without an indicator or feedback, the team knows it sent the message but does not know whether communication worked.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Checklist for a robust communication plan<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Before approving the plan, verify that:<\/p>\n\n\n\n<ul class=\"wp-block-list\"><li>priority stakeholders have been identified;<\/li><li>each communication has a clear objective;<\/li><li>audiences are segmented;<\/li><li>the level of detail is appropriate;<\/li><li>channel and frequency make sense;<\/li><li>critical triggers are defined;<\/li><li>responsibilities are clear;<\/li><li>there is a deadline when feedback is required;<\/li><li>contractual communication complies with the contract;<\/li><li>sensitive information is classified;<\/li><li>there is an official record location;<\/li><li>the plan is connected to the schedule;<\/li><li>risk and change communication is covered;<\/li><li>operations and maintenance participate before acceptance;<\/li><li>effectiveness will be monitored;<\/li><li>there are triggers for reviewing the plan itself.<\/li><\/ul>\n\n\n\n<h2 class=\"wp-block-heading\">Communication plan and Consulting Engineering<\/h2>\n\n\n\n<div class=\"wp-block-a3a-destaque\">\n<p class=\"wp-block-paragraph\">Consulting Engineering adds value when it turns dispersed communication into operational governance: routines, dashboards, workflows, escalation and traceable decisions.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><a href=\"https:\/\/a3aengenharia.com.br\/servicos\/implementacao\/gerenciamento-de-projetos\/\">Learn about Engineering Project Management<\/a><\/p>\n<\/div>\n\n\n\n<p class=\"wp-block-paragraph\">In complex projects, the difficulty is not filling in a spreadsheet, but designing a communication system consistent with governance, interfaces, contracts and decisions.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">In <a href=\"https:\/\/a3aengenharia.com.br\/servicos\/implementacao\/gerenciamento-de-projetos\/\">Engineering Project Management<\/a>, Consulting Engineering can structure governance routines, reports, dashboards, workflows, a communication matrix, escalation rules and decision mechanisms. The objective is to reduce noise and ensure that relevant information reaches the right party before it becomes delay or rework.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">In <a href=\"https:\/\/a3aengenharia.com.br\/servicos\/contratacao-integrada\/engenharia-do-proprietario\/\">Owner\u2019s Engineering<\/a>, this discipline helps integrate the owner, designers, suppliers, contractors, inspection and operations while preserving authority boundaries and contractual channels.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Final considerations<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">A project communication plan is not a meeting calendar. It is a governance mechanism for defining information, purpose, audience, channel, responsibility, timing, feedback and record.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Its effectiveness depends on three conditions: understanding stakeholders and their needs; connecting communication to real project decisions and deliverables; and reviewing the plan as the context changes.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">When these conditions are met, communication stops being an administrative activity and starts reducing uncertainty, accelerating decisions, preserving traceability and improving coordination among engineering, contracts, suppliers, operations and governance.<\/p>\n\n\n\n<details class=\"wp-block-details is-layout-flow wp-block-details-is-layout-flow\"><summary>Technical references<\/summary>\n<p class=\"wp-block-paragraph\">[1] INTERNATIONAL ORGANIZATION FOR STANDARDIZATION. ISO 21502:2020 \u2014 Project, programme and portfolio management \u2014 Guidance on project management. Geneva: ISO, 2020. Available at: <a href=\"https:\/\/www.iso.org\/standard\/74947.html\">https:\/\/www.iso.org\/standard\/74947.html<\/a><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">[2] PROJECT MANAGEMENT INSTITUTE. A Guide to the Project Management Body of Knowledge (PMBOK\u00ae Guide). 8th ed. Newtown Square: PMI, 2025. Available at: <a href=\"https:\/\/www.pmi.org\/standards\/pmbok\">https:\/\/www.pmi.org\/standards\/pmbok<\/a><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">[3] PROJECT MANAGEMENT INSTITUTE. Managing communications effectively and efficiently. Newtown Square: PMI. Available at: <a href=\"https:\/\/www.pmi.org\/learning\/library\/managing-communications-effectively-efficiently-5916\">https:\/\/www.pmi.org\/learning\/library\/managing-communications-effectively-efficiently-5916<\/a><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">[4] PROJECT MANAGEMENT INSTITUTE. Communication works for those who work at it. Newtown Square: PMI. Available at: <a href=\"https:\/\/www.pmi.org\/learning\/library\/techniques-communicate-project-stakeholders-na-7238\">https:\/\/www.pmi.org\/learning\/library\/techniques-communicate-project-stakeholders-na-7238<\/a><\/p>\n<\/details>\n\n\n\n<details class=\"wp-block-details is-layout-flow wp-block-details-is-layout-flow\"><summary>Frequently asked questions<\/summary>\n<div class=\"schema-faq wp-block-yoast-faq-block\"><div class=\"schema-faq-section\" id=\"faq-question-o-que-um-plano-de-comunica-o-em-projetos-d53c1b42\"><strong class=\"schema-faq-question\">What is a project communication plan?<\/strong> <p class=\"schema-faq-answer\">It is the instrument that defines audiences, objectives, information, channels, frequency or triggers, owners, deadlines, expected feedback, classification and records for project communications.<\/p><\/div><div class=\"schema-faq-section\" id=\"faq-question-o-que-deve-conter-um-plano-de-comunica-o-d87c1ba9\"><strong class=\"schema-faq-question\">What should a communication plan contain?<\/strong> <p class=\"schema-faq-answer\">At minimum, it should contain the stakeholder or audience, objective, content, level of detail, sender, recipient, channel, frequency or trigger, response deadline, classification, record and effectiveness measure.<\/p><\/div><div class=\"schema-faq-section\" id=\"faq-question-plano-de-comunica-o-a-mesma-coisa-que-plano-de-s-63e49da0\"><strong class=\"schema-faq-question\">Is a communication plan the same as a stakeholder plan?<\/strong> <p class=\"schema-faq-answer\">No. Stakeholder management defines who needs to be engaged and at what level. The communication plan details how information and interaction will occur to support that engagement and project decisions.<\/p><\/div><div class=\"schema-faq-section\" id=\"faq-question-como-escolher-o-canal-de-comunica-o-de-um-projet-76068e8e\"><strong class=\"schema-faq-question\">How should a project communication channel be selected?<\/strong> <p class=\"schema-faq-answer\">The channel should reflect the objective, complexity, criticality, need for interaction and evidence requirements. Complex decisions may require a meeting; approvals and documents need workflow; critical alerts need an immediate channel.<\/p><\/div><div class=\"schema-faq-section\" id=\"faq-question-qual-a-diferen-a-entre-comunica-o-s-ncrona-e-ass-7ae16dd6\"><strong class=\"schema-faq-question\">What is the difference between synchronous and asynchronous communication?<\/strong> <p class=\"schema-faq-answer\">Synchronous communication occurs in real time and is useful for discussion and negotiation. Asynchronous communication allows analysis and traceability and is suitable for documents, reports, dashboards and controlled comments.<\/p><\/div><div class=\"schema-faq-section\" id=\"faq-question-como-medir-a-efic-cia-do-plano-de-comunica-o-a1b4913d\"><strong class=\"schema-faq-question\">How can communication plan effectiveness be measured?<\/strong> <p class=\"schema-faq-answer\">Use outcomes such as on-time decisions, responses within SLA, reduced rework, comment closure, fewer recurring questions and alignment between the communication performed and the expected action.<\/p><\/div><div class=\"schema-faq-section\" id=\"faq-question-com-que-frequ-ncia-o-plano-de-comunica-o-deve-se-7282be4b\"><strong class=\"schema-faq-question\">How often should the communication plan be updated?<\/strong> <p class=\"schema-faq-answer\">Whenever there is a relevant change in stakeholders, phase, governance, contracts, suppliers, scope, risks or channels. Dynamic projects may require review in each management cycle.<\/p><\/div><div class=\"schema-faq-section\" id=\"faq-question-e-mail-pode-ser-o-principal-canal-de-comunica-o--eea5cc53\"><strong class=\"schema-faq-question\">Can email be the project\u2019s main communication channel?<\/strong> <p class=\"schema-faq-answer\">It can be useful for distribution and records, but it should not replace document management systems, workflows, formal decisions, issue management or contractual channels when those mechanisms are required.<\/p><\/div><\/div>\n<\/details>\n\n\n\n<details class=\"wp-block-details is-layout-flow wp-block-details-is-layout-flow\"><summary>Complementary technical materials<\/summary>\n<h4 class=\"wp-block-heading\">Related solutions<\/h4>\n\n<ul class=\"wp-block-list\"><li><a href=\"https:\/\/a3aengenharia.com.br\/solucoes\/gestao-e-governanca-de-engenharia\/gestao-processos-workflows-aprovacoes-tecnicas\/\">Process, Workflow and Technical Approval Management<\/a><\/li><li><a href=\"https:\/\/a3aengenharia.com.br\/solucoes\/gestao-e-governanca-de-engenharia\/gestao-contratos-escopo-entregaveis\/\">Contract, Scope and Deliverables Management<\/a><\/li><\/ul>\n\n<h4 class=\"wp-block-heading\">Related services<\/h4>\n\n<ul class=\"wp-block-list\"><li><a href=\"https:\/\/a3aengenharia.com.br\/servicos\/implementacao\/gerenciamento-de-projetos\/\">Engineering Project Management<\/a><\/li><li><a href=\"https:\/\/a3aengenharia.com.br\/servicos\/contratacao-integrada\/engenharia-do-proprietario\/\">Owner\u2019s Engineering<\/a><\/li><\/ul>\n\n<h4 class=\"wp-block-heading\">Main content on the topic<\/h4>\n\n<ul class=\"wp-block-list\"><li><a href=\"https:\/\/a3aengenharia.com.br\/conteudo\/artigos-tecnicos\/gestao-de-stakeholders\/\">Stakeholder Management in Projects<\/a><\/li><li><a href=\"https:\/\/a3aengenharia.com.br\/conteudo\/artigos-tecnicos\/mapeamento-stakeholders-como-identificar-analisar-mapa\/\">Stakeholder Mapping<\/a><\/li><li><a href=\"https:\/\/a3aengenharia.com.br\/conteudo\/artigos-tecnicos\/matriz-raci-projetos-engenharia\/\">RACI Matrix in Engineering Projects<\/a><\/li><\/ul>\n\n<h4 class=\"wp-block-heading\">Related technical content<\/h4>\n\n<ul class=\"wp-block-list\"><li><a href=\"https:\/\/a3aengenharia.com.br\/conteudo\/artigos-tecnicos\/gestao-interfaces-projetos-engenharia-matriz-icd-responsabilidades-mudancas\/\">Interface Management in Engineering Projects<\/a><\/li><li><a href=\"https:\/\/a3aengenharia.com.br\/conteudo\/artigos-tecnicos\/registro-riscos-risk-register-projetos-engenharia\/\">Risk Register in Engineering Projects<\/a><\/li><li><a href=\"https:\/\/a3aengenharia.com.br\/conteudo\/artigos-tecnicos\/gestao-requisitos-engenharia-definicao-rastreabilidade-mudancas-aceite\/\">Requirements Management in Engineering<\/a><\/li><\/ul>\n<\/details>\n","protected":false},"excerpt":{"rendered":"<p>Learn how to develop a project communication plan: audiences, objectives, channels, frequency, responsibilities, deadlines, feedback and governance.<\/p>\n","protected":false},"author":1,"featured_media":0,"parent":0,"template":"","meta":{"_a3a_global_related_solutions":[],"_a3a_global_related_services":[],"_a3a_global_related_materials":[],"_a3a_post_lang":"en-us","_a3a_translation_group_id":"2bfc9408-12f6-45ad-ad56-b9a683aaab65","_a3a_i18n_canonical_slug":"project-communication-plan-audiences-channels-responsibilities"},"categories":[],"segments":[],"mercados":[],"etapas":[],"class_list":["post-73272","articles","type-articles","status-publish","hentry"],"_links":{"self":[{"href":"https:\/\/a3aengenharia.com\/en-us\/wp-json\/wp\/v2\/articles\/73272","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/a3aengenharia.com\/en-us\/wp-json\/wp\/v2\/articles"}],"about":[{"href":"https:\/\/a3aengenharia.com\/en-us\/wp-json\/wp\/v2\/types\/articles"}],"author":[{"embeddable":true,"href":"https:\/\/a3aengenharia.com\/en-us\/wp-json\/wp\/v2\/users\/1"}],"version-history":[{"count":2,"href":"https:\/\/a3aengenharia.com\/en-us\/wp-json\/wp\/v2\/articles\/73272\/revisions"}],"predecessor-version":[{"id":73285,"href":"https:\/\/a3aengenharia.com\/en-us\/wp-json\/wp\/v2\/articles\/73272\/revisions\/73285"}],"wp:attachment":[{"href":"https:\/\/a3aengenharia.com\/en-us\/wp-json\/wp\/v2\/media?parent=73272"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/a3aengenharia.com\/en-us\/wp-json\/wp\/v2\/categories?post=73272"},{"taxonomy":"segments","embeddable":true,"href":"https:\/\/a3aengenharia.com\/en-us\/wp-json\/wp\/v2\/segments?post=73272"},{"taxonomy":"mercados","embeddable":true,"href":"https:\/\/a3aengenharia.com\/en-us\/wp-json\/wp\/v2\/mercados?post=73272"},{"taxonomy":"etapas","embeddable":true,"href":"https:\/\/a3aengenharia.com\/en-us\/wp-json\/wp\/v2\/etapas?post=73272"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}