{"id":72804,"date":"2026-08-28T13:37:44","date_gmt":"2026-08-28T16:37:44","guid":{"rendered":"https:\/\/a3aengenharia.com\/?post_type=articles&#038;p=72804"},"modified":"2026-08-28T13:37:44","modified_gmt":"2026-08-28T16:37:44","slug":"independent-qa-qc-engineering-owner-third-party","status":"publish","type":"articles","link":"https:\/\/a3aengenharia.com\/en-us\/content\/technical-articles\/independent-qa-qc-engineering-owner-third-party\/","title":{"rendered":"Independent QA\/QC in Engineering: When the Owner Needs a Third Party"},"content":{"rendered":"\n<p class=\"wp-block-paragraph\">Independent QA\/QC is the work of a technical party that does not execute the scope and that independently verifies whether processes, materials, equipment, documents, inspections, tests, and evidence meet the project requirements. Instead of relying exclusively on the contractor&#8217;s self-control, the Owner creates an additional layer of confidence between what was specified, what was executed, and what will be accepted.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">This independence does not mean duplicating the contractor&#8217;s work, replacing formal supervision, or assuming the technical responsibility of the executing party. Its role is to establish a second line of verification: assess whether the quality system is functioning, whether critical points are being controlled, whether the evidence is sufficient, and whether the condition presented as \u201ccompliant\u201d can actually support an acceptance decision.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The need increases when there is a high consequence of failure, interfaces among multiple suppliers, components that will become concealed, off-site manufacturing, irreversible tests, regulatory requirements, a history of nonconformities, or low maturity in the contractor&#8217;s quality system. In these scenarios, independence stops being a bureaucratic layer and becomes a mechanism for protecting the Owner&#8217;s technical interests.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">What independent QA\/QC means<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">The term combines two complementary functions. Quality Assurance focuses primarily on confidence in the process: procedures, responsibilities, planning, audits, qualification, controls, and the ability to produce compliant results. Quality Control focuses on verification of the product or service: inspections, measurements, tests, results, records, rejections, and releases.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">In an independent structure, these functions are performed or supervised by a team with no direct interest in accelerating production at the expense of technical criteria. This reduces a classic execution conflict: the same organization that must meet schedule and cost targets is also responsible for declaring whether its own work is acceptable.<\/p>\n\n\n\n<figure class=\"wp-block-table\"><table><tbody><tr><td>Dimension<\/td><td>Contractor control<\/td><td>Owner&#8217;s independent QA\/QC<\/td><\/tr><tr><td>primary objective<\/td><td>produce and demonstrate compliance<\/td><td>verify whether declared compliance is reliable<\/td><\/tr><tr><td>relationship<\/td><td>executing party<\/td><td>Owner, lender, or independent stakeholder<\/td><\/tr><tr><td>focus<\/td><td>process and product under its responsibility<\/td><td>project risk and sufficiency of evidence<\/td><\/tr><tr><td>authority<\/td><td>according to contract and internal system<\/td><td>according to the Owner&#8217;s mandate and authority matrix<\/td><\/tr><tr><td>sampling<\/td><td>defined by the contractor&#8217;s plan<\/td><td>also based on criticality and residual risk<\/td><\/tr><tr><td>nonconformity<\/td><td>record and address its own deviation<\/td><td>verify classification, disposition, correction, retest, and closure<\/td><\/tr><tr><td>acceptance<\/td><td>prepare evidence for submission<\/td><td>support the Owner&#8217;s decision without replacing the party holding contractual authority<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p class=\"wp-block-paragraph\">The most important point is to separate technical independence from contractual authority. An independent team may issue an opinion, recommend rejection, request additional evidence, or technically block progress when the contract so provides. Even so, the formal decision on acceptance, measurement, or receipt belongs to the role defined in the project&#8217;s governance.<\/p>\n\n\n\n<figure class=\"a3a-mermaid\"><svg overflow=\"visible\" id=\"a3a-diagram-1\" width=\"100%\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" class=\"flowchart\" style=\"max-width:min(1798.65625px, 100%);height:auto;display:block;margin:0 auto\" viewBox=\"0 0 1798.65625 68.5\" role=\"graphics-document document\" aria-roledescription=\"flowchart-v2\" aria-labelledby=\"chart-title-a3a-diagram-1\"><title id=\"chart-title-a3a-diagram-1\">Camadas de confian\u00e7a entre execu\u00e7\u00e3o, QA\/QC da contratada e verifica\u00e7\u00e3o independente do Owner<\/title><style>#a3a-diagram-1{font-family:Roboto,sans-serif;font-size:15px;fill:var(--a3a-diag-text, #0a0a0a);}@keyframes edge-animation-frame{from{stroke-dashoffset:0;}}@keyframes dash{to{stroke-dashoffset:0;}}#a3a-diagram-1 .edge-animation-slow{stroke-dasharray:9,5!important;stroke-dashoffset:900;animation:dash 50s linear infinite;stroke-linecap:round;}#a3a-diagram-1 .edge-animation-fast{stroke-dasharray:9,5!important;stroke-dashoffset:900;animation:dash 20s linear infinite;stroke-linecap:round;}#a3a-diagram-1 .error-icon{fill:var(--a3a-diag-canvas, #ffffff);}#a3a-diagram-1 .error-text{fill:#000000;stroke:#000000;}#a3a-diagram-1 .edge-thickness-normal{stroke-width:1px;}#a3a-diagram-1 .edge-thickness-thick{stroke-width:3.5px;}#a3a-diagram-1 .edge-pattern-solid{stroke-dasharray:0;}#a3a-diagram-1 .edge-thickness-invisible{stroke-width:0;fill:none;}#a3a-diagram-1 .edge-pattern-dashed{stroke-dasharray:3;}#a3a-diagram-1 .edge-pattern-dotted{stroke-dasharray:2;}#a3a-diagram-1 .marker{fill:var(--a3a-diag-stroke, #2e42a2);stroke:var(--a3a-diag-stroke, #2e42a2);}#a3a-diagram-1 .marker.cross{stroke:var(--a3a-diag-stroke, #2e42a2);}#a3a-diagram-1 svg{font-family:Roboto,sans-serif;font-size:15px;}#a3a-diagram-1 p{margin:0;}#a3a-diagram-1 .label{font-family:Roboto,sans-serif;color:var(--a3a-diag-text, #0a0a0a);}#a3a-diagram-1 .cluster-label text{fill:var(--a3a-diag-title, #0124af);}#a3a-diagram-1 .cluster-label span{color:var(--a3a-diag-title, #0124af);}#a3a-diagram-1 .cluster-label span p{background-color:transparent;}#a3a-diagram-1 .label text,#a3a-diagram-1 span{fill:var(--a3a-diag-text, #0a0a0a);color:var(--a3a-diag-text, #0a0a0a);}#a3a-diagram-1 .node rect,#a3a-diagram-1 .node circle,#a3a-diagram-1 .node ellipse,#a3a-diagram-1 .node polygon,#a3a-diagram-1 .node path{fill:var(--a3a-diag-fill, #eef2fd);stroke:var(--a3a-diag-stroke, #2e42a2);stroke-width:1px;}#a3a-diagram-1 .rough-node .label text,#a3a-diagram-1 .node .label text,#a3a-diagram-1 .image-shape .label,#a3a-diagram-1 .icon-shape .label{text-anchor:middle;}#a3a-diagram-1 .node .katex path{fill:#000;stroke:#000;stroke-width:1px;}#a3a-diagram-1 .rough-node .label,#a3a-diagram-1 .node .label,#a3a-diagram-1 .image-shape .label,#a3a-diagram-1 .icon-shape .label{text-align:center;}#a3a-diagram-1 .node.clickable{cursor:pointer;}#a3a-diagram-1 .root .anchor path{fill:var(--a3a-diag-stroke, #2e42a2)!important;stroke-width:0;stroke:var(--a3a-diag-stroke, #2e42a2);}#a3a-diagram-1 .arrowheadPath{fill:var(--a3a-diag-stroke, #0b0b0b);}#a3a-diagram-1 .edgePath .path{stroke:var(--a3a-diag-stroke, #2e42a2);stroke-width:2.0px;}#a3a-diagram-1 .flowchart-link{stroke:var(--a3a-diag-stroke, #2e42a2);fill:none;}#a3a-diagram-1 .edgeLabel{background-color:var(--a3a-diag-canvas, #ffffff);text-align:center;}#a3a-diagram-1 .edgeLabel p{background-color:var(--a3a-diag-canvas, #ffffff);}#a3a-diagram-1 .edgeLabel rect{opacity:0.5;background-color:var(--a3a-diag-canvas, #ffffff);fill:var(--a3a-diag-canvas, #ffffff);}#a3a-diagram-1 .labelBkg{background-color:rgba(255, 255, 255, 0.5);}#a3a-diagram-1 .cluster rect{fill:var(--a3a-diag-surface, #f8f8f8);stroke:var(--a3a-diag-border, #e2e8f0);stroke-width:1px;}#a3a-diagram-1 .cluster text{fill:var(--a3a-diag-title, #0124af);}#a3a-diagram-1 .cluster span{color:var(--a3a-diag-title, #0124af);}#a3a-diagram-1 div.mermaidTooltip{position:absolute;text-align:center;max-width:200px;padding:2px;font-family:Roboto,sans-serif;font-size:12px;background:var(--a3a-diag-canvas, #ffffff);border:1px solid hsl(0, 0%, 90%);border-radius:2px;pointer-events:none;z-index:100;}#a3a-diagram-1 .flowchartTitleText{text-anchor:middle;font-size:18px;fill:var(--a3a-diag-text, #0a0a0a);}#a3a-diagram-1 rect.text{fill:none;stroke-width:0;}#a3a-diagram-1 .icon-shape,#a3a-diagram-1 .image-shape{background-color:var(--a3a-diag-canvas, #ffffff);text-align:center;}#a3a-diagram-1 .icon-shape p,#a3a-diagram-1 .image-shape p{background-color:var(--a3a-diag-canvas, #ffffff);padding:2px;}#a3a-diagram-1 .icon-shape rect,#a3a-diagram-1 .image-shape rect{opacity:0.5;background-color:var(--a3a-diag-canvas, #ffffff);fill:var(--a3a-diag-canvas, #ffffff);}#a3a-diagram-1 .label-icon{display:inline-block;height:1em;overflow:visible;vertical-align:-0.125em;}#a3a-diagram-1 .node .label-icon path{fill:currentColor;stroke:revert;stroke-width:revert;}#a3a-diagram-1 :root{--mermaid-font-family:Roboto,sans-serif;}<\/style><g><marker id=\"a3a-diagram-1_flowchart-v2-pointEnd\" class=\"marker flowchart-v2\" viewBox=\"0 0 10 10\" refX=\"5\" refY=\"5\" markerUnits=\"userSpaceOnUse\" markerWidth=\"8\" markerHeight=\"8\" orient=\"auto\"><path d=\"M 0 0 L 10 5 L 0 10 z\" class=\"arrowMarkerPath\" style=\"stroke-width: 1; stroke-dasharray: 1, 0;\"><\/path><\/marker><marker id=\"a3a-diagram-1_flowchart-v2-pointStart\" class=\"marker flowchart-v2\" viewBox=\"0 0 10 10\" refX=\"4.5\" refY=\"5\" markerUnits=\"userSpaceOnUse\" markerWidth=\"8\" markerHeight=\"8\" orient=\"auto\"><path d=\"M 0 5 L 10 10 L 10 0 z\" class=\"arrowMarkerPath\" style=\"stroke-width: 1; stroke-dasharray: 1, 0;\"><\/path><\/marker><marker id=\"a3a-diagram-1_flowchart-v2-circleEnd\" class=\"marker flowchart-v2\" viewBox=\"0 0 10 10\" refX=\"11\" refY=\"5\" markerUnits=\"userSpaceOnUse\" markerWidth=\"11\" markerHeight=\"11\" orient=\"auto\"><circle cx=\"5\" cy=\"5\" r=\"5\" class=\"arrowMarkerPath\" style=\"stroke-width: 1; stroke-dasharray: 1, 0;\"><\/circle><\/marker><marker id=\"a3a-diagram-1_flowchart-v2-circleStart\" class=\"marker flowchart-v2\" viewBox=\"0 0 10 10\" refX=\"-1\" refY=\"5\" markerUnits=\"userSpaceOnUse\" markerWidth=\"11\" markerHeight=\"11\" orient=\"auto\"><circle cx=\"5\" cy=\"5\" r=\"5\" class=\"arrowMarkerPath\" style=\"stroke-width: 1; stroke-dasharray: 1, 0;\"><\/circle><\/marker><marker id=\"a3a-diagram-1_flowchart-v2-crossEnd\" class=\"marker cross flowchart-v2\" viewBox=\"0 0 11 11\" refX=\"12\" refY=\"5.2\" markerUnits=\"userSpaceOnUse\" markerWidth=\"11\" markerHeight=\"11\" orient=\"auto\"><path d=\"M 1,1 l 9,9 M 10,1 l -9,9\" class=\"arrowMarkerPath\" style=\"stroke-width: 2; stroke-dasharray: 1, 0;\"><\/path><\/marker><marker id=\"a3a-diagram-1_flowchart-v2-crossStart\" class=\"marker cross flowchart-v2\" viewBox=\"0 0 11 11\" refX=\"-1\" refY=\"5.2\" markerUnits=\"userSpaceOnUse\" markerWidth=\"11\" markerHeight=\"11\" orient=\"auto\"><path d=\"M 1,1 l 9,9 M 10,1 l -9,9\" class=\"arrowMarkerPath\" style=\"stroke-width: 2; stroke-dasharray: 1, 0;\"><\/path><\/marker><g class=\"root\"><g class=\"clusters\"><\/g><g class=\"edgePaths\"><path d=\"M208.719,34.25L212.885,34.25C217.052,34.25,225.385,34.25,233.052,34.25C240.719,34.25,247.719,34.25,251.219,34.25L254.719,34.25\" id=\"L_A_B_0\" class=\"edge-thickness-normal edge-pattern-solid edge-thickness-normal edge-pattern-solid flowchart-link\" style=\";\" data-edge=\"true\" data-et=\"edge\" data-id=\"L_A_B_0\" data-points=\"W3sieCI6MjA4LjcxODc1LCJ5IjozNC4yNX0seyJ4IjoyMzMuNzE4NzUsInkiOjM0LjI1fSx7IngiOjI1OC43MTg3NSwieSI6MzQuMjV9XQ==\" marker-end=\"url(#a3a-diagram-1_flowchart-v2-pointEnd)\"><\/path><path d=\"M480.703,34.25L484.87,34.25C489.036,34.25,497.37,34.25,505.036,34.25C512.703,34.25,519.703,34.25,523.203,34.25L526.703,34.25\" id=\"L_B_C_0\" class=\"edge-thickness-normal edge-pattern-solid edge-thickness-normal edge-pattern-solid flowchart-link\" style=\";\" data-edge=\"true\" data-et=\"edge\" data-id=\"L_B_C_0\" data-points=\"W3sieCI6NDgwLjcwMzEyNSwieSI6MzQuMjV9LHsieCI6NTA1LjcwMzEyNSwieSI6MzQuMjV9LHsieCI6NTMwLjcwMzEyNSwieSI6MzQuMjV9XQ==\" marker-end=\"url(#a3a-diagram-1_flowchart-v2-pointEnd)\"><\/path><path d=\"M734.734,34.25L738.901,34.25C743.068,34.25,751.401,34.25,759.068,34.25C766.734,34.25,773.734,34.25,777.234,34.25L780.734,34.25\" id=\"L_C_D_0\" class=\"edge-thickness-normal edge-pattern-solid edge-thickness-normal edge-pattern-solid flowchart-link\" style=\";\" data-edge=\"true\" data-et=\"edge\" data-id=\"L_C_D_0\" data-points=\"W3sieCI6NzM0LjczNDM3NSwieSI6MzQuMjV9LHsieCI6NzU5LjczNDM3NSwieSI6MzQuMjV9LHsieCI6Nzg0LjczNDM3NSwieSI6MzQuMjV9XQ==\" marker-end=\"url(#a3a-diagram-1_flowchart-v2-pointEnd)\"><\/path><path d=\"M1036.734,34.25L1040.901,34.25C1045.068,34.25,1053.401,34.25,1061.068,34.25C1068.734,34.25,1075.734,34.25,1079.234,34.25L1082.734,34.25\" id=\"L_D_E_0\" class=\"edge-thickness-normal edge-pattern-solid edge-thickness-normal edge-pattern-solid flowchart-link\" style=\";\" data-edge=\"true\" data-et=\"edge\" data-id=\"L_D_E_0\" data-points=\"W3sieCI6MTAzNi43MzQzNzUsInkiOjM0LjI1fSx7IngiOjEwNjEuNzM0Mzc1LCJ5IjozNC4yNX0seyJ4IjoxMDg2LjczNDM3NSwieSI6MzQuMjV9XQ==\" marker-end=\"url(#a3a-diagram-1_flowchart-v2-pointEnd)\"><\/path><path d=\"M1291.141,34.25L1295.307,34.25C1299.474,34.25,1307.807,34.25,1315.474,34.25C1323.141,34.25,1330.141,34.25,1333.641,34.25L1337.141,34.25\" id=\"L_E_F_0\" class=\"edge-thickness-normal edge-pattern-solid edge-thickness-normal edge-pattern-solid flowchart-link\" style=\";\" data-edge=\"true\" data-et=\"edge\" data-id=\"L_E_F_0\" data-points=\"W3sieCI6MTI5MS4xNDA2MjUsInkiOjM0LjI1fSx7IngiOjEzMTYuMTQwNjI1LCJ5IjozNC4yNX0seyJ4IjoxMzQxLjE0MDYyNSwieSI6MzQuMjV9XQ==\" marker-end=\"url(#a3a-diagram-1_flowchart-v2-pointEnd)\"><\/path><path d=\"M1557.406,34.25L1561.573,34.25C1565.74,34.25,1574.073,34.25,1581.74,34.25C1589.406,34.25,1596.406,34.25,1599.906,34.25L1603.406,34.25\" id=\"L_F_G_0\" class=\"edge-thickness-normal edge-pattern-solid edge-thickness-normal edge-pattern-solid flowchart-link\" style=\";\" data-edge=\"true\" data-et=\"edge\" data-id=\"L_F_G_0\" data-points=\"W3sieCI6MTU1Ny40MDYyNSwieSI6MzQuMjV9LHsieCI6MTU4Mi40MDYyNSwieSI6MzQuMjV9LHsieCI6MTYwNy40MDYyNSwieSI6MzQuMjV9XQ==\" marker-end=\"url(#a3a-diagram-1_flowchart-v2-pointEnd)\"><\/path><\/g><g class=\"edgeLabels\"><g class=\"edgeLabel\"><g class=\"label\" data-id=\"L_A_B_0\" transform=\"translate(0, 0)\"><foreignObject width=\"0\" height=\"0\"><div xmlns=\"http:\/\/www.w3.org\/1999\/xhtml\" class=\"labelBkg\" style=\"display: table-cell; white-space: nowrap; line-height: 1.5; max-width: 200px; text-align: center;\"><span class=\"edgeLabel\"><\/span><\/div><\/foreignObject><\/g><\/g><g class=\"edgeLabel\"><g class=\"label\" data-id=\"L_B_C_0\" transform=\"translate(0, 0)\"><foreignObject width=\"0\" height=\"0\"><div xmlns=\"http:\/\/www.w3.org\/1999\/xhtml\" class=\"labelBkg\" style=\"display: table-cell; white-space: nowrap; line-height: 1.5; max-width: 200px; text-align: center;\"><span class=\"edgeLabel\"><\/span><\/div><\/foreignObject><\/g><\/g><g class=\"edgeLabel\"><g class=\"label\" data-id=\"L_C_D_0\" transform=\"translate(0, 0)\"><foreignObject width=\"0\" height=\"0\"><div xmlns=\"http:\/\/www.w3.org\/1999\/xhtml\" class=\"labelBkg\" style=\"display: table-cell; white-space: nowrap; line-height: 1.5; max-width: 200px; text-align: center;\"><span class=\"edgeLabel\"><\/span><\/div><\/foreignObject><\/g><\/g><g class=\"edgeLabel\"><g class=\"label\" data-id=\"L_D_E_0\" transform=\"translate(0, 0)\"><foreignObject width=\"0\" height=\"0\"><div xmlns=\"http:\/\/www.w3.org\/1999\/xhtml\" class=\"labelBkg\" style=\"display: table-cell; white-space: nowrap; line-height: 1.5; max-width: 200px; text-align: center;\"><span class=\"edgeLabel\"><\/span><\/div><\/foreignObject><\/g><\/g><g class=\"edgeLabel\"><g class=\"label\" data-id=\"L_E_F_0\" transform=\"translate(0, 0)\"><foreignObject width=\"0\" height=\"0\"><div xmlns=\"http:\/\/www.w3.org\/1999\/xhtml\" class=\"labelBkg\" style=\"display: table-cell; white-space: nowrap; line-height: 1.5; max-width: 200px; text-align: center;\"><span class=\"edgeLabel\"><\/span><\/div><\/foreignObject><\/g><\/g><g class=\"edgeLabel\"><g class=\"label\" data-id=\"L_F_G_0\" transform=\"translate(0, 0)\"><foreignObject width=\"0\" height=\"0\"><div xmlns=\"http:\/\/www.w3.org\/1999\/xhtml\" class=\"labelBkg\" style=\"display: table-cell; white-space: nowrap; line-height: 1.5; max-width: 200px; text-align: center;\"><span class=\"edgeLabel\"><\/span><\/div><\/foreignObject><\/g><\/g><\/g><g class=\"nodes\"><g class=\"node default\" id=\"flowchart-A-0\" transform=\"translate(108.359375, 34.25)\"><rect class=\"basic label-container\" style=\"\" x=\"-100.359375\" y=\"-26.25\" width=\"200.71875\" height=\"52.5\"><\/rect><g class=\"label\" style=\"\" transform=\"translate(-70.359375, -11.25)\"><rect><\/rect><foreignObject width=\"140.71875\" height=\"22.5\"><div xmlns=\"http:\/\/www.w3.org\/1999\/xhtml\" style=\"display: table-cell; white-space: nowrap; line-height: 1.5; max-width: 200px; text-align: center;\"><span class=\"nodeLabel\"><p>Requisitos do Owner<\/p><\/span><\/div><\/foreignObject><\/g><\/g><g class=\"node default\" id=\"flowchart-B-1\" transform=\"translate(369.7109375, 34.25)\"><rect class=\"basic label-container\" style=\"\" x=\"-110.9921875\" y=\"-26.25\" width=\"221.984375\" height=\"52.5\"><\/rect><g class=\"label\" style=\"\" transform=\"translate(-80.9921875, -11.25)\"><rect><\/rect><foreignObject width=\"161.984375\" height=\"22.5\"><div xmlns=\"http:\/\/www.w3.org\/1999\/xhtml\" style=\"display: table-cell; white-space: nowrap; line-height: 1.5; max-width: 200px; text-align: center;\"><span class=\"nodeLabel\"><p>Execu\u00e7\u00e3o da contratada<\/p><\/span><\/div><\/foreignObject><\/g><\/g><g class=\"node default\" id=\"flowchart-C-3\" transform=\"translate(632.71875, 34.25)\"><rect class=\"basic label-container\" style=\"\" x=\"-102.015625\" y=\"-26.25\" width=\"204.03125\" height=\"52.5\"><\/rect><g class=\"label\" style=\"\" transform=\"translate(-72.015625, -11.25)\"><rect><\/rect><foreignObject width=\"144.03125\" height=\"22.5\"><div xmlns=\"http:\/\/www.w3.org\/1999\/xhtml\" style=\"display: table-cell; white-space: nowrap; line-height: 1.5; max-width: 200px; text-align: center;\"><span class=\"nodeLabel\"><p>QA\/QC da contratada<\/p><\/span><\/div><\/foreignObject><\/g><\/g><g class=\"node default\" id=\"flowchart-D-5\" transform=\"translate(910.734375, 34.25)\"><rect class=\"basic label-container\" style=\"\" x=\"-126\" y=\"-26.25\" width=\"252\" height=\"52.5\"><\/rect><g class=\"label\" style=\"\" transform=\"translate(-96, -11.25)\"><rect><\/rect><foreignObject width=\"192\" height=\"22.5\"><div xmlns=\"http:\/\/www.w3.org\/1999\/xhtml\" style=\"display: table-cell; white-space: nowrap; line-height: 1.5; max-width: 200px; text-align: center;\"><span class=\"nodeLabel\"><p>Evid\u00eancias de conformidade<\/p><\/span><\/div><\/foreignObject><\/g><\/g><g class=\"node default\" id=\"flowchart-E-7\" transform=\"translate(1188.9375, 34.25)\"><rect class=\"basic label-container\" style=\"\" x=\"-102.203125\" y=\"-26.25\" width=\"204.40625\" height=\"52.5\"><\/rect><g class=\"label\" style=\"\" transform=\"translate(-72.203125, -11.25)\"><rect><\/rect><foreignObject width=\"144.40625\" height=\"22.5\"><div xmlns=\"http:\/\/www.w3.org\/1999\/xhtml\" style=\"display: table-cell; white-space: nowrap; line-height: 1.5; max-width: 200px; text-align: center;\"><span class=\"nodeLabel\"><p>QA\/QC independente<\/p><\/span><\/div><\/foreignObject><\/g><\/g><g class=\"node default\" id=\"flowchart-F-9\" transform=\"translate(1449.2734375, 34.25)\"><rect class=\"basic label-container\" style=\"\" x=\"-108.1328125\" y=\"-26.25\" width=\"216.265625\" height=\"52.5\"><\/rect><g class=\"label\" style=\"\" transform=\"translate(-78.1328125, -11.25)\"><rect><\/rect><foreignObject width=\"156.265625\" height=\"22.5\"><div xmlns=\"http:\/\/www.w3.org\/1999\/xhtml\" style=\"display: table-cell; white-space: nowrap; line-height: 1.5; max-width: 200px; text-align: center;\"><span class=\"nodeLabel\"><p>Recomenda\u00e7\u00e3o t\u00e9cnica<\/p><\/span><\/div><\/foreignObject><\/g><\/g><g class=\"node default\" id=\"flowchart-G-11\" transform=\"translate(1699.03125, 34.25)\"><rect class=\"basic label-container\" style=\"\" x=\"-91.625\" y=\"-26.25\" width=\"183.25\" height=\"52.5\"><\/rect><g class=\"label\" style=\"\" transform=\"translate(-61.625, -11.25)\"><rect><\/rect><foreignObject width=\"123.25\" height=\"22.5\"><div xmlns=\"http:\/\/www.w3.org\/1999\/xhtml\" style=\"display: table-cell; white-space: nowrap; line-height: 1.5; max-width: 200px; text-align: center;\"><span class=\"nodeLabel\"><p>Aceite pelo Owner<\/p><\/span><\/div><\/foreignObject><\/g><\/g><\/g><\/g><\/g><\/svg><figcaption>Camadas de confian\u00e7a entre execu\u00e7\u00e3o, QA\/QC da contratada e verifica\u00e7\u00e3o independente do Owner<\/figcaption><\/figure>\n\n\n\n<h2 class=\"wp-block-heading\">Why the contractor&#8217;s self-control may not be sufficient<\/h2>\n\n\n\n<div class=\"wp-block-a3a-destaque\">\n<p class=\"wp-block-paragraph\">When the same organization that executes the work is also solely responsible for declaring its own compliance, the Owner assumes an information risk. In critical systems, a second line of verification reduces the likelihood that acceptance occurs with incomplete evidence or relaxed criteria.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><a href=\"https:\/\/a3aengenharia.com.br\/servicos\/contratacao-integrada\/engenharia-do-proprietario\/\">Learn about A3A Engenharia&#8217;s Owner&#8217;s Engineering services<\/a><\/p>\n<\/div>\n\n\n\n<p class=\"wp-block-paragraph\">Self-control is essential. No third party can compensate for a contractor without processes, supervision, inspection, documentation, and a quality culture. The problem arises when the Owner treats self-control as the only source of confidence in higher-criticality scopes.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The contractor has legitimate incentives related to productivity, schedule, and cost. These incentives can come into tension with decisions such as stopping a work front, rejecting a batch, dismantling an installation, repeating a test, or admitting that a stage must be redone. A mature quality system manages this tension. A weak system tends to postpone discovery of the problem.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">There is also a limit of perspective. The contractor normally controls what is within its own scope. The Owner needs visibility across contract interfaces, discipline compatibility, operational impact, asset requirements, final documentation, and integration risks. An activity may be \u201ccompliant\u201d in isolation and still produce an inadequate interface for the project.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Situations where a third party adds the most value<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">The decision should not be based solely on contract size. Small projects may contain high-criticality items, while large projects may include standardized low-risk portions. The best criterion is the combination of failure consequence, difficulty of detection, and cost of late correction.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Critical systems<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Data centers, substations, generation, protection, automation, electronic security, telecommunications, critical HVAC, industrial utilities, and protection systems may require independent verification when a failure causes downtime, safety risk, operational loss, or high recovery cost.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Concealed or irreversible elements<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Concrete placement, waterproofing, buried infrastructure, embedded cables, welds that will later become inaccessible, internal connections, seals, and other elements need to be verified before physical closeout. After that stage, missing evidence may require opening, demolition, or indirect testing.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Off-site manufacturing<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Equipment manufactured by third parties requires control of documentation, materials, processes, testing, <a href=\"https:\/\/a3aengenharia.com.br\/conteudo\/artigos-tecnicos\/fat-sat-testes-integrados-sistemas-criticos\/\">FAT<\/a>, and shipment release. <a href=\"https:\/\/a3aengenharia.com.br\/conteudo\/artigos-tecnicos\/inspecao-fabricacao-vendor-inspection-fornecedores-engenharia\/\">Vendor Inspection<\/a> allows the Owner to intervene while deviations can still be corrected at the source. If the Owner&#8217;s first technical contact occurs only upon receiving, correction costs increase significantly.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Interfaces among multiple suppliers<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">A supplier may correctly deliver its package and still have a failure at the interface with another supplier. Independent QA\/QC can work with interface matrices, boundary criteria, responsibilities, and integrated evidence.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">History of NCRs or low maturity<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Recurring nonconformities, incomplete documents, rework, traceability failures, tests without protocols, materials without certification, or large volumes of open items are signs that confidence in self-control needs to be reinforced.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">How to decide whether independence is necessary<\/h2>\n\n\n\n<figure class=\"wp-block-table\"><table><tbody><tr><td>Criterion<\/td><td>Low need<\/td><td>Increasing need<\/td><\/tr><tr><td>failure consequence<\/td><td>local and reversible effect<\/td><td>safety, operation, major CAPEX, or downtime<\/td><\/tr><tr><td>detectability<\/td><td>failure easily visible<\/td><td>hidden failure or detectable only in final tests<\/td><\/tr><tr><td>reversibility<\/td><td>simple correction<\/td><td>dismantling, demolition, or complex replacement<\/td><\/tr><tr><td>supplier maturity<\/td><td>consistent track record<\/td><td>new supplier, irregular performance, or recurring NCRs<\/td><\/tr><tr><td>interface complexity<\/td><td>isolated package<\/td><td>multiple disciplines and contracts<\/td><\/tr><tr><td>document criticality<\/td><td>simple documentation<\/td><td>Data Book, certification, traceability, configuration<\/td><\/tr><tr><td>Owner distance<\/td><td>direct follow-up<\/td><td>remote manufacturing or multiple simultaneous work fronts<\/td><\/tr><tr><td>impact of incorrect acceptance<\/td><td>low<\/td><td>risk transferred to operations<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p class=\"wp-block-paragraph\">The matrix does not need to result in \u201cinspect everything\u201d. The most efficient concept is risk-based QA\/QC. The greater the risk, the greater the review depth, presence frequency, sampling coverage, and authority at intervention points.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Independence does not mean 100% inspection<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">A mistaken interpretation is to assume that an independent third party should repeat all inspections performed by the contractor. This increases project cost and may even dilute responsibility.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The most robust design uses process review, intervention points in critical activities, criticality-driven sampling, and escalation when results indicate loss of control. If a sample shows repeated failures, coverage can increase; if a supplier maintains consistent performance, presence can be reduced without abandoning governance.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Typical scope of independent QA\/QC<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">The scope may range from a one-time audit to full follow-up throughout the procurement lifecycle. In a comprehensive structure, it may include review of requirements, the Quality Plan, PIT\/ITP, audits, inspections, tests, NCR management, document verification, and support for technical acceptance.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Review of requirements and contractual documents<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Before mobilization, the team assesses whether the specifications define objective criteria, applicable standards, deliverables, responsibility for inspections, traceability requirements, final documentation, and acceptance rules.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Review of the Quality Plan and PIT\/ITP<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">The Quality Plan must reflect the specific contract. The PIT must convert critical activities into controllable points and define method, frequency, criterion, record, and H\/W\/R points consistent with risk.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Audits and process verification<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Audits assess whether the defined system is actually being applied. ISO 19011:2026 provides guidance on audit principles, management of audit programs, performance of audits, and auditor competence.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Inspections, tests, and nonconformities<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">The team may participate in manufacturing inspections, receiving inspections, field execution, FAT, SAT, functional tests, and integrated tests. For NCRs, it verifies the requirement, disposition, correction, retest, and closeout evidence.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Document verification and acceptance<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">MDR\/VDR, certificates, reports, inspection records, FAT\/SAT, NCRs, as-built documentation, and final dossiers need to converge with the physical condition. At closeout, the third party consolidates evidence and reservations to support the Owner&#8217;s decision.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">How to define the third party&#8217;s authority<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Without an authority matrix, the independent team becomes a consultancy with no ability to intervene or creates blocks without contractual basis. The contract and Quality Plan must clarify who comments, classifies NCRs, places an activity on Hold, releases a Hold Point, approves deviations, authorizes shipment, accepts documents, and formalizes receipt.<\/p>\n\n\n\n<figure class=\"a3a-mermaid\"><svg overflow=\"visible\" id=\"a3a-diagram-2\" width=\"100%\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" class=\"flowchart\" style=\"max-width:min(538.19140625px, 100%);height:auto;display:block;margin:0 auto\" viewBox=\"0 0 538.19140625 1238.9375\" role=\"graphics-document document\" aria-roledescription=\"flowchart-v2\" aria-labelledby=\"chart-title-a3a-diagram-2\"><title id=\"chart-title-a3a-diagram-2\">Fluxo de decis\u00e3o para escalonamento de QA\/QC independente<\/title><style>#a3a-diagram-2{font-family:Roboto,sans-serif;font-size:15px;fill:var(--a3a-diag-text, #0a0a0a);}@keyframes edge-animation-frame{from{stroke-dashoffset:0;}}@keyframes dash{to{stroke-dashoffset:0;}}#a3a-diagram-2 .edge-animation-slow{stroke-dasharray:9,5!important;stroke-dashoffset:900;animation:dash 50s linear infinite;stroke-linecap:round;}#a3a-diagram-2 .edge-animation-fast{stroke-dasharray:9,5!important;stroke-dashoffset:900;animation:dash 20s linear infinite;stroke-linecap:round;}#a3a-diagram-2 .error-icon{fill:var(--a3a-diag-canvas, #ffffff);}#a3a-diagram-2 .error-text{fill:#000000;stroke:#000000;}#a3a-diagram-2 .edge-thickness-normal{stroke-width:1px;}#a3a-diagram-2 .edge-thickness-thick{stroke-width:3.5px;}#a3a-diagram-2 .edge-pattern-solid{stroke-dasharray:0;}#a3a-diagram-2 .edge-thickness-invisible{stroke-width:0;fill:none;}#a3a-diagram-2 .edge-pattern-dashed{stroke-dasharray:3;}#a3a-diagram-2 .edge-pattern-dotted{stroke-dasharray:2;}#a3a-diagram-2 .marker{fill:var(--a3a-diag-stroke, #2e42a2);stroke:var(--a3a-diag-stroke, #2e42a2);}#a3a-diagram-2 .marker.cross{stroke:var(--a3a-diag-stroke, #2e42a2);}#a3a-diagram-2 svg{font-family:Roboto,sans-serif;font-size:15px;}#a3a-diagram-2 p{margin:0;}#a3a-diagram-2 .label{font-family:Roboto,sans-serif;color:var(--a3a-diag-text, #0a0a0a);}#a3a-diagram-2 .cluster-label text{fill:var(--a3a-diag-title, #0124af);}#a3a-diagram-2 .cluster-label span{color:var(--a3a-diag-title, #0124af);}#a3a-diagram-2 .cluster-label span p{background-color:transparent;}#a3a-diagram-2 .label text,#a3a-diagram-2 span{fill:var(--a3a-diag-text, #0a0a0a);color:var(--a3a-diag-text, #0a0a0a);}#a3a-diagram-2 .node rect,#a3a-diagram-2 .node circle,#a3a-diagram-2 .node ellipse,#a3a-diagram-2 .node polygon,#a3a-diagram-2 .node path{fill:var(--a3a-diag-fill, #eef2fd);stroke:var(--a3a-diag-stroke, #2e42a2);stroke-width:1px;}#a3a-diagram-2 .rough-node .label text,#a3a-diagram-2 .node .label text,#a3a-diagram-2 .image-shape .label,#a3a-diagram-2 .icon-shape .label{text-anchor:middle;}#a3a-diagram-2 .node .katex path{fill:#000;stroke:#000;stroke-width:1px;}#a3a-diagram-2 .rough-node .label,#a3a-diagram-2 .node .label,#a3a-diagram-2 .image-shape .label,#a3a-diagram-2 .icon-shape .label{text-align:center;}#a3a-diagram-2 .node.clickable{cursor:pointer;}#a3a-diagram-2 .root .anchor path{fill:var(--a3a-diag-stroke, #2e42a2)!important;stroke-width:0;stroke:var(--a3a-diag-stroke, #2e42a2);}#a3a-diagram-2 .arrowheadPath{fill:var(--a3a-diag-stroke, #0b0b0b);}#a3a-diagram-2 .edgePath .path{stroke:var(--a3a-diag-stroke, #2e42a2);stroke-width:2.0px;}#a3a-diagram-2 .flowchart-link{stroke:var(--a3a-diag-stroke, #2e42a2);fill:none;}#a3a-diagram-2 .edgeLabel{background-color:var(--a3a-diag-canvas, #ffffff);text-align:center;}#a3a-diagram-2 .edgeLabel p{background-color:var(--a3a-diag-canvas, #ffffff);}#a3a-diagram-2 .edgeLabel rect{opacity:0.5;background-color:var(--a3a-diag-canvas, #ffffff);fill:var(--a3a-diag-canvas, #ffffff);}#a3a-diagram-2 .labelBkg{background-color:rgba(255, 255, 255, 0.5);}#a3a-diagram-2 .cluster rect{fill:var(--a3a-diag-surface, #f8f8f8);stroke:var(--a3a-diag-border, #e2e8f0);stroke-width:1px;}#a3a-diagram-2 .cluster text{fill:var(--a3a-diag-title, #0124af);}#a3a-diagram-2 .cluster span{color:var(--a3a-diag-title, #0124af);}#a3a-diagram-2 div.mermaidTooltip{position:absolute;text-align:center;max-width:200px;padding:2px;font-family:Roboto,sans-serif;font-size:12px;background:var(--a3a-diag-canvas, #ffffff);border:1px solid hsl(0, 0%, 90%);border-radius:2px;pointer-events:none;z-index:100;}#a3a-diagram-2 .flowchartTitleText{text-anchor:middle;font-size:18px;fill:var(--a3a-diag-text, #0a0a0a);}#a3a-diagram-2 rect.text{fill:none;stroke-width:0;}#a3a-diagram-2 .icon-shape,#a3a-diagram-2 .image-shape{background-color:var(--a3a-diag-canvas, #ffffff);text-align:center;}#a3a-diagram-2 .icon-shape p,#a3a-diagram-2 .image-shape p{background-color:var(--a3a-diag-canvas, #ffffff);padding:2px;}#a3a-diagram-2 .icon-shape rect,#a3a-diagram-2 .image-shape rect{opacity:0.5;background-color:var(--a3a-diag-canvas, #ffffff);fill:var(--a3a-diag-canvas, #ffffff);}#a3a-diagram-2 .label-icon{display:inline-block;height:1em;overflow:visible;vertical-align:-0.125em;}#a3a-diagram-2 .node .label-icon path{fill:currentColor;stroke:revert;stroke-width:revert;}#a3a-diagram-2 :root{--mermaid-font-family:Roboto,sans-serif;}<\/style><g><marker id=\"a3a-diagram-2_flowchart-v2-pointEnd\" class=\"marker flowchart-v2\" viewBox=\"0 0 10 10\" refX=\"5\" refY=\"5\" markerUnits=\"userSpaceOnUse\" markerWidth=\"8\" markerHeight=\"8\" orient=\"auto\"><path d=\"M 0 0 L 10 5 L 0 10 z\" class=\"arrowMarkerPath\" style=\"stroke-width: 1; stroke-dasharray: 1, 0;\"><\/path><\/marker><marker id=\"a3a-diagram-2_flowchart-v2-pointStart\" class=\"marker flowchart-v2\" viewBox=\"0 0 10 10\" refX=\"4.5\" refY=\"5\" markerUnits=\"userSpaceOnUse\" markerWidth=\"8\" markerHeight=\"8\" orient=\"auto\"><path d=\"M 0 5 L 10 10 L 10 0 z\" class=\"arrowMarkerPath\" style=\"stroke-width: 1; stroke-dasharray: 1, 0;\"><\/path><\/marker><marker id=\"a3a-diagram-2_flowchart-v2-circleEnd\" class=\"marker flowchart-v2\" viewBox=\"0 0 10 10\" refX=\"11\" refY=\"5\" markerUnits=\"userSpaceOnUse\" markerWidth=\"11\" markerHeight=\"11\" orient=\"auto\"><circle cx=\"5\" cy=\"5\" r=\"5\" class=\"arrowMarkerPath\" style=\"stroke-width: 1; stroke-dasharray: 1, 0;\"><\/circle><\/marker><marker id=\"a3a-diagram-2_flowchart-v2-circleStart\" class=\"marker flowchart-v2\" viewBox=\"0 0 10 10\" refX=\"-1\" refY=\"5\" markerUnits=\"userSpaceOnUse\" markerWidth=\"11\" markerHeight=\"11\" orient=\"auto\"><circle cx=\"5\" cy=\"5\" r=\"5\" class=\"arrowMarkerPath\" style=\"stroke-width: 1; stroke-dasharray: 1, 0;\"><\/circle><\/marker><marker id=\"a3a-diagram-2_flowchart-v2-crossEnd\" class=\"marker cross flowchart-v2\" viewBox=\"0 0 11 11\" refX=\"12\" refY=\"5.2\" markerUnits=\"userSpaceOnUse\" markerWidth=\"11\" markerHeight=\"11\" orient=\"auto\"><path d=\"M 1,1 l 9,9 M 10,1 l -9,9\" class=\"arrowMarkerPath\" style=\"stroke-width: 2; stroke-dasharray: 1, 0;\"><\/path><\/marker><marker id=\"a3a-diagram-2_flowchart-v2-crossStart\" class=\"marker cross flowchart-v2\" viewBox=\"0 0 11 11\" refX=\"-1\" refY=\"5.2\" markerUnits=\"userSpaceOnUse\" markerWidth=\"11\" markerHeight=\"11\" orient=\"auto\"><path d=\"M 1,1 l 9,9 M 10,1 l -9,9\" class=\"arrowMarkerPath\" style=\"stroke-width: 2; stroke-dasharray: 1, 0;\"><\/path><\/marker><g class=\"root\"><g class=\"clusters\"><\/g><g class=\"edgePaths\"><path d=\"M225.586,60.5L225.586,64.667C225.586,68.833,225.586,77.167,225.586,84.833C225.586,92.5,225.586,99.5,225.586,103L225.586,106.5\" id=\"L_A_B_0\" class=\"edge-thickness-normal edge-pattern-solid edge-thickness-normal edge-pattern-solid flowchart-link\" style=\";\" data-edge=\"true\" data-et=\"edge\" data-id=\"L_A_B_0\" data-points=\"W3sieCI6MjI1LjU4NTkzNzUsInkiOjYwLjV9LHsieCI6MjI1LjU4NTkzNzUsInkiOjg1LjV9LHsieCI6MjI1LjU4NTkzNzUsInkiOjExMC41fV0=\" marker-end=\"url(#a3a-diagram-2_flowchart-v2-pointEnd)\"><\/path><path d=\"M190.985,200.79L176.312,212.599C161.639,224.407,132.292,248.024,117.619,270.249C102.945,292.474,102.945,313.307,102.945,332.266C102.945,351.224,102.945,368.307,102.945,394.395C102.945,420.482,102.945,455.573,102.945,492.539C102.945,529.505,102.945,568.346,102.945,598.184C102.945,628.021,102.945,648.854,102.945,669.688C102.945,690.521,102.945,711.354,102.945,732.188C102.945,753.021,102.945,773.854,102.945,792.813C102.945,811.771,102.945,828.854,102.945,845.938C102.945,863.021,102.945,880.104,102.945,897.188C102.945,914.271,102.945,931.354,102.945,948.438C102.945,965.521,102.945,982.604,102.945,999.688C102.945,1016.771,102.945,1033.854,102.945,1045.896C102.945,1057.938,102.945,1064.938,102.945,1068.438L102.945,1071.938\" id=\"L_B_C_0\" class=\"edge-thickness-normal edge-pattern-solid edge-thickness-normal edge-pattern-solid flowchart-link\" style=\";\" data-edge=\"true\" data-et=\"edge\" data-id=\"L_B_C_0\" data-points=\"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\" marker-end=\"url(#a3a-diagram-2_flowchart-v2-pointEnd)\"><\/path><path d=\"M102.945,1128.438L102.945,1132.604C102.945,1136.771,102.945,1145.104,112.301,1153.18C121.657,1161.257,140.368,1169.076,149.724,1172.986L159.079,1176.895\" id=\"L_C_D_0\" class=\"edge-thickness-normal edge-pattern-solid edge-thickness-normal edge-pattern-solid flowchart-link\" style=\";\" data-edge=\"true\" data-et=\"edge\" data-id=\"L_C_D_0\" data-points=\"W3sieCI6MTAyLjk0NTMxMjUsInkiOjExMjguNDM3NX0seyJ4IjoxMDIuOTQ1MzEyNSwieSI6MTE1My40Mzc1fSx7IngiOjE2Mi43NzAwMDc2MjE5NTEyLCJ5IjoxMTc4LjQzNzV9XQ==\" marker-end=\"url(#a3a-diagram-2_flowchart-v2-pointEnd)\"><\/path><path d=\"M260.186,200.79L274.86,212.599C289.533,224.407,318.88,248.024,333.553,265.207C348.227,282.391,348.227,293.141,348.227,298.516L348.227,303.891\" id=\"L_B_E_0\" class=\"edge-thickness-normal edge-pattern-solid edge-thickness-normal edge-pattern-solid flowchart-link\" style=\";\" data-edge=\"true\" data-et=\"edge\" data-id=\"L_B_E_0\" data-points=\"W3sieCI6MjYwLjE4NjQyODY4MDE1NjA0LCJ5IjoyMDAuNzkwMTMzODE5ODQ0fSx7IngiOjM0OC4yMjY1NjI1LCJ5IjoyNzEuNjQwNjI1fSx7IngiOjM0OC4yMjY1NjI1LCJ5IjozMDcuODkwNjI1fV0=\" marker-end=\"url(#a3a-diagram-2_flowchart-v2-pointEnd)\"><\/path><path d=\"M348.227,360.391L348.227,364.557C348.227,368.724,348.227,377.057,348.227,384.724C348.227,392.391,348.227,399.391,348.227,402.891L348.227,406.391\" id=\"L_E_F_0\" class=\"edge-thickness-normal edge-pattern-solid edge-thickness-normal edge-pattern-solid flowchart-link\" style=\";\" data-edge=\"true\" data-et=\"edge\" data-id=\"L_E_F_0\" data-points=\"W3sieCI6MzQ4LjIyNjU2MjUsInkiOjM2MC4zOTA2MjV9LHsieCI6MzQ4LjIyNjU2MjUsInkiOjM4NS4zOTA2MjV9LHsieCI6MzQ4LjIyNjU2MjUsInkiOjQxMC4zOTA2MjV9XQ==\" marker-end=\"url(#a3a-diagram-2_flowchart-v2-pointEnd)\"><\/path><path d=\"M310.017,532.728L298.744,545.138C287.471,557.548,264.925,582.368,253.652,605.194C242.379,628.021,242.379,648.854,242.379,669.688C242.379,690.521,242.379,711.354,242.379,732.188C242.379,753.021,242.379,773.854,242.379,792.813C242.379,811.771,242.379,828.854,242.379,845.938C242.379,863.021,242.379,880.104,242.379,897.188C242.379,914.271,242.379,931.354,250.384,943.772C258.39,956.19,274.401,963.942,282.406,967.818L290.412,971.694\" id=\"L_F_G_0\" class=\"edge-thickness-normal edge-pattern-solid edge-thickness-normal edge-pattern-solid flowchart-link\" style=\";\" data-edge=\"true\" data-et=\"edge\" data-id=\"L_F_G_0\" data-points=\"W3sieCI6MzEwLjAxNjc2MTU5ODE4NzE0LCJ5Ijo1MzIuNzI3Njk5MDk4MTg3MX0seyJ4IjoyNDIuMzc4OTA2MjUsInkiOjYwNy4xODc1fSx7IngiOjI0Mi4zNzg5MDYyNSwieSI6NjY5LjY4NzV9LHsieCI6MjQyLjM3ODkwNjI1LCJ5Ijo3MzIuMTg3NX0seyJ4IjoyNDIuMzc4OTA2MjUsInkiOjc5NC42ODc1fSx7IngiOjI0Mi4zNzg5MDYyNSwieSI6ODQ1LjkzNzV9LHsieCI6MjQyLjM3ODkwNjI1LCJ5Ijo4OTcuMTg3NX0seyJ4IjoyNDIuMzc4OTA2MjUsInkiOjk0OC40Mzc1fSx7IngiOjI5NC4wMTE5MDkyOTg3ODA1LCJ5Ijo5NzMuNDM3NX1d\" marker-end=\"url(#a3a-diagram-2_flowchart-v2-pointEnd)\"><\/path><path d=\"M379.857,539.307L387.213,550.621C394.57,561.934,409.283,584.561,416.64,601.249C423.996,617.938,423.996,628.688,423.996,634.063L423.996,639.438\" id=\"L_F_H_0\" class=\"edge-thickness-normal edge-pattern-solid edge-thickness-normal edge-pattern-solid flowchart-link\" style=\";\" data-edge=\"true\" data-et=\"edge\" data-id=\"L_F_H_0\" data-points=\"W3sieCI6Mzc5Ljg1Njg0Mzk5NTY3MzEsInkiOjUzOS4zMDcyMTg1MDQzMjY5fSx7IngiOjQyMy45OTYwOTM3NSwieSI6NjA3LjE4NzV9LHsieCI6NDIzLjk5NjA5Mzc1LCJ5Ijo2NDMuNDM3NX1d\" marker-end=\"url(#a3a-diagram-2_flowchart-v2-pointEnd)\"><\/path><path d=\"M423.996,695.938L423.996,701.979C423.996,708.021,423.996,720.104,423.996,731.521C423.996,742.938,423.996,753.688,423.996,759.063L423.996,764.438\" id=\"L_H_I_0\" class=\"edge-thickness-normal edge-pattern-solid edge-thickness-normal edge-pattern-solid flowchart-link\" style=\";\" data-edge=\"true\" data-et=\"edge\" data-id=\"L_H_I_0\" data-points=\"W3sieCI6NDIzLjk5NjA5Mzc1LCJ5Ijo2OTUuOTM3NX0seyJ4Ijo0MjMuOTk2MDkzNzUsInkiOjczMi4xODc1fSx7IngiOjQyMy45OTYwOTM3NSwieSI6NzY4LjQzNzV9XQ==\" marker-end=\"url(#a3a-diagram-2_flowchart-v2-pointEnd)\"><\/path><path d=\"M423.996,820.938L423.996,825.104C423.996,829.271,423.996,837.604,423.996,845.271C423.996,852.938,423.996,859.938,423.996,863.438L423.996,866.938\" id=\"L_I_J_0\" class=\"edge-thickness-normal edge-pattern-solid edge-thickness-normal edge-pattern-solid flowchart-link\" style=\";\" data-edge=\"true\" data-et=\"edge\" data-id=\"L_I_J_0\" data-points=\"W3sieCI6NDIzLjk5NjA5Mzc1LCJ5Ijo4MjAuOTM3NX0seyJ4Ijo0MjMuOTk2MDkzNzUsInkiOjg0NS45Mzc1fSx7IngiOjQyMy45OTYwOTM3NSwieSI6ODcwLjkzNzV9XQ==\" marker-end=\"url(#a3a-diagram-2_flowchart-v2-pointEnd)\"><\/path><path d=\"M423.996,923.438L423.996,927.604C423.996,931.771,423.996,940.104,418.388,948.064C412.78,956.024,401.564,963.61,395.957,967.403L390.349,971.196\" id=\"L_J_G_0\" class=\"edge-thickness-normal edge-pattern-solid edge-thickness-normal edge-pattern-solid flowchart-link\" style=\";\" data-edge=\"true\" data-et=\"edge\" data-id=\"L_J_G_0\" data-points=\"W3sieCI6NDIzLjk5NjA5Mzc1LCJ5Ijo5MjMuNDM3NX0seyJ4Ijo0MjMuOTk2MDkzNzUsInkiOjk0OC40Mzc1fSx7IngiOjM4Ny4wMzUzNDY3OTg3ODA1LCJ5Ijo5NzMuNDM3NX1d\" marker-end=\"url(#a3a-diagram-2_flowchart-v2-pointEnd)\"><\/path><path d=\"M348.227,1025.938L348.227,1030.104C348.227,1034.271,348.227,1042.604,348.227,1050.271C348.227,1057.938,348.227,1064.938,348.227,1068.438L348.227,1071.938\" id=\"L_G_K_0\" class=\"edge-thickness-normal edge-pattern-solid edge-thickness-normal edge-pattern-solid flowchart-link\" style=\";\" data-edge=\"true\" data-et=\"edge\" data-id=\"L_G_K_0\" data-points=\"W3sieCI6MzQ4LjIyNjU2MjUsInkiOjEwMjUuOTM3NX0seyJ4IjozNDguMjI2NTYyNSwieSI6MTA1MC45Mzc1fSx7IngiOjM0OC4yMjY1LCJ5IjoxMDc1LjkzNzV9XQ==\" marker-end=\"url(#a3a-diagram-2_flowchart-v2-pointEnd)\"><\/path><path d=\"M348.227,1128.438L348.227,1132.604C348.227,1136.771,348.227,1145.104,338.871,1153.18C329.515,1161.257,310.804,1169.076,301.448,1172.986L292.093,1176.895\" id=\"L_K_D_0\" class=\"edge-thickness-normal edge-pattern-solid edge-thickness-normal edge-pattern-solid flowchart-link\" style=\";\" data-edge=\"true\" data-et=\"edge\" data-id=\"L_K_D_0\" data-points=\"W3sieCI6MzQ4LjIyNjU2MjUsInkiOjExMjguNDM3NX0seyJ4IjozNDguMjI2NTYyNSwieSI6MTE1My40Mzc1fSx7InkiOjExNzguNDM3NSwieCI6Mjg4LjQwMTg2NzM3ODA0ODh9XQ==\" marker-end=\"url(#a3a-diagram-2_flowchart-v2-pointEnd)\"><\/path><\/g><g class=\"edgeLabels\"><g class=\"edgeLabel\"><g class=\"label\" data-id=\"L_A_B_0\" transform=\"translate(0, 0)\"><foreignObject width=\"0\" height=\"0\"><div xmlns=\"http:\/\/www.w3.org\/1999\/xhtml\" class=\"labelBkg\" style=\"display: table-cell; white-space: nowrap; line-height: 1.5; max-width: 200px; text-align: center;\"><span class=\"edgeLabel\"><\/span><\/div><\/foreignObject><\/g><\/g><g class=\"edgeLabel\" transform=\"translate(102.9453125, 732.1875)\"><g class=\"label\" data-id=\"L_B_C_0\" transform=\"translate(-12.6328125, -11.25)\"><foreignObject width=\"25.265625\" height=\"22.5\"><div xmlns=\"http:\/\/www.w3.org\/1999\/xhtml\" class=\"labelBkg\" style=\"display: table-cell; white-space: nowrap; line-height: 1.5; max-width: 200px; text-align: center;\"><span class=\"edgeLabel\"><p>Sim<\/p><\/span><\/div><\/foreignObject><\/g><\/g><g class=\"edgeLabel\"><g class=\"label\" data-id=\"L_C_D_0\" transform=\"translate(0, 0)\"><foreignObject width=\"0\" height=\"0\"><div xmlns=\"http:\/\/www.w3.org\/1999\/xhtml\" class=\"labelBkg\" style=\"display: table-cell; white-space: nowrap; line-height: 1.5; max-width: 200px; text-align: center;\"><span class=\"edgeLabel\"><\/span><\/div><\/foreignObject><\/g><\/g><g class=\"edgeLabel\" transform=\"translate(348.2265625, 271.640625)\"><g class=\"label\" data-id=\"L_B_E_0\" transform=\"translate(-13.5859375, -11.25)\"><foreignObject width=\"27.171875\" height=\"22.5\"><div xmlns=\"http:\/\/www.w3.org\/1999\/xhtml\" class=\"labelBkg\" style=\"display: table-cell; white-space: nowrap; line-height: 1.5; max-width: 200px; text-align: center;\"><span class=\"edgeLabel\"><p>N\u00e3o<\/p><\/span><\/div><\/foreignObject><\/g><\/g><g class=\"edgeLabel\"><g class=\"label\" data-id=\"L_E_F_0\" transform=\"translate(0, 0)\"><foreignObject width=\"0\" height=\"0\"><div xmlns=\"http:\/\/www.w3.org\/1999\/xhtml\" class=\"labelBkg\" style=\"display: table-cell; white-space: nowrap; line-height: 1.5; max-width: 200px; text-align: center;\"><span class=\"edgeLabel\"><\/span><\/div><\/foreignObject><\/g><\/g><g class=\"edgeLabel\" transform=\"translate(242.37890625, 794.6875)\"><g class=\"label\" data-id=\"L_F_G_0\" transform=\"translate(-13.5859375, -11.25)\"><foreignObject width=\"27.171875\" height=\"22.5\"><div xmlns=\"http:\/\/www.w3.org\/1999\/xhtml\" class=\"labelBkg\" style=\"display: table-cell; white-space: nowrap; line-height: 1.5; max-width: 200px; text-align: center;\"><span class=\"edgeLabel\"><p>N\u00e3o<\/p><\/span><\/div><\/foreignObject><\/g><\/g><g class=\"edgeLabel\" transform=\"translate(423.99609375, 607.1875)\"><g class=\"label\" data-id=\"L_F_H_0\" transform=\"translate(-12.6328125, -11.25)\"><foreignObject width=\"25.265625\" height=\"22.5\"><div xmlns=\"http:\/\/www.w3.org\/1999\/xhtml\" class=\"labelBkg\" style=\"display: table-cell; white-space: nowrap; line-height: 1.5; max-width: 200px; text-align: center;\"><span class=\"edgeLabel\"><p>Sim<\/p><\/span><\/div><\/foreignObject><\/g><\/g><g class=\"edgeLabel\"><g class=\"label\" data-id=\"L_H_I_0\" transform=\"translate(0, 0)\"><foreignObject width=\"0\" height=\"0\"><div xmlns=\"http:\/\/www.w3.org\/1999\/xhtml\" class=\"labelBkg\" style=\"display: table-cell; white-space: nowrap; line-height: 1.5; max-width: 200px; text-align: center;\"><span class=\"edgeLabel\"><\/span><\/div><\/foreignObject><\/g><\/g><g class=\"edgeLabel\"><g class=\"label\" data-id=\"L_I_J_0\" transform=\"translate(0, 0)\"><foreignObject width=\"0\" height=\"0\"><div xmlns=\"http:\/\/www.w3.org\/1999\/xhtml\" class=\"labelBkg\" style=\"display: table-cell; white-space: nowrap; line-height: 1.5; max-width: 200px; text-align: center;\"><span class=\"edgeLabel\"><\/span><\/div><\/foreignObject><\/g><\/g><g class=\"edgeLabel\"><g class=\"label\" data-id=\"L_J_G_0\" transform=\"translate(0, 0)\"><foreignObject width=\"0\" height=\"0\"><div xmlns=\"http:\/\/www.w3.org\/1999\/xhtml\" class=\"labelBkg\" style=\"display: table-cell; white-space: nowrap; line-height: 1.5; max-width: 200px; text-align: center;\"><span class=\"edgeLabel\"><\/span><\/div><\/foreignObject><\/g><\/g><g class=\"edgeLabel\"><g class=\"label\" data-id=\"L_G_K_0\" transform=\"translate(0, 0)\"><foreignObject width=\"0\" height=\"0\"><div xmlns=\"http:\/\/www.w3.org\/1999\/xhtml\" class=\"labelBkg\" style=\"display: table-cell; white-space: nowrap; line-height: 1.5; max-width: 200px; text-align: center;\"><span class=\"edgeLabel\"><\/span><\/div><\/foreignObject><\/g><\/g><g class=\"edgeLabel\"><g class=\"label\" data-id=\"L_K_D_0\" transform=\"translate(0, 0)\"><foreignObject width=\"0\" height=\"0\"><div xmlns=\"http:\/\/www.w3.org\/1999\/xhtml\" class=\"labelBkg\" style=\"display: table-cell; white-space: nowrap; line-height: 1.5; max-width: 200px; text-align: center;\"><span class=\"edgeLabel\"><\/span><\/div><\/foreignObject><\/g><\/g><\/g><g class=\"nodes\"><g class=\"node default\" id=\"flowchart-A-0\" transform=\"translate(225.5859375, 34.25)\"><rect class=\"basic label-container\" style=\"\" x=\"-116.6171875\" y=\"-26.25\" width=\"233.234375\" height=\"52.5\"><\/rect><g class=\"label\" style=\"\" transform=\"translate(-86.6171875, -11.25)\"><rect><\/rect><foreignObject width=\"173.234375\" height=\"22.5\"><div xmlns=\"http:\/\/www.w3.org\/1999\/xhtml\" style=\"display: table-cell; white-space: nowrap; line-height: 1.5; max-width: 200px; text-align: center;\"><span class=\"nodeLabel\"><p>Verifica\u00e7\u00e3o independente<\/p><\/span><\/div><\/foreignObject><\/g><\/g><g class=\"node default\" id=\"flowchart-B-1\" transform=\"translate(225.5859375, 172.9453125)\"><polygon points=\"62.4453125,0 124.890625,-62.4453125 62.4453125,-124.890625 0,-62.4453125\" class=\"label-container\" transform=\"translate(-61.9453125, 62.4453125)\"><\/polygon><g class=\"label\" style=\"\" transform=\"translate(-36.1953125, -11.25)\"><rect><\/rect><foreignObject width=\"72.390625\" height=\"22.5\"><div xmlns=\"http:\/\/www.w3.org\/1999\/xhtml\" style=\"display: table-cell; white-space: nowrap; line-height: 1.5; max-width: 200px; text-align: center;\"><span class=\"nodeLabel\"><p>Conforme?<\/p><\/span><\/div><\/foreignObject><\/g><\/g><g class=\"node default\" id=\"flowchart-C-3\" transform=\"translate(102.9453125, 1102.1875)\"><rect class=\"basic label-container\" style=\"\" x=\"-94.9453125\" y=\"-26.25\" width=\"189.890625\" height=\"52.5\"><\/rect><g class=\"label\" style=\"\" transform=\"translate(-64.9453125, -11.25)\"><rect><\/rect><foreignObject width=\"129.890625\" height=\"22.5\"><div xmlns=\"http:\/\/www.w3.org\/1999\/xhtml\" style=\"display: table-cell; white-space: nowrap; line-height: 1.5; max-width: 200px; text-align: center;\"><span class=\"nodeLabel\"><p>Registrar evid\u00eancia<\/p><\/span><\/div><\/foreignObject><\/g><\/g><g class=\"node default\" id=\"flowchart-D-5\" transform=\"translate(225.5859375, 1204.6875)\"><rect class=\"basic label-container\" style=\"\" x=\"-127.984375\" y=\"-26.25\" width=\"255.96875\" height=\"52.5\"><\/rect><g class=\"label\" style=\"\" transform=\"translate(-97.984375, -11.25)\"><rect><\/rect><foreignObject width=\"195.96875\" height=\"22.5\"><div xmlns=\"http:\/\/www.w3.org\/1999\/xhtml\" style=\"display: table-cell; white-space: nowrap; line-height: 1.5; max-width: 200px; text-align: center;\"><span class=\"nodeLabel\"><p>Liberar conforme autoridade<\/p><\/span><\/div><\/foreignObject><\/g><\/g><g class=\"node default\" id=\"flowchart-E-7\" transform=\"translate(348.2265625, 334.140625)\"><rect class=\"basic label-container\" style=\"\" x=\"-88.2578125\" y=\"-26.25\" width=\"176.515625\" height=\"52.5\"><\/rect><g class=\"label\" style=\"\" transform=\"translate(-58.2578125, -11.25)\"><rect><\/rect><foreignObject width=\"116.515625\" height=\"22.5\"><div xmlns=\"http:\/\/www.w3.org\/1999\/xhtml\" style=\"display: table-cell; white-space: nowrap; line-height: 1.5; max-width: 200px; text-align: center;\"><span class=\"nodeLabel\"><p>Classificar desvio<\/p><\/span><\/div><\/foreignObject><\/g><\/g><g class=\"node default\" id=\"flowchart-F-9\" transform=\"translate(348.2265625, 490.6640625)\"><polygon points=\"80.2734375,0 160.546875,-80.2734375 80.2734375,-160.546875 0,-80.2734375\" class=\"label-container\" transform=\"translate(-79.7734375, 80.2734375)\"><\/polygon><g class=\"label\" style=\"\" transform=\"translate(-54.0234375, -11.25)\"><rect><\/rect><foreignObject width=\"108.046875\" height=\"22.5\"><div xmlns=\"http:\/\/www.w3.org\/1999\/xhtml\" style=\"display: table-cell; white-space: nowrap; line-height: 1.5; max-width: 200px; text-align: center;\"><span class=\"nodeLabel\"><p>Impacto cr\u00edtico?<\/p><\/span><\/div><\/foreignObject><\/g><\/g><g class=\"node default\" id=\"flowchart-G-11\" transform=\"translate(348.2265625, 999.6875)\"><rect class=\"basic label-container\" style=\"\" x=\"-91.7421875\" y=\"-26.25\" width=\"183.484375\" height=\"52.5\"><\/rect><g class=\"label\" style=\"\" transform=\"translate(-61.7421875, -11.25)\"><rect><\/rect><foreignObject width=\"123.484375\" height=\"22.5\"><div xmlns=\"http:\/\/www.w3.org\/1999\/xhtml\" style=\"display: table-cell; white-space: nowrap; line-height: 1.5; max-width: 200px; text-align: center;\"><span class=\"nodeLabel\"><p>Corre\u00e7\u00e3o e reteste<\/p><\/span><\/div><\/foreignObject><\/g><\/g><g class=\"node default\" id=\"flowchart-H-13\" transform=\"translate(423.99609375, 669.6875)\"><rect class=\"basic label-container\" style=\"\" x=\"-106.1953125\" y=\"-26.25\" width=\"212.390625\" height=\"52.5\"><\/rect><g class=\"label\" style=\"\" transform=\"translate(-76.1953125, -11.25)\"><rect><\/rect><foreignObject width=\"152.390625\" height=\"22.5\"><div xmlns=\"http:\/\/www.w3.org\/1999\/xhtml\" style=\"display: table-cell; white-space: nowrap; line-height: 1.5; max-width: 200px; text-align: center;\"><span class=\"nodeLabel\"><p>Hold e escalonamento<\/p><\/span><\/div><\/foreignObject><\/g><\/g><g class=\"node default\" id=\"flowchart-I-15\" transform=\"translate(423.99609375, 794.6875)\"><rect class=\"basic label-container\" style=\"\" x=\"-102.953125\" y=\"-26.25\" width=\"205.90625\" height=\"52.5\"><\/rect><g class=\"label\" style=\"\" transform=\"translate(-72.953125, -11.25)\"><rect><\/rect><foreignObject width=\"145.90625\" height=\"22.5\"><div xmlns=\"http:\/\/www.w3.org\/1999\/xhtml\" style=\"display: table-cell; white-space: nowrap; line-height: 1.5; max-width: 200px; text-align: center;\"><span class=\"nodeLabel\"><p>Engenharia do Owner<\/p><\/span><\/div><\/foreignObject><\/g><\/g><g class=\"node default\" id=\"flowchart-J-17\" transform=\"translate(423.99609375, 897.1875)\"><rect class=\"basic label-container\" style=\"\" x=\"-93.2265625\" y=\"-26.25\" width=\"186.453125\" height=\"52.5\"><\/rect><g class=\"label\" style=\"\" transform=\"translate(-63.2265625, -11.25)\"><rect><\/rect><foreignObject width=\"126.453125\" height=\"22.5\"><div xmlns=\"http:\/\/www.w3.org\/1999\/xhtml\" style=\"display: table-cell; white-space: nowrap; line-height: 1.5; max-width: 200px; text-align: center;\"><span class=\"nodeLabel\"><p>Disposi\u00e7\u00e3o t\u00e9cnica<\/p><\/span><\/div><\/foreignObject><\/g><\/g><g class=\"node default\" id=\"flowchart-K-21\" transform=\"translate(348.2265625, 1102.1875)\"><rect class=\"basic label-container\" style=\"\" x=\"-100.3359375\" y=\"-26.25\" width=\"200.671875\" height=\"52.5\"><\/rect><g class=\"label\" style=\"\" transform=\"translate(-70.3359375, -11.25)\"><rect><\/rect><foreignObject width=\"140.671875\" height=\"22.5\"><div xmlns=\"http:\/\/www.w3.org\/1999\/xhtml\" style=\"display: table-cell; white-space: nowrap; line-height: 1.5; max-width: 200px; text-align: center;\"><span class=\"nodeLabel\"><p>Verificar fechamento<\/p><\/span><\/div><\/foreignObject><\/g><\/g><\/g><\/g><\/g><\/svg><figcaption>Fluxo de decis\u00e3o para escalonamento de QA\/QC independente<\/figcaption><\/figure>\n\n\n\n<h2 class=\"wp-block-heading\">What distinguishes independent QA\/QC from supervision<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Technical supervision follows contractual compliance during execution and may include measurement, evidence, progress, documentation, and acceptance. Independent QA\/QC focuses on the reliability of the quality system and compliance evidence. In some contracts, the same team performs both functions; in others, they are separate.<\/p>\n\n\n\n<figure class=\"wp-block-table\"><table><tbody><tr><td>Function<\/td><td>Dominant question<\/td><\/tr><tr><td>technical supervision<\/td><td>is the service being executed according to the contract, design, and measurement conditions?<\/td><\/tr><tr><td>QA<\/td><td>is the planned process capable of producing a compliant result, and is it being followed?<\/td><\/tr><tr><td>QC<\/td><td>does the verified item meet the objective criterion?<\/td><\/tr><tr><td>audit<\/td><td>does the system or process have sufficient evidence and comply with the audit criteria?<\/td><\/tr><tr><td>Owner\u2019s Engineering<\/td><td>do technical decisions and interfaces protect the Owner&#8217;s interests?<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<h2 class=\"wp-block-heading\">What the third party should not do<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">It should not perform the control the supplier should perform, complete records on behalf of the contractor, approve engineering outside its authority, change criteria without formal change management, assume responsibility for physical execution, or accept exceptions without a technical and documentary basis.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">How to structure an independent QA\/QC contract<\/h2>\n\n\n\n<div class=\"wp-block-a3a-destaque\">\n<p class=\"wp-block-paragraph\">Independent QA\/QC does not have to mean full-time field presence. Coverage can be defined by criticality, risk triggers, H\/W\/R Points, audits, and milestones such as FAT, SAT, and technical acceptance.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><a href=\"https:\/\/a3aengenharia.com.br\/servicos\/implementacao\/apoio-tecnico-fiscalizacao-obras-contratos-engenharia\/\">Structure a risk-based supervision plan<\/a><\/p>\n<\/div>\n\n\n\n<p class=\"wp-block-paragraph\">A generic scope such as \u201cmonitor construction quality\u201d is insufficient. Terms of Reference should define the object and systems, reviewed documents, disciplines, activities requiring presence, H\/W\/R Points, frequency, reports, NCRs, interfaces with supervision and commissioning, authorities, indicators, Data Book, and response times.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">When risk is concentrated in a few milestones, continuous presence is not necessary. An on-demand model can combine remote document review, scheduled inspections, participation in FAT\/SAT, and mobilization based on risk triggers.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Qualification criteria for the independent team<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Competence must be compatible with the systems being verified. Assess education and professional registration, experience with the type of system, standards knowledge, inspection and commissioning experience, ability to interpret design documents, experience with NCRs, organizational independence, evidence methodology, and the ability to mobilize specialists.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Useful indicators for the Owner<\/h2>\n\n\n\n<figure class=\"wp-block-table\"><table><tbody><tr><td>Indicator<\/td><td>Interpretation<\/td><\/tr><tr><td>NCRs by period and discipline<\/td><td>concentration of problems<\/td><\/tr><tr><td>NCR recurrence<\/td><td>effectiveness of corrective actions<\/td><\/tr><tr><td>first-inspection approval<\/td><td>execution maturity<\/td><\/tr><tr><td>punch list by system<\/td><td>commissioning readiness<\/td><\/tr><tr><td>pending critical documents<\/td><td>acceptance\/handover risk<\/td><\/tr><tr><td>H\/W Points performed on schedule<\/td><td>process discipline<\/td><\/tr><tr><td>FAT approved on first execution<\/td><td>manufacturing quality and preparation<\/td><\/tr><tr><td>average NCR closeout time<\/td><td>response capability<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<h2 class=\"wp-block-heading\">When independence should begin<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">The best time is before contracting execution, when specifications, acceptance criteria, mandatory documents, PIT\/ITP and responsibilities can still be reviewed. The later the team enters, the greater the chance of encountering irreversible conditions.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Independent QA\/QC and risk management<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">The economic justification lies in avoided cost. A failure detected during design tends to be less expensive than the same failure found after manufacturing or installation. The principle is to position verification before the points at which the defect becomes more costly or difficult to detect.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">ISO 10005:2018 addresses quality plans applicable to processes, products, services, projects and contracts; ISO 10006:2017 addresses quality management in projects. Together with ISO 9001, they help structure process, evidence and improvement, without replacing discipline-specific technical standards.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Phased operating model<\/h2>\n\n\n\n<ol class=\"wp-block-list\"><li>Preparation: requirements, document matrix, Quality Plan, PIT\/ITP and acceptance criteria.<\/li><li>Suppliers: qualification, Vendor Inspection, H\/W\/R Points, FAT, NCRs and release.<\/li><li>Construction: critical inspections, traceability, interfaces and pending items.<\/li><li>Commissioning: readiness, testing, deviation closure and punch list.<\/li><li>Handover: Quality Dossier, Data Books, as-built documentation, manuals and recommendation for acceptance.<\/li><\/ol>\n\n\n\n<h2 class=\"wp-block-heading\">How to know whether the service is adding value<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Value should not be measured by the number of inspections, but by clearer requirements, earlier deviation detection, lower recurrence, reliable evidence, improved commissioning readiness and well-supported acceptance decisions.<\/p>\n\n\n\n\n<h2 class=\"wp-block-heading\">Final considerations<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Independent QA\/QC is a governance tool for projects in which the consequence of accepting an inadequate condition exceeds the cost of additional verification. Its purpose is not to create bureaucracy or distrust the contractor by default; it is to build a chain of technical confidence between requirement, execution, evidence, and acceptance.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The most efficient model is risk-based, with clearly defined authority, integration with supervision and Owner\u2019s Engineering, and selective use of H\/W\/R Points, audits, inspections, and document review. The contractor remains responsible for producing quality. The independent third party verifies whether that quality can be demonstrated consistently and sufficiently to protect the Owner&#8217;s decision.<\/p>\n\n\n\n<div class=\"wp-block-a3a-destaque\">\n<p class=\"wp-block-paragraph\">When the project already shows recurring NCRs, rework, weak evidence, or doubts about the executed condition, the approach stops being preventive and begins to require an independent diagnosis of the actual condition.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><a href=\"https:\/\/a3aengenharia.com.br\/servicos\/servicos-transversais\/auditoria-tecnica-engenharia\/\">Assess the technical condition with an Engineering Audit<\/a><\/p>\n<\/div>\n\n\n\n<details class=\"wp-block-details is-layout-flow wp-block-details-is-layout-flow\"><summary>Technical references<\/summary>\n<p class=\"wp-block-paragraph\">[1] INTERNATIONAL ORGANIZATION FOR STANDARDIZATION. ISO 9001:2015 \u2014 Quality management systems \u2014 Requirements. Geneva: ISO, 2015. Available at: <a href=\"https:\/\/www.iso.org\/standard\/62085.html\">https:\/\/www.iso.org\/standard\/62085.html<\/a><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">[2] INTERNATIONAL ORGANIZATION FOR STANDARDIZATION. ISO 10005:2018 \u2014 Quality management \u2014 Guidelines for quality plans. Geneva: ISO, 2018. Available at: <a href=\"https:\/\/www.iso.org\/standard\/70398.html\">https:\/\/www.iso.org\/standard\/70398.html<\/a><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">[3] INTERNATIONAL ORGANIZATION FOR STANDARDIZATION. ISO 10006:2017 \u2014 Quality management \u2014 Guidelines for quality management in projects. Geneva: ISO, 2017. Available at: <a href=\"https:\/\/www.iso.org\/standard\/70376.html\">https:\/\/www.iso.org\/standard\/70376.html<\/a><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">[4] INTERNATIONAL ORGANIZATION FOR STANDARDIZATION. ISO 19011:2026 \u2014 Guidelines for auditing management systems. Geneva: ISO, 2026. Available at: <a href=\"https:\/\/www.iso.org\/standard\/19011\">https:\/\/www.iso.org\/standard\/19011<\/a><\/p>\n<\/details>\n\n\n\n<details class=\"wp-block-details is-layout-flow wp-block-details-is-layout-flow\"><summary>Frequently asked questions<\/summary>\n<div class=\"schema-faq wp-block-yoast-faq-block\"><div class=\"schema-faq-section\" id=\"faq-question-o-que-qa-qc-independente-b52c4388\"><strong class=\"schema-faq-question\">What is independent QA\/QC?<\/strong> <p class=\"schema-faq-answer\">It is a layer of technical verification performed by a party that does not produce the scope and that assesses whether processes, inspections, tests, documents, and evidence are sufficient to demonstrate compliance to the Owner.<\/p><\/div><div class=\"schema-faq-section\" id=\"faq-question-qa-qc-independente-substitui-o-controle-da-contr-f93126ce\"><strong class=\"schema-faq-question\">Does independent QA\/QC replace the contractor&#8217;s quality control?<\/strong> <p class=\"schema-faq-answer\">No. The contractor remains responsible for performing its own QA\/QC. The third party verifies the effectiveness of that system and the reliability of the evidence.<\/p><\/div><div class=\"schema-faq-section\" id=\"faq-question-quando-vale-a-pena-contratar-uma-terceira-parte-0dc379a9\"><strong class=\"schema-faq-question\">When is it worthwhile to engage a third party?<\/strong> <p class=\"schema-faq-answer\">When there is a high consequence of failure, low detectability, irreversible elements, remote manufacturing, multiple interfaces, recurring NCRs, or insufficient in-house technical staff.<\/p><\/div><div class=\"schema-faq-section\" id=\"faq-question-qa-qc-independente-o-mesmo-que-fiscaliza-o-744c48e8\"><strong class=\"schema-faq-question\">Is independent QA\/QC the same as supervision?<\/strong> <p class=\"schema-faq-answer\">Not necessarily. Supervision follows contractual compliance and execution; independent QA\/QC focuses on the reliability of the quality system and evidence.<\/p><\/div><div class=\"schema-faq-section\" id=\"faq-question-a-terceira-parte-pode-bloquear-uma-atividade-5153d272\"><strong class=\"schema-faq-question\">Can the third party block an activity?<\/strong> <p class=\"schema-faq-answer\">Only when that authority is defined in the contract, PIT\/ITP, Quality Plan, or authority matrix.<\/p><\/div><div class=\"schema-faq-section\" id=\"faq-question-necess-rio-inspecionar-100-dos-itens-9cbae1fc\"><strong class=\"schema-faq-question\">Is it necessary to inspect 100% of the items?<\/strong> <p class=\"schema-faq-answer\">No. An efficient model combines process review, H\/W\/R Points, risk-based sampling, and increased coverage according to performance.<\/p><\/div><\/div>\n<\/details>\n\n\n\n<details class=\"wp-block-details is-layout-flow wp-block-details-is-layout-flow\"><summary>Additional technical materials<\/summary>\n<h4 class=\"wp-block-heading\">Related solutions<\/h4>\n<ul class=\"wp-block-list\"><li><a href=\"https:\/\/a3aengenharia.com.br\/solucoes\/gestao-e-governanca-de-engenharia\/gestao-requisitos-evidencias-criterios-aceite\/\">Requirements, Evidence, and Acceptance Criteria Management<\/a><\/li><li><a href=\"https:\/\/a3aengenharia.com.br\/solucoes\/gestao-e-governanca-de-engenharia\/gestao-pendencias-rfis-nao-conformidades\/\">Open Items, RFIs, and Nonconformities Management<\/a><\/li><li><a href=\"https:\/\/a3aengenharia.com.br\/solucoes\/gestao-e-governanca-de-engenharia\/gestao-processos-workflows-aprovacoes-tecnicas\/\">Process, Workflow, and Technical Approval Management<\/a><\/li><li><a href=\"https:\/\/a3aengenharia.com.br\/solucoes\/gestao-e-governanca-de-engenharia\/governanca-de-projetos-programas-e-portfolios\/\">Project, Program, and Portfolio Governance<\/a><\/li><\/ul>\n<h4 class=\"wp-block-heading\">Related services<\/h4>\n<ul class=\"wp-block-list\"><li><a href=\"https:\/\/a3aengenharia.com.br\/servicos\/contratacao-integrada\/engenharia-do-proprietario\/\">Owner\u2019s Engineering<\/a><\/li><li><a href=\"https:\/\/a3aengenharia.com.br\/servicos\/servicos-transversais\/auditoria-tecnica-engenharia\/\">Technical Engineering Audit<\/a><\/li><li><a href=\"https:\/\/a3aengenharia.com.br\/servicos\/implementacao\/apoio-tecnico-fiscalizacao-obras-contratos-engenharia\/\">Technical Support for Supervision<\/a><\/li><li><a href=\"https:\/\/a3aengenharia.com.br\/servicos\/servicos-transversais\/comissionamento-de-equipamentos\/\">Equipment Commissioning<\/a><\/li><li><a href=\"https:\/\/a3aengenharia.com.br\/servicos\/implementacao\/recebimento-tecnico-obras-servicos-engenharia\/\">Technical Acceptance of Construction and Services<\/a><\/li><\/ul>\n<h4 class=\"wp-block-heading\">Main content on the topic<\/h4>\n<ul class=\"wp-block-list\"><li><a href=\"https:\/\/a3aengenharia.com.br\/conteudo\/artigos-tecnicos\/qa-qc-obras-engenharia-inspecoes-rnc-aceite\/\">QA\/QC in Engineering Construction<\/a><\/li><li><a href=\"https:\/\/a3aengenharia.com.br\/conteudo\/artigos-tecnicos\/auditoria-da-qualidade-engenharia-planejamento-achados\/\">Quality Audit<\/a><\/li><li><a href=\"https:\/\/a3aengenharia.com.br\/conteudo\/artigos-tecnicos\/inspecao-fabricacao-vendor-inspection-fornecedores-engenharia\/\">Manufacturing Inspection and Vendor Inspection<\/a><\/li><li><a href=\"https:\/\/a3aengenharia.com.br\/conteudo\/artigos-tecnicos\/fat-sat-testes-integrados-sistemas-criticos\/\">FAT and SAT<\/a><\/li><li><a href=\"https:\/\/a3aengenharia.com.br\/conteudo\/artigos-tecnicos\/criterios-de-aceite-engenharia-requisitos-evidencias-validacao-tecnica\/\">Acceptance Criteria in Engineering<\/a><\/li><li><a href=\"https:\/\/a3aengenharia.com.br\/conteudo\/artigos-tecnicos\/evitar-nao-conformidades-comissionamento-engenharia\/\">How to Prevent Nonconformities from Reaching Commissioning<\/a><\/li><li><a href=\"https:\/\/a3aengenharia.com.br\/conteudo\/artigos-tecnicos\/obra-falhas-qualidade-o-que-contratar-diagnostico-correcao\/\">Construction Quality Failures: What to Hire<\/a><\/li><\/ul>\n<h4 class=\"wp-block-heading\">Related technical content<\/h4>\n<ul class=\"wp-block-list\"><li><a href=\"https:\/\/a3aengenharia.com.br\/conteudo\/artigos-tecnicos\/project-assurance-engenharia-revisao-independente-governanca\/\">Project Assurance in Engineering<\/a><\/li><li><a href=\"https:\/\/a3aengenharia.com.br\/conteudo\/artigos-tecnicos\/design-review-projetos-engenharia\/\">Design Review in Engineering Projects<\/a><\/li><li><a href=\"https:\/\/a3aengenharia.com.br\/conteudo\/whitepapers\/owners-engineering-framework-contratacao-governanca\/\">Owner\u2019s Engineering: Executive Framework<\/a><\/li><li><a href=\"https:\/\/a3aengenharia.com.br\/conteudo\/guias-tecnicos\/guia-completo-sobre-comissionamento\/\">Complete Guide to Commissioning<\/a><\/li><li><a href=\"https:\/\/a3aengenharia.com.br\/conteudo\/whitepapers\/framework-handover-tecnico-obras-sistemas-operacao\/\">Technical Handover Framework<\/a><\/li><\/ul>\n<\/details>\n","protected":false},"excerpt":{"rendered":"<p>When to engage independent QA\/QC in Engineering: risks, scope, authority, inspections, audits, H\/W\/R Points, NCRs, and support for Owner acceptance.<\/p>\n","protected":false},"author":1,"featured_media":0,"parent":0,"template":"","meta":{"_a3a_global_related_solutions":[],"_a3a_global_related_services":[],"_a3a_global_related_materials":[],"_a3a_post_lang":"en-us","_a3a_translation_group_id":"7290872b-cdc1-4635-81bf-7fa88d053ab0","_a3a_i18n_canonical_slug":"independent-qa-qc-engineering-owner-third-party"},"categories":[],"segments":[],"mercados":[],"etapas":[],"class_list":["post-72804","articles","type-articles","status-publish","hentry"],"_links":{"self":[{"href":"https:\/\/a3aengenharia.com\/en-us\/wp-json\/wp\/v2\/articles\/72804","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/a3aengenharia.com\/en-us\/wp-json\/wp\/v2\/articles"}],"about":[{"href":"https:\/\/a3aengenharia.com\/en-us\/wp-json\/wp\/v2\/types\/articles"}],"author":[{"embeddable":true,"href":"https:\/\/a3aengenharia.com\/en-us\/wp-json\/wp\/v2\/users\/1"}],"version-history":[{"count":1,"href":"https:\/\/a3aengenharia.com\/en-us\/wp-json\/wp\/v2\/articles\/72804\/revisions"}],"predecessor-version":[{"id":72820,"href":"https:\/\/a3aengenharia.com\/en-us\/wp-json\/wp\/v2\/articles\/72804\/revisions\/72820"}],"wp:attachment":[{"href":"https:\/\/a3aengenharia.com\/en-us\/wp-json\/wp\/v2\/media?parent=72804"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/a3aengenharia.com\/en-us\/wp-json\/wp\/v2\/categories?post=72804"},{"taxonomy":"segments","embeddable":true,"href":"https:\/\/a3aengenharia.com\/en-us\/wp-json\/wp\/v2\/segments?post=72804"},{"taxonomy":"mercados","embeddable":true,"href":"https:\/\/a3aengenharia.com\/en-us\/wp-json\/wp\/v2\/mercados?post=72804"},{"taxonomy":"etapas","embeddable":true,"href":"https:\/\/a3aengenharia.com\/en-us\/wp-json\/wp\/v2\/etapas?post=72804"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}