{"id":73016,"date":"2026-08-29T10:35:09","date_gmt":"2026-08-29T13:35:09","guid":{"rendered":"https:\/\/a3aengenharia.com\/?post_type=articles&#038;p=73016"},"modified":"2026-08-30T14:37:23","modified_gmt":"2026-08-30T17:37:23","slug":"quality-management-procurement-suppliers-engineering-2","status":"publish","type":"articles","link":"https:\/\/a3aengenharia.com\/en-us\/content\/technical-articles\/quality-management-procurement-suppliers-engineering-2\/","title":{"rendered":"Quality Management in Procurement: Requirements, Suppliers, Inspections, and Technical Acceptance"},"content":{"rendered":"\n<p class=\"wp-block-paragraph\">Quality Management in Procurement is the set of controls used to ensure that contracted materials, equipment, and services meet technical requirements before being incorporated into the project. It begins with specification definition and purchasing strategy, continues through supplier qualification and selection, document review, fabrication, inspections, FAT, nonconformity treatment, release for shipment, receipt, and ends with technical and documentary acceptance.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The central point is simple: supply quality cannot be inspected only at the end. If critical requirements are not included in the purchase requisition, if the supplier is not evaluated according to its actual capability, if the ITP does not define intervention points, or if the FAT has no objective criteria, the project transfers risk to stages where correction is more expensive and more difficult.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">In Engineering, quality-focused Procurement must integrate Engineering, Supply Chain, QA\/QC, supervision, inspection, commissioning, and operations. Purchasing ceases to be only a commercial acquisition and becomes a process for transforming design requirements into a verifiable product or service. Price remains relevant, but it cannot replace compliance, traceability, documentation, performance, and delivery capability.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">What quality means in Procurement<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Quality in Procurement means ensuring that the contracting process is capable of producing compliant and evidence-based supplies. This involves preventing specification errors, selecting capable suppliers, converting requirements into clauses and acceptance criteria, monitoring purchase order execution, and preventing unsuitable materials or equipment from silently advancing to the construction site.<\/p>\n\n\n\n<figure class=\"wp-block-table\"><table><tbody><tr><td>Stage<\/td><td>Quality risk<\/td><td>Expected control<\/td><\/tr><tr><td>Requisition<\/td><td>incomplete or ambiguous scope<\/td><td>specification, datasheet, and objective criteria<\/td><\/tr><tr><td>Quotation<\/td><td>supplier interprets requirements differently<\/td><td>technical bid leveling and clarifications<\/td><\/tr><tr><td>Selection<\/td><td>choice based only on price<\/td><td>technical qualification and supplier risk<\/td><\/tr><tr><td>Purchase order<\/td><td>requirements not transferred to the contract<\/td><td>clauses, VDR, ITP, inspection, and FAT<\/td><\/tr><tr><td>Fabrication<\/td><td>deviations not detected<\/td><td>Vendor Inspection, H\/W\/R points, audits<\/td><\/tr><tr><td>FAT<\/td><td>test without protocol or criterion<\/td><td>approved procedure and recorded results<\/td><\/tr><tr><td>Shipping<\/td><td>equipment shipped with critical open items<\/td><td>release note and document gate<\/td><\/tr><tr><td>Receipt<\/td><td>wrong, damaged, or undocumented item<\/td><td>receiving inspection and quarantine<\/td><\/tr><tr><td>Commissioning<\/td><td>problem discovered late<\/td><td>SAT, functional testing, and traceability<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p class=\"wp-block-paragraph\">The objective is not to bureaucratize every purchase. It is to size the control according to the criticality of the supply.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Technical Procurement and commercial Procurement<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">The purchasing function negotiates price, schedule, commercial terms, and supplier relationships. Technical Procurement focuses on translating and preserving engineering requirements throughout the contracting process.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The two dimensions need to work together. A commercially attractive proposal may be technically inadequate; a technically excellent solution may be financially unviable or unable to meet the project schedule.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The content <strong>Procurement in Engineering Projects: what it is, stages, criteria, and supplier management<\/strong> presents an overview of the process. Here, the focus is the QA\/QC and compliance-control layer within that journey.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Quality starts with the purchase requisition<\/h2>\n\n\n\n<div class=\"wp-block-a3a-destaque\">\n<p class=\"wp-block-paragraph\">The lowest quality cost occurs before the purchase. Incomplete requirements, subjective criteria, and unformalized deviations enter the purchase order as risk and reappear during fabrication, installation, or commissioning.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><a href=\"https:\/\/a3aengenharia.com.br\/servicos\/implementacao\/procurement\/\">Learn about A3A Engenharia&#8217;s Technical Procurement<\/a><\/p>\n<\/div>\n\n\n\n<p class=\"wp-block-paragraph\">Many problems originate before the supplier. A poorly structured requisition transfers ambiguity to the market and produces technically incomparable proposals.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">A robust requisition should define, when applicable:<\/p>\n\n\n\n<ul class=\"wp-block-list\"><li>scope and supply boundaries;<\/li><li>applicable standards and codes;<\/li><li>environmental and operating conditions;<\/li><li>performance characteristics;<\/li><li>interfaces;<\/li><li>materials and construction requirements;<\/li><li>inspection and testing criteria;<\/li><li>mandatory documentation;<\/li><li>traceability requirements;<\/li><li>FAT, SAT, and commissioning;<\/li><li>spares and consumables;<\/li><li>warranty;<\/li><li>training;<\/li><li>Data Book or Quality Dossier;<\/li><li>acceptance criteria.<\/li><\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">The best time to reduce a quality risk is before the RFQ is issued. Once the purchase order is placed, any additional requirement may generate cost, delay, or a commercial dispute.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">How to turn Engineering requirements into verifiable requirements<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">A specification must allow verification. Expressions such as \u201chigh quality,\u201d \u201cfirst-class material,\u201d or \u201cin accordance with good practice\u201d do not by themselves define an acceptance criterion.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The requirement should be associated with a means of demonstration.<\/p>\n\n\n\n<figure class=\"wp-block-table\"><table><tbody><tr><td>Requirement<\/td><td>Verification method<\/td><td>Evidence<\/td><\/tr><tr><td>critical dimension<\/td><td>measurement<\/td><td>dimensional report<\/td><\/tr><tr><td>electrical performance<\/td><td>test<\/td><td>protocol and results<\/td><\/tr><tr><td>specified material<\/td><td>certificate and traceability<\/td><td>certificate + batch\/heat number<\/td><\/tr><tr><td>environmental protection<\/td><td>inspection\/test<\/td><td>report, certificate, or test<\/td><\/tr><tr><td>functional logic<\/td><td>sequence test<\/td><td>FAT\/SAT<\/td><\/tr><tr><td>final documentation<\/td><td>document review<\/td><td>accepted MDR\/Data Book<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p class=\"wp-block-paragraph\">This logic connects Procurement to the Inspection and Test Plan and prevents acceptance from depending on subjective opinion.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Supplier qualification<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Qualifying a supplier does not mean only confirming corporate registration, financial capacity, or commercial history. For critical items, technical and quality capability must be verified.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The assessment may include:<\/p>\n\n\n\n<ul class=\"wp-block-list\"><li>experience with equivalent supplies;<\/li><li>facilities and production resources;<\/li><li>engineering capability;<\/li><li>quality management system;<\/li><li>qualification of special processes;<\/li><li>personnel competence;<\/li><li>inspection and measurement equipment;<\/li><li>control of sub-suppliers;<\/li><li>traceability capability;<\/li><li>historical performance;<\/li><li>treatment of NCRs;<\/li><li>documentation capability;<\/li><li>schedule and installed capacity.<\/li><\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">ISO 9001:2015 establishes requirements for controlling externally provided processes, products, and services. In Engineering Procurement, this means the level of control over the supplier should consider the potential impact of its supply on the project&#8217;s ability to meet requirements.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Supply criticality classification<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Not every item deserves the same QA\/QC effort. A criticality matrix makes it possible to allocate inspection and engineering where risk is highest.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Possible criteria:<\/p>\n\n\n\n<ul class=\"wp-block-list\"><li>impact on safety;<\/li><li>impact on availability;<\/li><li>difficulty of replacement;<\/li><li>lead time;<\/li><li>cost of failure;<\/li><li>fabrication complexity;<\/li><li>proprietary technology;<\/li><li>need for special processes;<\/li><li>integration with other systems;<\/li><li>supplier&#8217;s previous experience;<\/li><li>consequences of discovering a defect after installation.<\/li><\/ul>\n\n\n\n<figure class=\"a3a-mermaid\"><svg id=\"a3a-diagram-1\" width=\"100%\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" class=\"flowchart\" overflow=\"visible\" style=\"max-width:min(696.59765625px, 100%);height:auto;display:block;margin:0 auto\" viewBox=\"0 0 696.59765625 864.140625\" role=\"graphics-document document\" aria-roledescription=\"flowchart-v2\" aria-labelledby=\"chart-title-a3a-diagram-1\"><title id=\"chart-title-a3a-diagram-1\">Scaling quality control according to supply criticality<\/title><style>#a3a-diagram-1{font-family:Roboto,sans-serif;font-size:15px;fill:var(--a3a-diag-text, #0a0a0a);}@keyframes edge-animation-frame{from{stroke-dashoffset:0;}}@keyframes dash{to{stroke-dashoffset:0;}}#a3a-diagram-1 .edge-animation-slow{stroke-dasharray:9,5!important;stroke-dashoffset:900;animation:dash 50s linear infinite;stroke-linecap:round;}#a3a-diagram-1 .edge-animation-fast{stroke-dasharray:9,5!important;stroke-dashoffset:900;animation:dash 20s linear infinite;stroke-linecap:round;}#a3a-diagram-1 .error-icon{fill:var(--a3a-diag-canvas, #ffffff);}#a3a-diagram-1 .error-text{fill:#000000;stroke:#000000;}#a3a-diagram-1 .edge-thickness-normal{stroke-width:1px;}#a3a-diagram-1 .edge-thickness-thick{stroke-width:3.5px;}#a3a-diagram-1 .edge-pattern-solid{stroke-dasharray:0;}#a3a-diagram-1 .edge-thickness-invisible{stroke-width:0;fill:none;}#a3a-diagram-1 .edge-pattern-dashed{stroke-dasharray:3;}#a3a-diagram-1 .edge-pattern-dotted{stroke-dasharray:2;}#a3a-diagram-1 .marker{fill:var(--a3a-diag-stroke, #2e42a2);stroke:var(--a3a-diag-stroke, #2e42a2);}#a3a-diagram-1 .marker.cross{stroke:var(--a3a-diag-stroke, #2e42a2);}#a3a-diagram-1 svg{font-family:Roboto,sans-serif;font-size:15px;}#a3a-diagram-1 p{margin:0;}#a3a-diagram-1 .label{font-family:Roboto,sans-serif;color:var(--a3a-diag-text, #0a0a0a);}#a3a-diagram-1 .cluster-label text{fill:var(--a3a-diag-title, #0124af);}#a3a-diagram-1 .cluster-label span{color:var(--a3a-diag-title, #0124af);}#a3a-diagram-1 .cluster-label span p{background-color:transparent;}#a3a-diagram-1 .label text,#a3a-diagram-1 span{fill:var(--a3a-diag-text, #0a0a0a);color:var(--a3a-diag-text, #0a0a0a);}#a3a-diagram-1 .node rect,#a3a-diagram-1 .node circle,#a3a-diagram-1 .node ellipse,#a3a-diagram-1 .node polygon,#a3a-diagram-1 .node path{fill:var(--a3a-diag-fill, #eef2fd);stroke:var(--a3a-diag-stroke, #2e42a2);stroke-width:1px;}#a3a-diagram-1 .rough-node .label text,#a3a-diagram-1 .node .label text,#a3a-diagram-1 .image-shape .label,#a3a-diagram-1 .icon-shape .label{text-anchor:middle;}#a3a-diagram-1 .node .katex path{fill:#000;stroke:#000;stroke-width:1px;}#a3a-diagram-1 .rough-node .label,#a3a-diagram-1 .node .label,#a3a-diagram-1 .image-shape .label,#a3a-diagram-1 .icon-shape .label{text-align:center;}#a3a-diagram-1 .node.clickable{cursor:pointer;}#a3a-diagram-1 .root .anchor path{fill:var(--a3a-diag-stroke, #2e42a2)!important;stroke-width:0;stroke:var(--a3a-diag-stroke, #2e42a2);}#a3a-diagram-1 .arrowheadPath{fill:var(--a3a-diag-stroke, #0b0b0b);}#a3a-diagram-1 .edgePath .path{stroke:var(--a3a-diag-stroke, #2e42a2);stroke-width:2.0px;}#a3a-diagram-1 .flowchart-link{stroke:var(--a3a-diag-stroke, #2e42a2);fill:none;}#a3a-diagram-1 .edgeLabel{background-color:var(--a3a-diag-canvas, #ffffff);text-align:center;}#a3a-diagram-1 .edgeLabel p{background-color:var(--a3a-diag-canvas, #ffffff);}#a3a-diagram-1 .edgeLabel rect{opacity:0.5;background-color:var(--a3a-diag-canvas, #ffffff);fill:var(--a3a-diag-canvas, #ffffff);}#a3a-diagram-1 .labelBkg{background-color:rgba(255, 255, 255, 0.5);}#a3a-diagram-1 .cluster rect{fill:var(--a3a-diag-surface, #f8f8f8);stroke:var(--a3a-diag-border, #e2e8f0);stroke-width:1px;}#a3a-diagram-1 .cluster text{fill:var(--a3a-diag-title, #0124af);}#a3a-diagram-1 .cluster span{color:var(--a3a-diag-title, #0124af);}#a3a-diagram-1 div.mermaidTooltip{position:absolute;text-align:center;max-width:200px;padding:2px;font-family:Roboto,sans-serif;font-size:12px;background:var(--a3a-diag-canvas, #ffffff);border:1px solid hsl(0, 0%, 90%);border-radius:2px;pointer-events:none;z-index:100;}#a3a-diagram-1 .flowchartTitleText{text-anchor:middle;font-size:18px;fill:var(--a3a-diag-text, #0a0a0a);}#a3a-diagram-1 rect.text{fill:none;stroke-width:0;}#a3a-diagram-1 .icon-shape,#a3a-diagram-1 .image-shape{background-color:var(--a3a-diag-canvas, #ffffff);text-align:center;}#a3a-diagram-1 .icon-shape p,#a3a-diagram-1 .image-shape p{background-color:var(--a3a-diag-canvas, #ffffff);padding:2px;}#a3a-diagram-1 .icon-shape rect,#a3a-diagram-1 .image-shape rect{opacity:0.5;background-color:var(--a3a-diag-canvas, #ffffff);fill:var(--a3a-diag-canvas, #ffffff);}#a3a-diagram-1 .label-icon{display:inline-block;height:1em;overflow:visible;vertical-align:-0.125em;}#a3a-diagram-1 .node .label-icon path{fill:currentColor;stroke:revert;stroke-width:revert;}#a3a-diagram-1 :root{--mermaid-font-family:Roboto,sans-serif;}<\/style><g><marker id=\"a3a-diagram-1_flowchart-v2-pointEnd\" class=\"marker flowchart-v2\" viewBox=\"0 0 10 10\" refX=\"5\" refY=\"5\" markerUnits=\"userSpaceOnUse\" markerWidth=\"8\" markerHeight=\"8\" orient=\"auto\"><path d=\"M 0 0 L 10 5 L 0 10 z\" class=\"arrowMarkerPath\" style=\"stroke-width: 1; stroke-dasharray: 1, 0;\"><\/path><\/marker><marker id=\"a3a-diagram-1_flowchart-v2-pointStart\" class=\"marker flowchart-v2\" viewBox=\"0 0 10 10\" refX=\"4.5\" refY=\"5\" markerUnits=\"userSpaceOnUse\" markerWidth=\"8\" markerHeight=\"8\" orient=\"auto\"><path d=\"M 0 5 L 10 10 L 10 0 z\" class=\"arrowMarkerPath\" style=\"stroke-width: 1; stroke-dasharray: 1, 0;\"><\/path><\/marker><marker id=\"a3a-diagram-1_flowchart-v2-circleEnd\" class=\"marker flowchart-v2\" viewBox=\"0 0 10 10\" refX=\"11\" refY=\"5\" markerUnits=\"userSpaceOnUse\" markerWidth=\"11\" markerHeight=\"11\" orient=\"auto\"><circle cx=\"5\" cy=\"5\" r=\"5\" class=\"arrowMarkerPath\" style=\"stroke-width: 1; stroke-dasharray: 1, 0;\"><\/circle><\/marker><marker id=\"a3a-diagram-1_flowchart-v2-circleStart\" class=\"marker flowchart-v2\" viewBox=\"0 0 10 10\" refX=\"-1\" refY=\"5\" markerUnits=\"userSpaceOnUse\" markerWidth=\"11\" markerHeight=\"11\" orient=\"auto\"><circle cx=\"5\" cy=\"5\" r=\"5\" class=\"arrowMarkerPath\" style=\"stroke-width: 1; stroke-dasharray: 1, 0;\"><\/circle><\/marker><marker id=\"a3a-diagram-1_flowchart-v2-crossEnd\" class=\"marker cross flowchart-v2\" viewBox=\"0 0 11 11\" refX=\"12\" refY=\"5.2\" markerUnits=\"userSpaceOnUse\" markerWidth=\"11\" markerHeight=\"11\" orient=\"auto\"><path d=\"M 1,1 l 9,9 M 10,1 l -9,9\" class=\"arrowMarkerPath\" style=\"stroke-width: 2; stroke-dasharray: 1, 0;\"><\/path><\/marker><marker id=\"a3a-diagram-1_flowchart-v2-crossStart\" class=\"marker cross flowchart-v2\" viewBox=\"0 0 11 11\" refX=\"-1\" refY=\"5.2\" markerUnits=\"userSpaceOnUse\" markerWidth=\"11\" markerHeight=\"11\" orient=\"auto\"><path d=\"M 1,1 l 9,9 M 10,1 l -9,9\" class=\"arrowMarkerPath\" style=\"stroke-width: 2; stroke-dasharray: 1, 0;\"><\/path><\/marker><g class=\"root\"><g class=\"clusters\"><\/g><g class=\"edgePaths\"><path d=\"M275,60.5L275,64.667C275,68.833,275,77.167,275,84.833C275,92.5,275,99.5,275,103L275,106.5\" id=\"L_A_B_0\" class=\"edge-thickness-normal edge-pattern-solid edge-thickness-normal edge-pattern-solid flowchart-link\" style=\";\" data-edge=\"true\" data-et=\"edge\" data-id=\"L_A_B_0\" data-points=\"W3sieCI6Mjc1LCJ5Ijo2MC41fSx7IngiOjI3NSwieSI6ODUuNX0seyJ4IjoyNzUsInkiOjExMC41fV0=\" marker-end=\"url(#a3a-diagram-1_flowchart-v2-pointEnd)\"><\/path><path d=\"M232.63,223.271L216.859,236.374C201.087,249.478,169.543,275.684,153.772,303.579C138,331.474,138,361.057,138,375.849L138,390.641\" id=\"L_B_C_0\" class=\"edge-thickness-normal edge-pattern-solid edge-thickness-normal edge-pattern-solid flowchart-link\" style=\";\" data-edge=\"true\" data-et=\"edge\" data-id=\"L_B_C_0\" data-points=\"W3sieCI6MjMyLjYzMDQ5MzY5MjU3MTI2LCJ5IjoyMjMuMjcxMTE4NjkyNTcxMjZ9LHsieCI6MTM4LCJ5IjozMDEuODkwNjI1fSx7IngiOjEzOCwieSI6Mzk0LjY0MDYyNX1d\" marker-end=\"url(#a3a-diagram-1_flowchart-v2-pointEnd)\"><\/path><path d=\"M317.37,223.271L333.141,236.374C348.913,249.478,380.457,275.684,396.228,294.162C412,312.641,412,323.391,412,328.766L412,334.141\" id=\"L_B_D_0\" class=\"edge-thickness-normal edge-pattern-solid edge-thickness-normal edge-pattern-solid flowchart-link\" style=\";\" data-edge=\"true\" data-et=\"edge\" data-id=\"L_B_D_0\" data-points=\"W3sieCI6MzE3LjM2OTUwNjMwNzQyODc2LCJ5IjoyMjMuMjcxMTE4NjkyNTcxMjZ9LHsieCI6NDEyLCJ5IjozMDEuODkwNjI1fSx7IngiOjQxMiwieSI6MzM4LjE0MDYyNX1d\" marker-end=\"url(#a3a-diagram-1_flowchart-v2-pointEnd)\"><\/path><path d=\"M361.424,475.565L344.571,490.036C327.717,504.507,294.009,533.449,277.155,553.295C260.301,573.141,260.301,583.891,260.301,589.266L260.301,594.641\" id=\"L_D_E_0\" class=\"edge-thickness-normal edge-pattern-solid edge-thickness-normal edge-pattern-solid flowchart-link\" style=\";\" data-edge=\"true\" data-et=\"edge\" data-id=\"L_D_E_0\" data-points=\"W3sieCI6MzYxLjQyNDQ4NjM0NjQ0NDI3LCJ5Ijo0NzUuNTY1MTExMzQ2NDQ0Mjd9LHsieCI6MjYwLjMwMDc4MTI1LCJ5Ijo1NjIuMzkwNjI1fSx7IngiOjI2MC4zMDA3ODEyNSwieSI6NTk4LjY0MDYyNX1d\" marker-end=\"url(#a3a-diagram-1_flowchart-v2-pointEnd)\"><\/path><path d=\"M462.576,475.565L479.429,490.036C496.283,504.507,529.991,533.449,546.845,553.295C563.699,573.141,563.699,583.891,563.699,589.266L563.699,594.641\" id=\"L_D_F_0\" class=\"edge-thickness-normal edge-pattern-solid edge-thickness-normal edge-pattern-solid flowchart-link\" style=\";\" data-edge=\"true\" data-et=\"edge\" data-id=\"L_D_F_0\" data-points=\"W3sieCI6NDYyLjU3NTUxMzY1MzU1NTczLCJ5Ijo0NzUuNTY1MTExMzQ2NDQ0Mjd9LHsieCI6NTYzLjY5OTIxODc1LCJ5Ijo1NjIuMzkwNjI1fSx7IngiOjU2My42OTkyMTg3NSwieSI6NTk4LjY0MDYyNX1d\" marker-end=\"url(#a3a-diagram-1_flowchart-v2-pointEnd)\"><\/path><path d=\"M563.699,651.141L563.699,655.307C563.699,659.474,563.699,667.807,563.699,675.474C563.699,683.141,563.699,690.141,563.699,693.641L563.699,697.141\" id=\"L_F_G_0\" class=\"edge-thickness-normal edge-pattern-solid edge-thickness-normal edge-pattern-solid flowchart-link\" style=\";\" data-edge=\"true\" data-et=\"edge\" data-id=\"L_F_G_0\" data-points=\"W3sieCI6NTYzLjY5OTIxODc1LCJ5Ijo2NTEuMTQwNjI1fSx7IngiOjU2My42OTkyMTg3NSwieSI6Njc2LjE0MDYyNX0seyJ4Ijo1NjMuNjk5MjE4NzUsInkiOjcwMS4xNDA2MjV9XQ==\" marker-end=\"url(#a3a-diagram-1_flowchart-v2-pointEnd)\"><\/path><path d=\"M563.699,753.641L563.699,757.807C563.699,761.974,563.699,770.307,563.699,777.974C563.699,785.641,563.699,792.641,563.699,796.141L563.699,799.641\" id=\"L_G_H_0\" class=\"edge-thickness-normal edge-pattern-solid edge-thickness-normal edge-pattern-solid flowchart-link\" style=\";\" data-edge=\"true\" data-et=\"edge\" data-id=\"L_G_H_0\" data-points=\"W3sieCI6NTYzLjY5OTIxODc1LCJ5Ijo3NTMuNjQwNjI1fSx7IngiOjU2My42OTkyMTg3NSwieSI6Nzc4LjY0MDYyNX0seyJ4Ijo1NjMuNjk5MjE4NzUsInkiOjgwMy42NDA2MjV9XQ==\" marker-end=\"url(#a3a-diagram-1_flowchart-v2-pointEnd)\"><\/path><\/g><g class=\"edgeLabels\"><g class=\"edgeLabel\"><g class=\"label\" data-id=\"L_A_B_0\" transform=\"translate(0, 0)\"><foreignObject width=\"0\" height=\"0\"><div xmlns=\"http:\/\/www.w3.org\/1999\/xhtml\" class=\"labelBkg\" style=\"display: table-cell; white-space: nowrap; line-height: 1.5; max-width: 200px; text-align: center;\"><span class=\"edgeLabel\"><\/span><\/div><\/foreignObject><\/g><\/g><g class=\"edgeLabel\" transform=\"translate(138, 301.890625)\"><g class=\"label\" data-id=\"L_B_C_0\" transform=\"translate(-12.6328125, -11.25)\"><foreignObject width=\"25.265625\" height=\"22.5\"><div xmlns=\"http:\/\/www.w3.org\/1999\/xhtml\" class=\"labelBkg\" style=\"display: table-cell; white-space: nowrap; line-height: 1.5; max-width: 200px; text-align: center;\"><span class=\"edgeLabel\"><p>Yes<\/p><\/span><\/div><\/foreignObject><\/g><\/g><g class=\"edgeLabel\" transform=\"translate(412, 301.890625)\"><g class=\"label\" data-id=\"L_B_D_0\" transform=\"translate(-13.5859375, -11.25)\"><foreignObject width=\"27.171875\" height=\"22.5\"><div xmlns=\"http:\/\/www.w3.org\/1999\/xhtml\" class=\"labelBkg\" style=\"display: table-cell; white-space: nowrap; line-height: 1.5; max-width: 200px; text-align: center;\"><span class=\"edgeLabel\"><p>No<\/p><\/span><\/div><\/foreignObject><\/g><\/g><g class=\"edgeLabel\" transform=\"translate(260.30078125, 562.390625)\"><g class=\"label\" data-id=\"L_D_E_0\" transform=\"translate(-12.6328125, -11.25)\"><foreignObject width=\"25.265625\" height=\"22.5\"><div xmlns=\"http:\/\/www.w3.org\/1999\/xhtml\" class=\"labelBkg\" style=\"display: table-cell; white-space: nowrap; line-height: 1.5; max-width: 200px; text-align: center;\"><span class=\"edgeLabel\"><p>Yes<\/p><\/span><\/div><\/foreignObject><\/g><\/g><g class=\"edgeLabel\" transform=\"translate(563.69921875, 562.390625)\"><g class=\"label\" data-id=\"L_D_F_0\" transform=\"translate(-13.5859375, -11.25)\"><foreignObject width=\"27.171875\" height=\"22.5\"><div xmlns=\"http:\/\/www.w3.org\/1999\/xhtml\" class=\"labelBkg\" style=\"display: table-cell; white-space: nowrap; line-height: 1.5; max-width: 200px; text-align: center;\"><span class=\"edgeLabel\"><p>No<\/p><\/span><\/div><\/foreignObject><\/g><\/g><g class=\"edgeLabel\"><g class=\"label\" data-id=\"L_F_G_0\" transform=\"translate(0, 0)\"><foreignObject width=\"0\" height=\"0\"><div xmlns=\"http:\/\/www.w3.org\/1999\/xhtml\" class=\"labelBkg\" style=\"display: table-cell; white-space: nowrap; line-height: 1.5; max-width: 200px; text-align: center;\"><span class=\"edgeLabel\"><\/span><\/div><\/foreignObject><\/g><\/g><g class=\"edgeLabel\"><g class=\"label\" data-id=\"L_G_H_0\" transform=\"translate(0, 0)\"><foreignObject width=\"0\" height=\"0\"><div xmlns=\"http:\/\/www.w3.org\/1999\/xhtml\" class=\"labelBkg\" style=\"display: table-cell; white-space: nowrap; line-height: 1.5; max-width: 200px; text-align: center;\"><span class=\"edgeLabel\"><\/span><\/div><\/foreignObject><\/g><\/g><\/g><g class=\"nodes\"><g class=\"node default\" id=\"flowchart-A-0\" transform=\"translate(275, 34.25)\"><rect class=\"basic label-container\" style=\"\" x=\"-102.3828125\" y=\"-26.25\" width=\"204.765625\" height=\"52.5\"><\/rect><g class=\"label\" style=\"\" transform=\"translate(-72.3828125, -11.25)\"><rect><\/rect><foreignObject width=\"144.765625\" height=\"22.5\"><div xmlns=\"http:\/\/www.w3.org\/1999\/xhtml\" style=\"display: table-cell; white-space: nowrap; line-height: 1.5; max-width: 200px; text-align: center;\"><span class=\"nodeLabel\"><p>Classify criticality<\/p><\/span><\/div><\/foreignObject><\/g><\/g><g class=\"node default\" id=\"flowchart-B-1\" transform=\"translate(275, 188.0703125)\"><polygon points=\"77.5703125,0 155.140625,-77.5703125 77.5703125,-155.140625 0,-77.5703125\" class=\"label-container\" transform=\"translate(-77.0703125, 77.5703125)\"><\/polygon><g class=\"label\" style=\"\" transform=\"translate(-51.3203125, -11.25)\"><rect><\/rect><foreignObject width=\"102.640625\" height=\"22.5\"><div xmlns=\"http:\/\/www.w3.org\/1999\/xhtml\" style=\"display: table-cell; white-space: nowrap; line-height: 1.5; max-width: 200px; text-align: center;\"><span class=\"nodeLabel\"><p>Low impact?<\/p><\/span><\/div><\/foreignObject><\/g><\/g><g class=\"node default\" id=\"flowchart-C-3\" transform=\"translate(138, 432.140625)\"><rect class=\"basic label-container\" style=\"\" x=\"-130\" y=\"-37.5\" width=\"260\" height=\"75\"><\/rect><g class=\"label\" style=\"\" transform=\"translate(-100, -22.5)\"><rect><\/rect><foreignObject width=\"200\" height=\"45\"><div xmlns=\"http:\/\/www.w3.org\/1999\/xhtml\" style=\"display: table; white-space: break-spaces; line-height: 1.5; max-width: 200px; text-align: center; width: 200px;\"><span class=\"nodeLabel\"><p>Document control and receiving inspection<\/p><\/span><\/div><\/foreignObject><\/g><\/g><g class=\"node default\" id=\"flowchart-D-5\" transform=\"translate(412, 432.140625)\"><polygon points=\"94,0 188,-94 94,-188 0,-94\" class=\"label-container\" transform=\"translate(-93.5, 94)\"><\/polygon><g class=\"label\" style=\"\" transform=\"translate(-67.75, -11.25)\"><rect><\/rect><foreignObject width=\"135.5\" height=\"22.5\"><div xmlns=\"http:\/\/www.w3.org\/1999\/xhtml\" style=\"display: table-cell; white-space: nowrap; line-height: 1.5; max-width: 200px; text-align: center;\"><span class=\"nodeLabel\"><p>Moderate impact?<\/p><\/span><\/div><\/foreignObject><\/g><\/g><g class=\"node default\" id=\"flowchart-E-7\" transform=\"translate(260.30078125, 624.890625)\"><rect class=\"basic label-container\" style=\"\" x=\"-128.5\" y=\"-26.25\" width=\"257\" height=\"52.5\"><\/rect><g class=\"label\" style=\"\" transform=\"translate(-98.5, -11.25)\"><rect><\/rect><foreignObject width=\"197\" height=\"22.5\"><div xmlns=\"http:\/\/www.w3.org\/1999\/xhtml\" style=\"display: table-cell; white-space: nowrap; line-height: 1.5; max-width: 200px; text-align: center;\"><span class=\"nodeLabel\"><p>ITP + selected inspections<\/p><\/span><\/div><\/foreignObject><\/g><\/g><g class=\"node default\" id=\"flowchart-F-9\" transform=\"translate(563.69921875, 624.890625)\"><rect class=\"basic label-container\" style=\"\" x=\"-124.8984375\" y=\"-26.25\" width=\"249.796875\" height=\"52.5\"><\/rect><g class=\"label\" style=\"\" transform=\"translate(-94.8984375, -11.25)\"><rect><\/rect><foreignObject width=\"189.796875\" height=\"22.5\"><div xmlns=\"http:\/\/www.w3.org\/1999\/xhtml\" style=\"display: table-cell; white-space: nowrap; line-height: 1.5; max-width: 200px; text-align: center;\"><span class=\"nodeLabel\"><p>Intensive Vendor Inspection<\/p><\/span><\/div><\/foreignObject><\/g><\/g><g class=\"node default\" id=\"flowchart-G-11\" transform=\"translate(563.69921875, 727.390625)\"><rect class=\"basic label-container\" style=\"\" x=\"-118.5078125\" y=\"-26.25\" width=\"237.015625\" height=\"52.5\"><\/rect><g class=\"label\" style=\"\" transform=\"translate(-88.5078125, -11.25)\"><rect><\/rect><foreignObject width=\"177.015625\" height=\"22.5\"><div xmlns=\"http:\/\/www.w3.org\/1999\/xhtml\" style=\"display: table-cell; white-space: nowrap; line-height: 1.5; max-width: 200px; text-align: center;\"><span class=\"nodeLabel\"><p>Hold\/Witness Points + FAT<\/p><\/span><\/div><\/foreignObject><\/g><\/g><g class=\"node default\" id=\"flowchart-H-13\" transform=\"translate(563.69921875, 829.890625)\"><rect class=\"basic label-container\" style=\"\" x=\"-113.765625\" y=\"-26.25\" width=\"227.53125\" height=\"52.5\"><\/rect><g class=\"label\" style=\"\" transform=\"translate(-83.765625, -11.25)\"><rect><\/rect><foreignObject width=\"167.53125\" height=\"22.5\"><div xmlns=\"http:\/\/www.w3.org\/1999\/xhtml\" style=\"display: table-cell; white-space: nowrap; line-height: 1.5; max-width: 200px; text-align: center;\"><span class=\"nodeLabel\"><p>Formal technical release<\/p><\/span><\/div><\/foreignObject><\/g><\/g><\/g><\/g><\/g><\/svg><figcaption>Scaling quality control according to supply criticality<\/figcaption><\/figure>\n\n\n\n<p class=\"wp-block-paragraph\">The objective is to avoid two extremes: inspecting everything with the same intensity or controlling only items that have already caused problems.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Technical bid leveling<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Technical bid leveling should identify not only whether the supplier \u201ccomplies,\u201d but also where exceptions, assumptions, alternatives, and gaps exist.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">A bid-leveling matrix can compare:<\/p>\n\n\n\n<ul class=\"wp-block-list\"><li>item-by-item compliance;<\/li><li>declared deviations;<\/li><li>adopted standards;<\/li><li>performance characteristics;<\/li><li>supply boundaries;<\/li><li>included documents;<\/li><li>planned tests;<\/li><li>warranties;<\/li><li>spares;<\/li><li>interfaces;<\/li><li>technical lead times;<\/li><li>unanswered requirements.<\/li><\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">The worst situation is discovering after the purchase that each supplier had understood a different scope.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Technical deviations and TQ \u2014 Technical Queries<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">During quotation, questions should be formalized. Technical Queries, clarifications, and deviation lists help prevent informal agreements from disappearing when the purchase order is issued.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Every accepted deviation must be incorporated into the contractual documentation or explicitly referenced. Otherwise, the inspection team may enforce a requirement that had already been negotiated, or the supplier may claim an exception that was never approved.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Quality requirements in the purchase order<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">The purchase order must preserve the technical intent of the requisition. Possible attachments and requirements include:<\/p>\n\n\n\n<ul class=\"wp-block-list\"><li>final datasheet;<\/li><li>technical specification;<\/li><li>required document list;<\/li><li>required Quality Plan;<\/li><li>PIT\/ITP;<\/li><li>Vendor Document Requirement;<\/li><li>inspection and test procedures;<\/li><li>notification requirements;<\/li><li>H\/W\/R points;<\/li><li>FAT;<\/li><li>Data Book;<\/li><li>criteria for release for shipment;<\/li><li>receiving inspection requirements;<\/li><li>final acceptance criteria.<\/li><\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">Quality must be contracted. Inspection does not create a requirement that the purchase order never established.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Supplier Quality Plan<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">For complex supplies, the supplier may be required to submit a purchase-order-specific Quality Plan. ISO 10005:2018 provides guidelines for quality plans applicable to processes, products, services, projects, and contracts.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The plan may detail:<\/p>\n\n\n\n<ul class=\"wp-block-list\"><li>organization and responsibilities;<\/li><li>document flow;<\/li><li>subsupplier control;<\/li><li>inspection and testing;<\/li><li>calibration;<\/li><li>nonconformity control;<\/li><li>records;<\/li><li>audits;<\/li><li>release;<\/li><li>document delivery.<\/li><\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">The plan does not replace the ITP; it establishes the broader governance within which the ITP operates.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">ITP\/PIT and intervention points<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">The Inspection and Test Plan turns requirements into verifiable activities. For Procurement, it also organizes the Owner&#8217;s participation.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Hold Points may prevent progress without release. Witness Points ensure an opportunity to witness. Review Points structure document review.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The article <strong>Hold Point, Witness Point and Review Point in PIT\/ITP<\/strong> explains in greater depth how these interventions should be defined to avoid blockages and ambiguities.<\/p>\n\n\n\n\n<h2 class=\"wp-block-heading\">Vendor Inspection During Manufacturing<\/h2>\n\n\n\n<div class=\"wp-block-a3a-destaque\">\n<p class=\"wp-block-paragraph\">A critical supplier should not be controlled only at <a href=\"https:\/\/a3aengenharia.com.br\/conteudo\/artigos-tecnicos\/fat-sat-testes-integrados-sistemas-criticos\/\">FAT<\/a>. The <a href=\"https:\/\/a3aengenharia.com.br\/conteudo\/artigos-tecnicos\/plano-inspecao-testes-pit-itp-engenharia\/\">ITP\/PIT<\/a> must identify points where a failure can still be detected and corrected before the product progresses or becomes inaccessible.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><a href=\"https:\/\/a3aengenharia.com.br\/conteudo\/artigos-tecnicos\/inspecao-fabricacao-vendor-inspection-fornecedores-engenharia\/\">See how to structure Vendor Inspection<\/a><\/p>\n<\/div>\n\n\n\n<p class=\"wp-block-paragraph\">Manufacturing inspection verifies the supply while problems can still be corrected at the source. Depending on criticality, it may involve:<\/p>\n\n\n\n<ul class=\"wp-block-list\"><li>kick-off meeting;<\/li><li>document review;<\/li><li>raw material inspection;<\/li><li>dimensional inspection;<\/li><li>welding and NDT;<\/li><li>painting and finishing;<\/li><li>assembly;<\/li><li>intermediate tests;<\/li><li>instrument verification;<\/li><li>witnessing final tests;<\/li><li>NCR review;<\/li><li>Data Book verification.<\/li><\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">Inspection should be driven by the ITP rather than by generic factory visits.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Supplier audit<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Inspection and audit have different functions. Inspection verifies the product and process at specific points. Audit assesses system effectiveness and whether the planned controls are being implemented.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">An audit may be useful when:<\/p>\n\n\n\n<ul class=\"wp-block-list\"><li>the supplier is new;<\/li><li>there is a history of failures;<\/li><li>the item is critical;<\/li><li>special processes are involved;<\/li><li>recurring NCRs arise;<\/li><li>the schedule indicates risk;<\/li><li>subsuppliers play a relevant role.<\/li><\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">Auditing every supplier indiscriminately generates cost. The criterion should be risk.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Subsupplier Control<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">The Owner contracts one company, but a relevant portion of the product may be produced by third parties. The main supplier must control its subsuppliers according to the criticality of the outsourced activities.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">It is important to define whether certain critical subsuppliers require prior approval, whether their certificates must be included in the Data Book, and whether the Owner will have inspection rights at their facilities.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The supply chain must not break traceability.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">N\u00e3o conformidades em Procurement<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">RNCs devem ser tratadas antes que o item avance de etapa. O risco aumenta quando um desvio identificado em f\u00e1brica \u00e9 \u201cdeixado para corrigir no campo\u201d.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">O fluxo t\u00edpico \u00e9:<\/p>\n\n\n\n<figure class=\"a3a-mermaid\"><svg id=\"a3a-diagram-2\" width=\"100%\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" class=\"flowchart\" overflow=\"visible\" style=\"max-width:min(2010.75px, 100%);height:auto;display:block;margin:0 auto\" viewBox=\"0 0 2010.75 140.890625\" role=\"graphics-document document\" aria-roledescription=\"flowchart-v2\" aria-labelledby=\"chart-title-a3a-diagram-2\"><title id=\"chart-title-a3a-diagram-2\">Fluxo de tratamento de n\u00e3o conformidade em um fornecimento<\/title><style>#a3a-diagram-2{font-family:Roboto,sans-serif;font-size:15px;fill:var(--a3a-diag-text, #0a0a0a);}@keyframes edge-animation-frame{from{stroke-dashoffset:0;}}@keyframes dash{to{stroke-dashoffset:0;}}#a3a-diagram-2 .edge-animation-slow{stroke-dasharray:9,5!important;stroke-dashoffset:900;animation:dash 50s linear infinite;stroke-linecap:round;}#a3a-diagram-2 .edge-animation-fast{stroke-dasharray:9,5!important;stroke-dashoffset:900;animation:dash 20s linear infinite;stroke-linecap:round;}#a3a-diagram-2 .error-icon{fill:var(--a3a-diag-canvas, #ffffff);}#a3a-diagram-2 .error-text{fill:#000000;stroke:#000000;}#a3a-diagram-2 .edge-thickness-normal{stroke-width:1px;}#a3a-diagram-2 .edge-thickness-thick{stroke-width:3.5px;}#a3a-diagram-2 .edge-pattern-solid{stroke-dasharray:0;}#a3a-diagram-2 .edge-thickness-invisible{stroke-width:0;fill:none;}#a3a-diagram-2 .edge-pattern-dashed{stroke-dasharray:3;}#a3a-diagram-2 .edge-pattern-dotted{stroke-dasharray:2;}#a3a-diagram-2 .marker{fill:var(--a3a-diag-stroke, #2e42a2);stroke:var(--a3a-diag-stroke, #2e42a2);}#a3a-diagram-2 .marker.cross{stroke:var(--a3a-diag-stroke, #2e42a2);}#a3a-diagram-2 svg{font-family:Roboto,sans-serif;font-size:15px;}#a3a-diagram-2 p{margin:0;}#a3a-diagram-2 .label{font-family:Roboto,sans-serif;color:var(--a3a-diag-text, #0a0a0a);}#a3a-diagram-2 .cluster-label text{fill:var(--a3a-diag-title, #0124af);}#a3a-diagram-2 .cluster-label span{color:var(--a3a-diag-title, #0124af);}#a3a-diagram-2 .cluster-label span p{background-color:transparent;}#a3a-diagram-2 .label text,#a3a-diagram-2 span{fill:var(--a3a-diag-text, #0a0a0a);color:var(--a3a-diag-text, #0a0a0a);}#a3a-diagram-2 .node rect,#a3a-diagram-2 .node circle,#a3a-diagram-2 .node ellipse,#a3a-diagram-2 .node polygon,#a3a-diagram-2 .node path{fill:var(--a3a-diag-fill, #eef2fd);stroke:var(--a3a-diag-stroke, #2e42a2);stroke-width:1px;}#a3a-diagram-2 .rough-node .label text,#a3a-diagram-2 .node .label text,#a3a-diagram-2 .image-shape .label,#a3a-diagram-2 .icon-shape .label{text-anchor:middle;}#a3a-diagram-2 .node .katex path{fill:#000;stroke:#000;stroke-width:1px;}#a3a-diagram-2 .rough-node .label,#a3a-diagram-2 .node .label,#a3a-diagram-2 .image-shape .label,#a3a-diagram-2 .icon-shape .label{text-align:center;}#a3a-diagram-2 .node.clickable{cursor:pointer;}#a3a-diagram-2 .root .anchor path{fill:var(--a3a-diag-stroke, #2e42a2)!important;stroke-width:0;stroke:var(--a3a-diag-stroke, #2e42a2);}#a3a-diagram-2 .arrowheadPath{fill:var(--a3a-diag-stroke, #0b0b0b);}#a3a-diagram-2 .edgePath .path{stroke:var(--a3a-diag-stroke, #2e42a2);stroke-width:2.0px;}#a3a-diagram-2 .flowchart-link{stroke:var(--a3a-diag-stroke, #2e42a2);fill:none;}#a3a-diagram-2 .edgeLabel{background-color:var(--a3a-diag-canvas, #ffffff);text-align:center;}#a3a-diagram-2 .edgeLabel p{background-color:var(--a3a-diag-canvas, #ffffff);}#a3a-diagram-2 .edgeLabel rect{opacity:0.5;background-color:var(--a3a-diag-canvas, #ffffff);fill:var(--a3a-diag-canvas, #ffffff);}#a3a-diagram-2 .labelBkg{background-color:rgba(255, 255, 255, 0.5);}#a3a-diagram-2 .cluster rect{fill:var(--a3a-diag-surface, #f8f8f8);stroke:var(--a3a-diag-border, #e2e8f0);stroke-width:1px;}#a3a-diagram-2 .cluster text{fill:var(--a3a-diag-title, #0124af);}#a3a-diagram-2 .cluster span{color:var(--a3a-diag-title, #0124af);}#a3a-diagram-2 div.mermaidTooltip{position:absolute;text-align:center;max-width:200px;padding:2px;font-family:Roboto,sans-serif;font-size:12px;background:var(--a3a-diag-canvas, #ffffff);border:1px solid hsl(0, 0%, 90%);border-radius:2px;pointer-events:none;z-index:100;}#a3a-diagram-2 .flowchartTitleText{text-anchor:middle;font-size:18px;fill:var(--a3a-diag-text, #0a0a0a);}#a3a-diagram-2 rect.text{fill:none;stroke-width:0;}#a3a-diagram-2 .icon-shape,#a3a-diagram-2 .image-shape{background-color:var(--a3a-diag-canvas, #ffffff);text-align:center;}#a3a-diagram-2 .icon-shape p,#a3a-diagram-2 .image-shape p{background-color:var(--a3a-diag-canvas, #ffffff);padding:2px;}#a3a-diagram-2 .icon-shape rect,#a3a-diagram-2 .image-shape rect{opacity:0.5;background-color:var(--a3a-diag-canvas, #ffffff);fill:var(--a3a-diag-canvas, #ffffff);}#a3a-diagram-2 .label-icon{display:inline-block;height:1em;overflow:visible;vertical-align:-0.125em;}#a3a-diagram-2 .node .label-icon path{fill:currentColor;stroke:revert;stroke-width:revert;}#a3a-diagram-2 :root{--mermaid-font-family:Roboto,sans-serif;}<\/style><g><marker id=\"a3a-diagram-2_flowchart-v2-pointEnd\" class=\"marker flowchart-v2\" viewBox=\"0 0 10 10\" refX=\"5\" refY=\"5\" markerUnits=\"userSpaceOnUse\" markerWidth=\"8\" markerHeight=\"8\" orient=\"auto\"><path d=\"M 0 0 L 10 5 L 0 10 z\" class=\"arrowMarkerPath\" style=\"stroke-width: 1; stroke-dasharray: 1, 0;\"><\/path><\/marker><marker id=\"a3a-diagram-2_flowchart-v2-pointStart\" class=\"marker flowchart-v2\" viewBox=\"0 0 10 10\" refX=\"4.5\" refY=\"5\" markerUnits=\"userSpaceOnUse\" markerWidth=\"8\" markerHeight=\"8\" orient=\"auto\"><path d=\"M 0 5 L 10 10 L 10 0 z\" class=\"arrowMarkerPath\" style=\"stroke-width: 1; stroke-dasharray: 1, 0;\"><\/path><\/marker><marker id=\"a3a-diagram-2_flowchart-v2-circleEnd\" class=\"marker flowchart-v2\" viewBox=\"0 0 10 10\" refX=\"11\" refY=\"5\" markerUnits=\"userSpaceOnUse\" markerWidth=\"11\" markerHeight=\"11\" orient=\"auto\"><circle cx=\"5\" cy=\"5\" r=\"5\" class=\"arrowMarkerPath\" style=\"stroke-width: 1; stroke-dasharray: 1, 0;\"><\/circle><\/marker><marker id=\"a3a-diagram-2_flowchart-v2-circleStart\" class=\"marker flowchart-v2\" viewBox=\"0 0 10 10\" refX=\"-1\" refY=\"5\" markerUnits=\"userSpaceOnUse\" markerWidth=\"11\" markerHeight=\"11\" orient=\"auto\"><circle cx=\"5\" cy=\"5\" r=\"5\" class=\"arrowMarkerPath\" style=\"stroke-width: 1; stroke-dasharray: 1, 0;\"><\/circle><\/marker><marker id=\"a3a-diagram-2_flowchart-v2-crossEnd\" class=\"marker cross flowchart-v2\" viewBox=\"0 0 11 11\" refX=\"12\" refY=\"5.2\" markerUnits=\"userSpaceOnUse\" markerWidth=\"11\" markerHeight=\"11\" orient=\"auto\"><path d=\"M 1,1 l 9,9 M 10,1 l -9,9\" class=\"arrowMarkerPath\" style=\"stroke-width: 2; stroke-dasharray: 1, 0;\"><\/path><\/marker><marker id=\"a3a-diagram-2_flowchart-v2-crossStart\" class=\"marker cross flowchart-v2\" viewBox=\"0 0 11 11\" refX=\"-1\" refY=\"5.2\" markerUnits=\"userSpaceOnUse\" markerWidth=\"11\" markerHeight=\"11\" orient=\"auto\"><path d=\"M 1,1 l 9,9 M 10,1 l -9,9\" class=\"arrowMarkerPath\" style=\"stroke-width: 2; stroke-dasharray: 1, 0;\"><\/path><\/marker><g class=\"root\"><g class=\"clusters\"><\/g><g class=\"edgePaths\"><path d=\"M198.281,70.445L202.448,70.445C206.615,70.445,214.948,70.445,222.615,70.445C230.281,70.445,237.281,70.445,240.781,70.445L244.281,70.445\" id=\"L_A_B_0\" class=\"edge-thickness-normal edge-pattern-solid edge-thickness-normal edge-pattern-solid flowchart-link\" style=\";\" data-edge=\"true\" data-et=\"edge\" data-id=\"L_A_B_0\" data-points=\"W3sieCI6MTk4LjI4MTI1LCJ5Ijo3MC40NDUzMTI1fSx7IngiOjIyMy4yODEyNSwieSI6NzAuNDQ1MzEyNX0seyJ4IjoyNDguMjgxMjUsInkiOjcwLjQ0NTMxMjV9XQ==\" marker-end=\"url(#a3a-diagram-2_flowchart-v2-pointEnd)\"><\/path><path d=\"M371.531,70.445L375.698,70.445C379.865,70.445,388.198,70.445,395.865,70.445C403.531,70.445,410.531,70.445,414.031,70.445L417.531,70.445\" id=\"L_B_C_0\" class=\"edge-thickness-normal edge-pattern-solid edge-thickness-normal edge-pattern-solid flowchart-link\" style=\";\" data-edge=\"true\" data-et=\"edge\" data-id=\"L_B_C_0\" data-points=\"W3sieCI6MzcxLjUzMTI1LCJ5Ijo3MC40NDUzMTI1fSx7IngiOjM5Ni41MzEyNSwieSI6NzAuNDQ1MzEyNX0seyJ4Ijo0MjEuNTMxMjUsInkiOjcwLjQ0NTMxMjV9XQ==\" marker-end=\"url(#a3a-diagram-2_flowchart-v2-pointEnd)\"><\/path><path d=\"M553.281,70.445L557.448,70.445C561.615,70.445,569.948,70.445,577.615,70.445C585.281,70.445,592.281,70.445,595.781,70.445L599.281,70.445\" id=\"L_C_D_0\" class=\"edge-thickness-normal edge-pattern-solid edge-thickness-normal edge-pattern-solid flowchart-link\" style=\";\" data-edge=\"true\" data-et=\"edge\" data-id=\"L_C_D_0\" data-points=\"W3sieCI6NTUzLjI4MTI1LCJ5Ijo3MC40NDUzMTI1fSx7IngiOjU3OC4yODEyNSwieSI6NzAuNDQ1MzEyNX0seyJ4Ijo2MDMuMjgxMjUsInkiOjcwLjQ0NTMxMjV9XQ==\" marker-end=\"url(#a3a-diagram-2_flowchart-v2-pointEnd)\"><\/path><path d=\"M789.734,46.296L793.901,45.217C798.068,44.138,806.401,41.979,814.068,40.9C821.734,39.82,828.734,39.82,832.234,39.82L835.734,39.82\" id=\"L_D_E_0\" class=\"edge-thickness-normal edge-pattern-solid edge-thickness-normal edge-pattern-solid flowchart-link\" style=\";\" data-edge=\"true\" data-et=\"edge\" data-id=\"L_D_E_0\" data-points=\"W3sieCI6Nzg5LjczNDM3NSwieSI6NDYuMjk2MjI2MDY2Mzc4MTF9LHsieCI6ODE0LjczNDM3NSwieSI6MzkuODIwMzEyNX0seyJ4Ijo4MzkuNzM0Mzc1LCJ5IjozOS44MjAzMTI1fV0=\" marker-end=\"url(#a3a-diagram-2_flowchart-v2-pointEnd)\"><\/path><path d=\"M1029.828,39.82L1036.259,39.82C1042.69,39.82,1055.552,39.82,1067.747,39.82C1079.943,39.82,1091.471,39.82,1097.236,39.82L1103,39.82\" id=\"L_E_F_0\" class=\"edge-thickness-normal edge-pattern-solid edge-thickness-normal edge-pattern-solid flowchart-link\" style=\";\" data-edge=\"true\" data-et=\"edge\" data-id=\"L_E_F_0\" data-points=\"W3sieCI6MTAyOS44MjgxMjUsInkiOjM5LjgyMDMxMjV9LHsieCI6MTA2OC40MTQwNjI1LCJ5IjozOS44MjAzMTI1fSx7IngiOjExMDcsInkiOjM5LjgyMDMxMjV9XQ==\" marker-end=\"url(#a3a-diagram-2_flowchart-v2-pointEnd)\"><\/path><path d=\"M1299.688,39.82L1303.854,39.82C1308.021,39.82,1316.354,39.82,1326.758,42.005C1337.161,44.189,1349.635,48.558,1355.872,50.742L1362.109,52.926\" id=\"L_F_G_0\" class=\"edge-thickness-normal edge-pattern-solid edge-thickness-normal edge-pattern-solid flowchart-link\" style=\";\" data-edge=\"true\" data-et=\"edge\" data-id=\"L_F_G_0\" data-points=\"W3sieCI6MTI5OS42ODc1LCJ5IjozOS44MjAzMTI1fSx7IngiOjEzMjQuNjg3NSwieSI6MzkuODIwMzEyNX0seyJ4IjoxMzY1Ljg4NDUyNDA4NTIyNDcsInkiOjU0LjI0ODI4ODQxNDc3NTM2fV0=\" marker-end=\"url(#a3a-diagram-2_flowchart-v2-pointEnd)\"><\/path><path d=\"M1365.885,86.642L1359.018,89.047C1352.152,91.452,1338.42,96.261,1311.33,98.666C1284.24,101.07,1243.792,101.07,1201.079,101.07C1158.367,101.07,1113.391,101.07,1068.63,101.07C1023.87,101.07,979.326,101.07,937.046,101.07C894.766,101.07,854.75,101.07,831.221,100.158C807.692,99.246,800.649,97.422,797.128,96.51L793.607,95.597\" id=\"L_G_D_0\" class=\"edge-thickness-normal edge-pattern-solid edge-thickness-normal edge-pattern-solid flowchart-link\" style=\";\" data-edge=\"true\" data-et=\"edge\" data-id=\"L_G_D_0\" data-points=\"W3sieCI6MTM2NS44ODQ1MjQwODUyMjQ3LCJ5Ijo4Ni42NDIzMzY1ODUyMjQ2NH0seyJ4IjoxMzI0LjY4NzUsInkiOjEwMS4wNzAzMTI1fSx7IngiOjEyMDMuMzQzNzUsInkiOjEwMS4wNzAzMTI1fSx7IngiOjEwNjguNDE0MDYyNSwieSI6MTAxLjA3MDMxMjV9LHsieCI6OTM0Ljc4MTI1LCJ5IjoxMDEuMDcwMzEyNX0seyJ4Ijo4MTQuNzM0Mzc1LCJ5IjoxMDEuMDcwMzEyNX0seyJ4Ijo3ODkuNzM0Mzc1LCJ5Ijo5NC41OTQzOTg5MzM2MjE4OX1d\" marker-end=\"url(#a3a-diagram-2_flowchart-v2-pointEnd)\"><\/path><path d=\"M1474.578,70.445L1480.85,70.445C1487.122,70.445,1499.667,70.445,1511.544,70.445C1523.422,70.445,1534.633,70.445,1540.238,70.445L1545.844,70.445\" id=\"L_G_H_0\" class=\"edge-thickness-normal edge-pattern-solid edge-thickness-normal edge-pattern-solid flowchart-link\" style=\";\" data-edge=\"true\" data-et=\"edge\" data-id=\"L_G_H_0\" data-points=\"W3sieCI6MTQ3NC41NzgxMjUsInkiOjcwLjQ0NTMxMjV9LHsieCI6MTUxMi4yMTA5Mzc1LCJ5Ijo3MC40NDUzMTI1fSx7IngiOjE1NDkuODQzNzUsInkiOjcwLjQ0NTMxMjV9XQ==\" marker-end=\"url(#a3a-diagram-2_flowchart-v2-pointEnd)\"><\/path><path d=\"M1692.75,70.445L1696.917,70.445C1701.083,70.445,1709.417,70.445,1717.083,70.445C1724.75,70.445,1731.75,70.445,1735.25,70.445L1738.75,70.445\" id=\"L_H_I_0\" class=\"edge-thickness-normal edge-pattern-solid edge-thickness-normal edge-pattern-solid flowchart-link\" style=\";\" data-edge=\"true\" data-et=\"edge\" data-id=\"L_H_I_0\" data-points=\"W3sieCI6MTY5Mi43NSwieSI6NzAuNDQ1MzEyNX0seyJ4IjoxNzE3Ljc1LCJ5Ijo3MC40NDUzMTI1fSx7IngiOjE3NDIuNzUsInkiOjcwLjQ0NTMxMjV9XQ==\" marker-end=\"url(#a3a-diagram-2_flowchart-v2-pointEnd)\"><\/path><\/g><g class=\"edgeLabels\"><g class=\"edgeLabel\"><g class=\"label\" data-id=\"L_A_B_0\" transform=\"translate(0, 0)\"><foreignObject width=\"0\" height=\"0\"><div xmlns=\"http:\/\/www.w3.org\/1999\/xhtml\" class=\"labelBkg\" style=\"display: table-cell; white-space: nowrap; line-height: 1.5; max-width: 200px; text-align: center;\"><span class=\"edgeLabel\"><\/span><\/div><\/foreignObject><\/g><\/g><g class=\"edgeLabel\"><g class=\"label\" data-id=\"L_B_C_0\" transform=\"translate(0, 0)\"><foreignObject width=\"0\" height=\"0\"><div xmlns=\"http:\/\/www.w3.org\/1999\/xhtml\" class=\"labelBkg\" style=\"display: table-cell; white-space: nowrap; line-height: 1.5; max-width: 200px; text-align: center;\"><span class=\"edgeLabel\"><\/span><\/div><\/foreignObject><\/g><\/g><g class=\"edgeLabel\"><g class=\"label\" data-id=\"L_C_D_0\" transform=\"translate(0, 0)\"><foreignObject width=\"0\" height=\"0\"><div xmlns=\"http:\/\/www.w3.org\/1999\/xhtml\" class=\"labelBkg\" style=\"display: table-cell; white-space: nowrap; line-height: 1.5; max-width: 200px; text-align: center;\"><span class=\"edgeLabel\"><\/span><\/div><\/foreignObject><\/g><\/g><g class=\"edgeLabel\"><g class=\"label\" data-id=\"L_D_E_0\" transform=\"translate(0, 0)\"><foreignObject width=\"0\" height=\"0\"><div xmlns=\"http:\/\/www.w3.org\/1999\/xhtml\" class=\"labelBkg\" style=\"display: table-cell; white-space: nowrap; line-height: 1.5; max-width: 200px; text-align: center;\"><span class=\"edgeLabel\"><\/span><\/div><\/foreignObject><\/g><\/g><g class=\"edgeLabel\"><g class=\"label\" data-id=\"L_E_F_0\" transform=\"translate(0, 0)\"><foreignObject width=\"0\" height=\"0\"><div xmlns=\"http:\/\/www.w3.org\/1999\/xhtml\" class=\"labelBkg\" style=\"display: table-cell; white-space: nowrap; line-height: 1.5; max-width: 200px; text-align: center;\"><span class=\"edgeLabel\"><\/span><\/div><\/foreignObject><\/g><\/g><g class=\"edgeLabel\"><g class=\"label\" data-id=\"L_F_G_0\" transform=\"translate(0, 0)\"><foreignObject width=\"0\" height=\"0\"><div xmlns=\"http:\/\/www.w3.org\/1999\/xhtml\" class=\"labelBkg\" style=\"display: table-cell; white-space: nowrap; line-height: 1.5; max-width: 200px; text-align: center;\"><span class=\"edgeLabel\"><\/span><\/div><\/foreignObject><\/g><\/g><g class=\"edgeLabel\" transform=\"translate(1068.4140625, 101.0703125)\"><g class=\"label\" data-id=\"L_G_D_0\" transform=\"translate(-13.5859375, -11.25)\"><foreignObject width=\"27.171875\" height=\"22.5\"><div xmlns=\"http:\/\/www.w3.org\/1999\/xhtml\" class=\"labelBkg\" style=\"display: table-cell; white-space: nowrap; line-height: 1.5; max-width: 200px; text-align: center;\"><span class=\"edgeLabel\"><p>N\u00e3o<\/p><\/span><\/div><\/foreignObject><\/g><\/g><g class=\"edgeLabel\" transform=\"translate(1512.2109375, 70.4453125)\"><g class=\"label\" data-id=\"L_G_H_0\" transform=\"translate(-12.6328125, -11.25)\"><foreignObject width=\"25.265625\" height=\"22.5\"><div xmlns=\"http:\/\/www.w3.org\/1999\/xhtml\" class=\"labelBkg\" style=\"display: table-cell; white-space: nowrap; line-height: 1.5; max-width: 200px; text-align: center;\"><span class=\"edgeLabel\"><p>Sim<\/p><\/span><\/div><\/foreignObject><\/g><\/g><g class=\"edgeLabel\"><g class=\"label\" data-id=\"L_H_I_0\" transform=\"translate(0, 0)\"><foreignObject width=\"0\" height=\"0\"><div xmlns=\"http:\/\/www.w3.org\/1999\/xhtml\" class=\"labelBkg\" style=\"display: table-cell; white-space: nowrap; line-height: 1.5; max-width: 200px; text-align: center;\"><span class=\"edgeLabel\"><\/span><\/div><\/foreignObject><\/g><\/g><\/g><g class=\"nodes\"><g class=\"node default\" id=\"flowchart-A-0\" transform=\"translate(103.140625, 70.4453125)\"><rect class=\"basic label-container\" style=\"\" x=\"-95.140625\" y=\"-26.25\" width=\"190.28125\" height=\"52.5\"><\/rect><g class=\"label\" style=\"\" transform=\"translate(-65.140625, -11.25)\"><rect><\/rect><foreignObject width=\"130.28125\" height=\"22.5\"><div xmlns=\"http:\/\/www.w3.org\/1999\/xhtml\" style=\"display: table-cell; white-space: nowrap; line-height: 1.5; max-width: 200px; text-align: center;\"><span class=\"nodeLabel\"><p>Desvio identificado<\/p><\/span><\/div><\/foreignObject><\/g><\/g><g class=\"node default\" id=\"flowchart-B-1\" transform=\"translate(309.90625, 70.4453125)\"><rect class=\"basic label-container\" style=\"\" x=\"-61.625\" y=\"-26.25\" width=\"123.25\" height=\"52.5\"><\/rect><g class=\"label\" style=\"\" transform=\"translate(-31.625, -11.25)\"><rect><\/rect><foreignObject width=\"63.25\" height=\"22.5\"><div xmlns=\"http:\/\/www.w3.org\/1999\/xhtml\" style=\"display: table-cell; white-space: nowrap; line-height: 1.5; max-width: 200px; text-align: center;\"><span class=\"nodeLabel\"><p>RNC\/NCR<\/p><\/span><\/div><\/foreignObject><\/g><\/g><g class=\"node default\" id=\"flowchart-C-3\" transform=\"translate(487.40625, 70.4453125)\"><rect class=\"basic label-container\" style=\"\" x=\"-65.875\" y=\"-26.25\" width=\"131.75\" height=\"52.5\"><\/rect><g class=\"label\" style=\"\" transform=\"translate(-35.875, -11.25)\"><rect><\/rect><foreignObject width=\"71.75\" height=\"22.5\"><div xmlns=\"http:\/\/www.w3.org\/1999\/xhtml\" style=\"display: table-cell; white-space: nowrap; line-height: 1.5; max-width: 200px; text-align: center;\"><span class=\"nodeLabel\"><p>Conten\u00e7\u00e3o<\/p><\/span><\/div><\/foreignObject><\/g><\/g><g class=\"node default\" id=\"flowchart-D-5\" transform=\"translate(696.5078125, 70.4453125)\"><rect class=\"basic label-container\" style=\"\" x=\"-93.2265625\" y=\"-26.25\" width=\"186.453125\" height=\"52.5\"><\/rect><g class=\"label\" style=\"\" transform=\"translate(-63.2265625, -11.25)\"><rect><\/rect><foreignObject width=\"126.453125\" height=\"22.5\"><div xmlns=\"http:\/\/www.w3.org\/1999\/xhtml\" style=\"display: table-cell; white-space: nowrap; line-height: 1.5; max-width: 200px; text-align: center;\"><span class=\"nodeLabel\"><p>Disposi\u00e7\u00e3o t\u00e9cnica<\/p><\/span><\/div><\/foreignObject><\/g><\/g><g class=\"node default\" id=\"flowchart-E-7\" transform=\"translate(934.78125, 39.8203125)\"><rect class=\"basic label-container\" style=\"\" x=\"-95.046875\" y=\"-26.25\" width=\"190.09375\" height=\"52.5\"><\/rect><g class=\"label\" style=\"\" transform=\"translate(-65.046875, -11.25)\"><rect><\/rect><foreignObject width=\"130.09375\" height=\"22.5\"><div xmlns=\"http:\/\/www.w3.org\/1999\/xhtml\" style=\"display: table-cell; white-space: nowrap; line-height: 1.5; max-width: 200px; text-align: center;\"><span class=\"nodeLabel\"><p>Corre\u00e7\u00e3o ou reparo<\/p><\/span><\/div><\/foreignObject><\/g><\/g><g class=\"node default\" id=\"flowchart-F-9\" transform=\"translate(1203.34375, 39.8203125)\"><rect class=\"basic label-container\" style=\"\" x=\"-96.34375\" y=\"-26.25\" width=\"192.6875\" height=\"52.5\"><\/rect><g class=\"label\" style=\"\" transform=\"translate(-66.34375, -11.25)\"><rect><\/rect><foreignObject width=\"132.6875\" height=\"22.5\"><div xmlns=\"http:\/\/www.w3.org\/1999\/xhtml\" style=\"display: table-cell; white-space: nowrap; line-height: 1.5; max-width: 200px; text-align: center;\"><span class=\"nodeLabel\"><p>Reinspe\u00e7\u00e3o\/reteste<\/p><\/span><\/div><\/foreignObject><\/g><\/g><g class=\"node default\" id=\"flowchart-G-11\" transform=\"translate(1412.1328125, 70.4453125)\"><polygon points=\"62.4453125,0 124.890625,-62.4453125 62.4453125,-124.890625 0,-62.4453125\" class=\"label-container\" transform=\"translate(-61.9453125, 62.4453125)\"><\/polygon><g class=\"label\" style=\"\" transform=\"translate(-36.1953125, -11.25)\"><rect><\/rect><foreignObject width=\"72.390625\" height=\"22.5\"><div xmlns=\"http:\/\/www.w3.org\/1999\/xhtml\" style=\"display: table-cell; white-space: nowrap; line-height: 1.5; max-width: 200px; text-align: center;\"><span class=\"nodeLabel\"><p>Conforme?<\/p><\/span><\/div><\/foreignObject><\/g><\/g><g class=\"node default\" id=\"flowchart-H-15\" transform=\"translate(1621.296875, 70.4453125)\"><rect class=\"basic label-container\" style=\"\" x=\"-71.453125\" y=\"-26.25\" width=\"142.90625\" height=\"52.5\"><\/rect><g class=\"label\" style=\"\" transform=\"translate(-41.453125, -11.25)\"><rect><\/rect><foreignObject width=\"82.90625\" height=\"22.5\"><div xmlns=\"http:\/\/www.w3.org\/1999\/xhtml\" style=\"display: table-cell; white-space: nowrap; line-height: 1.5; max-width: 200px; text-align: center;\"><span class=\"nodeLabel\"><p>Fechamento<\/p><\/span><\/div><\/foreignObject><\/g><\/g><g class=\"node default\" id=\"flowchart-I-17\" transform=\"translate(1872.75, 70.4453125)\"><rect class=\"basic label-container\" style=\"\" x=\"-130\" y=\"-37.5\" width=\"260\" height=\"75\"><\/rect><g class=\"label\" style=\"\" transform=\"translate(-100, -22.5)\"><rect><\/rect><foreignObject width=\"200\" height=\"45\"><div xmlns=\"http:\/\/www.w3.org\/1999\/xhtml\" style=\"display: table; white-space: break-spaces; line-height: 1.5; max-width: 200px; text-align: center; width: 200px;\"><span class=\"nodeLabel\"><p>Atualizar Data Book e configura\u00e7\u00e3o final<\/p><\/span><\/div><\/foreignObject><\/g><\/g><\/g><\/g><\/g><\/svg><figcaption>Fluxo de tratamento de n\u00e3o conformidade em um fornecimento<\/figcaption><\/figure>\n\n\n\n<p class=\"wp-block-paragraph\">A disposi\u00e7\u00e3o pode exigir aprova\u00e7\u00e3o do cliente, especialmente quando altera requisito, material, desempenho ou configura\u00e7\u00e3o.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">FAT \u2014 Factory Acceptance Test<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">FAT is one of the main quality gates for equipment and systems. It must be planned before manufacturing is completed.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">A robust FAT requires:<\/p>\n\n\n\n<ul class=\"wp-block-list\"><li>approved procedure;<\/li><li>defined prerequisites;<\/li><li>identified configuration;<\/li><li>appropriate instruments;<\/li><li>acceptance criteria;<\/li><li>participants and responsibilities;<\/li><li>record forms;<\/li><li>treatment of pending items;<\/li><li>retest rule;<\/li><li>release definition.<\/li><\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">The site already has specific content on <strong>FAT and SAT<\/strong>, so Procurement should use that asset as a reference rather than reinventing its methodology for each purchase order.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Release for shipment<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Completion of the FAT does not automatically mean authorization to ship. Documents, NCRs, or actions may still be pending.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The shipping gate may verify:<\/p>\n\n\n\n<ul class=\"wp-block-list\"><li>approved FAT;<\/li><li>critical NCRs closed;<\/li><li>punch items compatible with shipment;<\/li><li>Data Book at the agreed stage;<\/li><li>identification and preservation;<\/li><li>packaging;<\/li><li>packing list;<\/li><li>transport documentation;<\/li><li>signed release note.<\/li><\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">For high-value equipment, shipping without this gate transfers risk from the factory to the site.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Receiving inspection<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Arrival at site creates a new control point. The team must confirm identity, quantity, integrity, preservation, and documentation before releasing the item to storage or installation.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The article <strong>Receiving Inspection of Materials and Equipment<\/strong> details quarantine, traceability, sampling, inspection, and release.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">A damaged or documentarily noncompliant item should not silently enter the construction process.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">SAT, Installation, and Commissioning<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">SAT verifies the equipment in its installed condition. It may confirm interfaces, power supply, communication, logic, instrumentation, signals, and performance in the actual environment.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Procurement must ensure that responsibilities for installation, support, supervision, startup, and SAT are contractually defined. Otherwise, failures at the interface between supplier and installer may remain without an owner.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Data Book as a Procurement deliverable<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Final documentation should be treated as part of the supply, not as an administrative courtesy. Payment and acceptance may be linked to documentation milestones when this is provided for in the contract.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The Data Book may include drawings, certificates, ITPs, reports, FAT records, NCRs, manuals, and final documentation. Its index should be defined in advance.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Supplier Quality indicators<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Useful indicators include:<\/p>\n\n\n\n<ul class=\"wp-block-list\"><li>NCR rate by supplier;<\/li><li>recurrence of defects;<\/li><li>first-inspection acceptance;<\/li><li>FAT approved on the first execution;<\/li><li>documents approved on first submission;<\/li><li>documentation delay;<\/li><li>percentage of Data Book accepted;<\/li><li>receiving rejection;<\/li><li>rework attributed to supplier;<\/li><li>NCR closure lead time.<\/li><\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">Indicators must be interpreted in context. A critical-equipment supplier may produce few units and still require in-depth qualitative analysis.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Supplier Performance and Lessons Learned<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Quality does not end when the purchase order is closed. Performance should inform future contracting decisions.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">A post-supply assessment may consider:<\/p>\n\n\n\n<figure class=\"wp-block-table\"><table><tbody><tr><td>Dimension<\/td><td>Questions<\/td><\/tr><tr><td>Engineering<\/td><td>did the supplier respond technically and control revisions?<\/td><\/tr><tr><td>Quality<\/td><td>did it comply with the ITP, address NCRs, and provide evidence?<\/td><\/tr><tr><td>Schedule<\/td><td>did it meet manufacturing and documentation milestones?<\/td><\/tr><tr><td>Commercial<\/td><td>did it manage changes and claims appropriately?<\/td><\/tr><tr><td>Field<\/td><td>was installation and SAT support effective?<\/td><\/tr><tr><td>Documentation<\/td><td>was the Data Book complete and traceable?<\/td><\/tr><tr><td>After-sales<\/td><td>did it respond to warranty and support needs?<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p class=\"wp-block-paragraph\">This record prevents every procurement cycle from starting from zero.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Risk-based Procurement<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Quality management should be proportional to risk. An off-the-shelf commercial component and a custom-engineered piece of equipment do not require the same level of control.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The risk matrix may define categories such as:<\/p>\n\n\n\n<ul class=\"wp-block-list\"><li>Class A: high criticality \u2014 audit, detailed ITP, H\/W points, FAT, and complete Data Book;<\/li><li>Class B: medium criticality \u2014 document review, selected inspections, and tests;<\/li><li>Class C: low criticality \u2014 certificate, receiving inspection, and document verification.<\/li><\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">The important point is that the classification is defined before purchasing.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">How to avoid unproductive bureaucracy<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Quality does not mean requiring documentation with no practical use. Some controls can increase cost without reducing risk.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Before including a requirement, ask:<\/p>\n\n\n\n<ul class=\"wp-block-list\"><li>what risk does it control?<\/li><li>what decision depends on the evidence?<\/li><li>who will review the document?<\/li><li>when will the information be used?<\/li><li>is the requirement proportional to criticality?<\/li><\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">If no one can answer, the requirement probably needs to be reviewed.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Interfaces Between Engineering, Procurement, and QA\/QC<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Problems arise when each function operates in isolation. Engineering specifies; Procurement buys; Quality inspects; Commissioning discovers the failure. An integrated process prevents this sequence.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Mature governance may use RACI to define who:<\/p>\n\n\n\n<ul class=\"wp-block-list\"><li>approves the specification;<\/li><li>qualifies the supplier;<\/li><li>conducts technical bid leveling;<\/li><li>approves deviations;<\/li><li>reviews the ITP;<\/li><li>participates in FAT;<\/li><li>releases shipment;<\/li><li>receives material;<\/li><li>accepts the Data Book;<\/li><li>approves NCR closure.<\/li><\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">The <strong>Engineering Process, Workflow, and Technical Approval Management<\/strong> solution can support formalization of these decisions.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Procurement Quality in EPC and EPCM Contracts<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">In EPC, the main contractor tends to assume a large share of Procurement and Supplier Quality. The Owner must define minimum requirements and intervention points for critical items.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">In EPCM, management may involve multiple packages contracted directly by the Owner, requiring greater document coordination and standardization among suppliers.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">In both cases, Procurement quality depends on a common strategy for requirements, inspection, documentation, and acceptance.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">How to Contract Technical Procurement<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">The Technical Procurement scope may include:<\/p>\n\n\n\n<ul class=\"wp-block-list\"><li>requirements review;<\/li><li>preparation of specifications and requisitions;<\/li><li>RFQ support;<\/li><li>technical bid leveling;<\/li><li>supplier analysis;<\/li><li>deviation review;<\/li><li>definition of QA\/QC requirements;<\/li><li>ITP and document review;<\/li><li>inspection and Vendor Inspection;<\/li><li>FAT;<\/li><li>receiving inspection;<\/li><li>NCR control;<\/li><li>Data Book review;<\/li><li>acceptance support.<\/li><\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">The service <strong>Technical Procurement: specification, bid leveling, suppliers, and contracting support<\/strong> is the natural commercial destination when the Owner needs to structure this function independently.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">What the Owner Should Require<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Before issuing the purchase order, the Owner should be able to answer:<\/p>\n\n\n\n<ul class=\"wp-block-list\"><li>are the requirements complete and verifiable?<\/li><li>is the supplier technically capable?<\/li><li>have deviations been formally addressed?<\/li><li>is the inspection level proportional to risk?<\/li><li>is the ITP defined?<\/li><li>do FAT and SAT have criteria?<\/li><li>are documentation requirements clear?<\/li><li>are there rules for NCRs and concessions?<\/li><li>is there a release-for-shipment gate?<\/li><li>does receiving have criteria?<\/li><li>does final acceptance consider documentation and performance?<\/li><\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">If these answers depend on future decisions, the risk has already entered the contract.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Final Considerations<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Quality Management in Procurement is the prevention of technical risk throughout the supply chain. The process begins before quotation and ends only when the supply has been received, tested, documented, and accepted.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The best results occur when Engineering, Procurement, and QA\/QC work within the same architecture: verifiable requirements, qualified supplier, criticality-based ITP, Vendor Inspection, FAT, controlled NCRs, traceable Data Book, and clear release gates. The objective is not to increase bureaucracy, but to prevent specification and manufacturing problems from being discovered at the most expensive stage of the project.<\/p>\n\n\n\n<div class=\"wp-block-a3a-destaque\">\n<p class=\"wp-block-paragraph\">When the Owner does not have an internal structure for technical bid leveling, inspection, NCR control, and document acceptance, Procurement technical risk can be addressed by an independent Engineering function.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><a href=\"https:\/\/a3aengenharia.com.br\/servicos\/implementacao\/apoio-tecnico-fiscalizacao-obras-contratos-engenharia\/\">Learn about technical support for inspection and supervision<\/a><\/p>\n<\/div>\n\n\n\n<details class=\"wp-block-details is-layout-flow wp-block-details-is-layout-flow\"><summary>Technical references<\/summary>\n<p class=\"wp-block-paragraph\">[1] INTERNATIONAL ORGANIZATION FOR STANDARDIZATION. ISO 9001:2015 \u2014 Quality management systems \u2014 Requirements. Geneva: ISO, 2015. Available at: <a href=\"https:\/\/www.iso.org\/standard\/62085.html\">https:\/\/www.iso.org\/standard\/62085.html<\/a><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">[2] INTERNATIONAL ORGANIZATION FOR STANDARDIZATION. ISO 10005:2018 \u2014 Quality management \u2014 Guidelines for quality plans. Geneva: ISO, 2018. Available at: <a href=\"https:\/\/www.iso.org\/standard\/70398.html\">https:\/\/www.iso.org\/standard\/70398.html<\/a><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">[3] INTERNATIONAL ORGANIZATION FOR STANDARDIZATION. ISO 10006:2017 \u2014 Quality management \u2014 Guidelines for quality management in projects. Geneva: ISO, 2017. Available at: <a href=\"https:\/\/www.iso.org\/standard\/70376.html\">https:\/\/www.iso.org\/standard\/70376.html<\/a><\/p>\n<\/details>\n\n\n\n<details class=\"wp-block-details is-layout-flow wp-block-details-is-layout-flow\"><summary>Frequently asked questions<\/summary>\n<div class=\"schema-faq wp-block-yoast-faq-block\"><div class=\"schema-faq-section\" id=\"faq-question-o-que-gest-o-da-qualidade-em-procurement-3bcaa50b\"><strong class=\"schema-faq-question\">What is Quality Management in Procurement?<\/strong> <p class=\"schema-faq-answer\">It is the application of requirements, supplier qualification, inspections, tests, document control, and acceptance criteria to ensure that acquired materials, equipment, and services meet the project and contract requirements.<\/p><\/div><div class=\"schema-faq-section\" id=\"faq-question-qual-a-diferen-a-entre-procurement-t-cnico-e-com-7cf934f1\"><strong class=\"schema-faq-question\">What is the difference between Technical Procurement and purchasing?<\/strong> <p class=\"schema-faq-answer\">Purchasing focuses on the commercial dimension of acquisition. Technical Procurement preserves and verifies Engineering requirements, bid leveling, deviations, inspections, tests, documentation, and acceptance.<\/p><\/div><div class=\"schema-faq-section\" id=\"faq-question-todo-fornecedor-precisa-de-vendor-inspection-e0b00930\"><strong class=\"schema-faq-question\">Does every supplier require Vendor Inspection?<\/strong> <p class=\"schema-faq-answer\">No. The level of control should be proportional to supply criticality, supplier history, and the impact of a failure.<\/p><\/div><div class=\"schema-faq-section\" id=\"faq-question-quando-deve-ser-definido-o-pit-itp-do-fornecedor-89bff2b6\"><strong class=\"schema-faq-question\">When should the supplier PIT\/ITP be defined?<\/strong> <p class=\"schema-faq-answer\">Inspection requirements should be established before contracting, and the detailed ITP should be reviewed before controlled manufacturing stages begin.<\/p><\/div><div class=\"schema-faq-section\" id=\"faq-question-o-fat-substitui-a-inspe-o-de-fabrica-o-abc7ee96\"><strong class=\"schema-faq-question\">Does FAT replace manufacturing inspection?<\/strong> <p class=\"schema-faq-answer\">No. FAT verifies certain functions and performance at the final stage. Many critical characteristics must be verified before or during manufacturing, or before they become inaccessible.<\/p><\/div><div class=\"schema-faq-section\" id=\"faq-question-data-book-faz-parte-da-qualidade-em-procurement-d1ea92ae\"><strong class=\"schema-faq-question\">Is the Data Book part of Procurement quality?<\/strong> <p class=\"schema-faq-answer\">Yes, when required by the scope. It consolidates drawings, certificates, inspections, tests, NCRs, and final supply documentation and may be a release or acceptance requirement.<\/p><\/div><\/div>\n<\/details>\n\n\n\n<details class=\"wp-block-details is-layout-flow wp-block-details-is-layout-flow\"><summary>Complementary technical materials<\/summary>\n<h4 class=\"wp-block-heading\">Related solutions<\/h4>\n<ul class=\"wp-block-list\"><li><a href=\"https:\/\/a3aengenharia.com.br\/solucoes\/gestao-e-governanca-de-engenharia\/gestao-requisitos-evidencias-criterios-aceite\/\">Requirements, Evidence, and Acceptance Criteria Management<\/a><\/li><li><a href=\"https:\/\/a3aengenharia.com.br\/solucoes\/gestao-e-governanca-de-engenharia\/gestao-pendencias-rfis-nao-conformidades\/\">Pending Items, RFIs, and Nonconformities Management<\/a><\/li><li><a href=\"https:\/\/a3aengenharia.com.br\/solucoes\/gestao-e-governanca-de-engenharia\/gestao-processos-workflows-aprovacoes-tecnicas\/\">Processes, Workflows, and Technical Approvals Management<\/a><\/li><li><a href=\"https:\/\/a3aengenharia.com.br\/solucoes\/gestao-e-governanca-de-engenharia\/governanca-de-projetos-programas-e-portfolios\/\">Project, Program, and Portfolio Governance<\/a><\/li><\/ul>\n<h4 class=\"wp-block-heading\">Related services<\/h4>\n<ul class=\"wp-block-list\"><li><a href=\"https:\/\/a3aengenharia.com.br\/servicos\/implementacao\/procurement\/\">Technical Procurement<\/a><\/li><li><a href=\"https:\/\/a3aengenharia.com.br\/servicos\/contratacao-integrada\/engenharia-do-proprietario\/\">Owner\u2019s Engineering<\/a><\/li><li><a href=\"https:\/\/a3aengenharia.com.br\/servicos\/servicos-transversais\/auditoria-tecnica-engenharia\/\">Technical Engineering Audit<\/a><\/li><li><a href=\"https:\/\/a3aengenharia.com.br\/servicos\/implementacao\/apoio-tecnico-fiscalizacao-obras-contratos-engenharia\/\">Technical Support for Inspection and Supervision<\/a><\/li><li><a href=\"https:\/\/a3aengenharia.com.br\/servicos\/implementacao\/recebimento-tecnico-obras-servicos-engenharia\/\">Technical Acceptance of Engineering Works and Services<\/a><\/li><\/ul>\n<h4 class=\"wp-block-heading\">Main content on the topic<\/h4>\n<ul class=\"wp-block-list\"><li><a href=\"https:\/\/a3aengenharia.com.br\/conteudo\/artigos-tecnicos\/inspecao-fabricacao-vendor-inspection-fornecedores-engenharia\/\">Manufacturing Inspection and Vendor Inspection<\/a><\/li><li><a href=\"https:\/\/a3aengenharia.com.br\/conteudo\/artigos-tecnicos\/inspecao-recebimento-materiais-equipamentos-engenharia\/\">Receiving Inspection of Materials and Equipment<\/a><\/li><li><a href=\"https:\/\/a3aengenharia.com.br\/conteudo\/artigos-tecnicos\/plano-inspecao-testes-pit-itp-engenharia\/\">Inspection and Test Plan (PIT\/ITP)<\/a><\/li><li><a href=\"https:\/\/a3aengenharia.com.br\/conteudo\/artigos-tecnicos\/hold-point-witness-point-review-point-pit-itp-engenharia\/\">Hold Point, Witness Point, and Review Point<\/a><\/li><li><a href=\"https:\/\/a3aengenharia.com.br\/conteudo\/artigos-tecnicos\/fat-sat-testes-integrados-sistemas-criticos\/\">FAT and SAT<\/a><\/li><li><a href=\"https:\/\/a3aengenharia.com.br\/conteudo\/artigos-tecnicos\/criterios-de-aceite-engenharia-requisitos-evidencias-validacao-tecnica\/\">Acceptance Criteria in Engineering<\/a><\/li><li><a href=\"https:\/\/a3aengenharia.com.br\/conteudo\/artigos-tecnicos\/relatorio-nao-conformidade-rnc-ncr-engenharia\/\">Nonconformity Report (RNC\/NCR)<\/a><\/li><\/ul>\n<h4 class=\"wp-block-heading\">Related technical content<\/h4>\n<ul class=\"wp-block-list\"><li><a href=\"https:\/\/a3aengenharia.com.br\/conteudo\/artigos-tecnicos\/procurement-projetos-engenharia-etapas-criterios\/\">Procurement in Engineering Projects<\/a><\/li><li><a href=\"https:\/\/a3aengenharia.com.br\/conteudo\/artigos-tecnicos\/design-review-projetos-engenharia\/\">Design Review in Engineering Projects<\/a><\/li><li><a href=\"https:\/\/a3aengenharia.com.br\/conteudo\/artigos-tecnicos\/gestao-requisitos-engenharia-definicao-rastreabilidade-mudancas-aceite\/\">Requirements Management in Engineering<\/a><\/li><li><a href=\"https:\/\/a3aengenharia.com.br\/conteudo\/whitepapers\/owners-engineering-framework-contratacao-governanca\/\">Owner\u2019s Engineering: Executive Framework<\/a><\/li><li><a href=\"https:\/\/a3aengenharia.com.br\/conteudo\/whitepapers\/framework-handover-tecnico-obras-sistemas-operacao\/\">Technical Handover Framework<\/a><\/li><\/ul>\n<\/details>\n","protected":false},"excerpt":{"rendered":"<p>How to apply quality management in Procurement: requirements, supplier qualification, technical bid leveling, ITP, Vendor Inspection, FAT, NCRs, Data Book, and acceptance.<\/p>\n","protected":false},"author":1,"featured_media":0,"parent":0,"template":"","meta":{"_a3a_global_related_solutions":[],"_a3a_global_related_services":[],"_a3a_global_related_materials":[],"_a3a_post_lang":"en-us","_a3a_translation_group_id":"79743f1e-4ab9-4c8c-95fa-c4320272493d","_a3a_i18n_canonical_slug":"quality-management-procurement-suppliers-engineering-2"},"categories":[],"segments":[],"mercados":[],"etapas":[],"class_list":["post-73016","articles","type-articles","status-publish","hentry"],"_links":{"self":[{"href":"https:\/\/a3aengenharia.com\/en-us\/wp-json\/wp\/v2\/articles\/73016","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/a3aengenharia.com\/en-us\/wp-json\/wp\/v2\/articles"}],"about":[{"href":"https:\/\/a3aengenharia.com\/en-us\/wp-json\/wp\/v2\/types\/articles"}],"author":[{"embeddable":true,"href":"https:\/\/a3aengenharia.com\/en-us\/wp-json\/wp\/v2\/users\/1"}],"version-history":[{"count":18,"href":"https:\/\/a3aengenharia.com\/en-us\/wp-json\/wp\/v2\/articles\/73016\/revisions"}],"predecessor-version":[{"id":73221,"href":"https:\/\/a3aengenharia.com\/en-us\/wp-json\/wp\/v2\/articles\/73016\/revisions\/73221"}],"wp:attachment":[{"href":"https:\/\/a3aengenharia.com\/en-us\/wp-json\/wp\/v2\/media?parent=73016"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/a3aengenharia.com\/en-us\/wp-json\/wp\/v2\/categories?post=73016"},{"taxonomy":"segments","embeddable":true,"href":"https:\/\/a3aengenharia.com\/en-us\/wp-json\/wp\/v2\/segments?post=73016"},{"taxonomy":"mercados","embeddable":true,"href":"https:\/\/a3aengenharia.com\/en-us\/wp-json\/wp\/v2\/mercados?post=73016"},{"taxonomy":"etapas","embeddable":true,"href":"https:\/\/a3aengenharia.com\/en-us\/wp-json\/wp\/v2\/etapas?post=73016"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}